7
FAHEEM AKRAM QA-QC Engineer / Inspector for (Static, Rotating Equipment, Steel Structural & Welding/Piping) 00971-50-9260286 [email protected] To build career in field of Quality Control & Quality Inspection at major company by utilizing my technical and communication skill relevant industrial training and extensive computer knowledge. DAE (Diploma of Associate Engineering) in Mechanical from GCT College in 2005 API-510 (Certified Pressure Vessel Inspector) Approval No.43641 API-580 (Certified RBI Inspector) Approval No. 50542 Certified Lead Auditor ISO 9001-2015 Auditor Transition Training Course , Certificate No. TUVSUDMETC1522042016/000062 Certified Lead Auditor ISO 9001-2008 Quality Management System (QMS) , Certificate No. 9474 ASNT Level II as per SNT-TC-1A in VT, RT, MT, PT Advance Safety Audit Course from Das Training institute, Das Island, Abu Dhabi, UAE Valid UAE License # 2306156-Abu Dhabi, Exp-21-10-2025 Approved Mechanical Inspector (Static & Rotating Equipment) from BECHTEL & GASCO at AGD-II Approved Mechanical Inspector (Static & Rotating Equipment) from MEPI TECHNIP at OAG-I Approved Mechanical Inspector (Static & Rotating Equipment) from ADGAS for TA 2010/2011/2012 Approved Mechanical Inspector (Static & Rotating Equipment) from Daewoo E&C at RRE, EPC-4 Approved Mechanical Inspector (Static & Rotating Equipment) from SK E&C at RRE, EPC-1 Approved Mechanical Inspector (Static & Rotating Equipment) from Samsung at CBDC Project Having 11+ years of experience in the field of inspection for static, rotating equipment, steel structural, welding, piping, preservation and their overhaul on offshore & onshore projects Preparation of ITP (Inspection Test Plan), MS (Method Statement) & Quality Procedures Having good practical and theoretical knowledge in interpretation of drawings, evaluating procedures, studying requirements and executing jobs, good working knowledge of related codes, specification, QA/QC procedures and inspection methods and different techniques. Raising & closing of NCR, CAR, PAR by fulfilling all documentation & field requirement Raising of Technical Query (TQ) against complex density of drawings & procedures Preparation of daily, weekly and monthly reports and maintaining the progress through different company sofwares and special programs Page 1 of 7 CAREER OBJECTIVE QUALIFICATION & ACHIEVEMENTS SYNOPSIS OF EXPERIENCE

CV Faheem Akram (Static, Rotating Structural, Welding)

Embed Size (px)

Citation preview

Page 1: CV Faheem Akram (Static, Rotating Structural, Welding)

FAHEEM AKRAMQA-QC Engineer / Inspector for (Static, Rotating Equipment, Steel Structural &

Welding/Piping)00971-50-9260286

[email protected]

To build career in field of Quality Control & Quality Inspection at major company by utilizing my technical and communication skill relevant industrial training and extensive computer knowledge.

DAE (Diploma of Associate Engineering) in Mechanical from GCT College in 2005 API-510 (Certified Pressure Vessel Inspector) Approval No.43641 API-580 (Certified RBI Inspector) Approval No. 50542 Certified Lead Auditor ISO 9001-2015 Auditor Transition Training Course , Certificate No.

TUVSUDMETC1522042016/000062 Certified Lead Auditor ISO 9001-2008 Quality Management System (QMS) , Certificate No. 9474 ASNT Level II as per SNT-TC-1A in VT, RT, MT, PT Advance Safety Audit Course from Das Training institute, Das Island, Abu Dhabi, UAE Valid UAE License # 2306156-Abu Dhabi, Exp-21-10-2025

