Upload
fouad-boutat
View
220
Download
0
Embed Size (px)
Citation preview
8/9/2019 dach.pdf
1/280
Revision RecordCourse Code Product
Product
VersionCourse Version ISSUE
OEA000200 LTE 3GPP R8 1.00
Developer/Modifier Time Approver New/Update
Don’t Print This Page
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page0
Zhu Dianrong 2010-5-10 New
8/9/2019 dach.pdf
2/280
LTE Protocols and
Procedures
www.huawei.com
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
8/9/2019 dach.pdf
3/280
Contents1. EPS Architecture
2. EPS Protocols
3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page2
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
8/9/2019 dach.pdf
4/280
Contents1. EPS Architecture
2. EPS Protocols
3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page3
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
8/9/2019 dach.pdf
5/280
Contents1. EPS Architecture
1.1 EPS Network Elements
1.2 EPS Interfaces
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page4
8/9/2019 dach.pdf
6/280
Contents1. EPS Architecture
1.1 EPS Network Elements1.2 EPS Interfaces
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page5
8/9/2019 dach.pdf
7/280
E-UTRAN Architecture
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page6
8/9/2019 dach.pdf
8/280
User Equipment
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page7
8/9/2019 dach.pdf
9/280
UE Categories
UE Category Maximum
DownlinkData Rate
Number of
DownlinkData Streams
Maximum
Uplink DataRate
Support for
Uplink64QM
1 10.3Mbit/s 1 5.2Mbit/s No
2 51.0Mbit/s 2 25.5Mbit/s No
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page8
3 102.0Mbit/s 2 51.0Mbit/s No
4 150.8Mbit/s 2 51.0Mbit/s No
5 302.8Mbit/s 4 75.4Mbit/s Yes
8/9/2019 dach.pdf
10/280
UE Identities IMSI (International Mobile Subscriber Identity)
IMEI (International Mobile Equipment Identity)
GUTI (Globally Unique Temporary Identity)
- -
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
IP Address - This may either be an IPv4 or IPv6 address
Page9
8/9/2019 dach.pdf
11/280
Evolved Node B
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page10
8/9/2019 dach.pdf
12/280
eNB Identities TAI (Tracking Area Identity) - is a logical group of
neighboring cells defined by the service provider in which an
LTE idle UE is able to move within without needing to
update the network. As such, it is similar to a RAI (Routing
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Area Identity) used in 2G and 3G packet switched networks.
ECGI (Evolved Cell Global Identity) - is comprised of the
MCC, MNC and ECI (Evolved Cell Identity), the later being
coded by each service provider.
Page11
8/9/2019 dach.pdf
13/280
Femto Cells In order to improve network coverage and capacity, the
3GPP have developed a new type of base station to operate
within the home or small business environment. Termed the
HeNB (Home Evolved Node B).
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
In additional identities which have been introduced by the3GPP for femto cell operation. These are:
CSG (Closed Subscriber Group) Identity.
HeNB.
Page12
8/9/2019 dach.pdf
14/280
Mobility Management Entity
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page13
8/9/2019 dach.pdf
15/280
Serving - Gateway
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page14
8/9/2019 dach.pdf
16/280
Packet Data Network - Gateway
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page15
8/9/2019 dach.pdf
17/280
Contents1. EPS Architecture
1.1 EPS Network Elements
1.2 EPS Interfaces
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page16
8/9/2019 dach.pdf
18/280
E-UTRAN Interfaces
UuS1-MME
S1-MME
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page17
X2
-
S1-U
8/9/2019 dach.pdf
19/280
EPC Architecture and Interfaces
S1-MMES10
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page18
S1-U
S11
S5/S8 SGi
8/9/2019 dach.pdf
20/280
Additional Network Elements and
Interfaces
S10
S6a
S101
S3
S13
CDMA
2000
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page19
S11
S5/S8 S2a
Gx
S2bS103
S12
S4
CDMA
2000
Trusted
N!"3G##
$#"A%%ess
U!trusted
N!"3G##
$#"A%%ess
&!
8/9/2019 dach.pdf
21/280
Questions Which Release 8 UE category supports MIMO 4x4?
a.1.
b.2.
c. 3
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page20
d. 4
e. 5
8/9/2019 dach.pdf
22/280
Questions True / False. An LTE system does not use the IMSI.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page21
8/9/2019 dach.pdf
23/280
Questions Which node terminates the UE’s NAS signaling?
a.eNB.
b.MME.
c. S-GW
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page22
d. PDN-GW.
8/9/2019 dach.pdf
24/280
8/9/2019 dach.pdf
25/280
Questions Which interface connects the eNB to the MME?
a.X2.b. S1-MME.
c. S1-U
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page24
d.S5.
8/9/2019 dach.pdf
26/280
Questions Which interface connects an eNB logically to another eNB?
a.X2.b. S1-MME.
c. S1-U
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page25
d.S5.
8/9/2019 dach.pdf
27/280
Contents1. EPS Architecture
2. EPS Protocols3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page26
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
8/9/2019 dach.pdf
28/280
Contents2. EPS Protocols
2.1 EPS Signaling
2.2 EPS Protocols
2.3 E-UTRAN Channel Mapping
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page27
8/9/2019 dach.pdf
29/280
Contents2. EPS Protocols
2.1 EPS Signaling
2.2 EPS Protocols
2.3 E-UTRAN Channel Mapping
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page28
8/9/2019 dach.pdf
30/280
LTE Control Plane
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page29
8/9/2019 dach.pdf
31/280
LTE User Plane
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page30
8/9/2019 dach.pdf
32/280
Contents2. EPS Protocols
2.1 EPS Signaling
2.2 EPS Protocols
2.3 E-UTRAN Channel Mapping
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page31
8/9/2019 dach.pdf
33/280
Uu Interface Protocols
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page32
8/9/2019 dach.pdf
34/280
NAS EMM and ESM ProceduresEMM !ro"e#ures ESM !ro"e#uresAttach Default EPS Bearer Context Activation
Detach Dedicated EPS Bearer Context Activation
Tracking Area Update EPS Bearer Context Modification
Service Request EPS Bearer Context Deactivation
Extended Service Request UE Requested PDN Connectivity
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page33
Authentication UE Requested Bearer Resource Allocation
Identification UE Requested Bearer Resource Modification
Security Mode Control ESM Information Request
EMM Status ESM Status
EMM Information
NAS Transport
Paging
8/9/2019 dach.pdf
35/280
Radio Resource Control
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page34
8/9/2019 dach.pdf
36/280
Packet Data Convergence Protocol
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page35
8/9/2019 dach.pdf
37/280
Radio Link Control
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page36
8/9/2019 dach.pdf
38/280
8/9/2019 dach.pdf
39/280
Physical Layer
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page38
8/9/2019 dach.pdf
40/280
Physical Layer
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page39
8/9/2019 dach.pdf
41/280
X2 Interface
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page40
8/9/2019 dach.pdf
42/280
S1 Interface
User"#'a!e
S1-U
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page41
$#
(a)er"2
(a)er"1
UD#
GT#-U
8/9/2019 dach.pdf
43/280
S11 Interface
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page42
8/9/2019 dach.pdf
44/280
S5/S8 Interface
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page43
8/9/2019 dach.pdf
45/280
-
C!tr'"#'a!e
S10
S10 Interface
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
$#
(a)er"2
(a)er"1
UD#
Page44
8/9/2019 dach.pdf
46/280
SGi
SGi Interface
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
$#
(a)er"2
(a)er"1
TC#"/"UD#
Page45
8/9/2019 dach.pdf
47/280
Contents
2. EPS Protocols
2.1 EPS Signaling
2.2 EPS Protocols
2.3 E-UTRAN Channel Mapping
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page46
8/9/2019 dach.pdf
48/280
LTE Channels
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page47
8/9/2019 dach.pdf
49/280
Logical Channels
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page48
8/9/2019 dach.pdf
50/280
8/9/2019 dach.pdf
51/280
8/9/2019 dach.pdf
52/280
Traffic Logical Channels
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page51
8/9/2019 dach.pdf
53/280
LTE Release 8 Transport Channels
.C,
#C,
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page52
-
AC,
U(-SC,
C
8/9/2019 dach.pdf
54/280
Downlink Physical Channels
PBCH (Physical Broadcast Channel)
PCFICH (Physical Control Format Indicator Channel)
PDCCH (Physical Downlink Control Channel)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page53
PDSCH (Physical Downlink Shared Channel)
U li k Ph i l Ch l
8/9/2019 dach.pdf
55/280
Uplink Physical Channels
PRACH (Physical Random Access Channel)
PUCCH (Physical Uplink Control Channel)
PUSCH (Physical Uplink Shared Channel)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page54
R di Ch l
8/9/2019 dach.pdf
56/280
Radio Channels
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page55
D li k Ch l M i
8/9/2019 dach.pdf
57/280
Downlink Channel Mapping
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page56
8/9/2019 dach.pdf
58/280
Q estions
8/9/2019 dach.pdf
59/280
Questions
What is the main control signaling protocol between the UE
and the MME?
