;;:~011 moulton parkway, suite i I 0, l..::JOIJn::i t'11lls, 1;ol1lnrn1;:i ~J:?f)b:.~
(714 i l I0-80<'8
CITY OF SIGNAL HILL 2175 Cherry Avenue
December 1, 1983
Signal Hill, California 90806
d. a. evans inc. P.nqmeering and geological
consultants in applied earth sciences
Our Job 78-34-51
Attention: Ms. Christine A. Shingleton, Director Planning & Community Development ·
Subject: Review of Report - Compliance with AlquistPriolo Special Studies Zone Act, Proposed Motel Development at 3555 East Pacific Coast Highway
Report Reviewed: "l;eology/Seismicity Investigation Site of Proposed Queen City Motel .... ", dated November 7, 1983, by "The Geologic Outfit"
Gentlemen:
This letter su1nrnarizes the results of our review of
the above referenced letter-report. The purpose of our review
was to determine whether or not the report provides compliance
with Section 2623 of the Alquist-Priolo Special Studies Zone
Act, and was authorized under the general agreement between our
firm and the City.
It is our opinion that the report/do;~-"'~ot satisfy the _,----··~····'-"""'"''"'
requirements of the Act and should not be approved by the City
for that purpose. Specifically, the report conclusion as to the
presence of faulting is not based on subsurface exploration
which permits direct observation of the area where faulting
could occur.
•
CITY OF SIGNAL HILL December 1, 1983 Page Two Our Job 78-34-~l
CENERAL COMMENTS
DAE/se
1. Until the rcsul ts of our studies of the implica-
tions of the Act on your City and its development
policies have heen approved, we recommend that,
unless specifically waived, the City insist on sub-
surface exploration (i.e., trenches) to determine
the presence or absence of faulting on a particular
site. Our studies have tentatively produced a
method of safely eliminating some of this explora-
tion and that method is being implemented in our
reviews.
2. Although the Act deals with the prevention of
ground rupture on the property, the hazards due to
ground shaking are inter-related and cannot be
ignored. We recommend that you (a) assure yourself
that any ground shaking criteria provided by the
consulting geologist is incorporated into the
structure de<;ign by the developer, (b) that the
reports by the geologist and consulting soil engi
neer are coordinated, and (c) the consultants
involved approve the final plans for development.
Respectfully submitted,
~vi}~ Dennis A. EvanrSoil Engineer RCE 14450 CEG 19
Three copies submitted
"'(I / G 'f-U
PRELIMINARY REPORT
SOIL AND GEOLOGY/SEISMICITY INVESTIGATIONS
Proposed Queen City Motel Expansion (J'.B'"t1 · M!st -Reser·¥Ofr Drive}
,,71 Signal Hill, California
'-- 355S e. P..c.Hw1. (.M,fer)
for
Li & Associates 716 Monterey Pass Road
Monterey Park, California 91754
Johnny Chung-ning Li Architect
Project HA-1413-3
November 11, 1983
NOV 151983 Clll OF. SIGNAL HILL
4 00.00'>li ~
< ,
•
8511 WCLLSFORD PLACE
November 11, 1983 HA-1413-3
Li & Associates
HlJ J\SSOCIATES
SUITE F SANTA FE SPRINGS, CALIFORNIA 90670
716 Monterey Pass Road Monterey Park, California 91754
Attention: Mr. Johnny Li
TELEPHONE (213) 695-6062
SUBJECT: PRELIMJ:NAR'i SOIL AND GEOIDGY/SEISMJ:CIT'l INVESTIGATIONS Queen City Motel Expansion 1811 West Reservoir Drive Signal Hill, California
Gentlemen:
Pursuant to your request, we have conducted a soil and geology/ seismicity investigation for the proposed motel complex to be located at 1811 West Reservoir Drive, Signal Hill, California.
According to the State of California Special Studies Zone Maps, the subject property is within an area suspected to be underlain by traces of an active earthquake fault. In order to determine whether a trace of a fault is present at the area of the proposed construction, a geology/seismicity investigation of the site was made by our consultant, Nr. Ray A. Eastman. A report of his findings and conclusions are attached as a part of this report.
Based on the findings and observations of this investigation, it is concluded that the proposed development of the subject property for the intended use is feasible from the geotechnical engineering viewpoint, provided the specific recommendations set forth herein are followed. The proposed structure may be supported by conventional spread footings resting on undisturbed natural soils.
The accompanying report presents relevant conclusions and recommendations for preliminary planning and foundation designs.
We thank you for entrusting us to undertake this investigation and look forward to future associations. If any q~estions arise concerning the interpretation of the report, please do not hesitate to call.
Very truly yours, HU SSOCIATES
President
REH/hh
.· ~ ·-
..
Geology/Seismicity Investigation Site of Proposed ~en City futel
Nortm.estern Corner of Pacific Coast Highway and Reservoir Di::ive West
Signal Hill, California
Client:
Hu Associates 8511 Wellsford Place
Santa Fe Springs, California 90670
November 7, 1983
PROJECT NO. : 132
•• Tlit Gtologic Outfit "
RAY A. EASTMAN ENG1NEEMING GEOLOGl!)l
,, "The Geologic Outfit"
Dr. Richard Hu th.I Associates 9511 Wellsford Place
RAY A. EASTMAN ENGINEERING QIOLOQIST .
19875 MARINO PLAZA YORBA LINDA, CALtrOANIA 92888
(714) 970·9248
NcNember 7, 1983
Santa Fe Springs, California 90670
Subject: Geology/Seismicity lnvestigation Site of Proposed Qleen City Motel Northwestern Cornei: of Pacific Coast Highway and Reservoir Drive West Signal Hill, California
Dear Dr. Hu;
Project 132 Page 1
Pursuant to your request, we are pleased to submit herein a report on the findings of our geology/seismicicy investigation for the subject site. As yoo know, this study was done conCUJ:rently with the geotechnical investigation.
It is understood that proposed constn1Ction calls for a Oio story, wood frame building with slab on grade floors at the lower level.
The subject investigation encompassed the following elements: a) determination of the geological setting, b) determination of !mown active and potentially active fault locations pertinent to the site, c) evaluation of probable earthquake activity related to these active and potentially active faults during the next 100 years, and d) conclusions with respect to the geology/seismicity conditions at the site and proposed development.
Integral phases of the study included: a) review of available geology and seismicity data, b) field geological examination of the site, c) subsurface examinaticn by means of three exploratory borings taken to depths of 41 feet, d) geological logging and soil sampling of the materials encountered at the boring locations, and e) geological analysis. /
Test boring data plotted on to a geologic section were used in lieu of trenches for the first phase of the site fault line investigation. The geologic data plotted very uniformly and continuous, and, accordingly, trenching was not considered necessary.
•• Project 132
Page 2
Finally, substantiating data for the report are contained in the attachments which are as follows: a) Selected References, b) Plot Plan, c) Geologic Section, d) Geology Map, e) Regional Geology Map, f) Oil Well Map, g) Oil Well Section, h) Fault and Earthquake Map, i) Epicenter Map and j) Boring 1Dgs.
The site encompasses flank of Signal Hill. about 135 feet.
GFDUX:lCAL SEITING
approximately 1 /2 acre of vacant land on the southerly Its topography is relatively level at an elevation of
Geology of significance is encompassed by a shallow Terrace deposit, the San Pedro formation and underlying older sedimentary formations. The Terrace deposit covers the site to depths of about six feet and consists mainly of moderately dense, brown silty fine sands. The San Pedro formation extends to depths of about 280 feet and may be divided into two main parts: the upper one third consists mainly of interbedded sections at 2 to 8 feet each of dense, gray and tan, silty fine sands, fine sands, silts and fine sandy clays; the looer two thirds consists mainly of dense sands and gravel with relatively minor interbeds of silts and clays. In tum, the older sedimentary rocks then extend dO\O!lWard to the basement rocks at depths of sO!De 12, 000 feet.
The geologic age of the Terrace deposit is very late Pleistocene and of the San Pedro Formation early Pleistocene.
Groundwater was not encountered in the borings drilled to 41 feet; a lack of groundwater was not unexpected since the basin water table is situated at a depth of some 200 feet at the site area.
Structural geology of significance is encompassed by the relatively nearby Newport-Inglewood fault system and the more distant Palos Verde, Whittier/Elsinore, Santa Monica/Sierra Madre, and San Jacinto/San And7eas systems. These fault systems are located with respect to the site as denoted in Table I.
' .
TABLE I
FAULT SYSIEMS PERTINENT 'ID SITE
Fault System
Newport - Inglewod - tbrtheast Flank Branch - Cherey Hill Branch - Reservoir Hill Branch Palos Verde Whittier/Elsinore Santa 11'.lnica/Sierra Madre San Jacinto/San Andreas
U:lcation to Site
300 feet to northeast 2000 feet to west 2200 feet to east 8 miles to southwest 18 miles to northeast 24 miles to north SO miles to northeast
Project 132 Page 3
wcations·of the nearby Northeast Flank and Cherry Hill are branch faults based upon near vertical projections from depth as depicted by oil well data. Also, in any case, the exploratory boring and geologic section data for this report show good continuity and there are no indications of fault line displacE!IOC'Ilt within the site to the depths explored.