Approved Mechanical Inspector (Static & Rotating Equipment) from BECHTEL & GASCO at AGD-II Approved Mechanical Inspector (Static & Rotating Equipment) from MEPI TECHNIP at OAG-I Approved Mechanical Inspector (Static & Rotating Equipment) from ADGAS for TA 2010/2011/2012 Approved Mechanical Inspector (Static & Rotating Equipment) from Daewoo E&C at RRE, EPC-4 Approved Mechanical Inspector (Static & Rotating Equipment) from SK E&C at RRE, EPC-1 Approved Mechanical Inspector (Static & Rotating Equipment) from Samsung at CBDC Project

Having 11+ years of experience in the field of inspection for static, rotating equipment, steel structural, welding, piping, preservation and their overhaul on offshore & onshore projects

Preparation of ITP (Inspection Test Plan), MS (Method Statement) & Quality Procedures Having good practical and theoretical knowledge in interpretation of drawings, evaluating procedures,

studying requirements and executing jobs, good working knowledge of related codes, specification, QA/QC procedures and inspection methods and different techniques.

Raising & closing of NCR, CAR, PAR by fulfilling all documentation & field requirement Raising of Technical Query (TQ) against complex density of drawings & procedures Preparation of daily, weekly and monthly reports and maintaining the progress through

different company sofwares and special programs Ensuring site work is being performed meeting all specifications & approved quality procedures All preparation for Audit (Internal & External) ensuring all documentation compliance with

approved procedures Strong coordination with client and discussing various problems during weekly meeting Coordination with supervisors & area engineers ensuring implementation of quality system

during site work, progress monitoring and maintaining the complete record in soft & hard form through company softwares

Code awareness, ASME V, ASME-VIII, ASME-IX, B31.3, API-686, STD-510, RP-571, -RP-572, RP-576, RP-577, RP- RP-652, RP-575

PROJECT’S RESPONSIBILITIES (Static & Rotating Equipment)

Field inspection of all the rotary and static equipment Material receiving inspection for all incoming material as per approved MTC’s, packing list

and delivery notes to ensure the received material is of the same grade and type and there is no physical damage.

Page 1 of 6

CAREER OBJECTIVE

QUALIFICATION & ACHIEVEMENTS

SYNOPSIS OF EXPERIENCE

EXPERIENCE DETAIL

Page 2: CV Faheem Akram (Static, Rotating Structural, Welding)

Preparing of Discrepancy Report or raising Non Conformity for any damage, lost and missing material which does not meet the minimum requirement and compliance with the approved procedures and project specification

Dimensional inspection of foundations, erection, grouting and all the auxiliary attachments of heavy equipment as per quality inspection plans

Inspection of package boiler and duct, economizer, primary and secondary steel, steam drum, FD fans, burners and other ancillary attachments

To check correct installation of louvers, dampers, expansion joints & davit arms Verify nameplate data/equipment tags in accordance with vendor data and specification

requirements Verify that there is no physical damage to equipment, and shims are placed of correct size Verify that paint touch up has been performed and inspected prior to installing the

equipment Ensure nozzles orientation are as per GA drawings Leveling & alignment of all the equipment prior to release for grouting Master level from machined surfaces for rotating equipment Preliminary shaft alignment for the rotating equipment prior to release of grouting & piping

connection Verify equipment set in accordance with specified tolerances. Release for grouting of the equipment (non shrink cemented based & epoxy grout) Check equipment bolts tightening by torquing, tensioning, striking and snug tightening

method, as applicable per vendor instructions or approved inspection test plans (ITP’s) Ensure all the piping connected to equipment have been NDT performed, hydro-tested,

flushed & reinstated Ensure motor solo run has been performed before final alignment verification of piping to equipment nozzles installed with correct parallelism/bolts/gaskets,

bolts free running between pipe/equipment flanges, no load (stress) transfer from piping to rotating equipment

Checked the soft foot and suction and discharge parallelism as per approved ITP’s or vendor documents

Final shaft alignment for Gas Turbines & Auxiliary , Compressors (LP,HP & gear box side), Pumps as per vendor and project specs

