1. Receive PO Sheet from merchandiser.2. Collect work order.3. Cutting register maintain.4. Collect sample from sample section.5. Make cut plan.6. Make marker for bulk cutting.7. Make cut program.8. Make fabric issue challan & send fabric store.9. Issue wise Fabric receives from store.10. Collect bulk cutting permission.11. PP meeting for bulk cutting.12. Relax fabric for bulk cutting.13. Set paper at lay table.14. Spreading fabric with lay count.15. Set marker upon the lay.16. If stripe fabric then draw pattern at upper lay.17. Marker placement & lay check by quality inspector.18. Cut fabric by cutter man.19. Send cut panel at numbering section.20. Cut panel numbering.21. Cut panel shorting & bundling.22. Make bundle card (Manually & computer ) 23. Send cut panel numbering section to quality table.24. All cut panel Check by quality inspector.25. Quality inspector makes alter summary report.26. Check cut panel measurement by quality inspector.27. Collect batch wise fabric for replace cutting.28. Shade matching & replace cut panel.29. Make cut panel replace record.30. Cut panel send embroidery /printing (if necessary).31. Receive cut panel from embroidery /printing (if necessary).32. Embroidery/Printing part matches with another other part & bundling.33. Scissoring cut panel for stripe fabric.34. Cutting wastage send at left over store.35. Floor cleaning by cleaner.36. Collect Rib/Piping/Lace/Interlining from store.37. Collect shade approval sheet.38. Spreading Rib/Piping/Lace/Interlining & lay count.39. Set marker or pattern.40. Cut Rib/Piping/Lace/Interlining.41. Differentiate size wise & color wise collar & cuff.42. Quality section Check With approval sheet.43. Send all cut panel at store.