Upload
jonathan-ng-cheong-tin
View
217
Download
3
Tags:
Embed Size (px)
DESCRIPTION
Jonathan Ng's CV - Folio sample
Citation preview
Jonathan Ng Cheong Tin 3/8 Falshaws Lane, North Melbourne Vic 3051
0412 001 499 | [email protected] Portfolio Link: http://issuu.com/jo.nct/docs/folio13
EDUCATION
AWARDS
PUBLICATION
EMPLOYMENT
Master of ArchitectureMelbourne School of Design, The University of MelbourneBachelor of Environments (Architecture Major)The University of Melbourne
Sparks 3, The University of Melbourne, Faculty of Architecture Publication.Cover + Content. http://issuu.com/jo.nct/docs/sparks_3_cover_2013
UPDIS Conceptual Vertical City, Shenzhen, China. 3rd Prize. http://issuu.com/jo.nct/docs/final_panel-_______________
Dream Stations, Chapman & Bailey Gallery, Melbourne, Abbotsford.Selected Exhibition’s Work.http://www.chapmanbailey.com.au/portfolio/dream-stations-visions-for-the-future-of-stations-and-travel-in-melbourne-and-beyond/
Drab train stations come to life in university design project, The Age. Featured Article’s Render.http://www.theage.com.au/photogallery/national/melbourne-train-stations-now-and-the-future-20140616-3a8dx.html?aggregate=&selectedImage=11
SuperStudio 24hr Competition organized by SONA under the AIA.Top 5 in Victoria
ADS Air Studio Exhibition, The University of Melbourne Architecture library.Selected Model
New Generation International Undergraduate University of Melbourne Scholarship. Selected Candidate.
Professional 3D renderings using 3Dsmax , Vray, Mental ray.Architectural documentation using Revit.
Schematic/concept Design production.3D visualization and animation using Lumion.Demonstrated effective communication by liaising with clients for their specifications and needs about their projects.Printing and graphic layouts.
Town planning and building permit application.Office administration and assisting staff. 3D residential documentation using Revit and AutoCad.Site measure-ups.
HK Drafting Services Pty Ltd , Melbourne.
Blight,Blight & Blight, Melbourne.
LHLK Architects , Melbourne.
Casual Draftsman.
Design Assistant
Part time Architecture Assistant.
CV: Jonathan Ng Cheong Tin 1/13
Jul 2013 - 2015
Mar 2013
Jan 2014
Jul 2014
Jun 2014
Jul 2010 - 2013
Sep 2012
Jul 2012
Jul 2010
Nov 2013 -Jan 14
Jul 2014 -Present
Mar 2013 -Sep 13
Participated in the concept design process of several ($200,000 to $ 1,000,000) projects. Creative and innovative solution provider including ESD solutions. Learnt the Building codes of Mauritius. Demonstrated strong 3D documentation skills through Revit.Produced detail audit experience including post-project photography for the French magazine “ L’Architecture de votre Region” (http://www.larchitecture.com) Experienced proposal presentation in front of clients. Provided a sound understanding of construction elements and the ability to apply the details. Ability to work in a close-knit team.Attending PCG meeting with different consultants for $ 30 million project.Exposed to the industry, meetings with consultants, contractors and client.
1-month placement with one of the best architecture firm in Mauritius.Assisted an architect (mentor) in his works and helped with the basic tasks such as developing the material, door schedules, sketches, 3D modeling and printing. Involved in the first LEED certified building in Mauritius.
Atelier IN.DIG.O Architecte DPLG , Mauritius.
Francis Wong Associates Ltd (FWA) , Mauritius.
Summer Intern
http://issuu.com/jo.nct/docs/recommendation_letter
http://issuu.com/jo.nct/docs/fwa_referee_letter/1
Student Intern
CV: Jonathan Ng Cheong Tin 2/13
Dec 2012 -Feb 13
Apr 2010 -May 10
Self-directed to work within set deadlines.Completion of good quality drawings at a fast pace with minimum supervision.Learned how to comply with the BCA and RESCODE adding complexity to clients’ tight –budget project thus making decisions on cost-basis.
Private Contractor, Melbourne. Freelance Draftsman. Aug 2012 -Present
INTERESTS AND ACTIVITIES
PROFESSIONAL MEMBERSHIP & CERTIFICATE
REFEREES
COMPUTER SKILLS
[YCS] Youth Charity Society The University of Melbourne Volunteering Club.
