17

CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :
Page 2: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

Gabriele Wood 1

CURRICULUM VITAE

GABRIELE WOOD

Profession : Public Participation and Social Consultant

Specialisation : Public Participation Process Implementation

Years experience : 10 years

KEY RESPONSIBILITIES

Specific responsibilities as a Public Participation and Social Consultant include professional execution

of public participation consulting for a variety of projects. This includes managing and coordinating

public participation processes for Environmental Impact Assessments (EIA).

SKILLS BASE AND CORE COMPETENCIES

Public Participation, Stakeholder Engagement and Stakeholder Management

Environmental Impact Assessment (Social Processes)

Public Speaking and Presentation Skills

Facilitation (workshops, focus group meetings, public meetings, public open days, committees)

Social Research (Qualitative and Quantitative)

Social Assessments (Stakeholder Analysis / Stakeholder Mapping)

Survey Design and Sampling

Monitoring and Evaluation

Community Needs Assessments

Environmental and Social Policy

IFC Performance Standards

Equator Principles

Report Writing and Quality Control

EDUCATION AND PROFESSIONAL STATUS

Degrees:

B. Hons. Anthropology (Cum Laude): University of Johannesburg (2004 – 2005)

B.A. Psychology: University of Johannesburg (2002 – 2004)

Courses:

International Association for Public Participation (IAP2) Certificate in Techniques for Effective

Public Participation (2015)

International Association for Public Participation (IAP2) Certificate in Foundations of Public

Participation (Planning and Communication for Effective Public Participation) (2015)

South African Advertising Research Foundation (SAARF) living Standards Measure (LSM)

Training (2010).

Certificate in Focus Group Moderation Skills, Market Research for Africa (2007)

Prestige Diploma in Public Relations: Allenby Campus Boksburg now Damlin College (2001)

Page 3: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

Gabriele Wood 2

EMPLOYMENT

May 2012 – Current: Savannah Environmental (Pty) Ltd: Public Participation and Social Consultant

March 2007 – April 2012: NMA Effective Social Strategists (Pty) Ltd: Assistant Project Manager: Public

Participation and Social Research

January 2005 – March 2007 (Part-time): University of Johannesburg: Department of Anthropology and

Development Studies: Student Tutor and Research Assistant

PROJECT EXPERIENCE

COAL FIRED POWER STATIONS:

Thabametsi Coal Fired Power Station – EIA & CCIA (for Thabametsi Power Company)

Transalloys Coal Fired Power Station – EIA (for Transalloys)

Umbani Coal Fired Power Station – EIA (for ISS Global Mining)

Tshivhaso Coal Fired Power Station – EIA (for Cennergi)

H2 Energy Power Station – EIA (for H2 Clean Energy)

INTEGRATED WASTE WATER MANAGEMENT PLANS AND WATER USE LICENSE

APPLICATIONS:

IPP Thabametsi Coal Fired Power Station – IWWMP AND WULA (for Thabametsi Power Company)

Yzermyn Coal Mine - IWWMP AND WULA (for Atha Africa Group)

GRID INFRASTRUCTURE CONNECTIONS AND SUBSTATIONS:

Cuprum-Burchell and Burchell to Mooidraai – BA (for Eskom)

Blackwood Power Line and Substation – BA (for VentuSA Energy)

Iziduli Power Line and Substation – BA (for Windlab)

132kV Power Line for the authorised Excelsior Wind Farm (for Amstilinx)

Saldanha Bay Network Strengthening project – EIA (for Eskom)

Olifantshoek Substation and Power Line – BA (for Eskom)

RENEWABLE ENERGY PROJECTS:

Garob Wind Energy Facility – EIA (for juwi Renewable Energy)

Tatuka PV Solar Energy Facility – EIA (for Eskom)

Majuba PV Solar Energy Facility – EIA (for Eskom)

Lethabo PV Solar Energy Facility – EIA (for Eskom)

Karreebosch Wind Energy Facility – EIA (for G7 Energies)

SolarReserve Kotulo Tsatsi Energy CSP Facilities – EIA (for SolarReserve & Kotulo Tsatsi Energy)

Buffels Solar 1 & 2 Energy Facilities – EIA (for Kabi Solar)

Woodhouse Solar 1 & 2 Energy Facilities – EIA (Genesis Eco Energy Developers)

