CAUDALES MEDIOS MENSUALES (m3/s)
Estacion: HUAYAO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
1980 18.09 34.43 42.75 16.79 10.62 7.87 8.84 8.60 8.41 17.06 15.09 17.99
1981 25.37 64.97 44.78 24.82 12.27 9.30 8.12 10.12 9.60 17.72 19.90 38.59
1982 46.84 52.33 36.84 24.47 13.35 12.06 10.62 10.57 12.17 17.59 22.09 25.47
1983 31.56 30.45 36.10 31.72 12.84 11.44 9.58 9.24 11.96 13.05 13.51 22.39
1984 34.28 105.93 65.63 46.55 14.30 11.80 10.53 11.19 10.16 13.67 18.37 24.65
1985 20.56 45.10 43.72 37.72 19.45 11.70 9.98 9.30 11.95 13.34 16.70 25.21
1986 47.98 71.32 75.60 36.83 18.11 11.19 10.96 11.02 11.58 12.41 14.70 13.81
1987 60.30 41.13 22.95 16.85 12.33 11.24 11.68 9.63 9.91 12.52 15.62 14.19
1988 67.70 49.95 27.67 28.34 13.90 10.29 9.20 7.20 9.42 11.11 13.62 11.19
1989 20.74 38.74 43.31 32.55 18.66 12.55 10.21 9.83 9.96 15.01 15.77 14.88
1990 27.82 22.38 15.64 20.82 12.38 17.70 12.36 10.42 12.13 17.29 44.66 51.68
1991 53.33 55.17 37.55 27.34 15.02 13.51 8.81 8.82 7.78 9.85 10.93 11.24
1992 13.81 11.09 13.92 10.28 9.50 10.57 10.33 10.10 9.07 12.73 6.38 6.37
PROM 36.03 47.92 38.96 27.31 14.06 11.63 10.09 9.70 10.32 14.10 17.49 21.36
CONSTRUCCION DE LA CURVA MASA
V = 0.0864QT
Donde: V = volumen, en MM3 (millones de m3)
T = número de días del mes
Q = caudal en m3/s
1º. Transformar los Q (mm3/s), a volumenes V(millones de m3)
2º. Acumular los volumenes y obtener la columna de vvolumenes acumulados
AÑO Q DIAS DIAS V VOL acumulado
m3/s ACUM mm3 mm3
ENE 36.03 31 31 96.501 96.501
FEB 47.92 28 59 115.934 212.434
MAR 38.96 31 90 104.346 316.781
ABR 27.31 30 120 70.797 387.578
MAY 14.06 31 151 37.648 425.226
JUN 11.63 30 181 30.151 455.377
JUL 10.09 31 212 27.035 482.412
AGO 9.70 31 243 25.968 508.381
SET 10.32 30 273 26.737 535.118
OCT 14.10 31 304 37.776 572.894
NOV 17.49 30 334 45.328 618.222
DIC 21.36 31 365 57.207 675.428
Al unir las tangentes con una linea vertical tenemos la capacidad mínima del embalse para satisfacer el caudal seguro Qs
0 50 100 150 200 250 300 350 400
0
100
200
300
400
500
600
700
800
CURVA MASA
Column I
TIEMPO
V A
CU
M (
mm
3)
capacidad mínima de embalse
Qs
QU = 150.00
CONSTRUCCION DE LA CURVA DE DURACION
AÑO 1 2 3 4 5 6 7 8 9 10 11 12
1980 42.75 34.43 18.09 17.99 17.06 16.79 15.09 10.62 8.84 8.60 8.41 7.87
1981 64.97 44.78 38.59 25.37 24.82 19.90 17.72 12.27 10.12 9.60 9.30 8.12
1982 52.33 46.84 36.84 25.47 24.47 22.09 17.59 13.35 12.17 12.06 10.62 10.57
1983 36.10 31.72 31.56 30.45 22.39 13.51 13.05 12.84 11.96 11.44 9.58 9.24
1984 105.93 65.63 46.55 34.28 24.65 18.37 14.30 13.67 11.80 11.19 10.53 10.16
1985 45.10 43.72 37.72 25.21 20.56 19.45 16.70 13.34 11.95 11.70 9.98 9.30
1986 75.60 71.32 47.98 36.83 18.11 14.70 13.81 12.41 11.58 11.19 11.02 10.96
1987 60.30 41.13 22.95 16.85 15.62 14.19 12.52 12.33 11.68 11.24 9.91 9.63
1988 67.70 49.95 28.34 27.67 13.90 13.62 11.19 11.11 10.29 9.42 9.20 7.20
1989 43.31 38.74 32.55 20.74 18.66 15.77 15.01 14.88 12.55 10.21 9.96 9.83
1990 51.68 44.66 27.82 22.38 20.82 17.70 17.29 15.64 12.38 12.36 12.13 10.42
1991 55.17 53.33 37.55 27.34 15.02 13.51 11.24 10.93 9.85 8.82 8.81 7.78