Installation of coupling and its guard after alignment has been achieved Lube oil flushing of compressors as per specs and vendor provided procedures Blade Angle, Tip Clearance, Pulley Alignment, Fan Assembly bolt tightening, belt tensioning

and guard installation for fin fan coolers Complete inspection of bolt tightening of each section for Feed Gas Compressor inlet, outlet

duct, WHRU (west heat recovery unit) Installation of secondary steel structure, gratings, hand railing, floor plate, treads & ladders

secured in place. Bolted and torqued, all clamps securely fixed as per drawing All the internal inspection of the columns Correct installation of trays, demister pad, distributor trays, structured packing, bed limiters,

packed bed, filling of rasching rings, sparge & down pipes, chimney trays as per specs Check the internal cleanliness, shell to wall clearances, down comer clearances, weir height,

leveling and bolt tightening Verification of vortex breakers & baffle plates Leak test of chimney tray and verification of completed welds Manway closing and final box up of columns, vessels, tanks & filters Load test of overhead cranes Verify proof load testing and deflection measurement of beam Verify clearances, tolerances and safety stops, rail clamps etc in accordance with

vendor/specs. Erection of two flares (102’ height) with all ancillary equipment Guy wire installation, tensioning of guy wires, verticality check, dead man, davit arm and

winches installed as per specs. Flare tip assembly installed correctly, flange bolts tightened and pilot piping completion

Key Performance on Major Shutdowns Inspection performed to determine physical condition of the vessels shell, heads, nozzles & to

determine type, rate and causes of damage mechanism & associated deterioration, and

Page 2 of 6

Page 3: CV Faheem Akram (Static, Rotating Structural, Welding)

documented each activity after every inspection, the inspection also includes future inspection, repair / replacement & yields a history that may form the basis of routine inspection & assessment by utilizing multiple NDE techniques & technologies

A visual external inspection of static equipment to find conditions that could impact the ability to maintain pressure integrity or condition that compromise the integrity of the supporting attachments

Carried out internal inspection for physical condition, inspection of degradation of material, thinning & pitting, cracking, erosion, blistering, deformation, trays & internal components repair / replacement of any damaged components

Skirt inspection and tapping with hammer of column different parts to check extreme thinning Inspection of linings (Metallic & non metallic), further investigation of corrosion beneath lining

& deposits & installation of new metallic strip lining where extreme thinning found in the column

Exchanger inspection of tube bundle, tube sheet, impingement plate, baffle plates, tie rods & other parts, differential pressure test and static head fluorescent test (shell side)

Foundation check , to check any settlement, concrete & fire proofing condition To check anchor bolts condition, concrete support, steel supports, grounding connection,

auxiliary equipment, protective coating and insulation condition, guy wires condition & tensioning, ancillary attachment, external metal surface.

Having the ability to inspect on stream & shutdown inspection activities for static equipment, pressure relieving devices, corrosion monitoring of different parts, their components corrosion coupons, probes & injection quills and investigation of failures

To advise on repair techniques. Material selection, welding procedure, inspection & testing requirement

Preparation of dossiers and handing over to client after mechanical completion walk down Having the knowledge to calculate Shell & head calculations, maximum allowable working

pressure, static head pressure, Hydrostatic, pneumatic tests , external pressure calculations. corrosion calculations (corrosion rate, remaining life & others)

PREVENTATIVE MAINTENANCE (Preservation) Preventative maintenance activities performed on all the equipment & piping throughout the

plant (Cleaning, shaft turning, reservoir filling with preservative oil) Record N2 purge pressure on required equipment Open suction & discharge flanges and inspect for dryness/corrosion, applied anti corrosion oil

if required Checked weather proofing, drainage, visual damage, corrosion and cleanliness are

maintained Check protective seal and cover, protective coatings, lubricants and preservatives are

intact

STEEL STRUCTURAL RESPONSIBILITIES

Material receiving inspection for all incoming material as per approved MTC’s, packing list and delivery notes to ensure the received material is of the same grade and type and there is no physical damage.