Gunstfontein Wind Energy Facility – EIA (for Gunstfontein Wind Farm)

Ilanga CSP 7, 8 and 9 Solar Facilities – EIA (for Emvelo Eco Projects)

Sol Invictus 1 – 4 PV Solar Energy Facilities – EIA (for Cyracraft)

150MW Noupoort Concentrated Solar Power (CSP) Project – EIA (for CRESCO Energy)

Hartebeest Wind Farm – EIA (for juwi Renewable Energy)

Page 4: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :
Page 5: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :
Page 6: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

1

CURRICULUM VITAE

TEBOGO MAPINGA

Profession : Principal Environmental Manager for Savannah Environmental

Consultants

Specialisation : Environmental Management

Years of experience : 10 years

KEY RESPONSIBILITIES

Project Management and client liaison;

Report writing and review;

Compliance monitoring and audit reporting;

Development of Proposals and Tenders; and

Staff monitoring.

SKILLS BASE AND CORE COMPETENCIES

Report Writing, drafting proposals and tenders;

Negotiating skill;

Problem solving;

Financial management and marketing;

Compliance advice for financial closure project;

Understanding of all Environmental Legislation (NEMA, NEM:BA, NEM:WA, NEM:AQA,

NEM:PAA, etc) and all other relevant legislation;

Ability to work independently and in a team;

Verbal, written and good presentation skills;

Time management and workload management;

Facilitation skills; and

Organizational, planning and analytic skills.

EDUCATION AND PROFESSIONAL STATUS

Degrees:

Bsc Degree majoring in Zoology, The University of Limpopo, 2006; and

Honours in Environmental Management: University of South Africa (in progress).

Courses:

Computer Literacy Course: University of Limpopo, 2005; and

Environmental Impact Assessment Training: University of Pretoria, 2012.

EMPLOYMENT HISTORY

Principal Environmental Consultants: Savannah Environmental (Pty) Ltd ( 2014 – current)

Tasks include: Compilation of Environmental Scoping Reports, Plan of Study,

Environmental Impact Assessment Reports, Basic Assessments and Environmental

management programmes; Environmental Screening Reports; Co-ordination of the public

participation process; Project management; project proposals and tenders; Client liaison

Page 7: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

2

and Marketing.

Environmental Scientist: GIBB Engineering and Science (Mega Projects) (1 June 2013- 31

March 2014) Tasks include: Re-writing the Revised Draft EIR Version 2 Eskom Nuclear-1

EIA; and Liaison with the client and specialists.

Environmental Officer Specialist production: Department of Environmental Affairs (1 April

2010 until 1 June 2013) Tasks include: Process EIA applications submitted to DEA within

the stipulated legislated time frames; Implement the SID and ERP EIA guideline; Provide

technical input into Appeal Response Report’s (ARR’s); Support Regulatory Services with

compliance monitoring and enforcement; Implement DEA and Public Entity EIA forums;

and Provide technical input into CD: IEA correspondence.

Environmental Project Manager: SEF (1 March 2009 until 31 April 2010) Tasks include:

Compilation of Environmental Scoping Reports, Plan of Study, Environmental Impact

Assessments, Basic Assessments and Environmental management plans; Co-ordination of

the public participation process; Project management, including specialists and other

team members; Development of terms of reference, project proposals and tenders; Client

liaison; Marketing; and Financial Management of projects.

Environmental Manager: SEF ( 1 April 2008 – 30 February 2009 ) Tasks include:

Compilation of Environmental Scoping Reports, Plan of Study, Environmental Impact

Assessments, Basic Assessments and Environmental management plans; Co-ordination

of the public participation process; Project management, including specialists and other

team members; Development of terms of reference, project proposals and tenders; and

Client liaison.

Environmental Practitioner/ Project Manager: Phaki Phakanani Environmental Consultants

(January 2007 - March 2008) Tasks include: Training of junior staff; Client Liaison;

Project co-ordination and facilitation; Managing specialists; Report writing and

presentations; Compiling Environmental Impact Assessment Reports (Basic and

Scoping/EIA Report); and Facilitating the Public Participation Process.