a.RRC.
b.RLC.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page58
c. S1AP
d.NAS.
8/9/2019 dach.pdf
60/280
Questions
8/9/2019 dach.pdf
61/280
Questions
Which protocol on the air interface is responsible for User
Plane ciphering/encryption?
a.RRC.
b.PDCP.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page60
c. RLC.
d.MAC.
Questions
8/9/2019 dach.pdf
62/280
Questions
Which protocol is used to carry S1AP and X2AP signaling?
a. GTPv1-U.
b.PDCP.
c. GTPv2-C.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page61
d.TCP.
e.SCTP.
Questions
8/9/2019 dach.pdf
63/280
Questions
What control protocol is used between the MME and the S-
GW?
a. GTPv1-U.
b.PDCP.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page62
c. GTPv2-C.
d.TCP.
e.SCTP.
Contents
8/9/2019 dach.pdf
64/280
Contents
1. EPS Architecture
2. EPS Protocols
3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page63
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
Contents
8/9/2019 dach.pdf
65/280
Contents
3. LTE/SAE Quality of Service
3.1 EPS Bearer Services and E-UTRA Radio Bearers
3.2 E-UTRA Radio Bearers
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page64
Contents
8/9/2019 dach.pdf
66/280
Contents
3. LTE/SAE Quality of Service
3.1 EPS Bearer Services and E-UTRA Radio Bearers
3.2 E-UTRA Radio Bearers
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page65
QoS in Packet Switched Networks
8/9/2019 dach.pdf
67/280
QoS in Packet Switched Networks
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page66
LTE Bearers
8/9/2019 dach.pdf
68/280
LTE Bearers
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page67
GT#".ased"Tra!s+rt"
#M$#"is"diere!t
Service Data Flows
8/9/2019 dach.pdf
69/280
Service Data Flows
SD"Ser*i%e"
Data"'
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page68
Default and Dedicated EPS
8/9/2019 dach.pdf
70/280
Bearers
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page69
EPS QoS Parameters
8/9/2019 dach.pdf
71/280
EPS QoS Parameters
GBR QoS Information
AMBR (Aggregate Maximum Bit Rate)
QoS Class Indicator
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page70
GBR QoS Information
8/9/2019 dach.pdf
72/280
GBR QoS Information
E-RAB Maximum Downlink Bit Rate.
E-RAB Maximum Uplink Bit Rate.
E-RAB Guaranteed Downlink Bit Rate.
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
.
Page71
Aggregate Maximum Bit Rate
8/9/2019 dach.pdf
73/280
gg egate a u t ate
UE AMBR (User Equipment Aggregate Maximum Bit Rate)
APN AMBR (Access Point Name Aggregate Maximum Bit
Rate)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page72
QoS Class Indicator
8/9/2019 dach.pdf
74/280
Q
QC$ %ype !riority !a"ketDelay&u#get 'ms(
!a"ketError Rate
Example Ser)i"e
1 GBR 2 100 10-2
Conversational Voice
2 GBR 4 150 10-3 Conversational Video
3 GBR 3 50 10-3
Real Time Gaming
4 GBR 5 300 10-6
Non-Conversational Voice
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page73
5 Non-GBR 1 100 10-
IMS Signaling
6 Non-GBR 6 300 10-6
Video, TCP Based
7 Non-GBR 7 100 10-3
Voice, Video, Interactive
Gaming
8 Non-GBR 8 300 10-6
Video, TCP Based
9 Non-GBR 9 300 10-6
Video, TCP Based
Allocation and Retention Priority
8/9/2019 dach.pdf
75/280
y
Priority Level (0 to 15)
Pre-emption Capability
Pre-emption Vulnerability
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page74
8/9/2019 dach.pdf
76/280
Signaling Radio Bearers
8/9/2019 dach.pdf
77/280
g g
SRB0
SRB1
SRB2
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page76
Data Radio Bearers
8/9/2019 dach.pdf
78/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page77
E#S".earer"
$de!tit)"0"t"15
Radio Bearer QoS
8/9/2019 dach.pdf
79/280
E-A."$D
E-A."(e*e'"S"#araeters
Tra!s+rt"(a)er"Address
GT#-TE$D
NAS-#DU
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page78
Uu S1-U S5/S8 SGi
S."2
S."1
Deau't"E#S".earer"E#S".earer"$de!tit)"7"5D."1
E-UTRA Configuration
8/9/2019 dach.pdf
80/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page79
E-UTRA Configuration Cont.
8/9/2019 dach.pdf
81/280
Various parameters can influence the performance, these include:
PDCP Compression.
RLC AM or UM.
RLC AM Polling Configuration.
Uplink MAC Priority.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Uplink MAC Prioritized Bit Rate.
Uplink MAC Bucket Size Duration.
HARQ Configuration and re-transmissions.
BSR (Buffer Status Report) Configuration.
SPS (Semi Persistent Scheduling) Configuration.
Physical Channel and Power Configuration.
Page80
Questions
8/9/2019 dach.pdf
82/280
The EPS Bearer typically is identified between the UE and
which other entity?
a. eNB.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page81
c. S-GW.
d. PDN-GW.
