2 1/2" 64.13mm 1 1/2" 37.41mm 15 9/16" 396mm 2 3/8" 60.98mm Mill Finish (Standard) Pre-Painted Aluminum (Firestone UnaClad Kynar Color:_______________) Powder Coated (Tiger Drylac RAL#________________) Available Finishes Galvalume® Lead-Coated Copper Rheinzink® Aluminum Copper Freedom Gray™ Available Materials 1:5 Cut Sheet - PD10 4/24/2018 Installation to be completed in accordance with manufacturer's written specifications and installation instructions. 1. See spec sheet or contact manufacturer for detailed material, finishes, and configuration options. 2. Contact manufacturer for detailed layout. 3. Do not scale drawings. 4. Subject to change without notice. 5. Scale: 289 Harrel Street Morrisville, VT 05661 Phone: 1.888.766.4273 Fax: 1.888.766.9994 Email: [email protected]

Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

2 1/2"64.13mm

1 1/2"37.41mm

15 9/16"396mm

2 3/8"60.98mm

Mill Finish (Standard)Pre-Painted Aluminum (Firestone UnaClad Kynar Color:_______________)Powder Coated (Tiger Drylac RAL#________________)

Available FinishesGalvalume®Lead-Coated CopperRheinzink®

AluminumCopperFreedom Gray™

Available Materials

1:5

Cut Sheet - PD10

4/24/2018

Installation to be completed in accordance with manufacturer's written specifications and installation instructions.1.See spec sheet or contact manufacturer for detailed material, finishes, and configuration options.2.Contact manufacturer for detailed layout.3.Do not scale drawings.4.Subject to change without notice.5.

Scale:

289 Harrel StreetMorrisville, VT 05661

Phone: 1.888.766.4273Fax: 1.888.766.9994

Email: [email protected]

Page 2: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

289 Harrel Street, Morrisville, VT 05661 • Toll Free Phone 1.888.766.4273 • Toll Free Fax 1.888.766.9994 • [email protected] A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA from recycled materials

PD10 and PD100F Snow Guard Installation Instructions

Typical Roof Types:

New slate (shown)

New synthetic slate

New composition shingle

New cedar shingle

Installation:

1. Install the first 3 rows of slate, and place the strap of the snow guard on the roof deck (fig. A).

2. Place the snow guard low enough on the slate to leave a minimum gap of 5/8”, or at least

3 times the thickness of the slate, whichever is greater, from the slate above (fig. B).

3. To attach the snow guard, use a minimum of 2 fasteners of a material compatible with the snowguard and the roof system.

Page 3: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

289 Harrel Street, Morrisville, VT 05661 • Toll Free Phone 1.888.766.4273 • Toll Free Fax 1.888.766.9994 • [email protected] A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA from recycled materials

Standard Snow Guard Layout Options

IMPORTANT: All layouts begin with a 3-row pattern. Estimated quantities provided include 3-row pattern. If

you have any questions, please contact us at 888-766-4273.

Please use the guidelines below to determine the appropriate layout for your installation.

Document Version 09.28.2018 07 72 53 Snow Guards

Layout Rafter

Length

Ground Snow Load

(psf) Roof Pitch

Est. Snow Guard

Qty Spacing

3-Row

Pattern 15' or less 75 psf or less

16/12 or

less 17 per 10’ of eave

3 rows, 24" on center horizontally with the middle row

staggered 12"

2x4

Pattern

15' or

greater 75 psf or less

16/12 or

less

12 per roofing

square

Space rows 2' vertically and 4' horizontally to within 10'

of the ridge

2x3

Pattern Any 75-110 psf

16/12 or

less

18 per roofing

square

Space rows 2' vertically and 3' horizontally to within 10'

of the ridge

2x2

Pattern Any 111-150 psf

16/12 or

less

24 per roofing

square

Space rows 2' vertically and 2' horizontally to within 10'

of the ridge

Page 4: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

289 Harrel Street, Morrisville, VT 05661 • Toll Free Phone 1.888.766.4273 • Toll Free Fax 1.888.766.9994 • [email protected] A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA from recycled materials

PD10 and PD100F Snow Guard Specification Sheet

Snow Guards

PART 1 – GENERAL

1.1 SUMMARY

A. WORK INCLUDES

1. PD10 and PD100F gusseted snow guards that attach directly to the roof deck.

2. Coordinate with the installation of the roof to assure proper placement of the

snow guards.

