Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
Gabriele Wood 1
CURRICULUM VITAE
GABRIELE WOOD
Profession : Public Participation and Social Consultant
Specialisation : Public Participation Process Implementation
Years experience : 10 years
KEY RESPONSIBILITIES
Specific responsibilities as a Public Participation and Social Consultant include professional execution
of public participation consulting for a variety of projects. This includes managing and coordinating
public participation processes for Environmental Impact Assessments (EIA).
SKILLS BASE AND CORE COMPETENCIES
Public Participation, Stakeholder Engagement and Stakeholder Management
Environmental Impact Assessment (Social Processes)
Public Speaking and Presentation Skills
Facilitation (workshops, focus group meetings, public meetings, public open days, committees)
Social Research (Qualitative and Quantitative)
Social Assessments (Stakeholder Analysis / Stakeholder Mapping)
Survey Design and Sampling
Monitoring and Evaluation
Community Needs Assessments
Environmental and Social Policy
IFC Performance Standards
Equator Principles
Report Writing and Quality Control
EDUCATION AND PROFESSIONAL STATUS
Degrees:
B. Hons. Anthropology (Cum Laude): University of Johannesburg (2004 – 2005)
B.A. Psychology: University of Johannesburg (2002 – 2004)
Courses:
International Association for Public Participation (IAP2) Certificate in Techniques for Effective
Public Participation (2015)
International Association for Public Participation (IAP2) Certificate in Foundations of Public
Participation (Planning and Communication for Effective Public Participation) (2015)
South African Advertising Research Foundation (SAARF) living Standards Measure (LSM)
Training (2010).
Certificate in Focus Group Moderation Skills, Market Research for Africa (2007)
Prestige Diploma in Public Relations: Allenby Campus Boksburg now Damlin College (2001)
Gabriele Wood 2
EMPLOYMENT
May 2012 – Current: Savannah Environmental (Pty) Ltd: Public Participation and Social Consultant
March 2007 – April 2012: NMA Effective Social Strategists (Pty) Ltd: Assistant Project Manager: Public
Participation and Social Research
January 2005 – March 2007 (Part-time): University of Johannesburg: Department of Anthropology and
Development Studies: Student Tutor and Research Assistant
PROJECT EXPERIENCE
COAL FIRED POWER STATIONS:
Thabametsi Coal Fired Power Station – EIA & CCIA (for Thabametsi Power Company)
Transalloys Coal Fired Power Station – EIA (for Transalloys)
Umbani Coal Fired Power Station – EIA (for ISS Global Mining)
Tshivhaso Coal Fired Power Station – EIA (for Cennergi)
H2 Energy Power Station – EIA (for H2 Clean Energy)
INTEGRATED WASTE WATER MANAGEMENT PLANS AND WATER USE LICENSE
APPLICATIONS:
IPP Thabametsi Coal Fired Power Station – IWWMP AND WULA (for Thabametsi Power Company)
Yzermyn Coal Mine - IWWMP AND WULA (for Atha Africa Group)
GRID INFRASTRUCTURE CONNECTIONS AND SUBSTATIONS:
Cuprum-Burchell and Burchell to Mooidraai – BA (for Eskom)
Blackwood Power Line and Substation – BA (for VentuSA Energy)
Iziduli Power Line and Substation – BA (for Windlab)
132kV Power Line for the authorised Excelsior Wind Farm (for Amstilinx)
Saldanha Bay Network Strengthening project – EIA (for Eskom)
Olifantshoek Substation and Power Line – BA (for Eskom)
RENEWABLE ENERGY PROJECTS:
Garob Wind Energy Facility – EIA (for juwi Renewable Energy)
Tatuka PV Solar Energy Facility – EIA (for Eskom)
Majuba PV Solar Energy Facility – EIA (for Eskom)
Lethabo PV Solar Energy Facility – EIA (for Eskom)
Karreebosch Wind Energy Facility – EIA (for G7 Energies)
SolarReserve Kotulo Tsatsi Energy CSP Facilities – EIA (for SolarReserve & Kotulo Tsatsi Energy)
Buffels Solar 1 & 2 Energy Facilities – EIA (for Kabi Solar)
Woodhouse Solar 1 & 2 Energy Facilities – EIA (Genesis Eco Energy Developers)
Gunstfontein Wind Energy Facility – EIA (for Gunstfontein Wind Farm)
Ilanga CSP 7, 8 and 9 Solar Facilities – EIA (for Emvelo Eco Projects)
Sol Invictus 1 – 4 PV Solar Energy Facilities – EIA (for Cyracraft)
150MW Noupoort Concentrated Solar Power (CSP) Project – EIA (for CRESCO Energy)
Hartebeest Wind Farm – EIA (for juwi Renewable Energy)
1
CURRICULUM VITAE
TEBOGO MAPINGA
Profession : Principal Environmental Manager for Savannah Environmental
Consultants
Specialisation : Environmental Management
Years of experience : 10 years
KEY RESPONSIBILITIES
Project Management and client liaison;
Report writing and review;
Compliance monitoring and audit reporting;
Development of Proposals and Tenders; and
Staff monitoring.