Further perspectives of the geological setting are, of course, also shown en the accompanying geologic maps and sections.
FAULTS AND F.ARI'HQuAf<E ACTIVITY
A two-fold classification has been adopted for fault activity: namely,
(1) An active fault is one along which there has been surface displacement within the last 10,000 years (Holocene Time) and
/ (2) a potentially active fault is one which exhibits evidence of
surface displacement within the last 2 million years (Quaternary Time); an exception is made for faults which are determined by direct evidence to have become inactive before 10,000 years ago.
Project 132 Page 4
These active and potentially active faults are the rnes along which earthquake activity affecting present-day construction is considered most likely to occur. It is not possible to state with certainty, however, that activity will not occur aloog other faults in the future.
The fault systems denoted in Table l are crnsidered to be active as based upon geological evidence of displacement during Holocene Time and/or earthquake
, activity during historic time except for the Palos Verde which is potentially active. The earthquake activity associated with these systems is further illustrated by the Fault and F.arthqua.ke Map and the data in Table 11.
TABLE 11
MAXIMl.M CREDIBLE AND PROBABLE EARTI!QUAl<E PAAAMETERS
Fault System Maxi.mum
Credible Magn.itude(l)
Newport-Inglewood 7. 0 (inclusive of the branch faults) Palos Verde 7.0
Whittier/Elsinore 7.5
Santa »:mica/Sierra l'1adre 7. 5
San Jacinto/San Andreas 8.25
Maxi.mum Probable Map;nitude(2)
6.5
6.0
6.5
6.5
7.5
(1) The maximum credible earthquake for a particular fault is the largest magnitude event that appears capable of occurring under the presently know tectonic framework.
(2) The maximum probable earthquake is to occur during a 100 year interval. occurrence, not as an assured event time.
the maximum earthquake likely lt is regarded as a probable
that will occur at a specific
Project 132 Page 5
The site is located within and between branches of the active Newport-Ingl~ fault system. It is also included within a Fault Hazards Study Zone as mapped by the California Division of Mines and Geology. Nonetheless, geologic data related to this investigation do not indicate the presence of a fault line located within the site to depths of at least 41 feet
- as explored by the test borings. Accordingly, no active or potentially active faults are known to be present directly within the site.
It is considered probable,however, that the site will experience ground shaking from earthquake activity associated with the aforementioned active or potentially active fault systema. The anticipated earthquake activity has been denoted earlier in Table 11 and the related, anticipated, ground shaking is denoted below in Tables Ill and IV.
TABLE 111
ANTICIPATED HORIZOOI'AL GROUND MJTION PARAMEI'ERS
FOR MAXIMUM CREDIBLE F.ARTHQUAKES
Ground Motion Parameters Significant Fault System Peak Acceleration (g) 653 of Peak (g) Duration, seconds
Newport-lnglewJO<i -44 .29 28-
Palos Verde .38 .25 26
Vlhittier/Elsinore .28 • 18 26
Santa M:inica/Sierra Madre .23 .15 26
San Jacinto/San Andreas • 14 .09 16
/
. .
TABLE lV
Project 132 Page 6
ANTIClPATED HORIZONTAL GROUND t-DTION P~
FOR MAXIMUM PRDBABIE ~
Gr01.Dd l'btion Parameters , Fault System Peak Acceleration (g) 65% of Peak (g)
Newport-Inglewood .40 .26
Palos Verde .25 .16
Whittier/Elsinore .18 .12
Santa MJnica/Sierra Madre .14 .09
San Jacinto/San Andreas .10 .06
Significant i)Jration, seconds
22
12
16
12
14
The depth to groundwater and the dense nature of the San Pedro formation both preclude any significance to soils liquefaction.
CONCLUSIONS
Proposed development at the site is considered feasible from a geological standpoint, in spite of the adjacent branch faults of the Newport-Inglewood system, provided that the following considerations are adhered td:
1) Fault Lines - the Northeast Flank branch fault is situated at approximately 300 feet to the northeast and the Cherry Hill branch fault is situated at approximately 2000 feet to the west. These branches are part of an active fault system. Aside from these branches, however, no geological evidence was found to indicate the presence of other fault lines directly within the site. Accordingly, the proposed construction appears to have a suitable distance from the nearest known fault line.
2) Ground Accelerations - a value of 65% of the probable peak value is considered to be a practical value for use in tentative design of one and two story wood frame structures and, on this basis a postulated value of 0.26g may be adopted for use.
Project 132 Page 7
3) Site Period - as an alternative, the site period is estimated as 1.2 seconds.
4) Foundation Criteria - the requirements of the geotechnical report should be adhered to for proper design and construction.
We trust this report will meet with your needs at this time. Hmrev'er, please , feel free to contact us if you have any questions.
Respectfully submitted,
~::[ ~__z;o:. --CF.G 423
dmj
Attachments
1 copy submitted
/
SELECI'ED REFERFNCES
Project 132 Page 8
Albee, A.L., and Smith, J.L., 1966, Earthquake Characteristics and Fault Activity in Southern California; Engineering Geology in Southern California: Association of Engineering Geologists.
Bolt, B.A., et. al., 1975, Geological Hazards, Springer-Verlag, New York.
Bookman-Edmons ton Engineering, Inc., 1979, Report on Ground Water Replenishma:!t, Central and West Basin Water Replenishment District.
California Department of Water Resources, 1961, Groundwater Basins of the Coastal Plain of T..os Angeles County: Bulletin 104, Appendix A.
California Division of Mines and Geology, 1977, Special Fault Hazard Study Zones •
.,,....~-,-----:-:----::----:-:--:---::"O'"':---' 1974, Review of Newport-Ingl~ Structural Zone: Special Report 114.
, 1974, Maximum Credible Rock ~~----,,.-------~------~ Acceleration from Earthquakes in California: Map Sheet 23.
Seed, H.B., and Idress, I.M., 1982, Ground Motions and Soil Liquefaction During Earthquakes: Earthquake Engineering Research Institute, Berkeley.
Seed, H.B., et,- al., 1975, Relationships Between Maxi= Acceleration, Maximum Velocity, Distance From Source and lncal Site Conditions for l!'bderately Strong Earthquakes: Earthquake Engineering Research Center, University of California.
U.S. Geological Survey, 1965, Geology of the Ins Angeles Basin, California: Professional Paper 420-A •
.,,....---::----,,--.,.-.,,....----,---c---~-· 1956, Groundwater Geology of the Coastal Zone Inng Beach-Santa Ana Area: Water-Supply Paper 1109.
\ t\
\ \ . \
:\:.J ~ ... "\
~" Hn fernando
Qa Quatern1r1 Deposits
Santa Ana
+
Ts TertiarJ SedimenhrJ Rocks
Mb Basement Rocks
' Active fault System
lin - 15mi
.. The Geologic Outfit ''
REGIONAL
RAY A. EASTMAN ENGINEERING GEOLOGIST
GEOLOGY MAP
192.
0 i-5.9
• 7- 7.t
Q1-1.s
11901
Sinh Barbara 19251
M11nltd• (Richter scale), Euthquahs •f m11nitude I ud ner since 1152
Adht hull system
"" ' ~ 1946·
'
"' r;t;47
El Centro lln-7Sml
San Dieco -
FAULT & EARTHQUAKE MAP
" Tht Gtologlt 011.iflt "
RAY A. EASTMAN ENGINEERING GEOi,OG1ST
i\J
Ref:
l.933 to 1974
fPICfNTE~ ~YHl!CilS ""' ~ . 1::=.s *. ..
" . ,..
• " • •
.. ·a.~:-:~ : .. , •• ,. ....... 'I~· ~· .. CHANNEi,. A .A I . • . . - t1 .
\, ,. I• h ' 11 /Mil L_...
• ,• • ~ • • • • •
x ,,. •, • .. .
• •
lilD'"'
Cal.ifornia Institute of Technology
" Tlr.t Gtologfr 011.(/it "
RAY A EASTMAN ENGINEERING GEOl.OOIST
· .
•X ,., 111~ z, .. ~. *'" ••
~··
• .. • •
Isl TE
'
.· •
•
,,.