Questions
8/9/2019 dach.pdf
83/280
What is used in the PDN-GW and the UE to map IP
datagrams to the correct EPS bearer?
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page82
Questions
8/9/2019 dach.pdf
84/280
How many EPS bearers can a UE have?
a. 5.
b. 6.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page83
. .
d. 8.
e. 9.
Questions
8/9/2019 dach.pdf
85/280
Which QCI value is linked to IMS signaling?
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page84
8/9/2019 dach.pdf
86/280
Contents
8/9/2019 dach.pdf
87/280
4. Radio Resource Control
4.1 The RRC Layer
4.2 RRC Structure
4.3 RRC States
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page86
4.4 RRC Services
Contents
8/9/2019 dach.pdf
88/280
4. Radio Resource Control
4.1 The RRC Layer
4.2 RRC Structure
4.3 RRC States
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page87
4.4 RRC Services
RRC Interaction with Lower Layers
8/9/2019 dach.pdf
89/280
C"
C!tr'
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page88
8/9/2019 dach.pdf
90/280
Services Expected From Lower
L
8/9/2019 dach.pdf
91/280
LayersThe main services that RRC expects from lower layersinclude:
PDCP - integrity protection and ciphering.
RLC - a reliable and in-sequence transfer of information,
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
without introducing duplicates and with support for
segmentation and concatenation.
Page90
Contents
8/9/2019 dach.pdf
92/280
4. Radio Resource Control
4.1 The RRC Layer
4.2 RRC Structure
4.3 RRC States
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page91
4.4 RRC Services
eNB Structure
8/9/2019 dach.pdf
93/280
e'a)"EMM"a!d"
ESM"Si!a'i! e'a)"$#"Dataras
E#S".earers
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page92
(CMAC
#)si%a'
Contents
8/9/2019 dach.pdf
94/280
4. Radio Resource Control
4.1 The RRC Layer
4.2 RRC Structure
4.3 RRC States
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page93
4.4 RRC Services
RRC States
8/9/2019 dach.pdf
95/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page94
Functions
8/9/2019 dach.pdf
96/280
Broadcast of SI (System Information):
Including NAS common information.
Information applicable for UEs in RRC Idle mode.
Including ETWS (Earthquake and Tsunami Warning System) notification.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page95
Functions Cont.
8/9/2019 dach.pdf
97/280
RRC Connection control:
Paging.
Establishment/modification/release of RRC connection.
Initial security activation.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
connec on mo y
Establishment/modification/release of RBs
Radio configuration control
QoS control
Recovery from Radio Link failure.
Page96
8/9/2019 dach.pdf
98/280
8/9/2019 dach.pdf
99/280
Mobility Procedures between
E-UTRA and CDMA2000
8/9/2019 dach.pdf
100/280
E-UTRA and CDMA2000
,a!d*er
C!!e%ti!"
Estab'ise!t/
1xTT"CS"A%ti*e E-UTA
C"C!!e%ted ,#D"A%ti*e
,a!d*er
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page99
e'ease
1xTT"Dra!t E-UTA
C"$d'e ,#D"$d'e
ese'e%ti! ese'e%ti!
Contents
8/9/2019 dach.pdf
101/280
4. Radio Resource Control
4.1 The RRC Layer
4.2 RRC Structure
4.3 RRC States
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page100
4.4 RRC Services
MIB and SIB1 Parameters
8/9/2019 dach.pdf
102/280
.a!didt
#,$C,
SN
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page101
LTE SIBs SIB2
Access Class Information
Radio Resource Configuration Common
UE-Timers And Constants
Uplink Frequency InformationMBF! Configuration Information
Ti Ali t Ti C
SIB5
Inter Frequency Carrier Freq 'ist
Inter Frequency Carrier Freq Info
Inter Frequency !eig&*our Cell 'ist
Inter Frequency !eig&*our Cell InfoInter Frequency Black Cell 'ist
8/9/2019 dach.pdf
103/280
Time Alignment Timer Common
SIB3
Cell Reselection Information
"-#yst
peed tate Reselection $arameters
Cell Reselection er%ing Freq Info-!on-Intra earc& Info
T&res&old er%ing 'o( )alue
Cell Reselection $riority
Intra Fre Cell Reselection Info
SIB6
Carrier Frequency 'ist UTRA +F,,T,,.
t-Reselection UTRA
SIB7
t-Reselection /ERA!Carrier Frequency Info 'ist
SIB8
C,MA0111 Reselection Information
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page102
q-R2'e%Min
p-Ma2
s-Intraearc&
Allo(ed Measurement Band(idt&
$resence Antenna $ort 3
!eig&*or Cell Config
t-ReselectionEUTRA
t-ReselectionEUTRA-F
SIB4
Intra Freq !eig&*our Cell 'ist$&ysical Cell I,
q-4ffsetCell
Intra Freq Black Cell 'ist
C/ $&ysical Cell Id Range
SIB9
#ome e!B !ame
SIB10
ET5 $rimary !otification
SIB11
ET5 econdary !otification
RRC Paging
8/9/2019 dach.pdf
104/280
#ai!"e%rd"(ist
- UE"$de!tit)"S-TMS$"r"$MS$
- CN"Dai!
S)ste"$!"Mdii%ati!
ET&S"$!di%ati!
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page103
RRC Connection
8/9/2019 dach.pdf
105/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page104
RRC Connection Reject
On reception of a RRC Connection Reject:
8/9/2019 dach.pdf
106/280
On reception of a RRC Connection Reject:
Stop timer T300 (Stops on reception of RRC Connection Setup or RRC
Connection Reject message).
Reset MAC and release the MAC configuration.
Start timer T302, with the timer value set to the “Wait Time”.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page105
Inform upper layers about the failure to establish the RRC connection and that
access barring for mobile originating calls, mobile originating signalling and
mobile terminating access is applicable, upon which the procedure ends;UE
utilizes the T302 timer.
Initial Security Activation
8/9/2019 dach.pdf
107/280
" "
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page106
" "
RRC Connection Reconfiguration
8/9/2019 dach.pdf
108/280
Measuree!t"C!iurati!"Mbi'it)"C!tr'"$!rati!"
Dedi%ated"$!"NAS
adi"esur%e"C!i"Dedi%ated"C"C!!e%ti!"e%!iurati!"
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page107
" " " "
- srb-TAddMd(ist
- drb-TAddMd(ist
- drb-Te'ease(ist
- MAC"Mai!"C!i
- S#S"C!i
- #)si%a'"C!i"Dedi%ated
Se%urit)"C!iurati!",:
e9ues
C"C!!e%ti!"e%!iurati!"C+'ete
C"C!!e%ti!"e-estab'ise!t
Counter Check
8/9/2019 dach.pdf
109/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page108
RRC Connection Re-establishment
The UE initiates the procedure when AS security has been
8/9/2019 dach.pdf
110/280
The UE initiates the procedure when AS security has been
activated and one of the following conditions is met:
Upon detecting RLF (Radio Link Failure).