Design :
Australian Institute of Architects (AIA) & SONA
Documentation :
Full driving Licence
Academic
Andy YuArchitect/Tutor
Dr. Michael TrudgeonArchitect/Tutor
Linda Kwok Director at LHLK Architects
Richard Blight Director at Blight,Blight & Blight
David Ma Arch. Designer at Cox Howlett & Bailey Woodland
Pat NgArchitect, DPLG , France President of the Mauritius Association of ArchitectPresident of the Green Building Council of Mauritius
Professional
Sport Coaching
Graphic :
Administrative :
Basketball University of Melbourne team in CYMS CompetitionHigh School League
Environmental :
Committee Member
SketchUp. Rhinoceros, Grasshopper, 3DSMax , Lumion.
Student affiliate
Revit, AutoCAD, ArchiCad.
Car owner
Certificate of Beginning Coaching General Principles
IES Virtual Environment, Ecotect, First Rate.
Adobe CS5/CS6 Suite (Photoshop, InDesign, Illustrator).
Microsoft Office Suite, iWork.
Division C
National Champion
3/13
Aug 2012 - Apr 13
Apr 2012 - Present
Jan 2009 - Present
+61 422571672
+61 409504090
+61 403696892
+61 407787759
+61 407577419
+61 411329465
+230 4546445
Feb 2012 - Present
Jan 2011 - Jan 12
2006 - 2008
Nafiseh Hamidi Architect/Tutor
CV: Jonathan Ng Cheong Tin
CV: Jonathan Ng Cheong Tin 4/13
Ruthven Train Station, Melbourne.Transit for All, Melbourne School of Design , M arch. Redevelopment of Train Station Precinct // Retail// Student Housing // Urban Strategy// Masterplan. [Revit/Lumion]
2014
CV: Jonathan Ng Cheong Tin 5/13
Ruthven Train Station, Melbourne.Transit for All, Melbourne School of Design , M arch.
Animation: http://vimeo.com/96671161
2014
CV: Jonathan Ng Cheong Tin 6/13
Entasis in the Sky, Melbourne.Applied Construction , M arch. 49 Floors Skyscraper Design & Construction. [Revit]Selected Physical Model, Wunderlich Gallery.
2014
CV: Jonathan Ng Cheong Tin 7/13
UPDIS Conceptual Vertical City, Shenzhen, China. 3rd Prize Governmental/ International Competition.http://issuu.com/jo.nct/docs/final_panel-_______________
2014
DN
DN
DN
UP
DN
UP
DN
DNDN
UP
DNUP
DN
UP
DN
DN
DN
DN
UP
561 m²
Room30
1193 m²
iBike Pty Ltd31
1485 m²
EVO Pty Ltd32
34 m²
PODIUM33
246 m²
INNOVATION PLATFORM34
467 m²
OUTDOOR SHOWROOM35
1233 m²
STORAGE FACILITIES36
277 m²
EXPERIMENTATION LAB37
362 m²
FOYER38
70 m²
STUDIO B39
124 m²
STUDIO C40
1182 m²
SUPRE45
249 m²
STAFF ROOM46
4905 m²
PIPEWORKS STAND47
133 m²
PIPEWORKS ADMINISTRATION48
417 m²
PLANT NURSERY49
247 m²
GIFTWARE STORE50
136 m²
HAIRDRESSER51
108 m²
COSMETICS52
1952 m²
PIPEWORKS HALL53
904 m²
FOOD COURT54
224 m²
GYM55
28 m²
HAMAM56
29 m²
SAUNA57
305 m²
FOYER58
737 m²
BLOCK B59
871 m²
BLOCK C6081 m²
Classroom61
VEGGIE GARDEN
60 m²
STUDIO A62
55 m²
FACILITIES63
43 m²
INFO DESK64
39 m²
TICKET BOOTH65
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TOD
ES
K S
TUD
EN
T PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TOD
ES
K S
TUD
EN
T P
RO
DU
CT
Eco Ericsson Precinct 2035, Broadmeadows.VEIL // Melbourne School of Design , M arch. Community Hub // Market // Commercial //Education precinct // Clean tech platformMaster-plan design & documentation. [Revit]
2013
CV: Jonathan Ng Cheong Tin 8/13
CV: Jonathan Ng Cheong Tin 9/13
Eco Ericsson Precinct 2035, Broadmeadows, Melb.VEIL // Melbourne School of Design , M arch.An incubator for the new knowledge economy.