EPICENTER MAP
r
\
EXPLANATtON
G Altu..,,·i.a1 and coastal d-eposlts
Sa Jtd~ fJ ra :i..•ie!, a n.d siH in .ttrea m. c.h a nn.t ~ a l'l.d bl"'1'C.tath rlood pla.iPU; :!ldt, i:::1ay, 111.ui, :1n..d gravel along -a n.d n far ~oal'f. C oars.er otl-tmot""1!.:f-.I h ig hlJI perill'ceab!~ to \.1.-'Cl-ter
UNCONFOF?MITY
G T-errace cover
Rt'ddish-brown lla.nd, no-r.fossiliferoi1~ a.nd p-roba b 1:v ra. rge lli' co-"' tine7t ta I
Palos Verdes sand Sand a1'!d .romi!' pe-bble "r.a.:i..-til; fos~ilif··roa~
-ailtd marinit; modt>ro.te1y ;perm.f'o.C.i.t :::i.id
large (g -l.bo i..·t \t:a-t-er ~able ; CT-D pB i;H .. ~ -0 nly lo ca Uv at .tdq-t• of me.tcu
U nnarned deposits Si1t, :taruI, and grrl1·.tl; m:oditrat.el)" fo 1;Cghtly
p.t'Tn'I ea bl e io u:a te,..; inJ e rr.td ta- crop out only locally at edg.f-& of m.-f"Ba.Ji ·
LOCAL UNCONFORMITY
B San Pedro f.armatiCl'n
Sand. gr-aul!'l, .1i1t, and cla.y; inc::lud-t.11 Timms Poin.t 9tlc and l..cnn ita. marl members at bas.f. T kick bod it's of Band and gra.i:tl Jlifld u:c;ter c->pioll.ely to ma1iy- -ztcfU.a
UNCONFORMITY
Consolidated rocks, undivided Include P-tco an.cl R.£.peltfJ f.orma~iam. Sh.alt.T
•iUsto?U, a.nd saJtds-to11:e; wa~i!'r-b-ta.r'".7tg pr<Jputie.1 dot:!lcribed in text
u D
Fault U upthroun1. Jidt.; 0, da-w11~hr.oicn. .eid~
--?--Trace -of p roba. ble fa.ult
1
)
"' < z a: uJ ,_ c(
• :::> 0
1In•1/z ml
GROUND-WATER GEOLOGY OF THE COASTAL ZONE, · WNG BEACH-S.'Jl.'TA.AN'A AREA. CALIFORNIA
GEOLOGICAL SURVEY WATER'-SUPPLY. PAPER 1109
' I
~I/
/
" Tht: Gt:ologlc Ouifit "
. . •
;
BASS, g 01£DfUlE 0 Jl•ftttY CiOODNIGHT
·~ir.IUl1' 1 I "Ntll I:;. tiOOL1H.N,1~T•4
? {" ... --... ..,
fl 0~ EL h:)O
~
'"i
' .
... _ ....
... VI
v
-
·~· --..,. -
CROSS SECTION 1-J
LONG B..EAC.H .... .OLL EIELO __ LO$ ANG(L£i COUNT"f', CALl,:-OftNIA
s c: .... 4.- ( ---=·r.. • z ·= ·y ,. u111•111~11,....
POii LOt:illlllllll tU f'Ylf[ ~I
1"11' ... i& l -~rllli'"MI...,...,..,
I I I
\
_:----·
-"" LONG BEACH OIL FIELD LOS ANGELES COUNTY, CAUFORNlA
!tt(l'illNG
CONTOURS ON TOP OF THE BROWN ZONE ACCOMPA."'ilY1 NG A E:PORT E1Y W L c NG-FU.Ml
OIVISION OF OIL t. GAS f E K.6$.J No!~ S'TATE: C9L I'.. Ci.AS 'SUPE.R'\l'l SO-It
''"" ·-~~=-~~~-==~~-~~~~,_.,;,:::: ll'OO 1)00"
IV"«Ol;!ll• ,. ••
(161'1.llril 'SE.& L.t'IEl. CONfCIJllll ;rfft;;iw.;. - uJQ FE£f
uo• .. • -OO"C'tl - ,... tG.I -~-Qt\,_ • 0..1-00L. • .....,oci.u-.-• ll'llf(.11~ • ITU(;;ptAl.J.,..,,.,....,.. •/'111'
_.__ CllOI..~ -t:u.:!o .,.... tU:Cnt...:: o-=""'''~ <:#' -loo.. ii- :OU UI ,-~-d.. l.DG-1- ~ '''-' ...,.,. ""I SU .JtoO._ -DI' ~ -1. ~ _,. ,......:;:,~LU DO!. P'fi:D JUI'
•
NOT!'• TH! 0.il.TA. PRESE!llTEll ON fl-il'g LDO 1:3 .2, Sl~PUFICAflON 01' ACTUAL., SliBSU~FACf. CONO~ flQN:! fN(:l)JNTF,RE;D ANO APPL.1!.! ONLY' Af 1'Hf! L!JC.~TlON Of1 THIS &Ol11NG AfiO n-IE DATE 01!' ORll.,.LINO. IT IS N01' ~~R~~NrrD ro alf: f;IEPRES.EITTAT1VE Of'- ~&SURFACE CONOI ftONS f!i."( Ol'HE" LOC~f10N$ 4.ND TlflillE3..
BORING NO. 1
" "' _, OE~TH o.
'" " FEET ;:\
5
10
15
20
25
30
l 112 9.3 0.39 0.21
4 119 9.6 l.06 0.42
2 118 10.7 0.71 0.70
2 107 13.4 0.93 1.05
3 103 7 .1 l. 21 1. 54
3 94 8. 7 1.64 2.03
3 95 6.9 2.Ql 2.52
4 96 8.2
continued
LOG OF BORING
DAfE ORIU.fil• 10-20-83
DRILLING EQUIPMENT• 18" dia. Bucket Auger 2200 lbs @ 12 inches drop
OAIVlllG WEIGHT• 1600 lbs below 20. feet \I/ATER DEPTH'
ELEVATIO'l •
not encountered rot determined
very firn;i to fire, silty brown rroist rrod a
fine, silty brown ccrrq;>
very fine to fire, v.silt lt.br
sl. canent:ed
fine, silty
fine, very silty lt.br
------------'i tan fire, sl. silty
fine, silty
fine, sl. silty
fine, clean
dk.gr
gray
lt.gr.
very fine to fine, clean ~~~1-«'"""'-"·--
very fine, clean
very fine to fine,
sl. silty
verv fine, clean
very fine to fine, clean
· lt.gr. sl. ist
lt.gr.
lt.gr. white
lt.gr.
green
./
Propose:l Queen City Motel Expansion 1811 l'1est Reservoir Drive Signal Hill, California
HU ASSOC I ATES Geotl!Chn-col cng1Mem•q CJflsu//anlS PROJECT No. HA-1413-3 PLATE A-1
NOT!' l'M! CATA. PRESENTEO Ott T'l11'! LOG 1$ A Sh\IPUfl"tCATICff 0, ~Tl.JAL. Sl.JB'.SUFtf=.-CE. CONDI fl0N3 fNCOIJNTe'.ReO ANO APl>LIES 0~1,.1 AT TH£ l..O(,\TIQN Ofl THl3 soi:,i1114G ANO Tl-IE: DAT! OF CRIU ... ING. IT IS. NCT "NAFtFt~NiEO TO Bl:. ~C.PRE!iENT°'iTl\IE ,')F ~ssui:iFAC! (:0NDIT!ON3 Ar l"ll"H!.lt ~C4'f'ION, .\ND TIM!.S.
BORING NO. 1 cont'd
~
" , OE:jJH 'j FEET ii\
OAT( uRILLED, 10-20-83
DRILLING EQUIPMENT; 18" dia. Bucket Auger ORIWlG WE:IGHT; 2200 lbs @ 12 inches drop
1600 lbs below 20' feet WATER DEPTH'
E:LEVATIDN '
not encountered mt dete:cmi.ned
very fine to fine, occa. a:iarse grains
lt.gr. tan
very fine, clean lt.crr.
sl. CO!!p IlDist
40_._..._~~~-+~~1--~ ... ~~~~~~~~~~~~~.µ.lt~.~b=r~.1---~---l~~-t End of Boring @ 40.0'
LOG OF BORING
HU ASSOC I ATES Geotecon,cat cnq1nee"nq CJ>s•lloMs
Prop:ised Queen City Motel Expansion 1811 ~:est Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-2
•
NQf£.1 "flil!i OAT4 PRESENTED ON TH1g LOG IS 4. SIMPl.Jpf1CArlON' Qlll' ~fUAL ~ijSl,lRF-.C'E; CON01110111S E'.NCOIJNiTE;RED O.NO A.PP1.,.!E3 ONl.T A.T fHE UX.ATION ~ \HIS. BOi:itNG ANO "'4E ~i! OF ORILU,..0. IT 1$ l"OT •IJAFU~~NIEO TO eE F:IEPRESENT~ll\I'! OF ~BSUR:~ll.C!. CONDITIONS. Ar {°lrHf.R LOC~r10111s 4ND r1~£.S,
DATE DRILLED,
BORING
l0-20-83
NO. 2
~
"' "
DRILLING EQUIPMHff' 18" dia. Bucket Auger 2200 lbs @ 12 inches drop
DRIVl~IG WEIGHT' 1600 lbs below 20. feet
O!::jJH ~ fe'.£T ;I
WATER DEPTH•
oLEVATION •
not encountered not determined
3 117 7.3 0.72 0.21
4 122 9.6 1. 78 0.42 5
10 2 108 12.6 0.93 1.05
15 3 106 5.1 1.22 1.54
20 3 97 6.1 1. 70 2.03
25 4 97 6.4 2.10 2.52
30 - 4 110 0.4
very ine to fine, SJ. ty hr.gr. moist i:.m::.:•c::;;;;;;,._.