SKILLS BASE AND CORE COMPETENCIES
Report Writing, drafting proposals and tenders;
Negotiating skill;
Problem solving;
Financial management and marketing;
Compliance advice for financial closure project;
Understanding of all Environmental Legislation (NEMA, NEM:BA, NEM:WA, NEM:AQA,
NEM:PAA, etc) and all other relevant legislation;
Ability to work independently and in a team;
Verbal, written and good presentation skills;
Time management and workload management;
Facilitation skills; and
Organizational, planning and analytic skills.
EDUCATION AND PROFESSIONAL STATUS
Degrees:
Bsc Degree majoring in Zoology, The University of Limpopo, 2006; and
Honours in Environmental Management: University of South Africa (in progress).
Courses:
Computer Literacy Course: University of Limpopo, 2005; and
Environmental Impact Assessment Training: University of Pretoria, 2012.
EMPLOYMENT HISTORY
Principal Environmental Consultants: Savannah Environmental (Pty) Ltd ( 2014 – current)
Tasks include: Compilation of Environmental Scoping Reports, Plan of Study,
Environmental Impact Assessment Reports, Basic Assessments and Environmental
management programmes; Environmental Screening Reports; Co-ordination of the public
participation process; Project management; project proposals and tenders; Client liaison
2
and Marketing.
Environmental Scientist: GIBB Engineering and Science (Mega Projects) (1 June 2013- 31
March 2014) Tasks include: Re-writing the Revised Draft EIR Version 2 Eskom Nuclear-1
EIA; and Liaison with the client and specialists.
Environmental Officer Specialist production: Department of Environmental Affairs (1 April
2010 until 1 June 2013) Tasks include: Process EIA applications submitted to DEA within
the stipulated legislated time frames; Implement the SID and ERP EIA guideline; Provide
technical input into Appeal Response Report’s (ARR’s); Support Regulatory Services with
compliance monitoring and enforcement; Implement DEA and Public Entity EIA forums;
and Provide technical input into CD: IEA correspondence.
Environmental Project Manager: SEF (1 March 2009 until 31 April 2010) Tasks include:
Compilation of Environmental Scoping Reports, Plan of Study, Environmental Impact
Assessments, Basic Assessments and Environmental management plans; Co-ordination of
the public participation process; Project management, including specialists and other
team members; Development of terms of reference, project proposals and tenders; Client
liaison; Marketing; and Financial Management of projects.
Environmental Manager: SEF ( 1 April 2008 – 30 February 2009 ) Tasks include:
Compilation of Environmental Scoping Reports, Plan of Study, Environmental Impact
Assessments, Basic Assessments and Environmental management plans; Co-ordination
of the public participation process; Project management, including specialists and other
team members; Development of terms of reference, project proposals and tenders; and
Client liaison.