Animation: https://vimeo.com/78883063
2013
Proposed Dwelling, Oakleigh, Melbourne. HK Drafting Ltd Pty, Melbourne. 3D Visualization. [Revit + Lumion]
2 Proposed Dwellings, Wantirna, Melbourne. LHLK Architects , Melbourne. Building Permit Application. [Revit + Autocad]
2014
2013
CV: Jonathan Ng Cheong Tin 10/13
Le Bocage Amphitheater/ Analysis Pty Ltd, Mauritius. Atelier In.Dig.O , Mauritius. Concept Design. [Revit]
2013
How
den
Stre
et
Howd
en S
treet
No. 2
No. 4
No. 6
No. 1657
No. 1655
7520
12070
9570
13
30
9320
40.234m
26
.48
7m
46.512mCONCRETE NEWDRIVEWAY
30
00
ENTRYEX.
BEDROOMEX.
BATHEX.BEDROOM
EX.LAUNDRYEX.
WCEX.
DINNINGEX.
LOUNGEEX.
PORCHEX.
DECKINGPROPOSED
Firs
t Fl
oor
Abo
ve
First Floor Above
Firs
t Fl
oor
Abo
ve
1 2 3 4 5 6 7 8 91011 LAND.
OFFICE
f.
LOUNGE ROOM
820
PROPOSED GARAGE
820
820
STORAGE ROOM
PROPOSED SITE PLAN30 SUTHERLAND STREET, MALVERN
Bushfire Attack Level:Australian Standard AS3959-2009 "Construction ofbuildings in bushfire prone areas"classifies this site as:
FDI
Vegetation
Distance to Vegetation
Slope
BAL
100
Low Threat Vegetation
>100m
Level Flat Site
Low
Habitable Windows
Non Habitable Windows
H.W
N.H.W
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
CV: Jonathan Ng Cheong Tin 11/13
Proposed Office Building 154- 156 Cardigan St, Carlton, Melbourne. Construction Design, B envs.Construction Documentation. [Revit]
E.O.I Wyndham City Council Gateway , Melbourne.Architecture Design Studio Air, B envs. Parametric design and fabrication. [Rhino + Grasshopper]
E.O.I Wyndham City Council Gateway , Melbourne.Architecture Design Studio Air, B envs. Architecture Library Exhibition.
2013
2012
2012
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
UP
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
A B C D
2
3
1
4
A
A3.01
A
A3.01
M_TOILET F_TOILET
D_TOILET
STORAGE
RECEPTION
EXHIBITION
OUTDOOR EXHIBITION
LOADING ZONE
KITCHEN
B
A3.02
B
A3.02
2690 3075
2410
4200
1659
2432
AHD 38.8
RM 1.06
RM 1.02
RM 1.05RM 1.04
RM 1.08
RM 1.07RM 1.03
RM 1.01
RM 1.09
ENTRY LOBBYRM 1.10
0.13
180
°
TITLE BOUNDARY 90°20' 12.08m
TITLE BOUNDARY 89°34' 10.25m
TITLE BOUNDARY 270° 22.30 m
TITL
E BO
UN
DAR
Y
18
0°17
'17
.75
m
38.8 39.1
38.5 38.8
TF
POC
EF
CT
5820
6000
5820
6000 6000 6000
1945MALE TOILET FEMALE TOILET STORAGE
KITCHEN
LOADING ZONE
7850
CAR
DIG
AN S
TREE
T
GR
ATTA
N P
LAC
E
500m
m W
IDE
WO
OD
EN P
LIN
THD
ISAB
LED
TO
ILET
1728
STO
RAG
E
OU
TDO
OR
EXH
IBTI
ON
EN
TRY
LOBB
Y
EXH
IBTI
ON
D
1718
1
8 11 12
