Client: Climate Change Coordination Office (CCCO) Head of CCCO : Dr Dinh Quang Cuong Da Nang Climate Change Mitigation for Buildings (DaCliMB) project Technical assistance for the Implementation of the Climate Change Action Plan in the City of Danang – Focus on households and commercial buildings 13 may 2014

Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

Client: Climate Change Coordination Office (CCCO)Head of CCCO : Dr Dinh Quang Cuong

Da Nang Climate Change Mitigation for Buildings (DaCliMB) project

Technical assistance for the Implementation of the Climate Change Action Plan in the City of Danang –Focus on households and commercial buildings

13 may 2014

Page 2: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

PRESENTATION OF THE PROJECT

Objectives, Work plan

Page 3: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

Data collection of official dataEnergy audit surveys of households and commercial buildingsAnalysis of resultsIdentification of key sectors and energy saving/low GHG potential

Benchmarking of energy efficiency projects for buildings and households in other cities similar to DanangIdentification of mitigation / energy efficiency targets in two sectorsFormulation of roadmap to achieve targetsFormulation of priority mitigation projects

Methodology for replication in other provinces/cities

Phase 1: GHG emissions and energy assessment

October 2013 – March 2014

Phase 2: Identification of mitigation targets and pilot projects

April – July 2014

Phase 3: Methodology for

replication

July - September 2014

WORK PLAN

Phase 1 report Phase 2 report Phase 3 report

3

Page 4: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

Asconit Project Coordinator

Vietnam

Da Nang PPC

Local Working Group:DOC, EVN, DISED, DOIT, DOST,

DONRE, DSO

NTP-RCC Steering Committee

Consultant Team France

Da Nang CCCO

AFD

ORGANIZATION SET-UP

4

Established by Da Nang ClimateChange Steering Committee(Decision 129/QĐ-BCĐ)

Page 5: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

PRESENTATION OF PHASE 1 RESULTS

Energy consumption & GhG emissions

Households and commercial buildings

Page 6: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

DATA COMPILATION

6

PrimarySources

Ex: Electricityconsumption 2005-

2012,

Urban Planning Strategies

Ex: Urban Master Plan, DN Socio-economicDevelopment Plan

Results of otherstudies/ Projects

Ex: DACRISS, ADB Project, APEC Low-carbon study, etc.

DaCliMBsurvey 250 households

Page 7: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

INTRODUCTION

7

-

1 000

2 000

3 000

4 000

5 000

6 000

2010 2020 2030

tCO

2e

GhG Emissions - Da Nang city

Wastewater

Solide waste

Residential

Commercial / institutionnal

Transportation

Manufacturing industries

36%

Residential

Commercial

Building sectors = a key sector in terms of GhG emissionsBy 2030, 36% of the total of GhG emissions of the Province

24%

Source: APEC 2013

Page 8: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (RESIDENTIAL SECTOR)

8

-

200

400

600

800

1 000

1 200

1 400

1 600

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

Fin

al E

ne

rgy

con

sum

pti

on

(G

Wh

)

Hoa Vang

Lien Chieu

Cam Le

Ngu Hanh Son

Son Tra

Thanh Khe

Hai Chau

x 2

x 2

+ 28%

Electricity consumption: x 2 between 2007 and 2013 (EVN)By 2020, x 2 compared to 2013

Page 9: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (RESIDENTIAL SECTOR)

9

Electricity consumption:

Other energy consumption:

-

500

1 000

1 500

2 000

2 500

3 000

3 500

4 000

Hai Chau ThanhKhe

Son Tra Ngu HanhSon

Cam Le LienChieu

Hoa Vang Da NangTotal

Ele

ctri

cal c

on

sum

pti

on

(kW

h/H

H/y

ear

)

