DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
BALANCE OF AN INSPECTION CYCLE - 2001 / 2011
Lus Ribeiro Freire, Estradas de Portugal
Carlos Santinho Horta, Estradas de Portugal
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
1 - HISTORICAL EVOLUTION
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- 1999 - Extinction of JAE and JAE-SA and the creation of three institutes - IEP, ICORand ICERR;
- 2001 - Collapse of Hintze Ribeiro Bridge;
- 2002 - Merger of IEP, ICOR and ICERR, into a single institute - IEP Instituto das Estradas de Portugal;
- 2003 - Contract of Provision and Implementation of a Bridge Management System.
- 2004 - Conversion of IEP into a public business enterprise, named Estradas de Portugal - E.P.E.
- 2005 - First bridge inventory, assessed approximately in 5 600 structures;- Beginning of PROPIS Program for Underwater Inspections 2005-2009.
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- 2006 - 18 procedures to update the Inventory and to carry out 5.400 Routine Inspections
- 4 procedures to carry out 1.500 Main Inspections- Project aggregations.
- 2007 - EP E.P.E. is converted into a joint-stock company with public funds, namedEstradas de Portugal S.A.
- First complete inventory, assessing the entire EPs patrimony in approximately 5500 bridges;
- First complete assessment of maintenance needs - IR- LNEC gives its assent to SGOAs premises.
- 2008 - Creation of DCM Construction and Maintenance Directorate.- Conclusion of the procedures that began in 2006.- Beginning of the Underwater Inspections campaign to all bridges affected by the
2007/2008 winter.
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- 2009 - Strategic decision to do all SGOA activities with internal resources.- DCM gives formation to COs technical staff about Inventory and Routine
Inspections.- Approval of a Training Program in Main Inspections to over 16 Engineers, in
coordination with the cole Nationale des Ponts en Chausses.
- 2010 - Approval of the 2nd SGOA Manuals Revision, by LNEC;- Main Inspections done by internal resources;
- 2011 - Conclusion of the 1st Cycle of Main Inspections to the whole set of bridges under EPs responsibility, which started in 2006;
- Publicizing of the 1st Procedure to the Service Provision of Complementary Resources of Diagnosis, Testing and Access with Mobile Platforms.
- Implementation of SGOC Retaining Walls Maintenance Management System.
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- 2012 - Conclusion of Underwater Inspections Manual;
- Procedure for an Underwater Inspections Campaign 2012;
- Development of Guides for Bridge Diagnosis;
- Beginning of the 1st Service Provision of Complementary Resources of Diagnosis;
- Inspection campaigns for particular bridges - LNEC;
- Updating the computer application GOA.
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
2 MANAGEMENT MODEL
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
Insp . Subaqu ticas
Insp . de Dano
Insp . Especiais
DCM
INSPEC ES
Insp . RotinaCO s
Insp . Principais
EM BOM
EM MAU
EC 1
EC 2
EC 3
EC 4
EC 5
Trabalhosde
Manuten o
deReparao
Invent rio
COs
Hist rico
SCG Information
OBRACentros
Operacionais
PROJECTODireco de
Projectos
Information Updating
Underwater Insp.
Damage Insp.
Special Insp.
Construction and
Maintenance Directorate
(DCM)
INSPECTIONS
Routine Insp.CO s
Principal Insp.
GOOD
BAD
EC 0
EC 1
EC 2
EC 3
EC 4
EC 5
Maintenance Works
Repair Works
Inventories
COs
Historical Record
INTERVENTIONOperations
Centre (COs)
PROJECT
Projects Directorate
Specific Survey
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- The Conservation Management Model allows all information on bridges to be correctly organized and handled, making it a fundamental instrument for the management of these structures;
- The Bridge Maintenance Management System consists of a series of activities in constant development and improvement;
- The set of activities that belong to the Bridge Maintenance Management System is transversal to the different EP directorates;
- The Conservation Management Model is completely integrated in EPs operations, ensuring the reliability of results.
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
3 BRIDGE MAINTENANCE MANAGEMENT SYSTEM
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
The Bridge Conservation Management System allows a vast knowledge of bridges Conditional Rating through a periodic update of the set of activities that support the system:
- The Bridge Inventory consists of Technical, Administrative and Constitutive data and requires permanent updating;
- The Routine Inspection is a visual assessment of bridge maintenance needs. When damage detected are considered important, a Main Inspections can be requested;
- The Main Inspection is a visual assessment of the safety of all bridge components that, according to their importance, allows the inspector to grade the urgency of the bridge intervention with as indicator factor called Condition Rating;
- The Underwater Main Inspection is a visual assessment of the safety of the underwater bridge components, as well as the river bed.