oonp
fine, very silty sl. cemented ----very fine to fine, silty sl. cemented
fine,- silty
fine, very silty
fine, silty
fine, clean
very fine to fine, clean
very fine, clean
lt.br.
lt.br. tan
lt.gr.
t.gr. sl. an !l'Oist
very fine to fine, sl.silt lt.gr.
vecy fine, clean
very fine, sl. silty silty sand lenses
very fine to fine, clean --~S<.lolo~
very fine, clean ·
5 very fine to fine, clean 35-&.;:....J.~9~6_,J~9~.l::....1._~.1-..-........ _~---~~-----__, ..... _..__ ....... __ _. continued
LOG OF BORING P:rop:.ised Queen City Motel Expansion
1811 tlest Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-3
.NOTI!• n-1!: CATA PRESENTED ON fHl5 LOG I'S a, SIMPUFICAflOlll OF ~TUAL S\JBS~ra.Cf CO!llOlflON' ENCOtJlllTEFIED ANO APF'LIES O~LY A,f fHE l,,OC.ATION OF THl3 901i1H\IG ANO rl-IE OAfE OF OFllLLifllG. IT 14} NOf 'MAFl"l~N"fEO ro Elf lilEPRESENTAT!'IJE OF $..JBSU~F~CE CONOI rlONS Ar orl-IEA LOC•flONS ANO Tl~Eg_
BORING NO. 2 cont'd
" ... , OEPTH 11.
'" " FEET ;\
SAND
DATE ORILIJODo 10-20-83
ORILLING roulPMENT• 18" dia.; llcuket Auger
DalVl/IG we10HT0 2200 lbs @ 12 in::hes drop " ~ ~ 1600 lbs below 20' feet
WATER DEPTH'
ELEVATION'
rot en::ountered oot detennined
very fine to fine,....!=~~....µ.oi;L. . ....j vecy fine to fine, sl. silty ---ve:r.y fine, clean
s . carp m:iist
3 96 9.5 very fine, sl. silt 40---.;; .... ..;;.;:~i-;;..;.;.i~~+-~-i-~~~....;.,;:;;..:ii...,;;.;;;,;,;~;.;:.;....:;.;;;.;;.;;"'-~-fol.i..o"""'"-l-~~i--~-f
End of Eoring @ 40.0'
LOG OF BORING Proposed Queen City Motel Expansion
1811 West Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-4
NOT!• ~ 0,6.rA PRESENTE:D ON rHI~ LLl<l l'j 4 $lMFll..IFIC4,fl0N 01' A(:TlJAI.. 5l..B5ufi'F.G.CE C0!'40lr10N~ t.Nc:otJNTE;FIE;l;J JI.NO APPLIE3 ONLY "'r fH! UX.""TION OF THIS eo~1NG Al'tO n-IE; EJAif 01' OFlll..,LiN<l. IT IS: NOf W4i.Fll:'f~1'ED l'O lilf: REPRESEffTAT!'J~ Ofl ';i.JSSURFllCI! CONOlflONS A"t' 01'1-IE:R LOC~TICINS ANa Tlil!Eg.
OATIO uRILl.£0·
BORING NO. 3
10-20-83
DRILL.ING EQUIPMENT' 18" dia. Bucket Auger
0£~TH ,. FE"!T
0Rlv1r~ WEIGHTo 2200 lbs @ 12 inches drop ~ 1600 lbs below 20' feet
WATER DEPTH'
ELEVATION'
not encountere:l rot determined
SAND very fine to fine, silt brown ll'Oist m.
l ll3 9.4 0.46 0.21
3 llB 9.7 0.80 0.42 5
2 117 ll.O l.04 0.70
10 4 110 16.B l.60 l.05
15 3 104 10.0 l.23 l.54
20 3 98 7. 7 1. 79 2. 03
25 5 95 6.9 2.00 2.52
30 3 99 8.3
gray
very fine to fine, brown v. silty, sl.' :cemented
fine, very silty lt.br.
fine, silty
very fim, silty
very fine to fine, lt.br very sil.,..ty ...... _______ tan
fine, sl. silty
very fine to fine, clean
lt.br. yellow
very fine to fine, clean lt.br. sl. ____ ---- -----tlt.gr. moist very fine, clean
very fine to fine, sl. silty
tan lt.br. lt.gr.
very fine, sl. silty yellow ---- ---- -----1lt.br.
very fine to fine, clean very fine, clean
very fine, sl. silty very hne, crean _:...__..+,;.,.
very fine, sl. silty lt.gr. tan
35 _._~5 ...... ~9~7_..~9~ ....... ~~'----'--~~-~~~~~~~~-...... ~---~--'--~~ continued
LOG OF BORING Prop::>lled Queen City M:>tel Expansion
1811 West P.eservoir Driive Signal Hill, California
PROJECT Na. HA-1413-3 PLATE A-5
NOT! 1 nil: DAT4 ~15SENT~0 ON ~IS LOO 1-g. ll. SIMPUFICA1'10N 011" ACTUAL SllBSURf"illtt CONDI rlON::ii ~COIJNT~R'ED ANO APP\.1E~ ONLY At' f\4E LOCATION Oii" THIS. BOl=l't~G ANO n-1! OAft! 0,. ORll.l.INO. IT IS NOi Wl\llFIAN~O ro BE ~£Pf:i£SENi~TlVE o~ 9JBSURF~C£ CONDITIONS ~T O~R t.OCAT!ONS ~NC rtMES.
BORING NO. 3.
DEPTH IH
rc£T
OAT£ URILL£0' 10-20-83
DRILLING E0UIPME1'lli' 18" dia. Bucket Auger 22 0 lbs @ 12 inches dr6p
DRIVING WEIGHT' 1600 lbs below 20' feet WATER OEPTH'
ELEVATION'
oot encountered not determined
very ine, c ean
very fine, sl. silty
very fine, clean
401'-~3+-~9~5-fl~l~-5~~--l .......... +-............... ~very~:...,:f~ine:.;;,:•;..;;sl~.;..;;s~il~t~y~~.j..W~w.j .......... -4. .......... ~ End Of BOrin:J @ 40.0 1
/
LOG OF BORING Proposed Qu-en City l'kltel E.l<pansion
1811 West Reseivoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-6
PRELIMINARY REPORT
SOIL AND GEOLOGY/SEISMICITY INVESTIGATIONS
PROPOSED QUEEN CITY MOTEL EXPANSION
1811 WEST RESERVOIR DRIVE
SIGNAL HILL, CALIFORNIA
FOR THE
LI AND ASSOCIATES
INTRODUCTION
'The following report presents the results of a soil investigation i
iconducted on the property located at 1811 West Reservoir Drive,
!!Signal Hill, California. The location of the site, relative to
if surrounding streets and landmarks, is shown on Plate 1, Vicinity
Map.
I; The purpose of this investigation was to obtain the geotechnical
Ii • • ,:engineering properties of the subsurface soils on which to base ,, :1
:!conclusions and recommendations for foundation support and other
':geotechnical matters pertinent to the proposed construction. I
:1
,Our professional services have been performed in accordance with 'I
;generally accepted engineering procedures under similar circum-
stances. No other warranty, expressed or implied, is made as
,to the professional advice included in this report.
I 11 1 ..\S~C)CL\TE:3
. . 2':1een City fA-1413-3 I I
'
I
I
-2-
PROPOSED DEVELOPMENT
t is understood that the subject property will be developed for
onstruction of a motel complex. The structure will be two-story
ood frame with "tuck-under" parking, constructed of concrete
lock walls. Finish grade is expected to be at or near to the
treet level, thus only limited grading is anticipated to develop
he building site. No detailed design loads and grading plan are
available at the time of this investigation.
FIELD EXPLORATIONS AND LABORATORY TESTING
rield explorations were performed to.establish the geotechnical I
1ronditions of the site. Three test borings were excavated at
!llocations shown on Plate 2. The explorations were logged by our
ilfield engineer and relatively undisturbed samples were obtained
!,for laboratory testing and inspection. Detailed description of 11
'the exploration procedures and the logs of test borings are ii " ,, . ;jpresented in the Appendix.
' I
Laboratory tests were performed to evaluate static soil properties.
iDescription of the test procedures and the test results are also i 'presented in the Appendix.
1 ll' ,\SSOCl,\Tl'5
. ,
f ueen City A-1413-3
I
I
-3-
SITE CONDITIONS
He subject property is located on the northwest corner of Pacific
oast Highway and Reservoir Drive West, in the City of Signal Hill,
alifornia.
he site is a relatively level lot behind the existing Queen City
otel facility. At the time of this investigation, the site is
ccupied by two one-story buildings at the locations shown on
late 2. The surface of the lot is covered with natural grasses.