PROJECT EXPERIENCE

ENVIRONMENTAL IMPACT ASSESSMENTS AND PUBLIC PARTICIPATION

SolarReserve Kotulo Tsatsi PV 1 Facility (2016)

SolarReserve Kotulo Tsatsi PV 2 Facility (2016)

Roggeveld Wind Farm- EMPr Amendment (2016)

Adams PV Facility (2016) - (All work required to reach financial close- permitting)

Bellatrix PV Facility (2016) - (All work required to reach financial close- permitting)

Ilanga CSP 1 Facility (2016)

Ilanga CSP 2 Facility (2016)

Ilanga CSP 3 Facility (2016)

Ilanga CSP 4 Facility (2016)

Ilanga CSP 5 Facility (2016)

Page 8: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

3

Ilanga CSP 7 Facility (2016)

Great Karoo EA amendment (2016)

Gunstfontein Wind Energy Facility (2015)

Gunstfontein 132 kV Power Line and Switching Station (2016)

Acwa Power SolarReserve Redstone Solar Thermal Power Plant EMPr amendment (2015)

Sirius Phase One Solar PV Facility (2015) (All work required to reach financial close-

permitting)

Nxuba Wind Farm (2015)- (All work required to reach financial close- permitting)

Karusa Wind Farm (2015)- (All work required to reach financial close- permitting)

Soetwater Wind Farm (2015) - (All work required to reach financial close- permitting)

Upington Two CSP Facility (2015)

Wesley Peddie Power Line Basic Assessment (2015)

Pofadder Wind (3 Phases) and Solar Energy Facilities (2014-2015);

Pofadder Power Line Basic Assessment Application (4 BAR’s) (2014-2015)

Castle Wind Energy Facility (2014-2015)

Spitskop Wind Energy Facility (2014-2015)

Bobididi Solar Facility-Environmental Screening (2014)

Son Sitrus Solar Energy Facility (2014)

Nuclear- 1 EIA (2013)

Langkuil Industrial Development, 2008 ( Environmental Manager and Project Manager)

Township Development in Reitfontein, 2008/2009

Upgrading of the BP Golf Course, 2008

Construction of the BP Soshanguve VV Filling Station, 2008

Construction of the BP Soshanguve ZZ Filling Station, 2008

Shell Filling Stations( Project Manager and Client Liaison), 2008/ 2009:

Watloo Filling Station

Chantelle Filling Station

M2 East Filling Station

Orlando Filling Station

Equestria Willowglen Filling Station

President Park Filling Station

Capital Park

Eskom- Komati Water Augmentation (2008)

Rainbow Junction Residential Development (2008/ 2009)

Township Development in Delmore Park Extension 7 (2008/ 2009)

West Rand District Municipality- Bulk Water Supply (2009)

West Rand District Municipality Air Quality Assessment (2009)

Lonmin K4 Shaft Mine Upgrading (2008/2009)

Westlake Residential Development (2008)

Montana Spruit Upgrading (2008)

Palm Ridge Township Development (2008)

Page 9: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

4

HM Pitjie Roads (2009)

Vlaakplat S24G Application (Mokgale City Local Municipality) (2008)

Rangeview Ext 2 S24G Application (Mogale City Local Municipality) (2008)

Construction of Khetho Bridge, Greater Giyani Local Municipality (2007)

Demolition and Relocation of Malamulele High School (2007)

Construction of Malamulele Shopping Complex (2007)

The Subdivision of land in Ellisrus, (2007)

Construction of the Senwabarwane Filling Station (2007)

Residential Development in Tlapeng Village (2007)

Township Development in Maphosa Village (2007)

Establishment of a Piggery in Mogalakwena Local Municipality (2007)

Establishment of two Piggeries in Elias Motsoaledi Local Municipality (2007);

Establishment of a Piggery in Modimolle Local Municipality (2007)

Township Development in Rietfontein (2007)

Public Participation and Section 24G Application for the National Taxi Scrapping Project

(2007)

Construction of a Shopping Complex in Zebediela (2007)

Establishment of a Guest House (ECA application) (2008)

Establishment of a Waste Management Depot in Rustenburg (2008)

Establishment of a Waste Management Depot in Tzaneen and Nkowa-Nkowa (2008)

Page 10: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

1

CURRICULUM VITAE

THALITA BOTHA

Profession : Junior Environmental Assessment Practitioner

Specialisation : Environmental Management

Years Experience : 19 months

KEY RESPONSIBILITIES

Professional execution of consulting services

Impact assessment reporting

Compliance monitoring and reporting

Development of project proposals for procuring new projects

Project administration

SKILLS BASE AND CORE COMPETENCIES

EIA Report writing;

Problem solving;

Administrative tasks;

GIS mapping;

Analysis and manipulation of geographical information and technical experience with the use

of ArcGIS; and

Ability to work independently and in a team.