Environmental Practitioner/ Project Manager: Phaki Phakanani Environmental Consultants
(January 2007 - March 2008) Tasks include: Training of junior staff; Client Liaison;
Project co-ordination and facilitation; Managing specialists; Report writing and
presentations; Compiling Environmental Impact Assessment Reports (Basic and
Scoping/EIA Report); and Facilitating the Public Participation Process.
PROJECT EXPERIENCE
ENVIRONMENTAL IMPACT ASSESSMENTS AND PUBLIC PARTICIPATION
SolarReserve Kotulo Tsatsi PV 1 Facility (2016)
SolarReserve Kotulo Tsatsi PV 2 Facility (2016)
Roggeveld Wind Farm- EMPr Amendment (2016)
Adams PV Facility (2016) - (All work required to reach financial close- permitting)
Bellatrix PV Facility (2016) - (All work required to reach financial close- permitting)
Ilanga CSP 1 Facility (2016)
Ilanga CSP 2 Facility (2016)
Ilanga CSP 3 Facility (2016)
Ilanga CSP 4 Facility (2016)
Ilanga CSP 5 Facility (2016)
3
Ilanga CSP 7 Facility (2016)
Great Karoo EA amendment (2016)
Gunstfontein Wind Energy Facility (2015)
Gunstfontein 132 kV Power Line and Switching Station (2016)
Acwa Power SolarReserve Redstone Solar Thermal Power Plant EMPr amendment (2015)
Sirius Phase One Solar PV Facility (2015) (All work required to reach financial close-
permitting)
Nxuba Wind Farm (2015)- (All work required to reach financial close- permitting)
Karusa Wind Farm (2015)- (All work required to reach financial close- permitting)
Soetwater Wind Farm (2015) - (All work required to reach financial close- permitting)
Upington Two CSP Facility (2015)
Wesley Peddie Power Line Basic Assessment (2015)
Pofadder Wind (3 Phases) and Solar Energy Facilities (2014-2015);
Pofadder Power Line Basic Assessment Application (4 BAR’s) (2014-2015)
Castle Wind Energy Facility (2014-2015)
Spitskop Wind Energy Facility (2014-2015)
Bobididi Solar Facility-Environmental Screening (2014)
Son Sitrus Solar Energy Facility (2014)
Nuclear- 1 EIA (2013)
Langkuil Industrial Development, 2008 ( Environmental Manager and Project Manager)
Township Development in Reitfontein, 2008/2009
Upgrading of the BP Golf Course, 2008
Construction of the BP Soshanguve VV Filling Station, 2008
Construction of the BP Soshanguve ZZ Filling Station, 2008
Shell Filling Stations( Project Manager and Client Liaison), 2008/ 2009:
Watloo Filling Station
Chantelle Filling Station
M2 East Filling Station
Orlando Filling Station
Equestria Willowglen Filling Station
President Park Filling Station
Capital Park
Eskom- Komati Water Augmentation (2008)
Rainbow Junction Residential Development (2008/ 2009)
Township Development in Delmore Park Extension 7 (2008/ 2009)
West Rand District Municipality- Bulk Water Supply (2009)
West Rand District Municipality Air Quality Assessment (2009)
Lonmin K4 Shaft Mine Upgrading (2008/2009)
Westlake Residential Development (2008)
Montana Spruit Upgrading (2008)
Palm Ridge Township Development (2008)
4
HM Pitjie Roads (2009)
Vlaakplat S24G Application (Mokgale City Local Municipality) (2008)
Rangeview Ext 2 S24G Application (Mogale City Local Municipality) (2008)
Construction of Khetho Bridge, Greater Giyani Local Municipality (2007)
Demolition and Relocation of Malamulele High School (2007)
Construction of Malamulele Shopping Complex (2007)
The Subdivision of land in Ellisrus, (2007)
Construction of the Senwabarwane Filling Station (2007)
Residential Development in Tlapeng Village (2007)
Township Development in Maphosa Village (2007)
Establishment of a Piggery in Mogalakwena Local Municipality (2007)
Establishment of two Piggeries in Elias Motsoaledi Local Municipality (2007);
Establishment of a Piggery in Modimolle Local Municipality (2007)
Township Development in Rietfontein (2007)
Public Participation and Section 24G Application for the National Taxi Scrapping Project
(2007)
Construction of a Shopping Complex in Zebediela (2007)
Establishment of a Guest House (ECA application) (2008)
Establishment of a Waste Management Depot in Rustenburg (2008)
Establishment of a Waste Management Depot in Tzaneen and Nkowa-Nkowa (2008)
1
CURRICULUM VITAE
THALITA BOTHA
Profession : Junior Environmental Assessment Practitioner
Specialisation : Environmental Management
Years Experience : 19 months
KEY RESPONSIBILITIES
Professional execution of consulting services
Impact assessment reporting
Compliance monitoring and reporting
Development of project proposals for procuring new projects
Project administration
SKILLS BASE AND CORE COMPETENCIES
EIA Report writing;
Problem solving;
Administrative tasks;
GIS mapping;
Analysis and manipulation of geographical information and technical experience with the use
of ArcGIS; and
Ability to work independently and in a team.