Upon handover failure.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Upon mobility from E-UTRA failure.Upon integrity check failure indication from lower layers.
Upon an RRC Connection Reconfiguration failure.
Page109
RRC Connection Re-establishment
8/9/2019 dach.pdf
111/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page110
8/9/2019 dach.pdf
112/280
RRC Connetion Release
8/9/2019 dach.pdf
113/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page112
Information Transfer
8/9/2019 dach.pdf
114/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page113
Measurement Configuration
Intra-frequency measurements: measurements at the
8/9/2019 dach.pdf
115/280
q y
downlink carrier frequency of the serving cell.
Inter-frequency measurements: measurements at
frequencies that differ from the downlink carrier frequency of
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
the serving cell.
Inter-RAT measurements of UTRA frequencies.
Inter-RAT measurements of GERAN frequencies.
Inter-RAT measurements of CDMA2000 HRPD or
CDMA2000 1xRTT frequencies.
Page114
8/9/2019 dach.pdf
116/280
Measurement Objects
8/9/2019 dach.pdf
117/280
Measuree!t"C!iurati!"
- eas:b;e%tTAddMd(ist
-- eas:b;e%t$d
-- eas:b;e%t"eas:b;e%tEUTA"
--- %arrierre9"C"C!!e%ti!"e%!iurati!"
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page116
"
--- a''edMeas.a!didt
--- +rese!%eA!te!!a#rt1
--- !eiCe''C!i--- setre9"
--- %e''sTAddMd(ist
---- %e''$!dex"
---- +)sCe''$d
---- %e''$!di*idua':set
e9ues
C"C!!e%ti!"e%!iurati!"
C+'ete
Report Configuration
8/9/2019 dach.pdf
118/280
Measuree!t"C!iurati!"
- re+rtC!iTAddMd(ist
-- re+rtC!i$d-- re+rtC!i"re+rtC!iEUTA
--- trierT)+e"e*e!tC"C!!e%ti!"e%!iurati!"
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.Page117
---- e*e!t$d"e
8/9/2019 dach.pdf
119/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page118
#eridi%a'"
e+rti!e+rt"$!ter*a'"s120="s240="s480="s640="
s1024="s2048="s5120="s10240=
i!1="i!6="i!12="i!30="i!60
Measurement Based Triggering
Events Event A1 - serving cell becomes better than the threshold.
8/9/2019 dach.pdf
120/280
Event A2 - serving cell becomes worse than the threshold.
Event A3 - neighbor cell becomes (including offset) better than the
serving cell.
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
.
Event A5 - serving cell becomes worse than Thresh1 (Threshold1) and
the neighbor cell becomes better than Thresh2 (Threshold2).
Event B1 - Inter RAT neighbor cell becomes better than threshold.
Event B2 - serving cell becomes worse than threshold1 and inter RAT
neighbor cell becomes better than threshold2.
Page119
Event Based Trigger (Event A3)
8/9/2019 dach.pdf
121/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page120
Event A3 Example
8/9/2019 dach.pdf
122/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page121
Event A3 TTT Timer
Entering condition:
8/9/2019 dach.pdf
123/280
Mn+ Ofn + Ocn− Hys > Ms + Ofs + Ocs + Off
Leaving condition:
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page122
Cell Selection
8/9/2019 dach.pdf
124/280
rx'e*eas"
rx'e*eas"
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page123
rx'e*eas"
Cell Reselection
Intra-frequency Measurements
8/9/2019 dach.pdf
125/280
If Squal > Sintrasearch - the UE may choose not to perform
intra-frequency measurements.
If Squal
8/9/2019 dach.pdf
126/280
Medium-mobility state criteria - this is met if the number of
cell reselections during time period TCRmax exceeds NCR_M
and does not exceed NCR_H.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
High-mobility state criteria - this is met if the number of cell
reselections during time period TCRmax exceeds NCR_H.
Ranking of Cells
Page125
Questions
What are the two main RRC states?
8/9/2019 dach.pdf
127/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page126
Questions
True/False. LTE uses substates like Cell_PCH and
8/9/2019 dach.pdf
128/280
Cell_FACH?
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page127
Questions
Which message is used to trigger LTE intra system
8/9/2019 dach.pdf
129/280
handovers?
a. System Information.
nn i n
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page128
c. RRC Connection Reconfiguration. d. Measurement Control.
Questions
Which event indicates that a neighboring cell is better than a
i ll b ff ?
8/9/2019 dach.pdf
130/280
serving cell by an offset?
a. Event A1.
v n
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page129
c. Event A3. d. Event A4.
8/9/2019 dach.pdf
131/280
Contents
1. EPS Architecture
2 EPS P l
8/9/2019 dach.pdf
132/280
2. EPS Protocols
3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page131
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
Contents
5. Packet Data Convergence Protocol
5 1 PDCP Operation
8/9/2019 dach.pdf
133/280
5.1 PDCP Operation
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page132
PDCP Functions
8/9/2019 dach.pdf
134/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page133
8/9/2019 dach.pdf
135/280
Control Plane PDCP Data PDU forSRB
8/9/2019 dach.pdf
136/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page135
Data Plane PDCP Data PDU forDRB (Long PDCP SN)
8/9/2019 dach.pdf
137/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page136
Data Plane PDCP Data PDU forDRB (Short PDCP SN)
8/9/2019 dach.pdf
138/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page137
PDCP Control PDU - Status Report
8/9/2019 dach.pdf
139/280
000
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page138
PDCP Control PDU - FeedbackReport
8/9/2019 dach.pdf
140/280
001
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page139
PDCP ROHC
Initialization and Refresh
First - Order
8/9/2019 dach.pdf
141/280
First Order
Second - Order
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page140
8/9/2019 dach.pdf
142/280
8/9/2019 dach.pdf
143/280
Count Value
8/9/2019 dach.pdf
144/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page143
PDCP Ciphering
8/9/2019 dach.pdf
145/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page144
Questions
True / False. PDCP is involved in NAS Ciphering.
8/9/2019 dach.pdf
146/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page145
Questions
What size PDCP Sequence Number supports UM and AM
RLC Modes?
8/9/2019 dach.pdf
147/280
a. 5bits.
i
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page146
c. 12bits.
d. 14bits.
Questions
True / False. EEA0, EEA1 and EEA2 encrypt information in
the air interface?
8/9/2019 dach.pdf
148/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page147
Questions
What term is used to identify IP header compression in LTE?
8/9/2019 dach.pdf
149/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page148
Contents
1. EPS Architecture
2. EPS Protocols
8/9/2019 dach.pdf
150/280
3. LTE/SAE Quality of Service
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page149
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
Contents
6. Radio Link Control and Medium Access Control
6.1 RLC Functions
8/9/2019 dach.pdf
151/280
6.2 RLC Modes and Formatting
6.3 MAC Functions
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page150
6.4 MAC Architecture
6.5 MAC Formatting
Contents
6. Radio Link Control and Medium Access Control
6.1 RLC Functions
8/9/2019 dach.pdf
152/280
6.2 RLC Modes and Formatting
6.3 MAC Functions
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page151
6.4 MAC Architecture
6.5 MAC Formatting
Services Provided to Upper Layers
8/9/2019 dach.pdf
153/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page152
Services Expected from LowerLayers Data transfer.