EDUCATION AND PROFESSIONAL STATUS

Degrees:

B.Sc. (Hons.) Environmental Management (2014), North-West University, Potchefstroom.

B.Sc. Environmental- and Biological Science (2013), North-West University, Potchefstroom.

EMPLOYMENT HISTORY

23 September 2015 – Current

Savannah Environmental (Pty) Ltd: Junior Environmental Assessment Practitioner

Page 11: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

2

PROJECT EXPERIENCE

Environmental Impact Assessments

Environmental Impact Assessment for the Ilanga CSP 9 Project, Northern Cape Province

(Emvelo Holdings)

Environmental Management Programme for the Thaba Eco Hotel PV Solar System, Gauteng

Province (Camco Clean Energy)

Environmental Impact Assessment for the Noupoort CSP Project, Northern Cape Province

(CRESCO Energy)

Basic Assessment for the Gunstfontein Switching Station and 132kV overhead power line,

Northern Cape Province (Gunstfontein Wind Farm)

Revision of Environmental Management Programme (EMP) for the Hopefield Small Wind

Farm, Western Cape Province (ACED)

Environmental Impact Assessment for the proposed Hartebeest Wind Farm, Western Cape

Province (Hartebeest Wind Farm)

Basic Assessment for the realignment of a section of the MN73 to accommodate solar energy

facilities near Paulputs Substation, Northern Cape Province (Northern Cape Department of

Roads and Public Works)

Public Participation

Ilanga CSP 7 and 9 Facilities, Northern Cape Province – EIA (Emvelo Holdings)

Noupoort CSP Project, Northern Cape Province – EIA (CRESCO Energy)

Hartebeest Wind Farm, Western Cape Province - EIA (Hartebeest Wind Farm)

The realignment of a section of the MN73 to accommodate solar energy facilities near

Paulputs Substation, Northern Cape Province – BA (Northern Cape Department of Roads and

Public Works)

Orkney Solar Farm – EIA (Genesis Eco-Energy Developments).

Tshivhaso Coal Fired Power Station, Limpopo Province – EIA (Cennergi)

Gunstfontein Wind Energy Facility -EIA (Gunstfontein Wind Farm)

GIS Mapping (ArcGIS 10.2)

Noupoort CSP Project, Northern Cape Province.

Sol Invictus PV Developments near Aggeneys, Northern Cape Province.

Sol Invictus Shared Infrastructure and Housing Development near Aggeneys, Northern Cape

Province.

Environmental Management Programme for the Hopefield Small Wind Farm, Western Cape

Province.

Environmental Impact Assessment for the proposed Hartebeest Wind Farm, Western Cape

Province.

Basic Assessment for the realignment of a section of the MN73 to accommodate solar energy

facilities near Paulputs Substation, Northern Cape Province.

Page 12: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

1

CURRICULUM VITAE

Gerhardus Alfred Botha

Profession : Ecologist and Environmental Consultant

Specialisation : Ecological studies including flora, wetland and fauna studies

Years experience : 6 Years

KEY RESPONSIBILITIES

Specific responsibilities as an Ecological Specialist and Environmental Consultant include,

inter alia, professional execution of specialist consulting services (including flora, wetland and

fauna studies, where required), impact assessment reporting, walk through surveys/ground-

truthing to inform final design, compilation of management plans, compliance monitoring and

audit reporting, in-house ecological awareness training to on-site personnel, and the

development of project proposals for procuring new work/projects.

SKILLS BASE AND CORE COMPETENCIES

Research Project Management

Ecological assessments for developmental purposes (BAR, EIA)

Working knowledge of environmental planning policies, regulatory frameworks and legislation

Identification and assessment of potential environmental impacts and benefits.