EDUCATION AND PROFESSIONAL STATUS
Degrees:
B.Sc. (Hons.) Environmental Management (2014), North-West University, Potchefstroom.
B.Sc. Environmental- and Biological Science (2013), North-West University, Potchefstroom.
EMPLOYMENT HISTORY
23 September 2015 – Current
Savannah Environmental (Pty) Ltd: Junior Environmental Assessment Practitioner
2
PROJECT EXPERIENCE
Environmental Impact Assessments
Environmental Impact Assessment for the Ilanga CSP 9 Project, Northern Cape Province
(Emvelo Holdings)
Environmental Management Programme for the Thaba Eco Hotel PV Solar System, Gauteng
Province (Camco Clean Energy)
Environmental Impact Assessment for the Noupoort CSP Project, Northern Cape Province
(CRESCO Energy)
Basic Assessment for the Gunstfontein Switching Station and 132kV overhead power line,
Northern Cape Province (Gunstfontein Wind Farm)
Revision of Environmental Management Programme (EMP) for the Hopefield Small Wind
Farm, Western Cape Province (ACED)
Environmental Impact Assessment for the proposed Hartebeest Wind Farm, Western Cape
Province (Hartebeest Wind Farm)
Basic Assessment for the realignment of a section of the MN73 to accommodate solar energy
facilities near Paulputs Substation, Northern Cape Province (Northern Cape Department of
Roads and Public Works)
Public Participation
Ilanga CSP 7 and 9 Facilities, Northern Cape Province – EIA (Emvelo Holdings)
Noupoort CSP Project, Northern Cape Province – EIA (CRESCO Energy)
Hartebeest Wind Farm, Western Cape Province - EIA (Hartebeest Wind Farm)
The realignment of a section of the MN73 to accommodate solar energy facilities near
Paulputs Substation, Northern Cape Province – BA (Northern Cape Department of Roads and
Public Works)
Orkney Solar Farm – EIA (Genesis Eco-Energy Developments).
Tshivhaso Coal Fired Power Station, Limpopo Province – EIA (Cennergi)
Gunstfontein Wind Energy Facility -EIA (Gunstfontein Wind Farm)
GIS Mapping (ArcGIS 10.2)
Noupoort CSP Project, Northern Cape Province.
Sol Invictus PV Developments near Aggeneys, Northern Cape Province.
Sol Invictus Shared Infrastructure and Housing Development near Aggeneys, Northern Cape
Province.
Environmental Management Programme for the Hopefield Small Wind Farm, Western Cape
Province.
Environmental Impact Assessment for the proposed Hartebeest Wind Farm, Western Cape
Province.
Basic Assessment for the realignment of a section of the MN73 to accommodate solar energy
facilities near Paulputs Substation, Northern Cape Province.
