Upload
amtris406
View
133
Download
0
Tags:
Embed Size (px)
DESCRIPTION
am
Citation preview
Contact Information
Referred employment opportunity
1. Water- Wastewater and Environmental Specialist2. Monitoring and Evaluation, Economic and Social3. Infrastructure , construction and Supervision
Name AM Tris HardiyantoEmail address [email protected] (official)
Postal address JL.Mahoni No 66 Depok Utara Depok 16421 Indonesia
Phone number + 62 8568823410 (office ) +62 21 77200420 ( home )Fax + 62 8458823410Mobile + 62 811146052Passport No R 586258 ( Indonesia Passport )
CV Amtris Hardiyanto Page 1
CURRICULUM VITAE
Category:
1. Family name : Hardiyanto
2. First names : A.M. Tris
3. Date of birth : 8 January 1963
4. Nationality : Indonesian
5. Civil status :Married ( 2 children , 19 years old and 17 years old )
6. Education:
Institution[ Date from - Date to ]
Degree(s) or Diploma(s) obtained:
University of Indonesia (2002 – 2004)
Master Degree, Major Environmental Science
University of Indonesia(1993 – 1998)
Bachelor Degree, Major Economic Business
Institute Sience Technologi
Bachelor Degree, Civil Engineering
University of Indonesia(1984 1988)
Diploma Degree, Mechanical Engineering
7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
Language Reading Speaking WritingEnglish 2 2 2Bahasa
Indonesia1 1 1
Melayu 1 1 1
8. Membership of professional bodies:
Indonesia Environmental Service (INDEVS),
Alumni Association ( University of Indonesia )
Water Environment Federation ( No 01016815),
ATAKI ( Environmental Association )
9. Other Skills :
Process & Design Wastewater treatment
CV Amtris Hardiyanto Page 2
Microsoft Project Program, Auto Cad , All windows application
Environmental Impact Analysis (EIA Certificate)
Management Project implementation
10. Present position: Water and Wastewater Specialist Mott MacDonald Indonesia
11. Years within the firm: 18 years
12. Key qualifications:
Senior Expert with 18 years of work experience in Water and Wastewater
process ( Industrial and Municipal ); Water Supply & Sanitation projects,
quality Engineering ; Feasibility Study , Research & Development Water &
Waste Water Treatment, Environment Protection, Quality Evaluation Audit,
Environmental Impact Assessment, Infrastructure management programme
and Supervision.
Post graduate academic credentials in Mechanical Engineering and
Environmental Protection.
Demonstrated experience with Monitoring and Evaluation as evidenced by
several projects funded by major multilateral and bilateral agencies; AUS aid,
ADB, UNDP etc.
Wastewater Project Manager with several years of experience in Engineering,
Procurement and Construction in Indonesia.
13.Specific experience in the region:
Country Date from - Date toIndonesia 2009 - Present
China Feb 2010 to May 2010Vietnam 0ct 2009 to Jan 2010
Singapore 2005 - 2009Indonesia 1988 - 2005
CV Amtris Hardiyanto Page 3
14. Professional experience
CV Amtris Hardiyanto Page 4
Date from - Date to
Location Company / Donor Position Description
July 2010 to present
IndonesiaMott Mac Donald Indonesia
Reff :
Imam Hudori
Phone :+6287821731974
Web Mail : www.mottmac.com
Deputy Team Leader and Water Supply and Environmental Specialist
Supporting to technical team to determine the feasibility and cost for pipeline, and system for water treatment from the Jatiluhur Reservoir to Jakarta at minimum cost, and calculating the financial and legal consequences also the adjustment of risk access to improve the reliability and safety of Water Supply to Jakarta and the vicinity.
As water supply specialist, responsible to identification of existing systems and data collection, for understanding the problems associated with water supply that will be planned within the future of Bandar Lampung Water Supply schema through PPP-Public Private Partnership Project.