Development of practical and achievable mitigation measures and management plans and

evaluation of risk to execution

Qualitative and Quantitative Research

Experienced in field research and monitoring

Working knowledge of GIS applications and analysis of satellite imagery data

Completed projects in several Provinces of South Africa and include a number of projects

located in sensitive and ecological unique regions.

EDUCATION AND PROFESSIONAL STATUS

Degrees:

2015: Currently completing a M.Sc. degree in Botany (Vegetation Ecology), University of the

Free State, Bloemfontein, RSA.

2009: B.Sc. Hons in Botany (Vegetation Ecology), University of the Free State, Bloemfontein,

RSA.

2008: B.Sc. in Zoology and Botany, University of the Free State, University of the Free State,

Bloemfontein, RSA.

Courses:

2013: Wetland Management (ecology, hydrology, biodiversity and delineation) – University of

the Free State accredited course.

2014: Introduction to GIS and GPS (Code: GISA 1500S) – University of the Free State

accredited course.

Professional Society Affiliations:

The South African Council of Natural Scientific Professions: Pr. Sci. Nat. Reg. No. 400502/14

(Botany and Ecology).

Page 13: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

2

EMPLOYMENT HISTORY

2016: ECO-CARE Consultancy

2015 - 2016: Ecologist, Savannah Environmental (Pty) Ltd

2013 – 2014: Working as ecologist on a freelance basis, involved in part-time and

contractual positions for the following companies

- Enviroworks (Pty) Ltd

- GreenMined (Pty) Ltd

- Eco-Care Consultancy (Pty) Ltd

- Enviro-Niche Consulting (Pty) Ltd

- Savannah Environmental (Pty) Ltd

- Esicongweni Environmental Services (EES) cc

2010 - 2012: Enviroworks (Pty) Ltd

PROJECT EXPERIENCE

ECOLOGICAL RELATED STUDIES AND SURVEYS

Barcelona 88/11kV substation and 88kV loop-in lines – Botanical Study (for Eskom).

Farm development for academic purposes (Maluti FET College) on the Farm Rosedale 107,

Harrismith – Ecological Study (for Agri Development Solutions).

New boardwalk from Suiderstrand Gravel Road to Rasperpunt, Agulhas National Park –

Botanical Survey (for SANPARKS).

New boardwalk linking the southern most tip of Africa to the Cape Agulhas Lighthouse,

Agulhas National Park – Botanical Survey (for SANPARKS)

Construction of an icon at the southern most tip of Africa, Agulhas National Park – Botanical

Survey (for SANPARKS).

Optic Fibre Infrastructure Network, City of Cape Town Municipality – Assisted in botanical

field work (for Dark Fibre Africa (Pty) Ltd).

Optic Fibre Infrastructure Network, Swartland Municipality – Assisted in botanical field work

(for Dark Fibre Africa).

National long haul optic fibre infrastructure network project, Bloemfontein to Beaufort West –

Protected and Endangered Species Walk-Through Survey & Invasive Plant Management Plan

(for NEOTEL Ltd).

National long haul optic fibre infrastructure network project, Bloemfontein to Beaufort West –

Vegetation Rehabilitation Plan for illegally cleared areas (for NEOTEL Ltd).

Proposed establishment of the Tugela Ridge Eco Estate on the farm Kruisfontein, Bergville –

Ecological Study (for Enviroworks (Pty) Ltd).

De Aar Freight Transport Hub – Ecological Scoping and Feasibility Study (for Enviroworks

(Pty) Ltd).

Construction of Botshabelo 132 kV line – Ecological Study (for Enviroworks (Pty) Ltd).

Establishment of Rocks Farm chicken broiler houses – Botanical study (for Rocks Farm (Pty)

Ltd).

Illegally ploughed land on the Farm Wolwekop 2353 – Vegetation Rehabilitation Study (for

Enviroworks (Pty) Ltd).

Proposed Gihon Solar Farm - Ecological Impact Assessment (for Savannah Environmental

(Pty) Ltd).

Proposed expansion of the existing Afrimat quarry near Hluhluwe – Botanical Study (for

GreenMined (Pty) Ltd).

Page 14: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

3

Audit of protected Acacia erioloba trees within the Assmang Wrenchville housing

development footprint area – Botanical Audit (for Eco-Care Consultancy (Pty) Ltd).

