DA Meeting Hannover 26/27 April 2007 1

J. FausteLPF-STOC Ops

Data Analysis meeting (Jorge Fauste STOC Operations Engineer)

Hannover 26/27 of April 2007

Page 2: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 2

J. FausteLPF-STOC Ops

Summary

• LPF Ground Segment Configuration

• STOC Configuration at ESOC– Mission Planning– Data Ingestion

• STOC Configuration at ESAC– Mission Planning– Data Ingestion

• Input Data to the DA/QL software

Page 3: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 3

J. FausteLPF-STOC Ops

LPF Ground Segment Configuration

STOC AT ESOC

STOC AT ESAC

Page 4: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 4

J. FausteLPF-STOC Ops

STOC CONFIGURATION AT ESOC

• In DEVLAN network:– Mission Planning server and client (MOIS)– Data Ingestion server and client (MUST)– STOC Office PCs (STOC Personnel)

• In PISALAN:– Lap-tops PIs– Data Analysis and Quick Look

Page 5: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 5

J. FausteLPF-STOC Ops

STOC CONFIGURATION AT ESOC

• Mission Planning (MOIS)– MOIS server at ESOC.

– Two clients one at ESOC one at ESAC.

– Both clients connected to the same server.

Page 6: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 6

J. FausteLPF-STOC Ops

STOC CONFIGURATION AT ESOC

• Data Ingestion– The MUST server will retrieve raw data from

the DDS system– The MUST client at ESOC will retrieve TM

ASCII files and auxiliary files from the MUST server.

– The MUST client will push the data to the DA/QL tools in the PISALAN

Page 7: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 7

J. FausteLPF-STOC Ops

STOC Configuration at ESAC

• ESAC Internal networks:– SCIPOSNET3: LTP PI’s (Lap-tops)– SCIOPSNET4: DA/QL, STOC Simulator,

Office PCs– SCIOPSNET6: MUST client, MOIS client

• ESAC External networks:– SCIOPSNET1: OPS and Legacy Archive– SCIOPSNET2: Visitors

Page 8: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 8

J. FausteLPF-STOC Ops

STOC Configuration at ESAC

• Mission Planning (MOIS)– MOIS server at ESOC.

– One client at ESAC.

Page 9: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 9

J. FausteLPF-STOC Ops

STOC Configuration at ESAC

• Data Ingestion:– The MUST server at ESOC will retrieve raw data from

the DDS system– The MUST client at ESAC will retrieve TM ASCII files

and auxiliary files from the MUST server.– The MUST client at ESAC will push the data to the

Archive at ESAC and to the DA/QL tools in the SCIOPSNET4

• Both Data Ingestion systems, ESOC and ESAC will run in parallel.

Page 10: DA Meeting Hannover 26/27 April 2007 1 J. Fauste LPF-STOC Ops Data Analysis meeting (Jorge Fauste STOC Operations Engineer) Hannover 26/27 of April 2007

DA Meeting Hannover 26/27 April 2007 10

J. FausteLPF-STOC Ops

Input Data to the DA/QL software

• Input data files for the DA/QL tools will be MUST ASCII files. Is any other ancillary file needed?

• This data will be provided by the STOC Data Ingestion and Distribution System.

• The number of files to be feed in the DA/QL, the exact format and naming convention need to be agreed.

• Several possibilities:– One file containing all Telemetry data– One file per parameter– One file for the ICE Telemetry and QL– Separate file for the DA software– ?????????????