2008

2014

-

500

1 000

1 500

2 000

2 500

3 000

3 500

4 000

4 500

5 000

Cẩm Lệ Hai Châu

Liên Chiểu

Ngũ Hành Sơn

Sơn Tra ThanhKhê

Fin

al e

ne

rgy

con

sum

pti

on

(kW

h/y

ear

/HH

)

Wood

LPG

Coal

Electricity

X 2

Page 10: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (RESIDENTIAL SECTOR)

10

Page 11: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (SERVICE SECTOR)

11

-

100

200

300

400

500

600

700

800

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

Fin

al E

ne

rgy

con

sum

pti

on

(G

Wh

)

Cultural & Sports

Restaurants

Hospitals

Offices

Commerces

Admin Buildings

Schools

Hotels

x 4,5

x 2,5

+ 31%

Electricity consumption: x 4,5 between 2007 and 2013 (EVN)By 2020, x 2,5 compared to 2013 Hotels + Commerces = 70% of the sector

Page 12: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (SERVICE SECTOR)

12 -

50

100

150

200

250

300

350

400

-

10 000

20 000

30 000

40 000

50 000

60 000

2006 2007 2008 2009 2010 2011 2012 2013

ho

tels

Ele

ctri

cal C

on

sum

pti

on

(M

Wh

)

Average electricity consumption

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Complex 2 stars 3 stars 4 stars

Oils products

LPG

Electricity

Energy consumption in hotels:

Uses 4 stars 3 stars 2 stars ComplexLighting 26% 13% 17% 23%

Air conditioning

53% 47% 46% 48%

Water heating

17% 27% 12% 12%

Other 4% 13% 17% 17%

Electricity uses in hotels:

Page 13: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (SERVICE SECTOR)

13

Page 14: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF RESULTS (GhG EMISSIONS)

14

Goal to reduce GhG Emissions in 2025:-20%Consistency with “National Green GrowthStrategy” (-2% / year)

How to achieve this goal in buildingsectors?The potencial of mitigation is muchhigher when the project is in thedesign phase

Page 15: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

CONCLUSION

NEXT STEPS AND OPPORTUNITIES

Page 16: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

CONTEXT AND PERSPECTIVES

16

• Current Weaknesses

– Low electricity tariff

– Limited capacities of EE office (central level)

– Lack of awareness at local level

– Dichotomy between legalframework and actualapplication

• Expected evolution

– 2013: Decision of the PM to increase tarif +22% by 2015

– PMR: Partnership for Market Readiness (ADB-WB)

– Numerous top-down EE projects: Da Nang pilot city

– Strategies and Action Plans by sector/ province

Page 17: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

NEXT STEPS

17

Identification of mitigation /

energy efficiency targets

Formulation of roadmap to

achieve targets

Formulation of priority

mitigation projects

Page 18: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

EXAMPLES OF PROJECT OPPORTUNITIES

18

Audit campaigns

EE in new buildings Targets: public buildings, affordable housing (public or private)

Large « eco-village » / « smart city » Project Target: according to the Master Plan

Improve EE in existing building – Retrofitting Target: administrative housing

Environmental certification Targets: new administration center, hotels

Capacity Building Target: DOC, Architects, etc. – Implementation of QCVN 09:2013 (EEBC)

Technical Assistance Target: EE project in parallel

Raising Awareness Projects

Page 19: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,

FINANCING OPPORTUNITIES

• AFD in Da Nang • Public funding

– i.e. for audits

• Other donors

– JICA

– WB-ADB Proposal for MarketReadiness

• Opportunity for Decentralized cooperationwith a French coastal city

19

DaCliMB DDIF

Phase 2: Project identification

Funding Tool

• Other AFD funding tools:

• FEXTE: Technical Expertise Tool• MHB Credit Line: for affordablehousing

Page 20: Da Nang Climate Change Mitigation for Buildings …ideffie.org/wp-content/uploads/2016/05/presentation...Asconit Project Coordinator Vietnam Da Nang PPC Local Working Group: DOC, EVN,