Rehabilitation of the N1 National Road between Sydenham and Glen Lyon – Peer Review of

Ecological Report (for EKO Environmental (Pty) Ltd)

Rehabilitation of the N6 National Road between Onze Rust and Bloemfontein – Peer Review of

Ecological Report (for EKO Environmental (Pty) Ltd)

Proposed expansion of the existing Scottburgh quarry near Amandawe – Botanical Study (for

GreenMined (Pty) Ltd).

Steelpoort Integration Project & Steelpoort to Wolwekraal 400kV Power Line – Botanical Walk

Through Survey (for Savannah Environmental (Pty) Ltd).

Proposed Transalloys circulating fluidised bed power station near Emalahleni – Ecological

Impacts Assessment (for Savannah Environmental (Pty) Ltd).

Proposed Umbani circulating fluidised bed power station near Kriel – Scoping Ecological

Impact Assessment & Ecological Impact Assessment (for Savannah Environmental (Pty) Ltd).

Proposed Tshepong 5MW PV, Nyala 5MW and Eland 5MW facilities within Harmony Gold’s

mining rights areas between Odendaalsrus and Welkom – Ecological Impact Assessment (for

Savannah Environmental (Pty) Ltd).

Proposed Noupoort CSP Facility near Noupoort, Northern Cape Province –Ecological Scoping

Assessment & Ecological Impacts Assessment (for Savannah Environmental (Pty) Ltd.).

Proposed Buffels Solar 1 PV Facility near Orkney, North West Province – Ecological Impact

Assessment (for Savannah Environmental (Pty) Ltd.).

Proposed Buffels Solar 2 PV Facility near Orkney, North West Province – Ecological Impact

Assessment (for Savannah Environmental (Pty) Ltd.).

Kalahari CSP Facility: 132kV Ferrum–Kalahari–UNTU & 132kV Kathu IPP–Kathu 1 Overhead

Power Lines, Kathu, Northern Cape Province – Fauna and Flora Pre-Construction Walk

Through Survey & Report (for Savannah Environmental (Pty) Ltd.).

Kalahari CSP Facility: Access Roads, Kathu, Northern Cape Province – Fauna and Flora Pre-

Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).

Karoshoek Solar Valley Development – Additional CSP Facility including tower infrastructure

associated with authorised CSP Site 2 near Upington, Northern Cape Province – Ecological

Scoping Report (for Savannah Environmental (Pty) Ltd.).

Karoshoek Solar Valley Development – Proposed Ilanga CSP 7 and 8 Facilities near Upington,

Northern Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).

Karoshoek Solar Valley Development – Proposed Ilanga CSP 9 Facility near Upington,

Northern Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).

Karusa Wind Farm (Phase 1 of the Hidden Valley Wind Energy Facility near Sutherland,

Northern Cape Province): Invasive Plant Management Plan (for Savannah Environmental

(Pty) Ltd.).

Proposed Karusa Facility Substation and Ancillaries near Sutherland, Northern Cape Province

– Ecological Basic Impact Assessment (for Savannah Environmental (Pty) Ltd.).

Proposed Eskom Karusa Switching Station and 132kV Double Circuit Overhead Power Line

near Sutherland, Northern Cape Province - Ecological Basic Impact Assessment (for

Savannah Environmental (Pty) Ltd.).

Karusa Wind Farm (Phase 1 of the Hidden Valley Wind Energy Facility near Sutherland,

Northern Cape Province): Plant Search and Rescue and Rehabilitation Management Plan (for

Savannah Environmental (Pty) Ltd.).

Authorised Karusa Wind Energy Facility near Sutherland, Northern Cape Province – Fauna

and Flora Pre-Construction Walk-Through Assessment & Report (for Savannah Environmental

(Pty) Ltd.).

Page 15: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

4

Proposed Soetwater Facility Substation, 132kV Overhead Power Line and Ancillaries, near

Sutherland, Northern Cape Province - Ecological Basic Impact Assessment (for Savannah

Environmental (Pty) Ltd.).

Soetwater Wind Farm (Phase 2 of the Hidden Valley Wind Energy Facility near Sutherland,

Northern Cape Province): Invasive Plant Management Plan (for Savannah Environmental

(Pty) Ltd.).