Notification of a transmission opportunity, together with the
8/9/2019 dach.pdf
154/280
total size of the RLC PDU (Protocol Data Units) to betransmitted in the transmission opportunity.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page153
Functions of the RLC Sublayer
Transfer of upper layer PDUs.
Error correction through ARQ.
Concatenation segmentation and reassembly of RLC SDU (Service Data
8/9/2019 dach.pdf
155/280
Concatenation, segmentation and reassembly of RLC SDU (Service Data
Units).
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
.
Reordering of RLC data PDUs.
Duplicate detection.
RLC SDU discard.
RLC re-establishment.
Protocol error detection.
Page154
Contents
6. Radio Link Control and Medium Access Control
6.1 RLC Functions
8/9/2019 dach.pdf
156/280
6.2 RLC Modes and Formatting
6.3 MAC Functions
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page155
6.4 MAC Architecture
6.5 MAC Formatting
Transparent Mode RLC
8/9/2019 dach.pdf
157/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page156
Unacknowledged Mode RLC
8/9/2019 dach.pdf
158/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page157
Acknowledged Mode Functions
Segmentation and reassembly.
Concatenation.
8/9/2019 dach.pdf
159/280
Error correction.
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
.
Duplicate detection.
Page158
Acknowledged Mode RLC
8/9/2019 dach.pdf
160/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page159
RLC PDU Formats
Data %ransfer Mo#e !DU Name
8/9/2019 dach.pdf
161/280
Transparent TMD
Unacknowledged UMD
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page160
Acknowledged AMD
AMD Segment
Status
RLC UMD 5bit SN
5bit"SN
8/9/2019 dach.pdf
162/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page161
8/9/2019 dach.pdf
163/280
FI Field Interpretation
+alue Des"ription
00 First byte of the Data field corresponds to the first byte of a RLC SDU.
Last byte of the Data field corresponds to the last byte of a RLC SDU.
8/9/2019 dach.pdf
164/280
01 First byte of the Data field corresponds to the first byte of a RLC SDU.
Last byte of the Data field does not correspond to the last byte of a RLC SDU.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page163
10 First byte of the Data field does not correspond to the first byte of a RLC SDU.
Last byte of the Data field corresponds to the last byte of a RLC SDU.
11 First byte of the Data field does not correspond to the first byte of a RLC SDU.
Last byte of the Data field does not correspond to the last byte of a RLC SDU.
8/9/2019 dach.pdf
165/280
8/9/2019 dach.pdf
166/280
RLC AMD with Odd Number ofLength Indicators
8/9/2019 dach.pdf
167/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page166
RLC AMD PDU Segment
8/9/2019 dach.pdf
168/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page167
AMD Segmentation
8/9/2019 dach.pdf
169/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page168
8/9/2019 dach.pdf
170/280
RLC Timers
t-PollRetransmit
t-Reordering
S P hibi
8/9/2019 dach.pdf
171/280
t-StatusProhibit
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page170
8/9/2019 dach.pdf
172/280
Contents
6. Radio Link Control and Medium Access Control
6.1 RLC Functions
6.2 RLC Modes and Formatting
8/9/2019 dach.pdf
173/280
6.3 MAC Functions
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page172
6.4 MAC Architecture
6.5 MAC Formatting
MAC Services
Mapping
Multiplexing
HARQ (H brid A tomatic Repeat Req est)
8/9/2019 dach.pdf
174/280
HARQ (Hybrid Automatic Repeat Request)
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Formatting
Page173
Services Expected from thePhysical Layer Data transfer services.
Signaling of HARQ feedback.
Signaling of Scheduling Request
8/9/2019 dach.pdf
175/280
Signaling of Scheduling Request.
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
, . . .
Page174
Contents
6. Radio Link Control and Medium Access Control
6.1 RLC Functions
6.2 RLC Modes and Formatting
8/9/2019 dach.pdf
176/280
6.3 MAC Functions
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page175
6.4 MAC Architecture
6.5 MAC Formatting
MAC Architecture
(i%a'"Ca!!e'"#riritiati!"U("
:!')
#CC, .CC, CCC, DCC, DTC, MAC"C!tr'
8/9/2019 dach.pdf
177/280
:!')
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page176
a!d"A%%ess"
C!tr'
De-"Mu'ti+'exi!C!tr'
,A
#C, .C, D(-SC, AC,U(-SC,
8/9/2019 dach.pdf
178/280
MAC PDU for DL-SCH and UL-SCH
:%t"1 E
:%t"2(
(C$D
:%t 3
1"t"i!di%ate"a!ter"
set""//E/(C$D
rat .it
(i%a'"Ca!!e'"
$de!tit)
8/9/2019 dach.pdf
179/280
Data
:%t"3
:%t"4rat".it"
07Bbits
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page178
:%t"N
Data
:%t"1
:%t"N
E
:%t"2(
(C$D
:%t"3
:%t"4
(rat".it"
1715bits
LCID Coding for DL-SCH
,C$D $n#ex Des"ription
00000 CCCH
00001-01010 Identity of the logical channel
8/9/2019 dach.pdf
180/280
01011-11011 Reserved
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page179
11100 UE Contention Resolution Identity
11101 Timing Advance Command
11110 DRX Command
11111 Padding
LCID Coding for UL-SCH
,C$D $n#ex Des"ription
00000 CCCH
00001-01010 Identity of the logical channel
01011-11001 Reserved
8/9/2019 dach.pdf
181/280
11010 Power Headroom Report
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page180
11011 C-RNTI
11100 Truncated BSR
11101 Short BSR
11110 Long BSR
11111 Padding
MAC Subheaders
8/9/2019 dach.pdf
182/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page181
Timing Advance Parameter
8/9/2019 dach.pdf
183/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page182
Buffer Status Report
Short BSR and Truncated BSR format
8/9/2019 dach.pdf
184/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Long BSR format
Page183
Power Control Headroom
8/9/2019 dach.pdf
185/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page184
8/9/2019 dach.pdf
186/280
#AC,"#reab'e"Se9ue!%e
AC,
Random Access Process
8/9/2019 dach.pdf
187/280
MAC"S%edu'i!"Gra!t
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
C"C!!e%ti!"e9uestU(-SC,
C"C!!e%ti!"Setu+
C"C!!e%ti!"Setu+"C+'eteU(-SC,
D(-SC,
Si!a''i!"adi".earer
C"C!!e%ted
Page186
Random Access Response
8/9/2019 dach.pdf
188/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page187
Uplink Grant
!arameter Si.e'bits(
Des"ription
Hopping Flag 1 Indicates whether the allocation should be using uplink hopping.
Fixed Size Resource Block Assignment 10 The assigned uplink resources.
Truncated Modulation and Coding Scheme 4 Indication of modulation and coding scheme to use.
8/9/2019 dach.pdf
189/280
-
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page188
, . . .
UL Delay 1 Indicates whether uplink assignment is delayed until the next
subframe, e.g. K+4+1.