SUBSURFACE CONDITIONS
oil Conditions
n general, the natural soils disclosed in the three test borings
onsist of up to l~ feet of moderately compact, very fine to fine, I
'
~ilty sands, followed by compact, slightly cemented silty sands I' ' to depths of 7 to Sli; feet. Below this are compact :Silty sands and
slightly silty sands to depths of 16 to 17 feet, followed by layers
bf compact clean sands and slightly silty sands to the depths '
penetrated.
Groundwater
,No groundwater was observed in any of the three test borings
'each penetrated to a depth of 40 feet. Groundwater is not
:considered to be a detrimental factor in construction.
t I
Queen City ~-1413-3 II 'I
I I
,1 ,1
-4-
CONCLUSIONS AND RECOMMENDATIOHS
ased on an evaluation of the site conditions and findings of this
nvestigation, it is concluded that the subject property is suit-
ble for the proposed development. Spread footings resting on the
ndisturbed natural soils will provide adequate foundation support
or the proposed structure.
oundation
n allowable bearing value of 2000 pounds per square foot is
ecommended for spread footings of at least one foot in width
laced at a depth of at least l~ feet below the lowest adjacent
final ground surface bearing on the undisturbed compact sands
fncountered at depths of one to l~ feet in the test borings. i,
~his value may be increased by 200 pounds per square foot for
f ach
~ach 1,
~500 I
I
'j'he I
additional foot in width and 500 pounds per square foot for
additional foot in depth over the minimum, to a maximum of
pounds per squ.n-e_foot.
bearing values are for dead plus live load and may be
Jncreased by one-third for momentary wind or seismic loads.
'i . ~aximum ultimate settlement of footings up to 5 feet wide conti-:1
~uoue and 8 feet square under the recommended bearing pressure is 'I not expected to exceed 3/4 of one inch. Differential settlement
is not expected to exceed ~ of an inch.
11 ( T ASS<>CJ ,\Tl'.S
/
ueen City -1413-3 -s-
ootings should be located below a line measured at a 45 degree
ngle from the. bottom of any utility trench, unless reviewed and
pproved by the Foundation Engineer.
ateral Desi n
~n allowable lateral bearing value against the sides of footings I' :pf 300 pounds per square foot per foot of depth, to a maximum of
l~ooo pounds per square foot, may be used provided there is positive
lbontact between the vertical bearing surface and the undisturbed 11
I' atural soils. Friction between the base of the footings and/or
I loor slabs and the underlying soil may be assumed as 0.4 times
I he dead load. I I,
lo/hen combining passive pressure and friction for
:p.ateral resistance, the passive component should be reduced by I:
:rne-third.
~loor Slabs on Grade
~he on-site surface soils are primarily cohesive silty sands. ,,
'tto special design precautions are needed for slabs resting on :1 ~hese materials.
A moisture barrier beneath slabs_-on-grade, preferably consisting I pf a water proof vapor barrier such as a plastic membrane of at
iea~t 6 mils in thickness, or at least 4 inches of rock, is :: ':c-ecommended in areas where slab moisture would be detrimental. ':
-6-
r~~l~=i' 11 surface loose soils shall be compacted prior to construction
f floor slabs to minimize differential settlement. It is recom-
ended the upper 12 inches of subgrade soils be compacted to at
east 90 percent of the maximum density as determined by ASTM
-1557-70 standard.
xcavations
11 shoring and bracing should be in accordance with current
If equirements of
tf the State of
urisdiction.
CAL/OSHA, the Industrial Accident Commission
California, and all other public agencies having
SITE PREPARATION
~<ior to grading operations, the following items, should be per-
:formed. I
All clearing, site preparation, or earthwork performed
on the project shall be conducted by the Contractor under the ,,
;supervision of the Foundation Engineer. " Ii ,,
" 1~xisting structure
Demolition and/or removal of the existing structures is to include
removal of the supporting foundation system. Existing paving and
' poncrete slabs should be removed from the site.
Utilities
Any underground utilities which are not to be reconnected should
be cut off a minimum of 4 feet beyond the edge of building peri-
meters and entirely removed frow. within the area of future
l-ll' i\~:::( l('l ATLS.
•
' .
Queen City f!A-1413-3 -7-
I
,I <f:Onstruction.
~he ends of cut-off lines should be plugged a minimum of 5 feet '
ith concrete exhibiting minimum shrinkage characteristics to
revent water migration to or from hollow lines. In addition,
apping of lines may be required should the plug be subject to
ny line pressures.
rees and Surf ace Ve etation
emoval of designated trees and shrubs in areas of proposed con
lrtruction should include rootballs. Resultant cavities shouid be
cleansed of loose soils and roots and rolled to a firm unyielding
rurface prior backfilling.
~rass and weed frowth in areas of future construction should be
!Ftripped and disposed of off site. Stripping should penetrate
~hree to six inches into surface soils. Any soils sufficiently
contaminated with organic-matter (such as root systems or strip-
1~ings mixed into the soils) so to prevent proper compaction shall 1;
be disposed of off site or set aside for future use in landscape
areas.
/ GRADING SPECIFICATIONS
After completion of the above preparatory items, grading operations
may commence. The following general specifications are recommended:
lfl T ,\5~()ClA.TI:~
ueen City A-1413-3 -8-
•
p.
I
All soils disturbed by removal of existing structures,
foundations and trees should be removed.
Prior to receiving of new fills, all loose surface soils
should be removed. The exposed surface shall be compacted to
at least 90 percent. All new fill shall be brought to near
optimum moisture condition, placed in layers not exceeding
6 inches thick, and compacted to at least 90 percent.
The existing subgrade soils within the proposed building and
paved areas should be compacted to at least 90 percent of the
maximum density prior to construction of floor slabs pav±ng
to secure uniform support.
Unless othereise specified, all other fills and backfills
should be compacted to at least 90 percent.
The compaction characteristics of all fill soils shall be
determined by ASTM D-1557-70 standard. The field density
and"degree of compaction shall be determined by ASTM D-1556,
or by other acceptable ASTM standard methods which are
acceptable to the governing public agency.
6. All new fill shall consist of clean, non-expansive soil, free /
of vegetation and other debris, ?nd shall be placed in layers
not exceed 6 inches at near optimum moisture content.
7. No rocks over 6 inches in greatest dimension shall be accepted
in any fill unless otherwise approved.
,, ,,
Queen City HA-1413-3 -9-
8. No jetting or water tamping of fill soils shall be permitted.
9. No soil shall be imported to the site without.prior approval
by the Foundation Engineer. The on-site soils would be
suitable for use in compacted fills provided all the organic
debris were removed.
10. Observations and testing of all compaction shall be under the
direction of the Foundation Engineer. The Foundation Engineer
shall the authority to reject the compacted fill ground until
such time as corrective measures necessary are taken to comply
with the specifications.
,111. '·
It is the Contractor's resr,ionsibility to-conform to the
" I .
I' 12.
grading specifications.
The Foundation Engineer should be notified at least 2 dyas
in advance of the start of grading. A joint meeting between
a representative of the client, the contractor, and the
foundation Engineer is recommended i:irior-to grading to'
discuss specific procedures and scheduling.
REMARKS
i, . /
'•The conclusions and recommendations contained in this report the
based on the data obtained from the test borings at the dates
and locations indicated in the logs and the site plan. It is
assumed that the soil conditions at the other areas do not deviate
significantly from those disclosed in the test borings. If any
~·{(' ,\.~S()CL\TE~
' ii
bueen City ~-1413-3 ',
ariations or undesirable conditions are encountered during
-10-
onstruction, or if the proposed construction will differ from
he planned at the present time, this office should be notified
o as to consider the need for modifications.
o responsibility for construction compliance with the design
oncepts, specifications or recommendations is assumed unless
n-site review by a representative of this office is performed
uring the course of construction which pertains to the specific
!areas covered by the recommendations contained herein.
Ii This report has been compiled for the exclusive use of the
Li and Associates. It shall not be transferred to any other
party or to another project without the consent and/or through
11review by this office.
" ,'
,The findings or this report are valid as of the present date. i
!However, changes in the conditiqns of ' ' !!the passage of time, whether they ~re ,I
the property can occur with
due to natural processes or
"to the works of man, on this or adjacent properties. In addition, il
II changes in applicable or appropriate standards occur, whether they
ilres9'1t from legislation or the broadening of knowledge. l\ccordingly, ,, 'I
:'the findings of this report may be invalidated, wholly or partially,
jby changes outside of our control. Therefore, this report is I
I ,
subject to review and should not be relied upon after a period 1
of two years without such review. I
I
I
ueen City A-1413-3 -11-
~his reoort is issued with the understanding that it is the
/~espons~bility of the owner, or the proper representative
hereof, to ensure that the information and recommendations
ontained herein are called to the attention of all parties
interested in the project and that the necessary steps are taken
1
to see that the Contractors and Subcontractors carry out such
11
recommendations in the field. i
llsamples obtained in this investigation will deteriorate with time 11
land will be unsuitable for further laboratory testing within the
month from the date of this report and, unless otherwise requested,
will be discarded at that time.
