DURABLE STRUCTURES LNEC Lisbon 31 May - 1June 2012 BALANCE OF AN INSPECTION CYCLE - 2001 / 2011 Luís Ribeiro Freire, Estradas de Portugal Carlos Santinho Horta, Estradas de Portugal DURABLE STRUCTURES LNEC Lisbon 31 May - 1June 2012 1 - HISTORICAL EVOLUTION ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC • Lisbon • Portugal • 31 May - 1 June 2012

D2_1_LFreire

Embed Size (px)

DESCRIPTION

zxfzf

Citation preview

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    BALANCE OF AN INSPECTION CYCLE - 2001 / 2011

    Lus Ribeiro Freire, Estradas de Portugal

    Carlos Santinho Horta, Estradas de Portugal

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    1 - HISTORICAL EVOLUTION

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - 1999 - Extinction of JAE and JAE-SA and the creation of three institutes - IEP, ICORand ICERR;

    - 2001 - Collapse of Hintze Ribeiro Bridge;

    - 2002 - Merger of IEP, ICOR and ICERR, into a single institute - IEP Instituto das Estradas de Portugal;

    - 2003 - Contract of Provision and Implementation of a Bridge Management System.

    - 2004 - Conversion of IEP into a public business enterprise, named Estradas de Portugal - E.P.E.

    - 2005 - First bridge inventory, assessed approximately in 5 600 structures;- Beginning of PROPIS Program for Underwater Inspections 2005-2009.

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - 2006 - 18 procedures to update the Inventory and to carry out 5.400 Routine Inspections

    - 4 procedures to carry out 1.500 Main Inspections- Project aggregations.

    - 2007 - EP E.P.E. is converted into a joint-stock company with public funds, namedEstradas de Portugal S.A.

    - First complete inventory, assessing the entire EPs patrimony in approximately 5500 bridges;

    - First complete assessment of maintenance needs - IR- LNEC gives its assent to SGOAs premises.

    - 2008 - Creation of DCM Construction and Maintenance Directorate.- Conclusion of the procedures that began in 2006.- Beginning of the Underwater Inspections campaign to all bridges affected by the

    2007/2008 winter.

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - 2009 - Strategic decision to do all SGOA activities with internal resources.- DCM gives formation to COs technical staff about Inventory and Routine

    Inspections.- Approval of a Training Program in Main Inspections to over 16 Engineers, in

    coordination with the cole Nationale des Ponts en Chausses.

    - 2010 - Approval of the 2nd SGOA Manuals Revision, by LNEC;- Main Inspections done by internal resources;

    - 2011 - Conclusion of the 1st Cycle of Main Inspections to the whole set of bridges under EPs responsibility, which started in 2006;

    - Publicizing of the 1st Procedure to the Service Provision of Complementary Resources of Diagnosis, Testing and Access with Mobile Platforms.

    - Implementation of SGOC Retaining Walls Maintenance Management System.

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - 2012 - Conclusion of Underwater Inspections Manual;

    - Procedure for an Underwater Inspections Campaign 2012;

    - Development of Guides for Bridge Diagnosis;

    - Beginning of the 1st Service Provision of Complementary Resources of Diagnosis;

    - Inspection campaigns for particular bridges - LNEC;

    - Updating the computer application GOA.

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    2 MANAGEMENT MODEL

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Insp . Subaqu ticas

    Insp . de Dano

    Insp . Especiais

    DCM

    INSPEC ES

    Insp . RotinaCO s

    Insp . Principais

    EM BOM

    EM MAU

    EC 1

    EC 2

    EC 3

    EC 4

    EC 5

    Trabalhosde

    Manuten o

    deReparao

    Invent rio

    COs

    Hist rico

    SCG Information

    OBRACentros

    Operacionais

    PROJECTODireco de

    Projectos

    Information Updating

    Underwater Insp.

    Damage Insp.

    Special Insp.

    Construction and

    Maintenance Directorate

    (DCM)

    INSPECTIONS

    Routine Insp.CO s

    Principal Insp.

    GOOD

    BAD

    EC 0

    EC 1

    EC 2

    EC 3

    EC 4

    EC 5

    Maintenance Works

    Repair Works

    Inventories

    COs

    Historical Record

    INTERVENTIONOperations

    Centre (COs)

    PROJECT

    Projects Directorate

    Specific Survey

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - The Conservation Management Model allows all information on bridges to be correctly organized and handled, making it a fundamental instrument for the management of these structures;

    - The Bridge Maintenance Management System consists of a series of activities in constant development and improvement;

    - The set of activities that belong to the Bridge Maintenance Management System is transversal to the different EP directorates;

    - The Conservation Management Model is completely integrated in EPs operations, ensuring the reliability of results.