1992 13.92 13.81 12.73 11.09 10.57 10.33 10.28 10.10 9.50 9.07 6.38 6.37
PROM 54.99 44.62 32.25 24.74 18.97 16.15 14.29 12.58 11.13 10.53 9.68 9.03
% 8.33 16.67 25.00 33.33 41.67 50.00 58.33 66.67 75.00 83.33 91.67 100.00
1º. Ordenar descendentemente los datos mensuales dandole una numeración2º. Luego calcular el promedio de estos
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
10.00
20.00
30.00
40.00
50.00
60.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
Indica el % de tiempo durante el cual los caudales han sido igualados o excedidos
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
10.00
20.00
30.00
40.00
50.00
60.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
CAUDALES MEDIOS MENSUALES (m3/s)
Estacion: ANGASMAYO
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
1980 111.09 172.22 199.59 105.59 53.83 34.03 40.65 38.97 37.67 110.87 91.98 110.64
1981 139.86 265.47 206.00 137.80 67.04 43.92 35.75 49.97 46.10 117.51 140.31 184.14
1982 212.43 229.09 180.35 136.48 76.30 65.30 53.77 53.45 66.24 116.16 164.52 140.26
1983 162.30 158.40 175.88 162.85 71.85 60.29 46.01 43.48 64.54 73.68 77.67 128.47
1984 171.72 370.41 267.30 211.52 84.71 63.19 53.08 58.24 50.30 79.13 124.20 137.15
1985 121.20 206.99 202.68 183.26 135.47 62.36 48.94 43.95 64.42 76.19 107.37 139.25
1986 215.93 282.88 294.35 180.32 121.53 58.30 56.46 56.95 61.44 68.27 88.40 92.41
1987 252.32 194.42 130.63 105.82 67.58 58.70 62.18 46.36 48.39 69.13 96.94 94.14
1988 273.03 221.93 148.39 150.82 81.18 51.26 43.24 29.76 44.82 57.61 78.67 101.66
1989 144.08 145.43 176.93 175.16 78.89 61.29 48.48 47.95 56.74 97.20 96.60 88.69
1990 131.56 130.18 102.88 96.06 70.73 88.22 47.43 39.78 55.50 110.43 191.38 157.23
1991 135.17 197.74 182.70 147.19 91.36 67.12 45.10 37.77 43.89 62.99 106.74 84.41
1992 114.71 107.80 148.69 83.83 46.87 40.98 32.86 34.25 37.18 88.94 74.42 53.74
PROM 168.11 206.38 185.87 144.36 80.56 58.07 47.23 44.68 52.09 86.78 110.71 116.32
CONSTRUCCION DE LA CURVA MASA
V = 0.0864QT
Donde: V = volumen, en MM3 (millones de m3)
T = número de días del mes
Q = caudal en m3/s
1º. Transformar los Q (mm3/s), a volumenes V(millones de m3)
2º. Acumular los volumenes y obtener la columna de vvolumenes acumulados
AÑO Q DIAS DIAS V VOL acumulado
m3/s ACUM mm3 mm3
ENE 168.11 31 31 450.260 450.260
FEB 206.38 28 59 499.278 949.538
MAR 185.87 31 90 497.847 1447.384
ABR 144.36 30 120 374.185 1821.570
MAY 80.56 31 151 215.784 2037.354
JUN 58.07 30 181 150.527 2187.881
JUL 47.23 31 212 126.493 2314.374
AGO 44.68 31 243 119.679 2434.053
SET 52.09 30 273 135.029 2569.082
OCT 86.78 31 304 232.425 2801.508
NOV 110.71 30 334 286.954 3088.462
DIC 116.32 31 365 311.558 3400.020
Al unir las tangentes con una linea vertical tenemos la capacidad mínima del embalse para satisfacer el caudal seguro Qs
0 50 100 150 200 250 300 350 400
0
500
1000
1500
2000
2500
3000
3500
4000
CURVA MASA
Column I
TIEMPO
V A
CU
M (
mm
3)
capacidad mínima de embalse
Qs
QU = 130.00
CONSTRUCCION DE LA CURVA DE DURACION
1º. Ordenar descendentemente los datos mensuales dandole una numeración2º. Luego calcular el promedio de estos
