CURRICULUM VITAE Name: SAJEEV KUMAR M P Born: 03.04.1971 Place of birth: TRIVANDRUM,KERALA,INDIA Nationality: INDIAN Marital status: MARRIED Languages: ENGLISH Profession: Site Manager, FLS Education: MECHANICAL ENGINEER Professional Experience 2010 - 2014 Site Manager & Chief Mechanical engineer for Sua Kuwait Line-2 - 8000 tpd project in Kuwait. 2009 - 2010 UCC, Calabar, Nigeria (7000 tpd green field project) Commissioning Assistance SINAI (Grey) CEMENT Line-2, Egypt Commissioing Assistance 2007- 2009 2006-2007 CIBA (Grey) PLANT, Algeria (7000 tpd green field turnkey project) Worked as a Chief Mechanical Engineer for the total plant installtion. Equipments : EV Crusher, Circular storage, Atox 50, Kiln, SF cooler, Ball mills, Ventomatic packing plant, Silos, Material handling equipments etc SEBRYAKOV CEMENT PLANT, Russia

CV-Sajeev Kumar 15062015

Embed Size (px)

Citation preview

Page 1: CV-Sajeev Kumar 15062015

CURRICULUM VITAE

Name: SAJEEV KUMAR M P

Born: 03.04.1971

Place of birth: TRIVANDRUM,KERALA,INDIA

Nationality: INDIAN

Marital status: MARRIED

Languages: ENGLISH

Profession: Site Manager, FLS

Education: MECHANICAL ENGINEER

Professional

Experience

2010 - 2014

Site Manager & Chief Mechanical engineer for Sua Kuwait Line-2 - 8000 tpd project in Kuwait.

2009 - 2010

UCC, Calabar, Nigeria (7000 tpd green field project) Commissioning Assistance SINAI (Grey) CEMENT Line-2, Egypt Commissioing Assistance

2007- 2009

2006-2007

CIBA (Grey) PLANT, Algeria (7000 tpd green field turnkey project) Worked as a Chief Mechanical Engineer for the total plant installtion. Equipments : EV Crusher, Circular storage, Atox 50, Kiln, SF cooler, Ball mills, Ventomatic packing plant, Silos, Material handling equipments etc SEBRYAKOV CEMENT PLANT, Russia

Page 2: CV-Sajeev Kumar 15062015

������������ �� �����������

� � �

2004-2005

2003-2004

2001-2002

2000-2001

Insatallation supervision and Commissioning assistance for Cement grinding unit Unidan Ball Mill (4.6x14m with MAAG central drive) ACC Cement plant Line-2,M’sila,Algeria (Green field turnkey project) Installation supervision & Commissioning assistance for equipment’s : Kiln, 5 stage ILC preheater, SF cooler, clinker transport system etc ACC Cement Plant Line-1, M’sila,Algeria (Green field turnkey project) Installation supervision & Commissioning assistance for equipment’s : Kiln, 5 stage ILC preheater, SF cooler, clinker transport system etc MISR BENISUEF CEMENT COMPANY,EGYPT Installation supervision & Commissioning assistance for Raw material handling system, UNIDAN –TYRAX Ball mill With RAR Separator, ILC Preheater, CIS-CFG-RFT cooler, UMS Ball mill with O-Sepa MAIHER CEMENT,MP,INDIA Installation supervision of conventional cooler upgradation with CIS-MFR KESORAM CEMENTS, RMAGUNDAM,AP,INDIA Installation supervision of Preheter upgradation DALMIA CEMENTS,TRICHY,TAMILNADU,INDIA Installation supervision of 5stage ILC preheater, Kiln shell replacement, Cooler upgradation with CIS-CFG-RFT MADRAS CEMENTS,MATHOD,KARNATAKA,INDIA Installtion supervision of 3.5x10.6 ball mill for cement grinding BINANI CEMENT LTD, SIROHI,RAJASTAN,INDIA Installation supervision for cooler up gradation with CIS-CFG SOURASHTRA CEMENTS, PORBANTHAR,GUJARATH,INDIA Installation supervision of 4.6x14m UNIDAN ball mill with Sepax separator for cement grinding & Material handling system MADRAS CEMENTS, ALATHIUR,TAMILNADU,INDIA Installtion supervision & Commissiong assistance of 5 stage ILC Preheater, Kiln, SF Cooler, CF Silo system, DUOFLEX burner with coal firing system

Page 3: CV-Sajeev Kumar 15062015

������������ �� �����������

� � �

CHETTINADU CEMENTS, PULIYUR,TAMILNADU,INDIA Installtion supervision of cooler upgradation with CIS-CFG

Job outside FLSmidth:

2005-2006 Worked with AL JAWAHAR ENGINEERING Co.L.L.C, Ras AL Khaima, UAE as a Project Engineer and involved in

• Project planing and coordination

• Evaluation of technical proposals

• Evaluation of offers & report preparation

• Techanical Feailbility study

• Preparation of Tenders

• Evaluation of Contracts

Involved in NATIONAL CEMENT FACTORY Grinding unit Project, Abudhabi Involved in FARSNOV CEMENT pre commissioning activites Involved in GULF CEMENT Company, RAS AL KHAIMA , Line-2 Kiln line project

1993 - 2000 Worked with KARAPARA PROJECT ENGINEERING, Surat, Gujarat, India as an Installation Engineer and involved in projects INDO GULF BIRLA COPPER,DAHEJ, GUJARATH,INDIA Worked as a Site-In-Charge Equipments : Rotary Granulator, Rotary Dryer, Rotary Cooler ( Equipments supplied by FFE Minarals,India) NIRMA SODA ASH Project, Bhavnagar, Gujarath,India Supervision of equipment installation: Material handling system like, stacker & reclaimers, belt conveyors,truck tripplers, bucket elevators etc & 2 ball mills for Lime grinding ARAVIND MILLS, Ahamadabad, Gujarath,India Erection supervision of material handling system & steel structures RELIANCE PETROCHEMICHALS, Jamnagar,

Page 4: CV-Sajeev Kumar 15062015

������������ �� �����������

� � �

Gujarath, India Erection supervision of Thermax boiler piping SOURASHTRA CMENTS,Porbanthar,Gujarath,India Erection supervision of Preheater upgradation