CQI Request 1 Indicates whether the UE has been requested to multiplex the
CQI (Channel Quality Indicator) into the scheduled PUSCH
transmission.
Backoff Indicator
Sub",eader"A
.$ :%t"1E T
Sub ,eader .A#$D"r".$
8/9/2019 dach.pdf
190/280
Sub",eader".
" "
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page189
MAC"A".
MAC"A"!
" ".a%?"$!di%atr
0"- 60s
Questions
True / False. RLC is able to provide an ARQ mechanism?
8/9/2019 dach.pdf
191/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page190
Questions
What two sizes of RLC sequence number are used for RLC
UM?
a. 5bits.
i
8/9/2019 dach.pdf
192/280
i
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page191
c. 10bits.
d. 12bits.
Questions
True / False. The AMD PDU segment is also available in
Release 8 HSPA+ systems?
8/9/2019 dach.pdf
193/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page192
Questions
Which parameter is used by MAC for logical channel
mapping?
8/9/2019 dach.pdf
194/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page193
Questions
How many LCID values are available for EPS bearers?
a. 4.
b. 8.
8/9/2019 dach.pdf
195/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page194
. .
d. 12.
Contents
1. EPS Architecture
2. EPS Protocols
3. LTE/SAE Quality of Service
8/9/2019 dach.pdf
196/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page195
.
5. Packet Data Convergence Protocol
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
Contents
7. X2/S1 Interface and Protocols
7.1 X2AP Functions and Procedures
7.2 S1AP Functions and Procedures
7.3 User Plane GTP Functions and Procedures
8/9/2019 dach.pdf
197/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page196
Contents
7. X2/S1 Interface and Protocols
7.1 X2AP Functions and Procedures
7.2 S1AP Functions and Procedures
7.3 User Plane GTP Functions and Procedures
8/9/2019 dach.pdf
198/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page197
X2AP Functions and Procedures
8/9/2019 dach.pdf
199/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page198
Mapping between X2AP Functionsand X2AP EPs
/un"tion Elementary !ro"e#ure's(
Mobility Management a) Handover Preparation.
b) SN Status Transfer.
c) UE Context Release.
d) Handover Cancel.
8/9/2019 dach.pdf
200/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page199
Load Management a) Load Indication.
b) Resource Status Reporting Initiation.
c) Resource Status Reporting.
Reporting of General Error Situations Error Indication.
Resetting the X2 Reset.
Setting up the X2 X2 Setup.
eNB Configuration Update eNB Configuration Update.
X2 Elementary Procedures (Class1)
Elementary !ro"e#ure $nitiatingMessage
Su""essful 0ut"ome Unsu""essful 0ut"ome
Response message Response message
Handover Preparation HANDOVER
REQUEST
HANDOVER REQUEST
ACKNOWLEDGE
HANDOVER PREPARATION
FAILURE
Reset RESET REQUEST RESET RESPONSE
X2 Setup X2 SETUP X2 SETUP RESPONSE X2 SETUP FAILURE
8/9/2019 dach.pdf
201/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page200
eNB Configuration Update ENB
CONFIGURATIO
N UPDATE
ENB CONFIGURATION UPDATE
ACKNOWLEDGE
ENB CONFIGURATION UPDATE
FAILURE
Resource Status Reporting
Initiation
RESOURCE
STATUS
REQUEST
RESOURCE STATUS RESPONSE RESOURCE STATUS FAILURE
X2 Elementary Procedures (Class2)
Elementary !ro"e#ure $nitiating Message
Load Indication LOAD INFORMATION
Handover Cancel HANDOVER CANCEL
SN Status Transfer SN STATUS TRANSFER
8/9/2019 dach.pdf
202/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page201
UE Context Release UE CONTEXT RELEASE
Resource Status Reporting RESOURCE STATUS UPDATE
Error Indication ERROR INDICATION
Message Formatting
Presence
Range
Criticality
8/9/2019 dach.pdf
203/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page202
Basic Mobility Procedures -Handover Preparation
8/9/2019 dach.pdf
204/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page203
,a!d*er"e9uest
,a!d*er"e9uest"A%?!'ede
Sur%e Taret
X2 Handover Preparation Failure
8/9/2019 dach.pdf
205/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page204
X2 SN Status Transfer
:'d"eN."UE"X2A#"$D"
Ne"eN."UE"X2A#"$D
E-A.s"Sub;e%t"T"Status"Tra!ser"(ist
- E-A."$D- e%ei*e"Status":"U("#DC#"SDUs":
- U( C:UNT >a'ue
8/9/2019 dach.pdf
206/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page205
SN"Status"Tra!ser
U("C:UNT">a'ue
- D("C:UNT">a'ue
Sur%e Taret
X2 UE Context Release
8/9/2019 dach.pdf
207/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page206
X2 Handover Cancel
8/9/2019 dach.pdf
208/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page207
X2 Load Indication
8/9/2019 dach.pdf
209/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page208
X2 Uplink Interference
8/9/2019 dach.pdf
210/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page209
Downlink RNTP
8/9/2019 dach.pdf
211/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page210
X2 Resource Status Request
8/9/2019 dach.pdf
212/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page211
X2 Resource Status Update
esur%e"Status"U+date
8/9/2019 dach.pdf
213/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page212
eN.1"Measuree!t"$D
eN.2"Measuree!t"$D
Ce''"Measuree!t"esu't- ECG$
- ,ardare"(ad"$!di%atr
- S1"TN("(ad"$!di%atr
- adi"esur%e"Status
8/9/2019 dach.pdf
214/280
eNB Configuration Update
Ser*ed"Ce''s"T"Add
Ser*ed"Ce''s"T"Mdi)
Ser*ed"Ce''s"T"De'ete
GU"Gru+"$d"T"Add"(ist
GU"Gru+"$d"T"De'ete"(ist