104 Km Pipe Transmission using 1800 to 1000 mm diameter pipe for Water Supply to 5 City in Eeast Java,
Environmental Impact Analysis for Pipe transmission Water Supply and Social Impact for Umbulan Project.
Responsibility for Operation HSE for installation and construction project.
Dec 2009 to April 2010
Indonesia PT.MLD subsidiary DHV Donor : Ausaid ProgramClient: Ministry of Public Utility
Reff : SetiajI Hadipryitno, PresidentDirector Email [email protected] : www.dhv.comPhone : +628121028706
Watsan SpecialistEnvironmental Impact Analysis of Municipal Wastewater Treatment Plant for Losari Makasar, Sulawesi,Indonesia.
To improve the quality and sustainability of Makasar City’s environmental wastewater infrastructure base, in particular targeting the protection of water recipients losari Beach.
Technical Assistance for the preparation of preliminary design for the Construction of the Waste Water Treatment Plant and sewerage network in the Municipality of Losari
Collect information from all relevant stakeholders and actors in the sustainable Environmental for Makassar City
CV Amtris Hardiyanto Page 5
Review DED, Effluent assessment, make alternative for Municipal WWTP Develop program monitoring and Environmental Evaluation.
CV Amtris Hardiyanto Page 6
Aug 2009-
Dec 2009
Indonesia PT. Mitra Lingkungan Dutaconsult/DHV
Donor : AusAID Program
Client : Ministry of public Settlement and Regional Infrastructure, Reference :Jim Coucouvinis | Technical Director Watsan Indonesia Infrastructure Initiative (IndII) FacilityOffice Phone: (+62) 21 230 6063 ext 146Hand Phone: (+62) 0816 990169Email: [email protected]: www.indii.co.id
Water Sector and Environmental Expert
Evaluation of Infrastructure Enhancement Grant Proposal from local Governments under The Indonesian Infrastructure Initiative (IndII) program to improve the delivery of municipal services and improve the living conditions of the urban environment include water supply and sanitation ( 9 local government in 4 province Sumatra, Java, Kalimantan and Sulawesi) under Ausaid program
Thematic studies of key aspects of the water sector amd prepared with the assistance of appropriate bodies. Assets program for need to reflect what can be realistically and reasonably achieved within the timeframe of the project Water Supply and sanitation that adds value to the project purpose.
Conduct meeting with SKPD ( local group government authority to be held involving key stakeholder to clearly identify these problem
Analyze the environmental, economic, social, political, legal, technical and institutional developments relevant to the promotion of sustainable water sanitation infrastructure project in Indonesia
CV Amtris Hardiyanto Page 7
May 2009 – Aug 2009
Hanoi PT. Mitra Lingkungan Dutaconsult/DHV
Donor : WSP Finland
Reference :
Markus SaariDirector (International)WSP Finland Ltd.tel. +358 40 7434662e-mail: [email protected]: www.wspgroup.fi or www.wsproup.com
International Consultant.
Monitoring and Evaluation
Review Water and Sanitation Phase1 and Make recommendation for WSP phase 2 for 8 Province in Vietnam ( project under WSP Finland program)
* recommends that, based on the current implementation status of phase 1 water supply and sanitation program Activities, prepare a forecast of expenditure for the phase 2 along with the anticipated unspent balance for submission to the Ministry of public utility.* Support the establishment of the Environmental 'Sustainable Water and Sanitation Task Force' of the Ministry of Utility ;
* Review relevant national document on Water Supply program including second national communication of Vietnam and Finland , and latest information on policies and measurement for water resources, agriculture, energy and waste management assess the tic uncial and institutional capability
2008 – 2009
Jakarta PT. Mitra Lingkungan Dutaconsult
Donor : Sinar Mas Group
Expert Group Manager Water Supply & Sanitation
Develop Program and Project Management for water and wastewater treatment, environmental assessment, industrial, drainage, sewerage and other infrastructure projects for BSD project with 3000 HH community.
Undertaking an initial assessment of investments by the private development partners. A detailed assessment amd provide an overview of current and proposed future activities especial in allocation water in the future.