7 9 10
3
1
A4.01
KIT
CH
EN
1823 2354 18236515 1001535 108 3087 4955
STEP STEP
RAMP
1:14 FALL
RAMP
1:8 FALL
200
282
2733OPENING TO OUTDOOR EXHIBITON
FA
6000
79
110
870
W1
W2
TFFFL RL 39.320
STEP
W1
W1
W1
FW
FWFW
FW FW FW
FWFW
FW
FW
FFL RL 39.320
FFL RL 39.200
W2
W1
W2
W2
W3
W3
W4
W1
W2
W5
W5
W5
W4
W1
W4
FFL RL 39.320
FFL RL 39.320
FFL RL 39.050
FFL RL 39.340
FFL RL 39.340FFL RL 39.340
FFL RL 39.320
STEP
W4
PJ
PJ
CJ PJ PJ PJ PJ PJ CJ
PJ PJ
CJ
PJ
PJ
CJ
PJ PJ PJ PJ PJ PJ PJ PJ PJ PJCJ
PJ
PJ
PJ PJ
PJ
PJ
CJ
W6
W3
CT
CT
POC
POC
POC
FA
RS
TITL
E B
OU
ND
ARY
0°0'
17.9
2 m
STEP
22
5860
W3
SGA
SS
WPWPWPWPWP
WPWP
DPDP
DP DP DP
DPDBDB
DB DB
D
771 1150 1393 79 1328 110 3080 1100STAIRS
4280
WES
T R
AMP
629
314
4300
761
190
1517
2394
1564
200
5695
1814
2354
1760
4977
685
20923
5
Scale
Checked by
Drawn by
Date
JN ARCHITECTS
1 : 50
GROUNDFLOOR PLAN
PRELIMINARY
154-156 CARDIGAN ST
UNIVERSITY OFMELBOURNE
21.05.13
JN
YL
A1.02
SCALEA1.02
1 : 50
GROUND FLOOR PLAN1
LEGEND
W1
W2
W3
W4
W5
W6
S
POC
CT
EF
FW
PJ
CJ
STAIR CONSTRUCTION
WALL TYPES
FLOOR FINISHES
DOOR TYPES
1
3
RS
CONSTRUCTION JOINT
FLOOR WASTE TO FLOOR DRAIN
PANEL JOINT
CAPRAL 425 NARROWLINE ALUMINIUM FIXEDDOUBLE GLAZED FRAME WITH 6mm GLASS
DANPALON PANELS 1040mm MODULAR LENGTH,16mm THICK ATTACHED TO ALUMINIUMCONNECTORS 100 x 50 mm
RONDO 92mm METAL STUD WALL WITH 10mmPLASTERBOARD ON EACH SIDE WITHOUTINSULATION
200mm REINFORCED PRECAST CONCRETESANDWICHED PANEL WITH 30mm INSULATIONMODULAR SIZE 2000x 4000mm WITH RENDEREDFINISH
100mm REINFORCED PRECAST CONCRETEPANELS WITHOUT INSULATION WITH RENDEREDFINISH80mm PLYWOOD TOILET PARTITION
10mm CERAMIC TILES ON TOP OF 10mm SCREED
ROXSET RC EPOXY FLOORING
20mm POLISHED CONCRETE
SAND INFILL
GLASS SLIDING DOOR 2300x 2300mm
SINGLE FLUSH DOOR 2032mm HIGH , 762mm WIDE,50mm THICK
ROLLER SHUTTERS 2500mm HIGH, 2400 WIDE ,120mm THICK
INTERIOR ASSEMBLED WOODEN STAIRS WITH50mm CLOSED STRINGERS ON BOTH SIDES, 18RISERS @ 187mm THICK
PROJECT DATUM
NOTESARCHITECT HAS BEEN ENGAGED TO PREPARE THESEDRAWINGS SOLELY FOR THE PURPOSES OF SEEKINGRELEVANT PERMITS RETROSPECTIVELY DUE TOCONSTRUCTION WORK CARRIED OUT PRIOR TO OBTAININGAUTHORITIES' CONSENT. QUALITY OF WORKMANSHIP INBOTH MATERIALS AND INSTALLATION/CONSTRUCTION ARENOT ASCERTAINED. INFORMATION PROVIDED BY THEOWNER / BUILDER REGARDING THE CONSTRUCTEDELEMENT MAY ALSO HAVE BEEN USED IN PREPARING THISDRAWING. DIMENSIONS ARE TAKEN FROM FINISHEDSURFACES AND ARE TO BE CONSIDERED APPROXIMATE. DONOT SCALE ANY DRAWINGS.