3. Provide appropriate fasteners for the snow guard and roof system.

B. RELATED SECTIONS

1. Section 076000: Flashing and Sheet Metal MasterFormat 2016 07 60 00

2. Section 073100: Shingles and Shakes MasterFormat 2016 07 31 00

3. Section 073200: Roof Tiles MasterFormat 2016 07 32 00

4. Section 077253: Snow Guards MasterFormat 2016 07 72 53

1.2 SYSTEM DESCRIPTION

A. COMPONENTS:

1. PD10 and PD100F snow guard system consists of individual metal snow

guards.

2. Fasteners

a. To be of metal compatible with snow guards.

b. Fasteners should be selected for compatibility with the roof deck.

c. Fastener strength should exceed or be equal to that of the snow guard

system.

B. DESIGN REQUIREMENTS

1. Spacing to be recommended by manufacturer or building engineer. 2. Minimum 2 fasteners per snow guard. 3. It is important to design new structures or assess existing structures to make sure that they can withstand retained snow loads.

Page 5: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

289 Harrel Street, Morrisville, VT 05661 • Toll Free Phone 1.888.766.4273 • Toll Free Fax 1.888.766.9994 • [email protected] A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA from recycled materials

1.3 SUBMITTAL

A. Submit manufacturer’s specifications, standard detail drawings, installation instructions,

and recommended layout.

1.4 QUALITY ASSURANCE

A. Installer to be experienced in the installation of specified roofing material and snow

guards for not less than 5 years in the area of the project.

1.5 DELIVERY / STORAGE / HANDLING

A. Inspect material upon delivery and order replacements for any missing or defective

items. Keep material dry, covered and off the ground until installed.

PART 2 – PRODUCTS

2.1 MANUFACTURER

A. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc.

289 Harrel St., Morrisville, VT 05661, (888) 766-4273

www.alpinesnowguards.com

2.2 MATERIALS

A. Copper – Strap, hood and gusset are 16 oz copper. Fleur-de-lis embellishment has a

minimum material thickness of .040

B. Lead-Coated Copper – Strap, hood and gusset are 16 oz lead-coated copper. Fleur-de-

lis embellishment is a minimum 20 oz lead-coated copper.

C. Galvalume® - Strap, hood and gusset are 26 gauge Galvalume (not available for

PD100F).

D. Aluminum – Strap, hood and gusset are .032 aluminum. Fleur-de-lis embellishment has

a minimum material thickness of .040

Page 6: Cut Sheet - PD10 - Alpine SnowGuardsA. Alpine SnowGuards. A division of Vermont Slate & Copper Services, Inc. 289 Harrel St., Morrisville, VT 05661, (888) 766-4273 2.2 MATERIALS A

289 Harrel Street, Morrisville, VT 05661 • Toll Free Phone 1.888.766.4273 • Toll Free Fax 1.888.766.9994 • [email protected] A Division of Vermont Slate & Copper Services, Inc. Made in Vermont USA from recycled materials

E. Freedom Gray™ - Strap, hood and gusset are 16 oz tin-zinc coated copper (not

available for PD100F).

F. Rheinzink® - Strap, hood and gusset are .8mm Rheinzink (not available for

PD100F).

2.3 FINISH (choose one):

A. Mill Finish – standard.

B. Powder Coated – available at additional cost.

C. Kynar 500® pre-painted coil – aluminum only (not available for PD100F).

PART 3 – EXECUTION

3.1 EXAMINATION

A. Substrate

1. Inspect structure on which snow guard system is to be installed and verify that

it will withstand any additional loading it may incur. Notify general contractor

of any deficiencies before installing Alpine SnowGuards.

2. Verify that roofing material has been installed correctly prior to installing snow

guards.

3.2 INSTALLATION

A. Comply with architectural drawings and snow guard manufacturer’s

recommendations for location of system. Comply with manufacturer’s written

installation instructions for installation and layout.

Document Version 02.02.2018

07 72 53 Snow Guards