8/9/2019 dach.pdf
215/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page214
Contents
7. X2/S1 Interface and Protocols
7.1 X2AP Functions and Procedures
7.2 S1AP Functions and Procedures
7.3 User Plane GTP Functions and Procedures
8/9/2019 dach.pdf
216/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page215
S1 Control and User Plane
8/9/2019 dach.pdf
217/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page216
S1AP Elementary Procedures (Class1)
Elementary !ro"e#ure $nitiating Message Su""essful 0ut"ome Unsu""essful 0ut"ome
Response message Response message
Handover Preparation HANDOVER REQUIRED HANDOVER COMMAND HANDOVER PREPARATION FAILURE
Handover Resource Allocation HANDOVER REQUEST HANDOVER REQUEST ACKNOWLEDGE HANDOVER FAILURE
Path Switch Request PATH SWITCH REQUEST PATH SWITCH REQUEST ACKNOWLEDGE PATH SWITCH REQUEST FAILURE
Handover Cancellation HANDOVER CANCEL HANDOVER CANCEL ACKNOWLEDGE
E-RAB Setup E-RAB SETUP REQUEST E-RAB SETUP RESPONSE
E-RAB Modify E-RAB MODIFY REQUEST E-RAB MODIFY RESPONSE
- e ease - -
Initial Context Setup INITIAL CONTEXT SETUP REQUEST INITIAL CONTEXT SETUP RESPONSE INITIAL CONTEXT SETUP FAILURE
8/9/2019 dach.pdf
218/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page217
Reset RESET RESET ACKNOWLEDGE
S1 Setup S1 SETUP REQUEST S1 SETUP RESPONSE S1 SETUP FAILURE
UE Context Release UE CONTEXT RELEASE COMMAND UE CONTEXT RELEASE COMPLETE
UE Context Modification UE CONTEXT MODIFICATION REQUEST UE CONTEXT MODIFICATION RESPONSE UE CONTEXT MODIFICATION FAILURE
eNB Configuration Update ENB CONFIGURATION UPDATE ENB CONFIGURATION UPDATE ACKNOWLEDGE ENB CONFIGURATION UPDATE FAILURE
MME Configuration Update MME CONFIGURATION UPDATE MME CONFIGURATION UPDATE ACKNOWLEDGE MME CONFIGURATION UPDATE FAILURE
Write-Replace Warning WRITE-REPLACE WARNING REQUEST WRITE-REPLACE WARNING RESPONSE
8/9/2019 dach.pdf
219/280
S1 Setup Request
G'ba'"eN."$D
eN."Nae":"
Su++rted"TAs
- TAC
.rad%ast"#(MNs- #(MN"$de!tit)
CSG"$d"(ist":
- CSG $d
8/9/2019 dach.pdf
220/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page219
- CSG"$d
Deau't"#ai!"DX
S1 Setup Response
MME"Nae":
8/9/2019 dach.pdf
221/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page220
Ser*ed"GUMME$s
- Ser*ed"#(MNs-- #(MN"$de!tit)
- Ser*ed"Gru+$Ds
-- MME"Gru+"$D
- Ser*ed"MMECs
-- MME"Cde
e'ati*e"MME"Ca+a%it)Criti%a'it)"Dia!sti%s":
S1 Initial UE Message
8/9/2019 dach.pdf
222/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page221
Downlink and Uplink NAS Transport
8/9/2019 dach.pdf
223/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page222
S1 Initial Context Setup RequestMME"UE"S1A#"$D"
eN."UE"S1A#"$D"UE"Areate"Maxiu".it"ate
E-A."t".e"Setu+"(ist"
- E-A."$D
- E-A."(e*e'"S"#araeters
- Tra!s+rt"(a)er"Address
- GT#-TE$D
- NAS-#DU":
UE"Se%urit)"Ca+abi'itiesSe%urit)"@e)
" "" "
,a!d*er"estri%ti!"(ist":
UE"adi"Ca+abi'it)":
8/9/2019 dach.pdf
224/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page223
$!itia'"C!text"Setu+"e9uest
Subs%riber"#ri'e"$D"r"AT/re9ue!%)"#ririt)":
CS"a''ba%?"$!di%atr":
S>CC":+erati!"#ssib'e":
$!itia'"C!text"Setu+"es+!se
Create"
Sessi!"
GT#*2-C
E-A."$D"7"5 S-G&"Address"
a!d"TE$D
S1 Initial Context Setup Response
MME"UE"S1A#"$D"
eN."UE"S1A#"$D"
E-A."Setu+"(ist"
- E-A."$D
- Tra!s+rt"(a)er"Address
- GT#-TE$D
" " " " "- " " " " "
Criti%a'it)"Dia!sti%s":
8/9/2019 dach.pdf
225/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page224
$!itia'"C!text"Setu+"e9uest
$!itia'"C!text"Setu+"es+!se
Mdi)"
.earer"
S-G&"Address"
a!d"TE$D
eN."Address"a!d"
TE$D E-A."$D"7"5
S1 E-RAB Setup Request
8/9/2019 dach.pdf
226/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page225
S1 E-RAB Setup Response
8/9/2019 dach.pdf
227/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page226
E-RAB Release Indication
8/9/2019 dach.pdf
228/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page227
Requirement for S1 HandoverProcedure
S11
S11
--S1-MME
S1-U
S1-U
S1-U
8/9/2019 dach.pdf
229/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page228
S1 U
8/9/2019 dach.pdf
230/280
S1 Handover Command
,a!d*er"Ca!d
MME"UE"S1A#"$D
" " "
Sur%e
" " "
,a!d*er"T)+e
NAS"Se%urit)"#araeters"r"E-UTAN"Ci"t"UTAN"GEAN
E A.s Sub;e%t t rardi! (ist :
8/9/2019 dach.pdf
231/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page230
E-A.s"Sub;e%t"t"rardi!"(ist":
- E-A."$D
- D("Tra!s+rt"(a)er"Address":- D("GT#-TE$D":
- U("Tra!s+rt"(a)er"Address":
- U("GT#-TE$D":
E-A.s"t"e'ease"(ist":
Taret"t"Sur%e"Tra!s+are!t"C!tai!er
Taret"t"Sur%e"Tra!s+are!t"C!tai!er"Se%!dar)":Criti%a'it)"Dia!sti%s":
S1 Handover Request
8/9/2019 dach.pdf
232/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page231
S1 Handover RequestAcknowledge
MME"UE"S1A#"$D"eN."UE"S1A#"$D
E-A.s"Aditted"(ist"
- E-A."$D
- Tra!s+rt"(a)er"Address
- GT#-TE$D- D("Tra!s rt"(a er"Address" :
" " " "
- D("GT#-TE$D":
- U("Tra!s+rt"(a)er"Address":
U( GT# TE$D :
8/9/2019 dach.pdf
233/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page232
,a!d*er"e9uest
- U("GT#-TE$D":
E-A.s"ai'ed"t"Setu+"(ist":Taret"t"Sur%e"Tra!s+are!t"C!tai!er
Criti%a'it)"Dia!sti%s":Taret
,a!d*er"e9uest"A%?!'ede
S1 Handover Notify
8/9/2019 dach.pdf
234/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page233
S1 Path Switch Request
8/9/2019 dach.pdf
235/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page234
S1 Path Switch Acknowledge
Taret Sur%e
rardi!