SGA SLOPED GLAZING ABOVE
FA FLOOR ABOVE
TF BORAL BLACKBUTT 19 mm, 85mm WIDE WOODENSTRIP FLOORING BOARDS ATTACHED ON BATTENS
RAMP CONSTRUCTIONSOLID IN-SITU CONCRETE RAMP,EAST RAMP 1:14 FALL DISABLEDACCESS RAMP, WEST RAMP 1:8 FALL
DPDB DIAGONAL BRACING
100mm DIA PVC DOWNPIPE
WP WOODEN PLINTH 4300X500mm
D DIRECTION OF TIMBER FLOOR BOARDS
Level 1 FFL
3750
2
GF FFL
460
Level 1 FCL
6450
GF FCL
3150
30 mm STYROFOAMINSULATION AROUNDBOX GUTTER
COLORBONDROOF DECK SUPPORTED BY PURLINS SITTING ON PACKERS.
INSULATION BATTWITH SARKING &SAFETY MESH UNDERNEATHZ10015 PURLIN
@1200mm CRS
PURLIN CLEATSWELDED TO 300UB
SS BOX GUTTERASSEMBLY WITH 1:100FALLFULLY SUPPORTED ONMETALDECK TRAY
DANPALON ALUMINIUM END CAP FIXED ON 100X100 mm SHS
DANPALON ALUMINIUM CAP WITH DRAIN HOLES
DANPALON AD3400 BREATHER TAPE
DANPALON PANEL 16 mm thick MULTICELL SEAMLESS SYSTEM
DANPALON SEAMLESS CONNECTOR 150X50mm MULLION
CAPRAL SUN LOUVRES SYSTEM 2600mm HIGH
HEAD TRACK WITH ROLLER HANGER INSIDE
LOUVRE'S KEEPER CUP
EASY GLIDE CHANNEL ONTHE SILL TRACK 4m LONG
FLASHING ON TOP OF THEDANPALON ALUMINIUM END CAP
250 UB
HEAD & BOTTOM DANPALON CHANNEL
DANPALON ALUMINIUM END CAP WITH DRAIN HOLES
COMPRESSIBLE FOAM
SL82 WITH20mm COVERWATERPROOF MEMBRANEON SAND BED
1000X1000 PAD FOOTINGMASS CONCRETE
150 mm Dia PVCDRAINAGE PIPE
DANPALON SEAMLESS CONNECTOR 150X50mm MULLIONBORAL BLACKBUTT 19 mm, 85mm WIDEWOODEN STRIP FLOORING BOARDSATTACHED TO BATTENS BYSECRET NAILING METHOD
CAPRAL 425 NARROWLINE FIXED ALUMINIUM GLAZING FRAMEWITH 6mm DOUBLE GLAZEDGLASS HELD BETWEEN WEDGES.
2600mm MULLION HIGH WITH 1000mm SPACING
FLASHING
200
min
EXHIBITIONSPACE
EXTERIOR
FLASHING FOR STEP
PACKER
START OF GUTTER
BATTENS WITH UNDERLAY OF0.2mm POLYTHENE VAPOURBARRIER MEMBRANE
TOP OF PARAPET
7715
RL 39.320
RL 42.470
RL 43.070
RL 45.770
RL 47.035
C
2
ALUCOBOND PANEL1000 x 2000mm HIGH, 6mm THICKFLAT STICK CONSTRUCTION
MARINE BOARD 10mm THICK
RONDO 92mm METAL STUDWALL
ACOUSTIC INSULATION
PLASTERBOARD LINING 10mm
75x35mm TOP HAT
ALUCOBOND BACKING STRIP
3M CHB DOUBLE SIDED TAPE
100mm DIA PVC DOWNPIPE
CAPRAL ALUMINIUM FIXED FRAME WINDOWS DOUBLE GLAZED GLASS6mm SUPPORTED BY WEDGES
ROLLER HANGER
SUN LOUVRE ALUMINIUM FRAME WELDEDTO WINDOW FRAME 100mm
SINGLE GLAZED FRAME
150 SHS
SILICONE CAULKINGWITH BACKING ROD
SEALANT AND BACKING ROD FOR DEFLECTION GAP
BOARDROOM
EXHIBITION
EXTERIOR
SEALANT JOINING SHS AND GLAZING FRAME,ACTING AS EXPANSION JOINT FOR ALUCOBONDCLADDING AND LOUVRE FRAME.