2007-2008
East Java PT. Mitra Lingkungan Duta Consult
PT . Amerta Bumi Capital
Reference :S.Yudith PrasetyoDirectorPhone : +6281332800551Email : [email protected]
Water Supply Consultant
Pre-FS The Umbulan Water Supply for Sidoarjo, Surabaya, and Adjacent town. Investigation for feasibility study water system and utilized spring water in technical and financial aspect.
Investigate Water Resources from Spring Water Umbulan and Rejoso River for water allocation policy to derive on river basin scale and coordinated on institutional level, identifying surplus and shortage zone along with the technical and institutional option to improve the water balance of the area.
Prepare for PPP Public –Private –Partnership Water Supply
CV Amtris Hardiyanto Page 8
2005 - 2007
Singapore EnviroSolution & Consulting Pte.Ltd
Donor : Multi Donor Fund and UNDP
ReferenceAntun HidayatNational CoordinatorPhone : +6281360374081Email : [email protected]
Senior Consultant/ Water Sector Expert/ Monitoring and Evaluation
Involved in project management in the field of environmental research and consultancy; prepares Pollution Control Studies & Quantitative risk Assessments for waste management program and chemical manufacturing industries business development
Involved in various project with consultancy and NGO organization. The work included planning, tendering and supervision of several infrastructure related projects, environment evaluations, environmental impact studies, environmental training and development of guidelines and training handbooks. Responsible for pre feasibility study, acted as the liaise officer for the sanitary landfill site assignment in Aceh, Indonesia between the Government ,UNDP and consult-ants as well as engineer in several designs of the project
Evaluation of potable water systems, water supply and sanitation systems, and solid waste management projects.
Involved in a number of Environmental Impact Assessment s (EIA) of various projects including sanitary landfill In the 9 District province Aceh, Tsunami Recovery Waste Management Program.
Proposed and conduct UKL/UPL and DPPL for the various landfill site in Aceh-Nias
Monitoring and controlling Waste Management Program compliance in all areas, including sub district area, and conduct effective planning, staff training and development, organisation and time management
2004 – 2005
Singapore Glowtec Environmental. Pte.Ltd
Donor /Client : Batamindo
Chuan Diong Sian
President Director
Phone :+65 63566861+6597981910Email : [email protected]
Water Sector and Environmental Specialist
Project Design and Construction for Water and Wastewater Treatment Designing effective Project Operational procedures to ensure the smooth
running of all operations Responsible for Environmental assessment and management for the
project construction Investigating and understanding weekly shrinkage issues, construction a user
friendly guide, and subsequently testing and commissioning and completion of the project.
Apr 2004 – May
2004 (2 months)
Indonesia PT.Nippon Kiyoe ConsortiumDonor/client : ADB
Reference:
River Design EngineerLower Brantas River Basin Rehabilitation Project, under the Rehabilitation Loan Carry out the design of proposed groundsills including stability analysis;
Carry out the structural design of the proposed ground sills.
CV Amtris Hardiyanto Page 9
Johannes WibowoTeam LeaderEmail : [email protected] :+628158933523
2003 - 2004
Lampung, Indonesia
Medco Ethanol Lampung
Donor : Medco Group
Reference:
Sulasmo SudharnoPhone: +62-21 72786844Email [email protected]
www.medcoenergi.com
Project Manager Pre feasibility study for the Medco Ethanol Lampung, Capacity 180 klpd,
location Kota Bumi, Lampung Review the Detail Engineering Design Wastewater Treatment with the
Principal and consultant Serve as project Manager and Engineer of works for a variety of construction
projects including the construction of a water, waste water treatment plants, roads and infra-structure
Sept 2002-
November 2003
Indonesia ADB
Client : Ministry of Settlement and Regional Infrastructure, Directorate General of Water ResourcesReference:
Billy masterionDirector [email protected] :+62 21 42886678
Hydraulica MondelingFlood Management in Selected River Basin Project Indonesia –ADB – TA no. 4159-INO
Objectives of the project are to reduce the incidence of and damage from flooding in selected river basins
Prepared Hydraulic and flood modelling for Ciujung River, Tuntang and Jragung River with SOBEK Software.