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    3 BRIDGE MAINTENANCE MANAGEMENT SYSTEM

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    The Bridge Conservation Management System allows a vast knowledge of bridges Conditional Rating through a periodic update of the set of activities that support the system:

    - The Bridge Inventory consists of Technical, Administrative and Constitutive data and requires permanent updating;

    - The Routine Inspection is a visual assessment of bridge maintenance needs. When damage detected are considered important, a Main Inspections can be requested;

    - The Main Inspection is a visual assessment of the safety of all bridge components that, according to their importance, allows the inspector to grade the urgency of the bridge intervention with as indicator factor called Condition Rating;

    - The Underwater Main Inspection is a visual assessment of the safety of the underwater bridge components, as well as the river bed.

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4 SUMMARY OF ACTIVITIES

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4 SUMMARY OF ACTIVITIES

    4.1 Patrimony Analysis

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - On December 31, 2011, the system databaseshowed 5.029 bridges surveyed in EPs directmanagement or directly involved in its roadnetwork.

    4.1.1 Distribution, by district, of EP bridges or those directly involved in its roads

    0

    100

    200

    300

    400

    EP Direct Management Interferes with EP roads

    EP Direct Management

    Interferes with EP roads

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - Water Ducts prevails over other types of structures (40%) .

    4.1.2 Distribution of EP bridges, by type (in December 31, 2012)

    8

    399

    150

    1805

    534 509

    984

    9

    159

    0

    250

    500

    750

    1000

    1250

    1500

    1750

    2000

    Outras PassagemAgrcola

    Passagem dePees

    PassagemHidrulica

    PassagemInferior

    PassagemSuperior

    Ponte Tnel Viaduto

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - Theres a predominance of bridges with a length lower than 50m (84%). In this set prevail bridges with a length below 10m (55%).

    4.1.3 Distribution of EP bridges, by length (in December 31, 2012)

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - The predominance of masonry structures is related to the age of the Portuguese road network;

    - The predominance of concrete structures is related to the reduced length of the bridges that are part of EPs patrimony.

    4.1.4 Distribution of EP bridges, by deck material type (in December 31, 2012)

    40%

    34%

    19%

    4% 3% Reiforced Concrete

    Masonry

    Precast/Prestressed Concrete

    Flexible Culverts (ARMCO)

    Steel and Composite Steel andConcrete

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4 SUMMARY OF ACTIVITIES

    4.2 Routine Inspections

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - In each 2 years cycle, a campaign of Routine Inspections is carried out for all EP bridges.

    4.2.1 Multi-year Routine Inspections Plan

    321

    5502

    38

    1575

    3261

    2483 2596

    0

    1000

    2000

    3000

    4000

    5000

    6000

    2006 2007 2008 2009 2010 2011 2012

    1st Cycle 2nd Cycle 3rd Cycle

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - The request of a Main Inspections usually results from an alert situation in a Routine Inspection;- Main Inspections are only carried out when its anticipation is justified;- Following the Main Inspections, a great amount of interventions have been carried out, preventing a more

    severe evolution of detected damage.

    4.2.2 Main Inspections carried out as a result of the Routine Inspections requests

    321

    5502

    38

    1575

    3261

    2483

    17

    907

    2 153295 13617

    2082 46 45 58

    0

    1000

    2000

    3000

    4000

    5000

    6000

    2006 2007 2008 2009 2010 2011

    1st Cycle 2nd Cycle

    Routine Inspections Principal Inspection Requests Confirmed Requests

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4 SUMMARY OF ACTIVITIES

    4.3 Main Inspections

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - Since June 2010, all Main Inspections to ordinary bridges are done by EPs technical staff;- In 2011, the first cycle of 5 years ended, with all EP bridges assessed;- The second cycle of Main Inspections will start in 2012 and will last until 2016. In this period of time, almost

    5.150 bridges will be inspected; - For the planning of this second cycle a great number of new bridges will be added to EPs patrimony duo to the

    incorporation of Grande Lisboa and Douro Litoral concessions.

    4.3.1 Distribution or Main Inspections done by internal and external resources

    349

    8 40 80 65

    387

    900

    1097

    691 734

    0

    544 8 7

    36

    15

    67

    116

    454

    904 847

    0

    200

    400

    600

    800

    1000

    1200

    1400

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    Meios Internos Contratao ExternaInternal Resources Outsourced

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - Main Underwater Inspections are held every 4 years in approximately 150 bridges which foundations are permanently under water;

    - These Inspections are carried out in a 2 years cycle, when and where needed;- To date, an Underwater Inspections Manual is being developed, to increase the technical knowledge about

    the behavior of bridge underwater components.

    4.3.2 Multi-year Main Underwater Inspections Plan

    35

    0

    8 9

    40

    24

    68

    1 0

    85

    0

    40

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    1 ciclo 2 ciclo

    1st Cycle 2nd Cycle

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - At the end of 2009, the percentage of bridges with EC4 and EC5 was 6%. This percentage decreased to avalue of 4,42%, in the end of 2011.

    - At the end of 2011, the percentage of EC3 was 14,75%. It follows that almost 80,83% of bridges are consideredin a Very Good or Good condition.