#at"Sit%"e9uest"A%?!'ede
MME"UE"S1A#"$D
8/9/2019 dach.pdf
236/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page235
eN."UE"S1A#"$D
UE"Areate"Maxiu".it"ate":E-A."T".e"Sit%ed"i!"U+'i!?"(ist":
- E-A."$D"
- Tra!s+rt"(a)er"Address
- GT#-TE$D
E-A."T".e"e'eased"(ist":
Se%urit)"C!text
Criti%a'it)"Dia!sti%s":
Handover Cancel
8/9/2019 dach.pdf
237/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page236
S1 UE Context Release
8/9/2019 dach.pdf
238/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page237
S1 UE Context Release Request
MME"UE"S1A#"$D
eN."UE"S1A#"$DCause"
UE"C!text"e'ease"e9uest
"
8/9/2019 dach.pdf
239/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page238
S1 Reset
Cause"
eset"T)+e
- S1"$!tera%e
-- eset"A''- " " "
eset
" " "
-- UE-Ass%iated"(i%a'"S1"C!!e%ti!"(ist"
8/9/2019 dach.pdf
240/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page239
eset"A%?!'ede
8/9/2019 dach.pdf
241/280
Location Reporting Control
8/9/2019 dach.pdf
242/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page241
Overload Start
8/9/2019 dach.pdf
243/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page242
8/9/2019 dach.pdf
244/280
Contents
7. X2/S1 Interface and Protocols7.1 X2AP Functions and Procedures
7.2 S1AP Functions and Procedures
7.3 User Plane GTP Functions and Procedures
8/9/2019 dach.pdf
245/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page244
GTP Tunnels
8/9/2019 dach.pdf
246/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page245
GTPv1-U Header
8/9/2019 dach.pdf
247/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page246
Extension Header
8/9/2019 dach.pdf
248/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page247
GTPv1-U Procedures
Message %ype +alue Message
1 Echo Request
2 Echo Response
3-25 Reserved
26 Error Indication
27-30 Reserved
31 Supported Extension Headers Notification
32-253 Reserved
254 End Marker
8/9/2019 dach.pdf
249/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page248
254 End Marker
255 G-PDU
GTPv1 Echo Procedure
E%"e9uest
#ri*ate"Exte!si!":
""
e%*er)≥ 60s
8/9/2019 dach.pdf
250/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page249
#ri*ate"Exte!si!":E%"e9uest
E%"es+!se
Supported Extension HeadersNotification
$!%'udi!"Exte!si!",eader
G-#DU
Su++rted"Exte!si!",eaders"Ntii%ati!
8/9/2019 dach.pdf
251/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page250
Exte!si!"!t"su++rted
GTPv1 End Marker
8/9/2019 dach.pdf
252/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page251
Questions
True / False. LTE can work without an X2 interface?
8/9/2019 dach.pdf
253/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page252
Questions
What is the name of the protocol which is used to reliablytransport X2AP and S1AP signaling?
8/9/2019 dach.pdf
254/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page253
Questions
How are S1AP messages for a UE correlated?
8/9/2019 dach.pdf
255/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page254
Questions
After a mobile establishes an RRC connection, what is thefirst message send from the eNB across the S1-MME
interface?
8/9/2019 dach.pdf
256/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page255
Questions
What message is used by a target eNB to inform the MMEof a successful X2 handover?
8/9/2019 dach.pdf
257/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page256
Questions
What version of GTP is used in the E-UTRAN?
a. GTPv1-C.
b. GTPv1-U.
. - .
d. GTPv2-U.
8/9/2019 dach.pdf
258/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page257
Contents
1. EPS Architecture
2. EPS Protocols
3. LTE/SAE Quality of Service
.
5. Packet Data Convergence Protocol
6 Radio Link Control and Medium Access Control
8/9/2019 dach.pdf
259/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page258
6. Radio Link Control and Medium Access Control
7. X2/S1 Interface and Protocols
8. Mobility in LTE
Contents
8. Mobility in LTE
8.1 X2 Handover
8.2 S1 Handover
8.3 Inter RAT Handover
8/9/2019 dach.pdf
260/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page259
Contents
8. Mobility in LTE
8.1 X2 Handover
8.2 S1 Handover
8.3 Inter RAT Handover
8/9/2019 dach.pdf
261/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page260
Handover Phases
8/9/2019 dach.pdf
262/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page261
X2 Based Handover with LosslessPDCP
Sur%e Taret
8/9/2019 dach.pdf
263/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page262
Sur%e Taret
X2 Based Handover with LosslessPDCP
C"C!!e%ti!"e%!iurati!"" "
a!d"A%%ess"es+!se
+ ete #at"Sit%"
e9uest Mdi)".earer"
e9uest
Mdi)".earer"
es+!se#at"Sit%
#DC#"Status"e+rt
#DC#"Status"e+rt
UE C
8/9/2019 dach.pdf
264/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page263
es+ seat S t%e9uest"A%?
E!d"Mar?er
GT#-U"Messae
E!d"Mar?er
GT#-U"Messae
UE"C!text"
e'ease
Mobility Control Information
8/9/2019 dach.pdf
265/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page264
X2AP SN Status Transfer
8/9/2019 dach.pdf
266/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page265
Contents
8. Mobility in LTE
8.1 X2 Handover
8.2 S1 Handover
8.3 Inter RAT Handover
8/9/2019 dach.pdf
267/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page266
Inter MME and S-GW HandoverPreparation Phase
,a!d*er"e9uiredrard"
e'%ati!"e9uest
Create
Sessi!
e9uest
CreateS i
,a!d*er"e9uest
8/9/2019 dach.pdf
268/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Sessi!
es+!se
9
,a!d*er"e9uest"A%?
Page267
Create"$!dire%t"Data"" "
Inter MME and S-GW HandoverPreparation Phase
" "
e9uest
Create"$!dire%t"
Data"rardi!"
Tu!!e'"es+!se
rard"e'%ati!"
es+!se
Create $!dire%t Data
8/9/2019 dach.pdf
269/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved.
Create"$!dire%t"Data"
rardi!"Tu!!e'"
e9uest
Create"$!dire%t"
Data"rardi!"Tu!!e'"es+!se
Page268
Inter MME and S-GW HandoverExecution Phase
8/9/2019 dach.pdf
270/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page269
Inter MME and S-GW HandoverExecution Phase
8/9/2019 dach.pdf
271/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page270
Tracking Area Update and ClearingResources
Tra%?i!"Area"U+date"#r%edure
De'ete"
De'ete"$!dire%t"Data"
di T '
"
Sessi!"
e9uest
De'ete"
Sessi!"es+!se
UE"C!text"e'ease"
Ca!d
UE"C!text"e'ease"
C+'ete
8/9/2019 dach.pdf
272/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page271
De'ete"$!dire%t"Data"
rardi!"Tu!!e'"
es+!se
rardi!"Tu!!e'"
e9uest
De'ete"$!dire%t"Data"
rardi!"Tu!!e'"es+!se
De'ete"$!dire%t"Data"
rardi!"Tu!!e'"e9uest
8/9/2019 dach.pdf
273/280
E-UTRAN to UTRAN Handover
8/9/2019 dach.pdf
274/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page273
E-UTRAN to UTRAN Handover(cont.)
8/9/2019 dach.pdf
275/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page274
Questions
True / False. LTE is able to be configured to perform
Lossless Intra-LTE handovers?
8/9/2019 dach.pdf
276/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page275
Questions
What is the name given to the last GTP-U message sent
from S-GW to the source (old) eNB after completion?
8/9/2019 dach.pdf
277/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page276
Questions
True / False. It is possible to handover from one eNB to
another even if the X2 interface is not present.
8/9/2019 dach.pdf
278/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page277
Questions
Which entity makes the decision for handovers?
a. MME.
b. S-GW.
. .
d. eNB.
8/9/2019 dach.pdf
279/280
Copyright © 2010 Huawei Technologies Co., Ltd. All rights reserved. Page278
Thank you. .
8/9/2019 dach.pdf
280/280