I
The report is subject to review by controlling public agencies
having jurisdiction.
Respectfully submitted,
1HU ASSOCIATES I I
I~~~~::;;=;;::;~~--~
REH/hh
VICINITY MAP
HU ASSOCIATES Geottchmcat Env1flHrifl9 Cim•ulfanrs
~· . Proposed Queen City Motel Expansion
1811 t-Test Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE 1
s .
• Queen City HA-1413-3
APPENDIX
FIELD EXPLORATIONS AND LABORATORY TESTING
FIELD EXPLORATIONS
-la-
The subsurface conditions at the site were explored by drilling
three test borings at the locations shown on the Plot Plan, Plate
' 2 adopted from the •site Plan" prepared by Li and Associates,
Architect, undated. The test borings were drilled by means of a
power bucket auger each to a depth of 40 feet below the existing
grade. The approximately locations of the test borings were
determined by tape measurement from the property boundaries.
The location of the test borings should be considered accurate only
to the degree implied by the method used.
Thesoils encountered during the excavation were logged by the
field engineer. Undisturbed and bulk samples of the soils were
secured at selected intervals from the test borings for laboratory
examination and te~ting. Detailed logs of the test borings are
presented on Plate A-1,through. A-6, Logs of Test Borings.
The lines designating the interface between soil materials on
the logs of test borings represent approximate boundaries. The
transition between materials may be gradual.
LABORATORY TESTING
Moisture-Density Tests
, Queen City HA-1413-3 -2a-
The field moisture content and dry density of the materials encoun-
tered were determined by performing tests on selected undisturbed
samples to aid in the classification and correlation of the. soil
and to obtain qualitative information relative to their strengths
and compressibilities. The results of the tests are shown on the
, Logs of Test Borings, Plates A-1 through A-6.
Direct Shear Tests
Direct shear tests were performed on selected undisturbed samples
of the soil to evaluate the shear strength. and supporting capacity
of the foundation materials. Shear tests were made with a direct
shear machine of the strain control type at a strain rate of
approximately 0.05 inches per minute. The samples were tested at
field moisture content under surcharge pressure equivalent to the
overburden pressure. The yield-point values determined from the
tests are presented on Plates A-1 through A-~6,, Logs of Test aorings.
Consolidation Tests
Consolidation tests were performed on representative undisturbed
samples ofthe natural soils to evaluate the volume changes of
soil subjected to increased loads. Deformations of the specimen
are recorded at selected time' intervals. The results of pressure-
consolidation curve, which are used to estimate the probable
magnitude and rate of settlement of the tested soil under applied
loads, are presented on Plates A-7 to A-14, Consolidation Tests.
Queen City HA-1413-3.
Grain-Size Distribution
-3a-
Grain-size distributions were performed to assist in the soils
classification and for correlation of test data between various
samples. They were determined mainly by sieve analysis performed
in accordance with ASTM Test, Designation D-422-63. A sieve analysis
is conducted by passing the soil through a number of different sized
sieves and measuring the amount of soils retained on each sieve. A
grain-size distribution curve is generated by plotting percent of
soil passing each sieve versus the corresponding grain size repre
sented by the sieve. The results of these analyses are presented
on Plates A-14 and A-15, Grain Size Curves.
/
/llOTI!."• TI-ff!" CAT4 F't:ti:SatTEi'.0 ON Tl'ltS LOO I~ 4 $1MPl...!fl'l(A.r10Ni o,- .a.<:TUAI.. ';t.19$tJRFAC'( C0NDIT10M !NCOl.lffT~REll ~NO 4i:ii:r1..1e:S (INt,.'1 AT THE t.OC~TION °" Tt·llS 8i0Ft•NG ANO: TliE DAiE 0,, c-.11..L.1NG. IT 13 NOr W~11'-AN.T!D TO SE REPRESENTATl'IJ£ Of! Sl.Jl3SWRFACE CONOITION~ .0.T On.ER 1.0CATIONS il,.ND T1"4ES.
BORING NO. 1
"' "' _, CEPTH °""
'" " ••Er ~
5
10
15
20
25
30
1 112 9.3 0.39 0.21
4 119 9.6 1.06 0.42
2 118 10.7 0.71 0.70
2 107 13.4 0.93 1.05
3 103 7 .1 1. 21 1. 54
3 94 8. 7 1.64 2.03
3 95 6.9 2.01 2.52
4 96 8.2
2 96 • 8.4
DATE DRILLED' 10-20-83
DRILLING EQUIPMENT; 18" dia. Bucket Auger 2200 lbs @ 12 inches drop
DRIVl'IG WEIGHT• 1600 lbs belOlll 20 r feet WATER OEPfH'
l::LIOVATION'
not encountenrl not detennined
SAND very fine to fine, silty brown rroist rrod
fine, silty brown
vecy fine to fine, v.silt lt.br sl. canented
fine, silty
fine, vecy silty
fine, sl. silty
fine, silty
fine, sl. silty
fine, clean
lt.br ---.....t tan
dk.gr.
gray
lt.gr.
~~~--~~-~~~~green vecy fine to fine, clean t.qr.
~~~l-lo'aoL.-1·-~~
very fine, clean
very fine to fine,
sl. silty
very fine, clean
very fine to fine, clean
lt.gr.
lt.gr.
lt.gr. white
lt.gr.
green
sl. ist
35·---'-~--'~--'~~..._~ ....... ~~~~~~~~~~~~~-'-~~..._~ ...... .._~_. continued
LOG OF BORING Proposed Queen City Motel Expansion
1811 l-Jest ReseI.VOir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-1
NOT! 1 ll-11! CATA F'RESENre:o ON ™•' U:.G I' A Sl,..~...1.l'l(ArlON OF ~TUAL 5ti9Sl.JltFAC! LONDITIQN3 !NCOUNTEP1£0 ANO APPl...!E3 C~T Ai n-E; LDCAl'ION. Of' t'tllS l30~tNG ANO THI!: 0.1\f! OF °"ILUNG. 11' I' NOT W4.~~A.NT'!O iO ee: REPR~~T.:>.iP.11! OF ~ssui:t.~4.C!. CONOITIOHS .l\T OfHEN: l.OC4TICIN!i .!,ND T:Ml!S.
BORING NO. 1 cont'd
DATE ORILLE0° l0-20-83
DRILLING EQUIPMENT 18" dia. Bucket Auger ORIVING WEIGHT• 2200 lbs @ 12 inches drop
1600 lbs below 20' feet WATER OEPTH'
ELl::VATION'
not ercountered mt detennine:i
very fine to fine, occa. coarse grains
lt.gr. tan
--...... ,,....---.,....-- ----+----very fine, clean lt.qr.
sl. corrp roist
40..,...-;.~--1~-+~--1~~+-~~~~~~~~~~~~.....-1-t.~br...._ ...... ~-+~-.... End of Boring @ 40.0'
.
-
.
-
.
-
LOG OF BORING Proi:;ose:i Queen City Motel Expansion
1811 Pest Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-2
NQTE" 1
5
10
15
20
25
TI-+!' DATA PRESENT~O ON nu~ ~ IS A S!MPU~rClilON 01' ~TtJAl. 5u9SUAF0.C[ CONDITIONS ENCOUtitfE,.-!D AND APPl.IE.3 ClNLY ~f THIE l.OCA.TION ~ rH1g. eo~1 ... G ANO '1"-11!: OAT! OF DRtlUNG". IT IS NOt' WA~~~NT'ED ro a~ RC.F'RES!.NTAT1VE o~ ~BSUR~ACE COfo!OlilONS .O.i ('Jl'HEflt L.OC4f10111S ANO ilMES.
BORING NO. 2
3 117 7.3 0.72 0.21
4 122 9.6 1.78 0.42
2 108 12.6 0.93 1.05
3 106 5.1 1.22 1.54
3 97 6.1 1. 70 2.03
4 97 6.4 2.10 2.52
DA TE ORILL£0 • l0-20-83
DRILLING EllUIPMENT• 18" diao Bucket Auger 2200 lbs @ 12 inches drop
ORIVIMG W<:IGHT• 1600 lbs below 20' feet WATER DEPTH•
l':LEVATION •
not encountered not determined
very fJ.ne to fine, silty br.gr. Ill:list
fine, very silty sl. cemented
----very fine to fine, silty sl. c:anented
fine, silty
fine, very silty
fine, silty
fine, clean
lt.br.
lt.br. tan
ay an
very fine to fine, clean lt.gr.
very fine, clean
very fine to fine, al.silt
very fine, clean
sl. ITDist
30 . 4 110 0.4 very fine, sl. silty silty sand lenses
very fine to fine, clean ___ J£Si,.1..J.!.UL..J
very fine, clean·
5 very fine to fine, clean. 35 ..L;!...!~9~6:__~9~-~1..L.~...l..~-1~~~~~~~~~~~~~0:.W:llJ.........J.~~..L..~~
continued
LOG OF BORING Proposed {1ueen City Motel Expansion
1811 ~lest Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-3
• '
NOT!:• n'I!: ~TA PRESENTl::D ON fH!5 i,,OG 15 A Sl"'P\.JFtC:AflON oF ~ru• .. 3.JBSURFM:£ CONDI r10111.s ~caur.iiE.rt!D AkiD AP~l.IES ClNt.'f AT rME; UX.ATION Of' THI~ BORING iliNO 1'-le'. DA.TE OF DRILLING. IT IS NOT lilA.RRA.l\iTU1 TO Bl: FIE:PR~S£flii4TLVI! OF ~B5Ui:ilf"at! CONOI TIONS 4T O~lil WCATIONS ~NO r1tt111!S.