1
CURRICULUM VITAE
Gerhardus Alfred Botha
Profession : Ecologist and Environmental Consultant
Specialisation : Ecological studies including flora, wetland and fauna studies
Years experience : 6 Years
KEY RESPONSIBILITIES
Specific responsibilities as an Ecological Specialist and Environmental Consultant include,
inter alia, professional execution of specialist consulting services (including flora, wetland and
fauna studies, where required), impact assessment reporting, walk through surveys/ground-
truthing to inform final design, compilation of management plans, compliance monitoring and
audit reporting, in-house ecological awareness training to on-site personnel, and the
development of project proposals for procuring new work/projects.
SKILLS BASE AND CORE COMPETENCIES
Research Project Management
Ecological assessments for developmental purposes (BAR, EIA)
Working knowledge of environmental planning policies, regulatory frameworks and legislation
Identification and assessment of potential environmental impacts and benefits.
Development of practical and achievable mitigation measures and management plans and
evaluation of risk to execution
Qualitative and Quantitative Research
Experienced in field research and monitoring
Working knowledge of GIS applications and analysis of satellite imagery data
Completed projects in several Provinces of South Africa and include a number of projects
located in sensitive and ecological unique regions.
EDUCATION AND PROFESSIONAL STATUS
Degrees:
2015: Currently completing a M.Sc. degree in Botany (Vegetation Ecology), University of the
Free State, Bloemfontein, RSA.
2009: B.Sc. Hons in Botany (Vegetation Ecology), University of the Free State, Bloemfontein,
RSA.
2008: B.Sc. in Zoology and Botany, University of the Free State, University of the Free State,
Bloemfontein, RSA.
Courses:
2013: Wetland Management (ecology, hydrology, biodiversity and delineation) – University of
the Free State accredited course.
2014: Introduction to GIS and GPS (Code: GISA 1500S) – University of the Free State
accredited course.
Professional Society Affiliations:
The South African Council of Natural Scientific Professions: Pr. Sci. Nat. Reg. No. 400502/14
(Botany and Ecology).
2
EMPLOYMENT HISTORY
2016: ECO-CARE Consultancy
2015 - 2016: Ecologist, Savannah Environmental (Pty) Ltd
2013 – 2014: Working as ecologist on a freelance basis, involved in part-time and
contractual positions for the following companies
- Enviroworks (Pty) Ltd
- GreenMined (Pty) Ltd
- Eco-Care Consultancy (Pty) Ltd
- Enviro-Niche Consulting (Pty) Ltd
- Savannah Environmental (Pty) Ltd
- Esicongweni Environmental Services (EES) cc
2010 - 2012: Enviroworks (Pty) Ltd
PROJECT EXPERIENCE
ECOLOGICAL RELATED STUDIES AND SURVEYS
Barcelona 88/11kV substation and 88kV loop-in lines – Botanical Study (for Eskom).
Farm development for academic purposes (Maluti FET College) on the Farm Rosedale 107,
Harrismith – Ecological Study (for Agri Development Solutions).
New boardwalk from Suiderstrand Gravel Road to Rasperpunt, Agulhas National Park –
Botanical Survey (for SANPARKS).
New boardwalk linking the southern most tip of Africa to the Cape Agulhas Lighthouse,
Agulhas National Park – Botanical Survey (for SANPARKS)
Construction of an icon at the southern most tip of Africa, Agulhas National Park – Botanical
Survey (for SANPARKS).
Optic Fibre Infrastructure Network, City of Cape Town Municipality – Assisted in botanical
field work (for Dark Fibre Africa (Pty) Ltd).
Optic Fibre Infrastructure Network, Swartland Municipality – Assisted in botanical field work
(for Dark Fibre Africa).
National long haul optic fibre infrastructure network project, Bloemfontein to Beaufort West –
Protected and Endangered Species Walk-Through Survey & Invasive Plant Management Plan
(for NEOTEL Ltd).
National long haul optic fibre infrastructure network project, Bloemfontein to Beaufort West –
Vegetation Rehabilitation Plan for illegally cleared areas (for NEOTEL Ltd).
Proposed establishment of the Tugela Ridge Eco Estate on the farm Kruisfontein, Bergville –
Ecological Study (for Enviroworks (Pty) Ltd).
De Aar Freight Transport Hub – Ecological Scoping and Feasibility Study (for Enviroworks
(Pty) Ltd).