AÑO 1 2 3 4 5 6 7 8 9 10 11 12
1980 199.59 172.22 111.09 110.87 110.64 105.59 91.98 53.83 40.65 38.97 37.67 34.03
1981 265.47 206.00 184.14 140.31 139.86 137.80 117.51 67.04 49.97 46.10 43.92 35.75
1982 229.09 212.43 180.35 164.52 140.26 136.48 116.16 76.30 66.24 65.30 53.77 53.45
1983 175.88 162.85 162.30 158.40 128.47 77.67 73.68 71.85 64.54 60.29 46.01 43.48
1984 370.41 267.30 211.52 171.72 137.15 124.20 84.71 79.13 63.19 58.24 53.08 50.30
1985 206.99 202.68 183.26 139.25 135.47 121.20 107.37 76.19 64.42 62.36 48.94 43.95
1986 294.35 282.88 215.93 180.32 121.53 92.41 88.40 68.27 61.44 58.30 56.95 56.46
1987 252.32 194.42 130.63 105.82 96.94 94.14 69.13 67.58 62.18 58.70 48.39 46.36
1988 273.03 221.93 150.82 148.39 101.66 81.18 78.67 57.61 51.26 44.82 43.24 29.76
1989 176.93 175.16 145.43 144.08 97.20 96.60 88.69 78.89 61.29 56.74 48.48 47.95
1990 191.38 157.23 131.56 130.18 110.43 102.88 96.06 88.22 70.73 55.50 47.43 39.78
1991 197.74 182.70 147.19 135.17 106.74 91.36 84.41 67.12 62.99 45.10 43.89 37.77
1992 148.69 114.71 107.80 88.94 83.83 74.42 53.74 46.87 40.98 37.18 34.25 32.86
PROM 229.37 196.35 158.62 139.84 116.17 102.76 88.50 69.15 58.45 52.89 46.62 42.45
% 8.33 16.67 25.00 33.33 41.67 50.00 58.33 66.67 75.00 83.33 91.67 100.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
50.00
100.00
150.00
200.00
250.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
Indica el % de tiempo durante el cual los caudales han sido igualados o excedidos
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
50.00
100.00
150.00
200.00
250.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
CAUDALES MEDIOS MENSUALES (m3/s)
Estacion: LAIVE
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
1980 81.11 119.52 132.17 77.55 42.74 28.49 33.34 32.12 31.17 80.97 68.64 80.82
1981 99.43 175.24 140.04 98.13 51.89 35.70 29.76 40.02 37.26 85.24 99.72 128.03
1982 143.89 153.83 124.50 97.30 58.19 50.70 42.70 42.48 51.35 84.38 114.79 99.68
1983 113.41 111.00 122.99 113.76 55.17 47.25 37.20 35.39 50.18 56.41 59.11 92.23
1984 119.22 235.27 176.31 143.34 63.82 49.25 42.21 45.82 40.25 60.09 89.52 97.73
1985 87.60 140.63 138.04 126.27 96.67 48.68 39.29 35.72 50.10 58.11 78.70 99.05
1986 145.98 185.37 191.99 124.48 87.82 45.86 44.58 44.92 48.04 52.74 66.28 68.92
1987 167.54 133.05 93.60 77.70 52.26 46.15 48.56 37.45 38.90 53.32 71.90 70.06
1988 179.64 149.57 104.77 106.29 61.46 40.93 35.22 25.31 36.35 45.38 59.78 75.00
1989 102.08 102.93 122.41 121.33 59.93 47.94 38.96 38.59 44.78 72.07 71.68 66.46
1990 94.20 93.32 75.79 71.33 54.41 66.16 38.22 32.71 43.91 80.69 131.21 110.27
1991 96.47 135.06 125.93 104.02 68.24 51.95 36.55 31.24 35.68 49.11 78.29 63.62
1992 83.44 78.99 104.96 63.23 37.82 33.58 27.62 28.66 30.81 66.63 56.91 42.68
PROM 116.46 139.52 127.19 101.90 60.80 45.59 38.02 36.19 41.44 65.01 80.50 84.20
CONSTRUCCION DE LA CURVA MASA
V = 0.0864QT
Donde: V = volumen, en MM3 (millones de m3)
T = número de días del mes
Q = caudal en m3/s
1º. Transformar los Q (mm3/s), a volumenes V(millones de m3)