BORING NO. 2 cont'd
DE~TH ,. ....
DATE vRILLEO• 10-20-83
DRILLING EQUIPMENT; 18" dia.: Bcuket Auger
DRIVlrlG WEIGHT• 2200 lbs @ 12 ioches drop 1600 lbs below 20' feet
WATER DEPTH•
ELEVATION•
mt er=itered iPt detennined
very fine to fine,....>:;=::.:....+-..._·---l very fine to fine, sl. silty ---very fine, clean
s . a:xrp rroist
3 96 9.5 very fine, sl. silt 40 ... -i-..;.;.--1...;.,;~~--11---.f--~~.;.;;,;;~;;.;;;~~;...;.;;;:.: ..... ~-l-'"""";u...,,,,_~-+~~
End of Eorirq @ 40.0'
LOG OF BORING PrqnsErl Queen City MDtel Expansion
1811 West Reservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-4
OEPTI+ IN
rE£"t
5
10
15
20
25
30
35
~ 0AT4 MESENT~D ON 1'1-11! l.OQ IS. I\ SIMF'UF'ICATION' IJ, .il.C'TU.41.. St.i8Sl.IRFACI! CONOITIONS' !NCOIJNfEAEO ANO APP\.11!! ONl..'f AT T'H£ L.Oc~flON fJF tHlg eoi:i:1NG, AND n-ie: OAT£ a, CflH.t.ING. If IS NOT w~~fl.\.Nf!:D ro EIE ~E.PA'fS!NTA.TllJE iJF ':IJBSU~F".Q(.11! CONOlf!QNS .Q.f ~n+E" LOCAflOl\IS ~ND TIMES.
BORING NO. 3
" ... , .. " :I
SAND
1 113 9.4 0.46 0.21
3 118 9.7 a.so 0.42
2 117 11.0 1.04 0.70
4 110 16.8 1.60 1.05
3 104 10.0 1.23 1.54
3 98 7.7 1. 79 2.03
·5 95 6.9 2.00 2.52
3 99 8.3
5 97 continued
DATE LlRILLED' 10-20-83
DRILLING EQUIPMENT• 18" dia. Bucket Auger 2200 lbs @ 12 inches drop
DRIVlllG WEIGHT' 1600 lbs below 20' feet WATER DEPTH' not encountered
ELEVATION' not deter!llined
very fine to fine, silt brown m:iist gray
very fine to fine, brown v. silty, sl • .,cenented
fine, very silty lt.br.
fine, silty
very fiile, silty
very fine to fine, lt.br verv sil~ tan fine, sl. silty
very fine to fine, lt.br. clean. yellow
very fine to fine, clean lt.br. sl. lt.gr. rroist
very fine, clean
very fine to fine, tan sl. silty lt.br.
lt.gr.
'
very fine, sl. silty rel low t.br.
very fine to fine, clean very fine, clean
very fine, sl. silty very :tine, ciean
very fine, sl. silty
COl11?
Propo!!ed Queen City !btel Expansion
LOG OF BORING 1811 West Reservoir DriV1l Signal Hill, California
HU ASSOCIATES ~tf!C1'rt1caf Cnq1nttrtf7(J C.Jt'IJLilfcnts PROJECT No. HA-1413-3 PLATE A-5
N0f£1 TM€ 0AfA PA!S!NTEO ON TMl'J uJG t'J A Sl'tt~fl'l(ATION OF AC:l"UAL.. ';t.IBSl;RF4.CJ!, CONOlrlONS ~COUNTl:.ft!O ANO APt:it...IES ONl.l' AT flo-1£ LlJC..tlfiotli Of' nus SOR~l'Hl ANO TH£ CATE" OF DAtlUNG. IT 1'1 NOT Wl\IHt~NTEC TO 8E RltPR£SEl"ITi\TIVe: ilF ';U89Ui=l.~.\C! CONOITION'J . AT OfHE" l0C..\TION$ .\NO T;~!.S.
BORING NO. 3
DATE ilRlll.£0 10-20-83
DRILLING EOUIPMEr:ff; 18" dia. Bucket Auger 2200 .lbs @ 12 incites drop
DRIVING WEIGHT; 1600 lbs below 20' feet
WATER DEPTH;
ELEVATION'
SAND very ine,
very fine,
Ve£i:: fine, very fine,
mt erK;:OUntered
not detennined
c ean
sl. silty
cle;:m sl. silty
l!Dl.St CU1l'
.br. :Or.
End of Borir¥J @ 40.0'
LOG OF BORING
HU ASSOC I ATES c;.,c1wm<cat El"l1"""''l"l c.:mo11ant>
/
Proposed Qu-en City Motel Expansion 1811 West 11eservoir Drive Signal Hill, California
PROJECT No. HA-1413-3 PLATE A-6
Pressure in Kips per Square Foot
0.1 0
0.2- 0.3 0.5 0.8 I 2- ' 5 El 10 20 30 40
....... ""8-....._
1 -...........
r--..... r"-. ...
2 " -~ ,.,
.... ~ "' "' -- " 3
c: 0
4 ·--0
-0
·-- 5 0
"' c 0 6 u
-c: 7 ... u ..... ... 8 a..
I
9
10
.
11
12 Boring ~!o. 1 @ 2.0' Q WAfEft: P£1U10TT!D 1"0 CONTACT SAMPt,..E:
Prq:osed Queen City Motel EXpansion
CONSOLIDATION TESTS 1811 West Rese1V0ir Drive Signal Hill, California
~
HU ASSOCIATES Geofec/'ln1co/ £flqfpeen119 C()l1sul.'orrl!!I PROJECT No. !lA-1413-3 I PLATE A-7
'
Pressure i fl Kips per Square Foot
0.1 0.2 0.3 0
0.5 0.6 I 2 3 5 8 I() zo 30 40
-c
'""& 1
~ ['._
r-... 2 ..... ~
I""--~ i'-1"1 ..... ""' "" r-- I' I'
3 "\
-c: I
0 4 ·--"
"Q
·- 5 -0
"' c: 0 6 u
-c: 7 ., " .... .. 8 c.. !
9
10
'
11
12 Boring No. l @ 7.0' 0 W6TER PERMlrfE:o ro CONTACT SA.MPL.E.
Proposed Queen City Motel Elcpansion
CONSOLIDATION TESTS 1811 "~st Reservoir Drive Signal Hill, California
HU ASSOCIATES Gf!oftt/1n1caf E17tJineer1t7tJ C(](l!J&1/:'cnts PROJECT No. HA-1413-3 · 1 PLATE A-8
Pressure in Kips per Square Foot
0.1 0.2 0.3 0
o.:s o.e I 2 3 5 8 I() 20 30 40.
-~ - .......
1 -.... !'....
J".., r-.. . r-.. !'-.. -2 ,... ,_ "' r.. ['....
3
·, c: 0
4 ·--0 ..
'a
·- 5 -0 Ill
c: 0 6
(.)
- I -c: 7
I ., u I I
I I ... I I I I i .,
8 Q.. I
I ·. -' . -
9
10
11
"
12 Boring No. 1 @ 10.0' Q WATER FIERMITTED TO CONTACT SAMPL(
Proposed Queen City Motel Expansion CONSOLIDATION TESTS 1811 West Reservoir Drive
Signal Hill, California
.. HU ASSOCIATES PROJECT No. HA-1413-3 I PLATE A-9 GeorecM1cfJ/ Enq11ree11119 ~1s1..1f;'on/$
.Pressure. in Kips per Square Foot ' .
0.1 0.2 O_l 05 0.8 I 2 l 5 8 IO 20 ~o 40 0
~ I
1 ........ r---...
I'-r-.. • ...._ r-.. 2
r"' r-~, -
3
\ c: 0
4 ·--0
-0
·- 5 -0 UI
c: '
0 6 u
-c 7 ... u ... ... 8 a.
- I .