115mm DIASTAINLESS STEEL SUPPORT FOR DPSCREW FIXED TO GLAZING FRAME
Level 1 FFL
3750
B
GF FCL
3150
ALUCOBONDCLADDINGPANELS
75x35mm TOP HAT@600crs
MOISTURE BARRIER
SL82 REBARSTEEL FORMWORKFIXED ON BONDEK
92 RONDO STEELBOTTOM PLATE
INSULATION BATTS R-VALUE IS 1.5,
10mm PLASTERBOARD
TIMBER SKIRTING OFIXED TO STUD WALL,ON TOP OF CARPET EDGE
BONWEDGE FIXED TO BONDEKCONNECTED TO SUSPENSION CLIPS
9.5mm CARPET FINISH
BONDEK
MARINE BOARD FIXED TOALUCOBOND TOP HAT & STUDWALL
3M VHB DOUBLESIDED TAPE
HEAD FLASHING
300UB
75x35mm TOP HAT@600crs
ALUMINIUM FRAMESLIDING DOOR CAPRAL
SUSPENSIONS CLIP
FURRING CHANNEL 129
ACOUSTIC CEILING PANELS 10mm
FURRING CHANNEL WALL TRACK 140CONNECTING CHANNELTO ALUMINIUM FRAME
SUSPENSION RODS
SILICONE SEAL
LEVEL 1 LOBBY
EXTERIOR
P51 RONDO SHADOWLINEFIXED TO PLASTERBOARDAND CLIPPED TO FURRING CHANNELWALL TRACK 140
ENTRY LOBBY
RL 42.470
RL 43.070
Scale
Checked by
Drawn by
Date
JN ARCHITECTS
As indicated
DetailsPRELIMINARY
154-156 CARDIGAN ST
UNIVERSITY OFMELBOURNE
21.05.13
JN
YL
A4.01SCALE 1 : 20A4.01
WALL DETAIL SECTION1
SCALE 1 : 5A4.01
PLAN DETAIL3
SCALE 1 : 5A4.01
SECTION DETAIL2A1.02
A1.03
A1.03
NOTESARCHITECT HAS BEEN ENGAGED TO PREPARE THESEDRAWINGS SOLELY FOR THE PURPOSES OF SEEKINGRELEVANT PERMITS RETROSPECTIVELY DUE TOCONSTRUCTION WORK CARRIED OUT PRIOR TO OBTAININGAUTHORITIES' CONSENT. QUALITY OF WORKMANSHIP INBOTH MATERIALS AND INSTALLATION/CONSTRUCTION ARENOT ASCERTAINED. INFORMATION PROVIDED BY THEOWNER / BUILDER REGARDING THE CONSTRUCTEDELEMENT MAY ALSO HAVE BEEN USED IN PREPARING THISDRAWING. DIMENSIONS ARE TAKEN FROM FINISHEDSURFACES AND ARE TO BE CONSIDERED APPROXIMATE. DONOT SCALE ANY DRAWINGS.
CV: Jonathan Ng Cheong Tin 12/13
UP
UPDN
1
2
3
4
5
6
7
18
16
14
12
10
9
8
D
J
11
I
F
A
H
C
G
E
B
SHOWROOMMODERN END
CAFE
SHOWROOMPODIUM
BOARDROOM
OFFICES
TOILETS
SHOWER ROOM AMP ENTRY
DISABLEDPARKING
OFFICES
STAFF ROOM
MINI GOLFENTRANCE
FIRESTAIRS
MINI GOLFHOLE 1
WAITING ROOM
17
15
13
Barlow Motors, Melbourne CBD. Architecture Design Studio Fire, B envsCar Showroom/ 300 Car parks /Offices / Bachelor Pad[Revit design/documentation]
2012
CV: Jonathan Ng Cheong Tin 13/13
Studley Park Boathouse, Kew, Melbourne. Architecture Design Studio Water , B envs. Learning from Masters: Tadao Ando Language.[Sketchup + Podium]
Above the shrooms, around the marble, our celestial home, Melbourne. Top 5 in Victoria. https://vimeo.com/48858621SuperStudio, 24 Hour competition. [Rhino + Grasshopper]
2011
2012