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4 SUMMARY OF ACTIVITIES
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4 SUMMARY OF ACTIVITIES
4.1 Patrimony Analysis
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- On December 31, 2011, the system databaseshowed 5.029 bridges surveyed in EPs directmanagement or directly involved in its roadnetwork.
4.1.1 Distribution, by district, of EP bridges or those directly involved in its roads
0
100
200
300
400
EP Direct Management Interferes with EP roads
EP Direct Management
Interferes with EP roads
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- Water Ducts prevails over other types of structures (40%) .
4.1.2 Distribution of EP bridges, by type (in December 31, 2012)
8
399
150
1805
534 509
984
9
159
0
250
500
750
1000
1250
1500
1750
2000
Outras PassagemAgrcola
Passagem dePees
PassagemHidrulica
PassagemInferior
PassagemSuperior
Ponte Tnel Viaduto
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- Theres a predominance of bridges with a length lower than 50m (84%). In this set prevail bridges with a length below 10m (55%).
4.1.3 Distribution of EP bridges, by length (in December 31, 2012)
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- The predominance of masonry structures is related to the age of the Portuguese road network;
- The predominance of concrete structures is related to the reduced length of the bridges that are part of EPs patrimony.
4.1.4 Distribution of EP bridges, by deck material type (in December 31, 2012)
40%
34%
19%
4% 3% Reiforced Concrete
Masonry
Precast/Prestressed Concrete
Flexible Culverts (ARMCO)
Steel and Composite Steel andConcrete
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4 SUMMARY OF ACTIVITIES
4.2 Routine Inspections
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- In each 2 years cycle, a campaign of Routine Inspections is carried out for all EP bridges.
4.2.1 Multi-year Routine Inspections Plan
321
5502
38
1575
3261
2483 2596
0
1000
2000
3000
4000
5000
6000
2006 2007 2008 2009 2010 2011 2012
1st Cycle 2nd Cycle 3rd Cycle
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- The request of a Main Inspections usually results from an alert situation in a Routine Inspection;- Main Inspections are only carried out when its anticipation is justified;- Following the Main Inspections, a great amount of interventions have been carried out, preventing a more
severe evolution of detected damage.
4.2.2 Main Inspections carried out as a result of the Routine Inspections requests
321
5502
38
1575
3261
2483
17
907
2 153295 13617
2082 46 45 58
0
1000
2000
3000
4000
5000
6000
2006 2007 2008 2009 2010 2011
1st Cycle 2nd Cycle
Routine Inspections Principal Inspection Requests Confirmed Requests
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4 SUMMARY OF ACTIVITIES
4.3 Main Inspections
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- Since June 2010, all Main Inspections to ordinary bridges are done by EPs technical staff;- In 2011, the first cycle of 5 years ended, with all EP bridges assessed;- The second cycle of Main Inspections will start in 2012 and will last until 2016. In this period of time, almost
5.150 bridges will be inspected; - For the planning of this second cycle a great number of new bridges will be added to EPs patrimony duo to the
incorporation of Grande Lisboa and Douro Litoral concessions.
4.3.1 Distribution or Main Inspections done by internal and external resources
349
8 40 80 65
387
900
1097
691 734
0
544 8 7
36
15
67
116
454
904 847
0
200
400
600
800
1000
1200
1400
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Meios Internos Contratao ExternaInternal Resources Outsourced
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- Main Underwater Inspections are held every 4 years in approximately 150 bridges which foundations are permanently under water;
- These Inspections are carried out in a 2 years cycle, when and where needed;- To date, an Underwater Inspections Manual is being developed, to increase the technical knowledge about
the behavior of bridge underwater components.
4.3.2 Multi-year Main Underwater Inspections Plan
35
0
8 9
40
24
68
1 0
85
0
40
0
10
20
30
40
50
60
70
80
90
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
1 ciclo 2 ciclo
1st Cycle 2nd Cycle
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- At the end of 2009, the percentage of bridges with EC4 and EC5 was 6%. This percentage decreased to avalue of 4,42%, in the end of 2011.
- At the end of 2011, the percentage of EC3 was 14,75%. It follows that almost 80,83% of bridges are consideredin a Very Good or Good condition.
4.3.3 Condition Rating of EP Bridges
0,74%
26,00%
54,09%
14% 3,90% 0,52%
EC0
EC1
EC2
EC3
EC4
EC5
14,75%
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4 SUMMARY OF ACTIVITIES
4.4 Interventions in bridges with Condition Ratings of EC4 e EC5
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- The diagram shows the number of bridges with EC4 and EC5 detected in Main Inspections.- It also shows the number of bridges with Solved situations, due to the conclusion of its intervention, or due
to the fact that they were transferred to other organization or were deactivated.- Per year the diagram shows the number of Bridges with Unsolved situations transfer from the year before.