Construction of Botshabelo 132 kV line – Ecological Study (for Enviroworks (Pty) Ltd).
Establishment of Rocks Farm chicken broiler houses – Botanical study (for Rocks Farm (Pty)
Ltd).
Illegally ploughed land on the Farm Wolwekop 2353 – Vegetation Rehabilitation Study (for
Enviroworks (Pty) Ltd).
Proposed Gihon Solar Farm - Ecological Impact Assessment (for Savannah Environmental
(Pty) Ltd).
Proposed expansion of the existing Afrimat quarry near Hluhluwe – Botanical Study (for
GreenMined (Pty) Ltd).
3
Audit of protected Acacia erioloba trees within the Assmang Wrenchville housing
development footprint area – Botanical Audit (for Eco-Care Consultancy (Pty) Ltd).
Rehabilitation of the N1 National Road between Sydenham and Glen Lyon – Peer Review of
Ecological Report (for EKO Environmental (Pty) Ltd)
Rehabilitation of the N6 National Road between Onze Rust and Bloemfontein – Peer Review of
Ecological Report (for EKO Environmental (Pty) Ltd)
Proposed expansion of the existing Scottburgh quarry near Amandawe – Botanical Study (for
GreenMined (Pty) Ltd).
Steelpoort Integration Project & Steelpoort to Wolwekraal 400kV Power Line – Botanical Walk
Through Survey (for Savannah Environmental (Pty) Ltd).
Proposed Transalloys circulating fluidised bed power station near Emalahleni – Ecological
Impacts Assessment (for Savannah Environmental (Pty) Ltd).
Proposed Umbani circulating fluidised bed power station near Kriel – Scoping Ecological
Impact Assessment & Ecological Impact Assessment (for Savannah Environmental (Pty) Ltd).
Proposed Tshepong 5MW PV, Nyala 5MW and Eland 5MW facilities within Harmony Gold’s
mining rights areas between Odendaalsrus and Welkom – Ecological Impact Assessment (for
Savannah Environmental (Pty) Ltd).
Proposed Noupoort CSP Facility near Noupoort, Northern Cape Province –Ecological Scoping
Assessment & Ecological Impacts Assessment (for Savannah Environmental (Pty) Ltd.).
Proposed Buffels Solar 1 PV Facility near Orkney, North West Province – Ecological Impact
Assessment (for Savannah Environmental (Pty) Ltd.).
Proposed Buffels Solar 2 PV Facility near Orkney, North West Province – Ecological Impact
Assessment (for Savannah Environmental (Pty) Ltd.).
Kalahari CSP Facility: 132kV Ferrum–Kalahari–UNTU & 132kV Kathu IPP–Kathu 1 Overhead
Power Lines, Kathu, Northern Cape Province – Fauna and Flora Pre-Construction Walk
Through Survey & Report (for Savannah Environmental (Pty) Ltd.).
Kalahari CSP Facility: Access Roads, Kathu, Northern Cape Province – Fauna and Flora Pre-
Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).
Karoshoek Solar Valley Development – Additional CSP Facility including tower infrastructure
associated with authorised CSP Site 2 near Upington, Northern Cape Province – Ecological
Scoping Report (for Savannah Environmental (Pty) Ltd.).
Karoshoek Solar Valley Development – Proposed Ilanga CSP 7 and 8 Facilities near Upington,
Northern Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).
Karoshoek Solar Valley Development – Proposed Ilanga CSP 9 Facility near Upington,
Northern Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).
Karusa Wind Farm (Phase 1 of the Hidden Valley Wind Energy Facility near Sutherland,
Northern Cape Province): Invasive Plant Management Plan (for Savannah Environmental
(Pty) Ltd.).
Proposed Karusa Facility Substation and Ancillaries near Sutherland, Northern Cape Province
– Ecological Basic Impact Assessment (for Savannah Environmental (Pty) Ltd.).
Proposed Eskom Karusa Switching Station and 132kV Double Circuit Overhead Power Line
near Sutherland, Northern Cape Province - Ecological Basic Impact Assessment (for
Savannah Environmental (Pty) Ltd.).