Jul 2001 to Sept 2002
Indonesia European Union
Client : Directorate General of Water Resources, Dept Of Public Works & The Lampung Province Local Government
Hydraulic Engineer Good Governance in Water Resources Management (GGWRM) Project –
Project Management Unit of Lampung, Indonesia Prepare basin water resources management master planning; Prepare water allocation strategies for the arrangement of integrated river
basin management; Support the senior specialists in preparing watershed management
plans, river behavior study, water quality management network;
CV Amtris Hardiyanto Page 10
2000 - 2001
Indonesia PT.Gamma Epsilon
Donor : IBRD
Client : Ministry of Settlement and Regional Infrastructure, Directorate General of Water Resources
Consultant Java Irrigation Improvement and water Resources Management project :
Irrigation Development and Turn Over Component (IBRD Loan), DG of Water Resources Development Ministry of Public Works
The Government of Indonesia introduced policies and action programmes for water resources development and management. Within the World Bank supported JIWMP these policies and action programme are worked out in different components to develop river basin plans and water resources management in 5 pilot basins on Java, rehabilitation and upgrading of 225,000 ha irrigated area handed over to the provinces, special maintenance for 350,000 ha irrigated area to be handed and to the farmers and introduction of Irrigation Services Fee. Set up of the database system and GIS related with the Water Resources Management
1994 - 2000
Jakarta PT Sarana Adiniagatama
Client : Salim Group
Wisma Indocement , floor 18
Jl.Jend Sudirman Kav 21
Jakarta , Indonesia
Reff :
Mr Djunedy Suparmo
Telp : +62-21-5703770
Project Manager Project Design and Construction for Water and Wastewater Treatment Process Design, Include design of various water, wastewater and sewage
treatment plant, tender preparation and technical proposal and equipment procurement
Provides day today leadership and works with staff to ensure a high-performance, customer service oriented work environment that supports achieving the department’s and the District’s mission, objectives and values regarding team building and employee empowerment;
Conduct for construction WWTP, reviewing and analyzing the environment and existing situation of planning area;
Below are the achievement (Engineering Procurement Construction and Management) Project :
Waste Water Treatment Plant, Capacity 600 m3/dayPT.Bimoli Palm Oil,Bitung North Sulawesi ( Year 2000)
Waste Water Treatment Plant, Capacity 750 m3/dayPT.Indo Sentra Pelangi, Semarang ( Year 2000)
Waste Water Treatment Plant, Capacity 800 m3/dayPT. Indofood Sukses Makmur ( Year 1999)
Waste Water Treatment Plant, 200 m3/dayPT.Saritama, Narogong, Bogor ( Year 1999 )
Waste Water Treatment Plant, 1500 m3/dayPT.Indolakto, Sukabumi ( 1997-1998)
Waste Water Treatment Plant , Capacity 10500 m3/dayPT.Bataminto, Batam ( 1995 – 1997 )
CV Amtris Hardiyanto Page 11
Wastewater Treatment Plant, Capacity 5400 m3/dayPT. Bukit Indah City ,Cikampek, Indonesia ( 1994 – 1995 )
1993 - 1994
Cikampek,
Indonesia
PT Pacific Indonesia
Client : Salim Group
Quality Engineering Manager
To manage day to day operation of Engineering for ensuring all aspect of the production operation work efficiency and effectively.
Work closely with design/ product engineer providing technical support in areas of production.
Prepare corrective measurement technical system. Technical operation (achieving planned engineering, maintenance schedules, inventory management, assets and equipment management, quality management.
1992 - 1993
Jakarta PT Indoroc Manufacturing
Client : Salim Group
Engineering Manager/ Monitoring Expert
Responsible in monitoring the process of projects to ensure timely delivery of assignments while maintaining standards and cost effectiveness, Analyze & execute project based on contract, ensure the quality, cost, and time management for the project.