Preparing of Discrepancy Report or raising Non Conformity for any damage, lost and missing material which does not meet the minimum requirement and compliance with the approved procedures and project specification

Stagewise inspection of all components like handrails, ladders, platforms, gratings, stairways etc., to ensure whether all parts of structural steel installed with correct elevation, orientation, plumbness, leveling, and bolt tightening as per specified tolerances, ITP, approved procedures and project specification.

Release for grouting, bolt tightening and final inspection of completed structure

WELDING, PIPING & NDT AWARENESS

Material receiving inspection for all incoming material as per approved MTC’s, packing list and delivery notes to ensure the received material is of the same grade and type and there is no physical damage.

Preparing of Discrepancy Report or raising Non Conformity for any damage, lost and missing material which does not meet the minimum requirement and compliance with the approved procedures and project specification

Page 3 of 6

Page 4: CV Faheem Akram (Static, Rotating Structural, Welding)

Stage wise Inspection of fabrication of pipe spools which includes material identification, inspection of joint fit up, inspection before, during and after welding, checking and witnessing NDT(RT/UT/PT/MT) requirements, witnessing PWHT activities, witnessing hydro tests and pneumatic tests, review of test packages and inspection of coatings etc.

Review of ITP/WPS/PQR/WPQ/MTR, witness and certification of welding procedures and welders qualification tests.

Ensures that welder tests, welding inspection, NDT activities(RT/UT/PT/MT) and NDT evaluations are properly carried out and that certificates are provided accordingly by continuous monitoring and document review

Ensuring site work is being performed meeting all specifications & approved quality procedures and ITP’s.

Incoming material inspection - verifying the material traceability, test certificates, physical condition for any damages or corrosion related problems

Inspection of welding consumables, baking and storage of electrodes. Verifying calibration of welding machines, ovens and welder quivers. Verifying fabrication and erection of pipe spools as per isometric drawing. Isometric lines checking, punch listing, test pack preparation, review and box up Conducting Tool Box talk for welders, welding operators and fitters.

Review of calibration certificates for ovens, welding machines and inspection tools. Review of Welder Qualification and applicable ranges of welder performance. In process monitoring of welding, preheat, inter-pass temperature In-charge of monitoring welder’s performance and maintaining welder’s continuity records. Review and maintaining the QC Record, Daily Welding Reports, NDT Reports etc., Conducting Hydro-Testing, flushing, reinstatement and its all documentation Preparation for punch listing, line verification & punch items killing RT for different dia joints by using SWSI & DWSI techniques Preparation for RT request and Marking of the repairs joints. DPT for the welded joints and maintaining the record UT sport reading (Thickness Measurement) with Stresstel Thickness Meter of Piping and Tank’s

roof, shell and bottom plates with manual and computerized sketches Inspected Pitting, Gouging with sketches Coating Inspection with Holiday Detector to inspect the discontinuities, cracks, pinholes, gaps

and other flaws Hardness Preparation of dossiers and handing over to client after mechanical completion walk down Preparation of daily, weekly and monthly reports and maintaining the progress through

different company sofwares and special programs

SHUTDOWN DURATION DETAIL

From 4 March, to 23 May, 2012 Das Island ADGAS Plant, Major Overhaul of Train-2, Boiler 3 & 4From 27th March, to 10th May, 2011 Das Island ADGAS Plant, Major overhaul of Train-1, Boiler 1 & 2From 16 Jan, 11 to 28 Feb, 2011 (Phase-II)Takreer Oil Refinery Major overhaul of Condensate PlantFrom 1st Dec 10 to 15 Dec, 10Habshan (Gasco Plant) Long Term Shutdown (Area-1 to Area-6)From 16 Oct, 10 to 16 Nov, 10 (Phase-I) Takreer Oil Refinery Major overhaul of Gasoline & Condensate Plant

