PT.JAYA KARYA PERDANA TARIF OF HEAVY DUTY EQUIPMENT & TRANSPORTATION PERIODE 2012 NO EQUIPMENT UNIT DAY OVERTIME MONTHLY 1 450ton crawler tahun 2010 76jut a 11juta 950juta 2 350ton Superlift thn 2010 54jut a 8,2juta 688juta 3 250ton Clawler thn 2009 25jut a 3,8juta 320juta 4 150ton Hydraulik Tadano 20jut a 2,9juta 300juta 5 100ton Hd.T TerrainCrane 14jut a 1,1juta 230juta 6 80ton mechanik T,Crane 10jut a 1juta 180juta 7 70tonRough TeranoCrane 8juta 1juta 150juta 8 50RoughCraneTranoC rane 4,5ju ta 430ribu 115juta 9 45tonHydraulik crane 4juta 365ribu 98juta 10 35tonHydraulik crane 3,5ju ta 310ribu 70juta 11 20tonHydraulik craneKato 1,8ju ta 220ribu 35juta 12 10 Ton Forklift 2,9ju ta 380ribu 39juta

Daftar Harga 2 Alat Berat

Embed Size (px)

Citation preview

Page 1: Daftar Harga 2 Alat Berat

PT.JAYA KARYA PERDANATARIF OF HEAVY DUTY EQUIPMENT & TRANSPORTATION

PERIODE 2012

NO EQUIPMENT UNIT DAY OVERTIME MONTHLY

1 450ton crawler tahun 2010 76juta 11juta 950juta

2 350ton Superlift thn 2010 54juta 8,2juta 688juta

3 250ton Clawler thn 2009 25juta 3,8juta 320juta

4 150ton Hydraulik Tadano 20juta 2,9juta 300juta

5 100ton Hd.T TerrainCrane 14juta 1,1juta 230juta

6 80ton mechanik T,Crane 10juta 1juta 180juta

7 70tonRough TeranoCrane 8juta 1juta 150juta

8 50RoughCraneTranoCrane 4,5juta 430ribu 115juta

9 45tonHydraulik crane 4juta 365ribu 98juta

10 35tonHydraulik crane 3,5juta 310ribu 70juta

11 20tonHydraulik craneKato 1,8juta 220ribu 35juta

12 10 Ton Forklift 2,9juta 380ribu 39juta

13 5 Ton Forklift 1,3juta 240ribu 19juta

14 3ton Forklift 800ribu 180ribu 15juta

15 80t Lowbed Traller 4,2juta 640ribu 90juta

16 40t Lowbed Traller 1,9juta 350ribu 60juta

17 High Bed Traller 2juta 300ribu 50juta

18 Tronton th.2010 900ribu 120ribu 30juta

19 D.Truck index 22 th.2011 420ribu 575ribu 38juta

20 3ton Foco Unit Crane 950ribu 185ribu 32juta

21 50 ton Crawler th.2009 4,7juta 820ribu 90juta

22 Tower Crane Penner 4,7juta 750ribu 65juta

21 Whell Loader 1,7juta 290ribu 39juta

22 Becho Loader 2juta 330ribu 45juta

23 TB.Tongkang 270 feet - - Negotiable

Page 2: Daftar Harga 2 Alat Berat

Mobilization /Demobilization.

EQUIPMENT STANDART 15-30M 30-43M OVER43M

250ton Cwarler Fushun QY 95juta - - -

150ton Mechanic Truck Crane P&H 3juta 5,5juta 6juta 7,5juta

120ton Hydraulic Truck Crane Tadano 3,8juta - - -

110ton Hydraulic Crane 4,5juta - - -

100ton Hydraulic Crane 3,2juta - - -

80ton Mechanic Truck Crane L/B 3,2juta 4,3juta 5,8juta 5,8juta

70ton Rought Terran Crane 3,2juta - - -

50ton Rought Terran Crane 1,8juta - - -

35ton Mechanic Truck Crane P&H 1,8juta 3,2juta 3,2juta -

45ton Hydraulik Crane(KATO) 800Ribu - - -

35ton Hydraulik Crane(KATO) 800Ribu - - -

20ton Hydraulik Crane 550Ribu - - -

Crane Pancang 15juta - - -

Condition : (Fdield in Merak ,Cilegon).1.Fuel Operator and Maintenance Shell be. 2.Lifting Accessaries,Securityshould be Arranged by hirers. 3.Daily Working Hour : 08.00 – 12.00 and 13.00 – 17.00 hours and 18.00 – 24.00 (Netto 8 hours) Off ours.4.Minimum Charge 3 (Three) Days for 80 ton Crane up to 150 ton and 2 (Two) Week for 250 ton CWD Up.5.No Special Charge is Applied on Sunday /Holiday Works sheet. 6.Emergency Order (After 3pm of one day before working days) is Added as Surcharge of 50%.7.PPn Tax Shall be Charged in Accourdance with Governance Regulation on offering.8.Cargo Insurance With Waiver of Sublogation Clause Shall be Procured by Hirer (Outside Tranportation Case)9.Steel Plate Rp.120.000/Pcs/Shift.Concreete Block Rp.105.000/Ton/Shift.MobDemob as per Equipment Used

Jakarta, Januari 2012 PT.JAYA KARYA PERDANA

Toni Fatullah 087771169054.