Karusa Wind Farm (Phase 1 of the Hidden Valley Wind Energy Facility near Sutherland,
Northern Cape Province): Plant Search and Rescue and Rehabilitation Management Plan (for
Savannah Environmental (Pty) Ltd.).
Authorised Karusa Wind Energy Facility near Sutherland, Northern Cape Province – Fauna
and Flora Pre-Construction Walk-Through Assessment & Report (for Savannah Environmental
(Pty) Ltd.).
4
Proposed Soetwater Facility Substation, 132kV Overhead Power Line and Ancillaries, near
Sutherland, Northern Cape Province - Ecological Basic Impact Assessment (for Savannah
Environmental (Pty) Ltd.).
Soetwater Wind Farm (Phase 2 of the Hidden Valley Wind Energy Facility near Sutherland,
Northern Cape Province): Invasive Plant Management Plan (for Savannah Environmental
(Pty) Ltd.).
Authorised Soetwater Wind Energy Facility near Sutherland, Northern Cape Province - Fauna
and Flora Pre-Construction Walk-Through Assessment & Report (for Savannah Environmental
(Pty) Ltd.).
Soetwater Wind Farm (Phase 2 of the Hidden Valley Wind Energy Facility near Sutherland,
Northern Cape Province): Plant Search and Rescue and Rehabilitation Management Plan (for
Savannah Environmental (Pty) Ltd.).
Sirius Phase 1 Solar PV Project near Upington, Northern Cape Province- Fauna and Flora Pre-
Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).
Sirius Phase 2 Solar PV Project near Upington, Northern Cape Province- Fauna and Flora Pre-
Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province Invasive Plant
Management Plan (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province - Invasive Plant
Management Plan (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province – Rehabilitation and
Revegetation Plan (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province – Rehabilitation and
Revegetation Plan (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province - Plant Rescue and
Protection Plan (for Savannah Environmental (Pty) Ltd.).
Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province - Plant Rescue and
Protection Plan (for Savannah Environmental (Pty) Ltd.).
Proposed Expansion of the existing Komsberg Main Transmission Substation near Sutherland,
Northern Cape Province - Ecological Basic Impact Assessment (for Savannah Environmental
(Pty) Ltd.).
Proposed Semonkong Wind Energy Facility near Semonkong, Maseru District, Lesotho –
Ecological Pre-Feasibility Study (for Savannah Environmental (Pty) Ltd.).
Proposed Metal Industrial Cluster and Associated Infrastructure near Kuruman, Northern
Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).
Proposed Woodhouse 1 and Woodhouse 2 PV Facilities near Vryburg, North West Province –
Ecological Scoping Report & Ecological Impact Assessment (for Savannah Environmental
(Pty) Ltd.).
Proposed CAMCO Clean Energy 100kW PV Solar Facility, Thaba Eco Lodge near
Johannesburg, Gauteng Province: Ecological and Ridge Basic Assessment Report (for
Savannah Environmental (Pty) Ltd.).
Proposed Orkney Solar PV Facility near Orkney, North West Province - Ecological Scoping
Report & Ecological Impact Assessment (for Savannah Environmental (Pty) Ltd.).
Proposed 132kV Power Line and On-Site Substation for the Authorised Golden Valley II Wind
Energy Facility near Bedford, Eastern Cape Province - Ecological Basic Assessment Report (for
Savannah Environmental (Pty) Ltd.).
5
WETLAND DELINEATION AND HYDROLOGICAL ASSESSMENTS
Proposed Nyala 5MW PV facility within Harmony Gold’s mining rights areas between
Odendaalsrus and Welkom – Wetland Assessment & Delineation (for Savannah
Environmental (Pty) Ltd).
Proposed Eland 5MW PV facility within Harmony Gold’s mining rights areas between
Odendaalsrus and Welkom – Wetland Assessment & Delineation (for Savannah
Environmental (Pty) Ltd).