9
10
11
12 Boring No. l @ 15. 0' Q W•T!~ _PERMITi(D TO CONfACT SAMP\.li!
Proposed Queen City MOtel E>Cpansion
CONSOLIDATION TESTS · 1811 West Reservoir Drive Signal Hill, california
~
HU ASSOCIATES PROJECT No. HA-1413-3 I PLATE A-10 Geotec/1r11cal £AqiM~,.,tltJ COii suftJttf$
Pressure '" Kips per Square Foot
0.1 0.2 O.l a 0.5 0.9 I 2 3 5 9 10 20 30 <lO '<
-~ ""N....._
1 ...........
r---..... r--.. ... - f"... 2 - ~ I'
I' I' -
1'.. 3
c 0
4 ---0 'Q
·- 5 -0
"' = 0 6 u
-= 7 .. u ... .. 8 a. - i - I
, " ~ -9
10
/
11 - ..
.. 12
Boring No. 3@ 4.0 1 Q WATER Pe;AMlif(O TO CONTACT gAMPLE
Prop:ised Queen City Motel Expansion
CONSOLIDATION TESTS 1811 West Reservoir Drive Signal. Hill, California
•• HU ASSOCIATES G«Jt«:/1f71cal Enqineeri11t;1 Cet1sul,"Cnts PROJECT No. HA-1413-3 I PLATE A-11
I
Pressure in Kips. per Square Foot
0.1 0
0.2 0.3 05 0.8 I z 3 :; e IO zo 30 40 -
-,.. ~~
l ,....., I'--..
' 2
' .. !"--. I'-. p.... ~ ..
"" r-.." "'-~ 3
' - .... -c:
0 4 ·--<;I
'<;I
·- 5 -0 .. c 0 6 I u
I
I - I -c 7 QI I I
i I I u
I ' I ' ... ' ' ' QI I
8 ! : I a.. I I I I I i
i 9 i i
I i
10
11
-·
12 Boring No. 3 @ 1 .o.• Q WATEi. P!llU1UTT!D fO CONT.l\CT SAMPt.£
Prop:ised Queen City Motel Expansion
CONSOLIDATION TESTS 1811 l'Jest Reservoir Drive Signal Hill, California
~
HU ASSOCIATES G~t~cnn1co/ Eng1nfMnng COflStJ/."(JtlfS PROJECT No. HA-1413-3 r PLATE. A-12
Pressure in Ki·ps per Square Foot •
0.1 0
0.2 O.l 0., 0.8 I 2 3 5 8 K) 20 30 <IO
""A. - --1 .........
I"--.. I""'-.
1' ~ - ,..,_ 2
~
~ "" '"to. ~ -
' .
3
' c: Q
4 ·--Q
"Q
·-- 5 0
"' c: Q 6 u
-c: 7 -., <.> ... .,
8 a_
- I . ' I " -
9
10
/
11
..
12 BOring No. 3 @ 10.0• Q WATER PERMITTED iO CONfA.CT 'SA~Pt.E
Prop:ised Queen City Motel Expansion CONSOLIDATION TESTS 1811 West ReServoir Drive
Signal Hill, Californi<1
~
HU ASSOCIATES Geatecn111ca1 £nqirreenng ConstJl"onts PROJECT No. HA-1413-3 I PLATE A-13
,
:c SIEVE ANALYSIS HYDROMETER ANALYSIS c SIZE: OF OPENl~G "' INCHES U.S. sr;.ND4~D SIEVE Nll-M8ERS GA41N SIZE IN MM
I;; G') 10· • 2 l·lt.! ' .,. 1/.1 1/4 • 10 20 40 60 100 >CO 0.01 ooo• O.OOL
~ :;o '""' !l: ~ "•L
0
n J> r. ~ ~ ...
~ - '
"-'~ - - 10
z ~-- -- --·- -1--1-- - ,_ - - ··- --~ .~. - .L --~- -- ·----
(II a "' .
~ MD ··-~ ~ -· C---f- 20
en "tl
i - --~- rn - - ~- -
-- - - ·- - - :a N "tl - ~\ n
fTI 7 ·- ·- ·--- L- -·-- -- . ' - - . -· ---- ------ 30 fTI
1f l'TI :a \~ z
n . - --·- ' -- ----- --·- - -· \ ,. - - f-. - - ----- -I
a fTI
' (") z c.. - - -- - 40 8 -I 3 \ ~ c b-
-- -- - . - - . ---- ·- :a ::0 :!! 1 <I>
,jl z - ---~- 50 -· - rn 1 < fTI I :a ~ l'TI :a - - -· - --- ~ --- - -- - ·--- - - - - - -- \ - ~ - ·'- --~
- I CD
§' (/) CD 4· - .. ----- - . ~ - - -- --· -- I - - 60 -<
-< ~
-- .. ·-· ·-~ - . ~
~ '\. rn
~ 30 -· -- --·----- ~ -- --- ··- -~ ,__ ---· 70 fTI I Gl
~ Gl -- --· .....___ __ ·--· _,_ - -· .\- ' - ..... -- - ·-~~ -- :r -· ---· --·- f- -I
:r -- \ -I ·- ·----- --·- - ·- - ---- -- \-· ,_ ·- --- -- - . 80
~ \
L. - -- - --- - - ,_ - --·--- ,_ . - -- -' - ' - - - - -- "--- -
c.. 10 -- r------- ;- ·- --~ 90 ~
·-· '"d
-I
~ --- - --- I+ - ----- - ~ - -·· ~-· -·--- .. + - ·- -- -- -- -·-- -- - . ·-~ -- --L
~ OIOO 100
1-'Ul $0 ., • ' o.• 0.1 O.O!!i OOL 0.005 0-.001
' Ill co a GRAIN SIZE IN MILLI METERS
!~~ .... ' GRAVEL I SAND \ SILT .... r I Finl I CDair1-1 M1cOu111 I fin• !
or· CLAY .... CIM!irae
w ~-rt:;,-I w .... m () .... ,_,_ .....__
~~~ "tl Ct.1rve Boring Deplh Nah.ii<ll r ~o~ Soil Closs~ f 1 cot ion LL PL Pl )> No. '-11. ft. W/C, 0/c
,_,_ ~· -I HI ID Pl hf 1 1 15 SAND, fine, clean 7.1
:i- 2 1 25 SAND, very fine to fine, sl. silty 6.9 "'~ .... 3 2 '15 SAND, fine, clean 5.1 ..
i:;· 4 2 25 SAND. V"'"" fine to fine· sl.. c;!+-u ~ A :;,-
::c SJ EVE ANALYSIS HYDROMETER ANALYSIS c SIZE OF OPEN tMG IM INCHES U.S. 'ST.-,NDAAD SIEVE" NUMBERS GftAIH SIZE IN "~ l>
G) • 2 HI.! I ,,,. ,,,, 1/4 • 10 20 40 60 100 zoo 00> 0005 0.001
"' 10' 0
"' ;;c ~, ' 0 n l>
~ - - -- ·- 10 z -- --- f-- ·- - ~ -- --- ~\-·--- . - ~ - ·-- ---- ·-
(II ~ - --- ·-·- - - -·- 2{)
U> l:l
f ---- --~- -- -- -- ·- rn
@_ ..
::0 N .. n
rn 7 - ·- - ·- - I- - - -· -·· 30 rn
i ITI ::0 2 n -- - -- -· .. - ·- - .. - ·- -- ---- -I rn \
(") 2 e- -- - - . .. - -- - . j.-· - -- .. ·- c---f----- 40 n -I
" 0
gi c -- I> ::!l \ ::0
~ ::0 "' z 50 - 50 rn ~ < rn \ ::0
~ rn ::0 - - - -------- - . -- - -.-- ·-. --Ill
~ U> ro 40 H- - -
-® " -· - - . - 60 -< -<
~ f-· ~ f-- ---- --- -- . ·- --- - - . - - - -- ~ - ~ - '-!"
~ '-!" 3: 70 ,.,,
rn ··- -- -· . - - - -- -- -~ -- ~--
~~\ - -- - - .. 1-- - -G>
;:;; Cl ·- f- > - --- . ' - -· - . ·- - . .. - '. f- - J:
I --1 -I
-I 2( -> I - .. -·- ---- -· . ,_ -- 80 l:l
~ .. ~ - ~ - I-. ------<-
-~ 10 ---- --- --·-- -- - .. - - ----- ·- . - -- -- . -- - •.. 90 rn . - ----
0 -I - - -- - ------ - .... . ·-- - --· - - - -·- -·--- - .. - -- . - . ·- ··- --· f- - - - ·-
~ ,_.(II
OIDD . 100
fJ) "" 2 00 IO ' I o.• 0.1 000 om 000> 0001
~ f ~- GRAIN SIZE IN MILLIMETERS
.... e:.1 I GRAVEL I SANO I SILT CLAY I "" I I CCIG.f"ll I M1diurt1 I F"ln• I
or .... Coar"11 Finl
w ~w~ I w :, m .Q .. ~~~ Cur1i1e Boring Oepln Na,ural r I"· .... ~ Soil C los'S if i cat ion LL f>L Pl
~ Hi 11 No. No. ft. W/C,% -I
~- & 3 15 SAND, . very fine fine, clean 10.0 ,., 5 to
1' ~ ~· 6 3 25 Sl\ND • verv fine to fine. sl. siltv 6.9 .... , U> ...
§