2º. Acumular los volumenes y obtener la columna de vvolumenes acumulados
AÑO Q DIAS DIAS V VOL acumulado
m3/s ACUM mm3 mm3
ENE 116.46 31 31 311.933 311.933
FEB 139.52 28 59 337.531 649.463
MAR 127.19 31 90 340.672 990.135
ABR 101.90 30 120 264.131 1254.266
MAY 60.80 31 151 162.851 1417.117
JUN 45.59 30 181 118.163 1535.280
JUL 38.02 31 212 101.822 1637.102
AGO 36.19 31 243 96.923 1734.025
SET 41.44 30 273 107.424 1841.450
OCT 65.01 31 304 174.125 2015.575
NOV 80.50 30 334 208.662 2224.237
DIC 84.20 31 365 225.511 2449.748
Al unir las tangentes con una linea vertical tenemos la capacidad mínima del embalse para satisfacer el caudal seguro Qs
0 50 100 150 200 250 300 350 400
0
500
1000
1500
2000
2500
3000
CURVA MASA
Column I
TIEMPO
V A
CU
M (
mm
3)
capacidad mínima de embalse
Qs
QU = 450.00
CONSTRUCCION DE LA CURVA DE DURACION
1º. Ordenar descendentemente los datos mensuales dandole una numeración2º. Luego calcular el promedio de estos
AÑO 1 2 3 4 5 6 7 8 9 10 11 12
1980 132.17 119.52 81.11 80.97 80.82 77.55 68.64 42.74 33.34 32.12 31.17 28.49
1981 175.24 140.04 128.03 99.72 99.43 98.13 85.24 51.89 40.02 37.26 35.70 29.76
1982 153.83 143.89 124.50 114.79 99.68 97.30 84.38 58.19 51.35 50.70 42.70 42.48
1983 122.99 113.76 113.41 111.00 92.23 59.11 56.41 55.17 50.18 47.25 37.20 35.39
1984 235.27 176.31 143.34 119.22 97.73 89.52 63.82 60.09 49.25 45.82 42.21 40.25
1985 140.63 138.04 126.27 99.05 96.67 87.60 78.70 58.11 50.10 48.68 39.29 35.72
1986 191.99 185.37 145.98 124.48 87.82 68.92 66.28 52.74 48.04 45.86 44.92 44.58
1987 167.54 133.05 93.60 77.70 71.90 70.06 53.32 52.26 48.56 46.15 38.90 37.45
1988 179.64 149.57 106.29 104.77 75.00 61.46 59.78 45.38 40.93 36.35 35.22 25.31
1989 122.41 121.33 102.93 102.08 72.07 71.68 66.46 59.93 47.94 44.78 38.96 38.59
1990 131.21 110.27 94.20 93.32 80.69 75.79 71.33 66.16 54.41 43.91 38.22 32.71
1991 135.06 125.93 104.02 96.47 78.29 68.24 63.62 51.95 49.11 36.55 35.68 31.24
1992 104.96 83.44 78.99 66.63 63.23 56.91 42.68 37.82 33.58 30.81 28.66 27.62
PROM 153.30 133.89 110.97 99.25 84.27 75.56 66.20 53.26 45.91 42.02 37.60 34.58
% 8.33 16.67 25.00 33.33 41.67 50.00 58.33 66.67 75.00 83.33 91.67 100.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
Indica el % de tiempo durante el cual los caudales han sido igualados o excedidos
0.00 20.00 40.00 60.00 80.00 100.00 120.00
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
CURVA DE DURACION
Row 107
%
Q (
m3
/se
g)
Q1 206.382 185.873 168.114 144.365 116.326 110.717 86.788 80.569 58.07
10 52.0911 47.2312 44.68
1.- Ordenar los caudales de mayor a menor:206.38185.87168.11144.36116.32110.71
86.7880.5658.0752.0947.2344.68
2.- Calcular el rango de la muestraR = 161.70
3.- Seleccionar intervalo de clase NCN = 12NC = 5
4.-ΔX = R/NCΔX = 32.34
5.- Calculo de los limites de clase de cada uno de los intervalos
INTERVALO DE CLASE FRECUENCIA
1 174.04 206.38 174.04 2 2 17
2 141.70 174.04 141.70 2 4 33
3 109.36 141.70 109.36 2 6 50
4 77.02 109.36 77.02 2 8 67
5 44.68 77.02 44.68 4 12 100
6
Calculo de amplitud ΔX
LIMITE INFERIOR
No dias Q≥ LI % DIAS Q≥ LI