    4.3.3 Condition Rating of EP Bridges

    0,74%

    26,00%

    54,09%

    14% 3,90% 0,52%

    EC0

    EC1

    EC2

    EC3

    EC4

    EC5

    14,75%

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4 SUMMARY OF ACTIVITIES

    4.4 Interventions in bridges with Condition Ratings of EC4 e EC5

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - The diagram shows the number of bridges with EC4 and EC5 detected in Main Inspections.- It also shows the number of bridges with Solved situations, due to the conclusion of its intervention, or due

    to the fact that they were transferred to other organization or were deactivated.- Per year the diagram shows the number of Bridges with Unsolved situations transfer from the year before.

    4.4.1 Progress in solving EC4 and EC5 detected

    74 73 87 91 92 119 153 158166 188 147 68

    13

    75 7596

    117137

    181

    235

    299

    340

    404421

    216

    274

    353

    408 421

    1 29

    2645

    6282

    141174

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

    Por resolver/acumulado Detectadas/acumuladas Previso de resoluo Resolvidos/acumuladosUnsolved / cumulative Detected / cumulative Solution in hand Solved / cumulative

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - The study combines projects of several bridges located in the same area, with similar damages and identical intervention priority.

    - To date a study on all Foot Bridges is under development. Due to their particular dimension and need of strategic analysis, this study will allow the planning and prioritization of interventions.

    4.4.2 Annual distribution of studies and projects of EP bridges

    721 20 23

    58

    85

    64

    6

    52

    143

    112

    144

    7 21 20 23

    58

    1941

    638

    87

    5565

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    220

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    Obras de arte com projecto EstudosBridges with Project Studies

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    15 8 29 17 21

    3333 48

    37

    89

    149

    159

    23

    7

    3 2

    23

    15 11

    11 16

    812

    8

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

    Reabilitadas Interveno prioritria provisria

    17 2034 29 35

    48

    77

    53

    161

    EC4 e EC5EC4 and EC5

    - Until 2010, over 333 interventions were performed.- Until 2014, over 447 interventions are expected to be performed.- Until 2015, all bridges with EC4 and EC5 are expected to be solved, for most of them are planned to be

    intervene in 2012 and 2013.

    4.4.3 Annual distribution of interventions in EP bridgesRepaired Priority temporary intervention

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    - Until 2007 - Amounts including taxes.

    - Since 2008 - Amounts without taxes, due to EPs new legislative framework;

    - Summarizing, the amounts due to bridge requalification and common conservation have been increasing, due to EPs campaign to preserve its patrimony.

    4.4.4 Absolut Amounts of the Operational Investment

    3,0 3,8 3,5 13,6 16,6 17,9 17,2 33,1 31,6 25,8

    54,0 ( O.A. )

    149,3116,2

    137,5110,2

    77,6 76,7 94,6 87,4 92,3

    65,4

    16,2 ( C.P. )

    22,0 27,4 36,743,1 41,7 55,1 38,2 40,8 39,4

    41,552,0 ( C.C. )

    321,6

    262,1236,6

    338,5

    256,3

    205,4176,3

    127,0

    206,9

    90,1

    37,2 ( Cst. )

    495,9

    409,5 414,3

    505,4

    392,2355,0

    326,4

    288,3

    370,2

    222,8

    159,4 ( T.O. )

    0

    50100

    150

    200250

    300

    350400

    450

    500550

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

    Benef. /Requal.Obras Arte

    Cons. Peridica Cons. Corrente Construo Total OperacionalBridge Repair/ Rehabilitation

    Network Periodic Conservation

    Network Continuous Maintenance

    Construction of new roads and bridges

    TOTAL

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4.4.5 Operational Investment Analysis

    0,6% 0,9% 0,8% 2,7% 4,2% 5,0% 5,2%11,5% 8,5% 11,6%

    33,9%

    Bridge Repair/ Rehabilitation

    Network Periodic Conservation

    Network Continuous Maintenance

    Construction of new roads and bridges

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    5 PLANNING FOR THE FUTURE

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    The future in the Bridge Conservation Management domain:

    Strategic Planning

    Technical Developments

    Management Planning

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Strategic Planning:

    Updating the computer application where the Bridge MaintenanceManagement System is based on, with the aim of: Developing the Inspections Planning; Integrate the evolutional improvements of SGOA; Highlight all the information concerning the Inventory and the Inspections; Access and registration control of changed information; Development of Pivot Tables, to allow the selections of results according to

    the persuade objectives; Flexibility, fitting the management needs of EP; SGOAs integration and interaction with other EPs computer applications,

    such as Gesto Documental, SIG, Planeamento.

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Technical Developments:

    Continue the technical training of Inspectors to introduce skills thatincrease their ability of making a proper assessment of bridges safetyconditions.

    Pursuit the development and improvement of Manuals and the Systemsupport documentation.

    Management Planning:

    Believe in a technical and financial support to keep a cycle of preventiveinterventions (3 to 5 years) progressively decreasing the reactiveinterventions (1 to 2 years).

    Integrated management of the different management systems developed in EPfor other structures, such as SGOA, SGPAV, SGOC.

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    SGOA BALANCE OF AN INSPECTION CYCLE - 2001 / 2011

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012