4.4.1 Progress in solving EC4 and EC5 detected
74 73 87 91 92 119 153 158166 188 147 68
13
75 7596
117137
181
235
299
340
404421
216
274
353
408 421
1 29
2645
6282
141174
0
50
100
150
200
250
300
350
400
450
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Por resolver/acumulado Detectadas/acumuladas Previso de resoluo Resolvidos/acumuladosUnsolved / cumulative Detected / cumulative Solution in hand Solved / cumulative
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- The study combines projects of several bridges located in the same area, with similar damages and identical intervention priority.
- To date a study on all Foot Bridges is under development. Due to their particular dimension and need of strategic analysis, this study will allow the planning and prioritization of interventions.
4.4.2 Annual distribution of studies and projects of EP bridges
721 20 23
58
85
64
6
52
143
112
144
7 21 20 23
58
1941
638
87
5565
0
20
40
60
80
100
120
140
160
180
200
220
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Obras de arte com projecto EstudosBridges with Project Studies
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
15 8 29 17 21
3333 48
37
89
149
159
23
7
3 2
23
15 11
11 16
812
8
0
20
40
60
80
100
120
140
160
180
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Reabilitadas Interveno prioritria provisria
17 2034 29 35
48
77
53
161
EC4 e EC5EC4 and EC5
- Until 2010, over 333 interventions were performed.- Until 2014, over 447 interventions are expected to be performed.- Until 2015, all bridges with EC4 and EC5 are expected to be solved, for most of them are planned to be
intervene in 2012 and 2013.
4.4.3 Annual distribution of interventions in EP bridgesRepaired Priority temporary intervention
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
- Until 2007 - Amounts including taxes.
- Since 2008 - Amounts without taxes, due to EPs new legislative framework;
- Summarizing, the amounts due to bridge requalification and common conservation have been increasing, due to EPs campaign to preserve its patrimony.
4.4.4 Absolut Amounts of the Operational Investment
3,0 3,8 3,5 13,6 16,6 17,9 17,2 33,1 31,6 25,8
54,0 ( O.A. )
149,3116,2
137,5110,2
77,6 76,7 94,6 87,4 92,3
65,4
16,2 ( C.P. )
22,0 27,4 36,743,1 41,7 55,1 38,2 40,8 39,4
41,552,0 ( C.C. )
321,6
262,1236,6
338,5
256,3
205,4176,3
127,0
206,9
90,1
37,2 ( Cst. )
495,9
409,5 414,3
505,4
392,2355,0
326,4
288,3
370,2
222,8
159,4 ( T.O. )
0
50100
150
200250
300
350400
450
500550
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Benef. /Requal.Obras Arte
Cons. Peridica Cons. Corrente Construo Total OperacionalBridge Repair/ Rehabilitation
Network Periodic Conservation
Network Continuous Maintenance
Construction of new roads and bridges
TOTAL
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
4.4.5 Operational Investment Analysis
0,6% 0,9% 0,8% 2,7% 4,2% 5,0% 5,2%11,5% 8,5% 11,6%
33,9%
Bridge Repair/ Rehabilitation
Network Periodic Conservation
Network Continuous Maintenance
Construction of new roads and bridges
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
5 PLANNING FOR THE FUTURE
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
The future in the Bridge Conservation Management domain:
Strategic Planning
Technical Developments
Management Planning
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
Strategic Planning:
Updating the computer application where the Bridge MaintenanceManagement System is based on, with the aim of: Developing the Inspections Planning; Integrate the evolutional improvements of SGOA; Highlight all the information concerning the Inventory and the Inspections; Access and registration control of changed information; Development of Pivot Tables, to allow the selections of results according to
the persuade objectives; Flexibility, fitting the management needs of EP; SGOAs integration and interaction with other EPs computer applications,
such as Gesto Documental, SIG, Planeamento.
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
Technical Developments:
Continue the technical training of Inspectors to introduce skills thatincrease their ability of making a proper assessment of bridges safetyconditions.
Pursuit the development and improvement of Manuals and the Systemsupport documentation.
Management Planning:
Believe in a technical and financial support to keep a cycle of preventiveinterventions (3 to 5 years) progressively decreasing the reactiveinterventions (1 to 2 years).
Integrated management of the different management systems developed in EPfor other structures, such as SGOA, SGPAV, SGOC.
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12
DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012
SGOA BALANCE OF AN INSPECTION CYCLE - 2001 / 2011
ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012
LNEC
ICD
S12