PROJECT DURATION DETAIL

From Feb, 2014 to date Presently Working with AL-Jaber Energy Services as a Sr. QA/QC (Static, Rotating Equipment &

Steel Structural Inspector) at Samsung, Carbon Black & Delayed Coker Project (CBDC) in Takreer Oil Refinery, Ruwais, Abu Dhabi, UAE

Scope: Construction of new plant including Fabrication of piping, welding, steel structural, static and rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

From June, 2012 Jan, 2014

Page 4 of 6

Page 5: CV Faheem Akram (Static, Rotating Structural, Welding)

Worked with AL-Jaber Energy Services as a Sr. QA/QC (Static, Rotating Equipment & Steel Structural Inspector) at SK E&C, EPC-1, Ruwais Refinery Expansion Project (RREP), at Ruwais, Abu Dhabi, UAE

Scope: Modification of Existing Plant (repair, replacement & tie-in joints) Construction of new plant including Fabrication of piping, welding, steel structural, static and rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

From June 2011 to 27 Jan, 2012 Worked with Descon Engineering Ltd as a QA/QC (Static, Rotating & Welding Inspector) at

Daewoo EPC-4, Ruwais Refinery Expansion Project at Ruwais, Abu Dhabi, UAE Scope: Construction of new plant including Fabrication of piping, welding, steel structural,

static and rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

From Oct, 2009 to Sep 2010 Worked with Descon Engineering Ltd as a QA/QC (Static, Rotating & Welding Inspector) at

MEPI/TECHNIP, Offshore Associated Gases Project (OAG-I) ADGAS at DAS Island, Abu Dhabi, UAE

Scope: Modification of Existing Plant (repair, replacement & tie-in joints) and Construction of new plant including Fabrication of piping, welding, steel structural, static and rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

From Feb, 2008 to Sep, 2009 Worked with Descon Engineering Ltd as a QA/QC (Static, Rotating & Welding Inspector) at Asab

Gas Development Phase-II Project (AGD-II), Gasco, Asab, Abu Dhabi, UAE Scope: Construction of new plant including Fabrication of piping, welding, steel structural,

static and rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

From Aug, 2005 to Nov, 2007 Worked with Bosicor Oil Refinery as a QA/QC (Static, Rotating & Welding Inspector) at CDU

Revamp Project & Turnaround Client, Bosicor Oil Refinery Scope: Existing plant modification Fabrication of piping, welding, steel structural, static and

rotating equipment installation, electrical, instrumentation and civil work with final dossier submission

THIRD PARTY DETAIL

Worked with Third Party Inspection Co., (Global NDE Services) on its various sitesFrom May, 2004 to June, 2005PROJECTS

Worked with Shell Pakistan Pvt., Ltd, Construction of Tanks at Keamari, Karachi Terminals as an NDT Inspector

Worked with Imperial Construction Co., (ICC), Construction of Edible Oil Refinery at Port Qasim, Karachi as an NDT Inspector.

Worked with Al-Tariq Constructors Pvt., Ltd, Construction of LPG Presser Vessel at Mach Goth, Karachi as a NDT Inspector

Worked with Echo West (72” dia KWSB line) at Dhabeji as an NDT Inspector

HSE AWARENESS

H2S Awareness, Breathing Apparatus trainings from Das Training Institute, Das Island, Abu Dhabi,(PICWS) Person Incharge at work site, HSE General trainings, Live plant hazards, confined spaces, work at height and others

Name : FAHEEM AKRAMS/o : MUHAMMAD AKRAMEmail : [email protected]

Page 5 of 6

PERSONAL DETAILS

Page 6: CV Faheem Akram (Static, Rotating Structural, Welding)

Cell # : 00971-50-9260286, 0092-322-2009987

Any further detail may also be furnished upon request.