Page 3: Daftar Harga 2 Alat Berat

Harga Sewa Alat Berat

No Uraian Kosong All in

1 Excavator Standard SK.200 Rp.155.000,-/jam Rp.340.000,-/Jam

2 Excavator SK.300 Rp.269.000,-/jam Rp.380.000,-/Jam

3 Bulldozer D6 Rp.165.000,-/jam Rp.390.000,-/Jam

4 Bulldozer D8 Rp.348.000,-/jam Rp.630.000,-/Jam

5 Hydraulick Breaker Standar SK.200 Rp.249.000,-/jam Rp.550.000,-/Jam

6 Hydraulick Breaker SK.300 Rp.318.000,-/jam Rp.690.000,-/Jam

6 Vibro Roller Rp.155.000,-/jam Rp.450.000,-/Jam

8 Stoom Walze 6-8ton & 8-10ton Rp.88.500,-/jam Rp.195.000,-/Jam

9 Stoom Walze 10 ton – 12 ton Rp.110.000,-/jam Rp.240.000,-/Jam

10 Motor Grader Rp.305.000,-/jam Rp.580.000,-/Jam

11 Shi Foot Rp.105.000,-/jam Rp.350.000,-/Jam

12 Truck Tronton tahun 2010 up.Flat Deck Rp.225.000,-/jam Rp.1.310.000,-/Hari

13 Dump Truck Indek 22 tahun 2011 up. Rp.244.000,-/Jam Rp.1.500.000,-/Hari

14 Genset 80.KVA Rp.296.000,-/Jam Rp.52.000.000,-/Bln

15 Travo Las 600 A Rp.200.000,-/Hari Rp.4.000.000/Bulan

16 Genset 120KVA Rp.320.000,-/Hari Rp.71.000.000,-/Bln

17 Commetto 150 ton - 1500 ton Negotiable Negotiable

18 Truck Mounted “Hiap” crane caps.10 ton Rp.2.500.000,-/Hari Rp.54.000.000,-/Bln

19 Truck Mounted “Hiap” crane caps.5 ton Rp.1600.000,-/Hari Rp.36.000.000,-/Bln

20 Truck Mounted “Hiap” crane caps.3 ton Rp.1.300.000,-/Hari Rp.29.000.000,-/Bln

21 Welding Rectifier Transformer 300 – 500A Rp.100.000,-/Hari Rp.2.300.000,-/Bln

22 Welding Enggine Transformer 300 – 500 A Rp.200.000,-/Hari Rp.4.500.000,-/Bln

23 Plasma Cutting Mechine Rp.225.000,-/Hari Rp.6.000.000,-/Bln

24 Elec.Winc.Hoice.kapasitas 5 ton Rp.550.000,-/Hari Rp.13.000.000,-/Bln

25 Compressor 175 CFM Rp.476.000,-/Hari Rp.12.000.000,-/Bln

26 Mini Excavator 0,1 M3 Rp.100.000,-/Jam Rp.16.000.000,-/Bln

27 Water Truck kapasitas 8000 liter Rp.1.200.000,-/Hari Rp.25.000.000,-/Bln

28 Generator 25 KVA Rp.240.000,-/Hari Rp.5.000.000,-/Bln

29 Generator 45 KVA Rp.450.000,-/Hari Rp.9.000.000,-/Bln

30 Generator 250 KVA Rp.3.000.000,-/Hari Rp.70.000.000,-/Bln

Page 4: Daftar Harga 2 Alat Berat

Keterangan :

1. Syarat pemakaian sewa minimum 200 jam2. Pembayaran Cash dimuka3. Bahan Bakar Solar Industri4. Keamanan,Uang Makan dan Penginapan Operator di tanggung Penyewa5. Apabila terjadi Stand by (Alat tidak dapat beroperasi) karena kesalahan penyewa,maka

dikenakan pembayaran 50% dari harga sewa perhari (8 Jam)6. Apabila terjadi kerusakan alat, maka akan diganti dengan hari berikutnya 7. Alat tidak dapat beroperasi apabila penyewa belum menyelesaikan administrasi keuangan

(pembayaran cash dimuka)8. Over head 15% adalah biaya Mobilisasi,Oli,Pelumas dan Maintenance.

Toni Fatullah. 087771169054.