Execute and ensure the quality of maintenance work to be carried out on mechanical equipment, respecting budget, policies and deadlines.
Contribute in his field, to the development of working methods and definition of procedures and ensure their implementation. Optimize maintenance operations, using best available tools and procedures in order to maximise equipment availability.
Ensure proper day-to-day scheduling of works and necessary resources. Ensure completion of major operations within schedule (yearly overhaul).
1991 - 1992
Jakarta PT. Mattel Indonesia
( USA Company )
Product Engineer Promoted to Develop and implement policies and management system in
product safety, Supported quality and laboratories, analyzed processes for potential modifications, functioned as primary liaison between company and buyer regulatory agencies.
To improve on product quality. To get better product or to fulfil government regulation. As well as to solve the problem in conjunction with product formulation, or ingredient.
1990 - 1991
Jakarta PT. Panasonic Matsushita Electronic
( Japan Company )
Research & Development Engineer
R & D work closely with management production to en-sure they get all the support they need to enable them to support new design release and easy in the applications when the product running with standard and specification Define the detailed methodology for carrying out all the jobs according to priorities, required resources, skills co-ordination and supervision.
Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely.
Prepare time and cost estimates for work orders and job plans to help optimising resources allocation.
1989 - 1990
Jakarta, Indonesia
PT. YKK Alumico Indonesia
Jl. Manis Industrial Estate, Jl. Manis Raya No. 23, Tangerang, Banten 15810
Research & Development Engineer
Responsible for monitoring design progress, checking structural analysis from consultant, Fully Support Engineering Department.
Ensure, upon completion of repairs, that equipment is in good operating condition, ready to meet operational requirements, fully inspected, tested, clean and safe.
CV Amtris Hardiyanto Page 12
Reff : Mr Moriwaki
Telp: (021) 5919073, (021) 5917910 Fax: (021) 5919074, (021) 5917413
1988 – 1989
Jakarta, Indonesia
Siemens Indonesia, PTKrakatau Industrial Estate Cilegon Kav. B-2, Jl. Eropa I, Cilegon, Banten 42443Business Line: Power generationReff :
Bambang Munajat General ManagerPhone: (0254) 369500Fax: (0254) [email protected]
Quality Engineer Reporting to Mechanical Manager to provide mechanical design, correction
based on standardized plant or customer requirement. To get define within target zero defects or parts and minimize design time
Responsible for implementing Distribution Board and Mo-tor Control. Local Adaptation. Manage Complaint and Part Data Based. Preparing/ Updating Offering Tools,
Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely.
14. Other relevant information (e.g., Publications)
The Implementation of Industrial Liquid Waste Management ( Study on the implementation of Wastewater Treatment Plant in Tugurejo Sub District, Semarang,
Central Java Indonesia) Library University of Indonesia, 2004
Cost and Benefit to Built Wastewater Treatment Plant for Environmental Sustainability; Library University of Indonesia publishers 1998
Soft Loan for Environmental Protection, Minister Environmental digital publishers , Indonesia 2003
15. Courses and Trainings :
Review of Environmental Regulations
Green Building LEED in House Training, Shanghai 2010
Training in Hazardous Waste Management 2009Seminar
Environmental Due Diligence seminar and site assessment PT.Duta Mitra Lingkungan, Jakarta 2009
Hazardous Analysis & Risk Assessment training, Ministry of Environmental Indonesia.
Seminar of “Technology for Persistent Organic Pollutants (PoPs) Degradation Faculty of Chemical, Bogor Agriculture University-Bogor
Workshop of “Culture, Capture Conflicts: Sustaining Fish Production Livelihood in Indonesia Reservoirs
CV Amtris Hardiyanto Page 13
Certificated Course on Civil Engineering and Environmental Problem held by University of Indonesia
EHS management particularly in EHS compliance and due diligence auditing, EHS Permitting, EMS-ISO 14001 & OHSAS
CV Amtris Hardiyanto Page 14