Proposed BlueWave 75MW PV Plant near Welkom Free State Province – Wetland Delineation
and compilation of Map (for BlueWave Capital)
Proposed Wolmaransstad Municipality 75MW PV Solar Energy Facility in the North West
Province – Wetland Delineation Assessment (for Savannah Environmental (Pty) Ltd.).
AVIFAUNAL ASSESSMENTS
Proposed TEWA Solar 1 Facility, east of Upington, Northern Cape Province – Avifaunal Impact
Assessment (for Savannah Environmental (Pty) Ltd).
Proposed TEWA Solar 2 Facility, east of Upington, Northern Cape Province – Avifaunal Impact
Assessment (for Savannah Environmental (Pty) Ltd).
ENVIRONMENTAL IMPACT ASSESSMENT
Barcelona 88/11kV substation and 88kV loop-in lines – BA (for Eskom).
Thabong Bulk 132kV sub-transmission inter-connector line – EIA (for Eskom).
Groenwater 45 000 unit chicken broiler farm – BA (for Areemeng Mmogo Cooperative).
Optic Fibre Infrastructure Network, City of Cape Town Municipality – BA (for Dark Fibre Africa
(Pty) Ltd).
Optic Fibre Infrastructure Network, Swartland Municipality – BA (for Dark Fibre Africa).
Construction and refurbishment of the existing 66kV network between Ruigtevallei Substation
and Reddersburg Substation – EMP (for Eskom).
Lower Kruisvallei Hydroelectric Power Scheme (Ash river) – EIA (for Kruisvallei Hydro (Pty)
Ltd).
Construction of egg hatchery and associated infrastructure – BA (For Supreme Poultry).
Construction of the Klipplaatdrif flow gauging (Vaal river) – EMP (DWAF).
ENVIRONMENTAL COMPLIANCE AUDITING AND ECO
National long haul optic fibre infrastructure network project, Bloemfontein to Laingsburg –
ECO.
National long haul optic fibre infrastructure network project, Wolmaransstad to Klerksdorp –
ECO.
Construction and refurbishment of the existing 66kV network between Ruigtevallei Substation
and Reddersburg Substation – ECO.
Construction and refurbishment of the Vredefort/Nooitgedacht 11kV power line – ECO
Environmental compliance audit and botanical account of Afrisam’s premises in Bloemfontein
– Environmental Compliance Auditing.
6
OTHER PROJECTS:
Keeping and breeding of lions (Panthera leo) on the farm Maxico 135, Ficksburg –
Management and Business Plan (for Enviroworks (Pty) Ltd.)
Keeping and breeding of lions (Panthera leo) on the farm Mooihoek 292, Theunissen –
Management and Business Plan (for Enviroworks (Pty) Ltd.)
Keeping and breeding of wild dogs (Lycaon pictus) on the farm Mooihoek 292, Theunissen –
Management and Business Plan (for Enviroworks (Pty) Ltd.)
Existing underground and aboveground fuel storage tanks, TWK AGRI: Pongola –
Environmental Management Plan (for TWK Agricultural Ltd).
Existing underground fuel storage tanks on Erf 171, TWK AGRI: Amsterdam – Environmental
Management Plan (for TWK Agricultural Ltd).
Proposed storage of 14 000 L of fuel (diesel) aboveground on Erf 32, TWK AGRI: Carolina –
Environmental Management Plan (for TWK Agricultural Ltd).
Proposed storage of 23 000 L of fuel (diesel) above ground on Portion 10 of the Farm Oude
Bosch, Humansdorp – Environmental Management Plan (for TWK Agricultural Ltd).
Proposed storage of 16 000 L of fuel (diesel) aboveground at Panbult Depot – Environmental
Management Plan (for TWK Agricultural Ltd).
Existing underground fuel storage tanks, TWK AGRI: Mechanisation and Engineering, Piet
Retief – Environmental Management Plan (for TWK Agricultural Ltd).
Existing underground fuel storage tanks on Portion 38 of the Farm Lothair, TWK AGRI:
Lothair – Environmental Management Plan (for TWK Agricultural Ltd).