Authorised Soetwater Wind Energy Facility near Sutherland, Northern Cape Province - Fauna

and Flora Pre-Construction Walk-Through Assessment & Report (for Savannah Environmental

(Pty) Ltd.).

Soetwater Wind Farm (Phase 2 of the Hidden Valley Wind Energy Facility near Sutherland,

Northern Cape Province): Plant Search and Rescue and Rehabilitation Management Plan (for

Savannah Environmental (Pty) Ltd.).

Sirius Phase 1 Solar PV Project near Upington, Northern Cape Province- Fauna and Flora Pre-

Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).

Sirius Phase 2 Solar PV Project near Upington, Northern Cape Province- Fauna and Flora Pre-

Construction Walk-Through Assessment & Report (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province Invasive Plant

Management Plan (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province - Invasive Plant

Management Plan (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province – Rehabilitation and

Revegetation Plan (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province – Rehabilitation and

Revegetation Plan (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 1) Solar PV Facility near Upington, Northern Cape Province - Plant Rescue and

Protection Plan (for Savannah Environmental (Pty) Ltd.).

Sirius (Phase 2) Solar PV Facility near Upington, Northern Cape Province - Plant Rescue and

Protection Plan (for Savannah Environmental (Pty) Ltd.).

Proposed Expansion of the existing Komsberg Main Transmission Substation near Sutherland,

Northern Cape Province - Ecological Basic Impact Assessment (for Savannah Environmental

(Pty) Ltd.).

Proposed Semonkong Wind Energy Facility near Semonkong, Maseru District, Lesotho –

Ecological Pre-Feasibility Study (for Savannah Environmental (Pty) Ltd.).

Proposed Metal Industrial Cluster and Associated Infrastructure near Kuruman, Northern

Cape Province – Ecological Scoping Report (for Savannah Environmental (Pty) Ltd.).

Proposed Woodhouse 1 and Woodhouse 2 PV Facilities near Vryburg, North West Province –

Ecological Scoping Report & Ecological Impact Assessment (for Savannah Environmental

(Pty) Ltd.).

Proposed CAMCO Clean Energy 100kW PV Solar Facility, Thaba Eco Lodge near

Johannesburg, Gauteng Province: Ecological and Ridge Basic Assessment Report (for

Savannah Environmental (Pty) Ltd.).

Proposed Orkney Solar PV Facility near Orkney, North West Province - Ecological Scoping

Report & Ecological Impact Assessment (for Savannah Environmental (Pty) Ltd.).

Proposed 132kV Power Line and On-Site Substation for the Authorised Golden Valley II Wind

Energy Facility near Bedford, Eastern Cape Province - Ecological Basic Assessment Report (for

Savannah Environmental (Pty) Ltd.).

Page 16: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

5

WETLAND DELINEATION AND HYDROLOGICAL ASSESSMENTS

Proposed Nyala 5MW PV facility within Harmony Gold’s mining rights areas between

Odendaalsrus and Welkom – Wetland Assessment & Delineation (for Savannah

Environmental (Pty) Ltd).

Proposed Eland 5MW PV facility within Harmony Gold’s mining rights areas between

Odendaalsrus and Welkom – Wetland Assessment & Delineation (for Savannah

Environmental (Pty) Ltd).

Proposed BlueWave 75MW PV Plant near Welkom Free State Province – Wetland Delineation

and compilation of Map (for BlueWave Capital)

Proposed Wolmaransstad Municipality 75MW PV Solar Energy Facility in the North West

Province – Wetland Delineation Assessment (for Savannah Environmental (Pty) Ltd.).

AVIFAUNAL ASSESSMENTS

Proposed TEWA Solar 1 Facility, east of Upington, Northern Cape Province – Avifaunal Impact

Assessment (for Savannah Environmental (Pty) Ltd).

Proposed TEWA Solar 2 Facility, east of Upington, Northern Cape Province – Avifaunal Impact

Assessment (for Savannah Environmental (Pty) Ltd).

ENVIRONMENTAL IMPACT ASSESSMENT

Barcelona 88/11kV substation and 88kV loop-in lines – BA (for Eskom).

Thabong Bulk 132kV sub-transmission inter-connector line – EIA (for Eskom).

Groenwater 45 000 unit chicken broiler farm – BA (for Areemeng Mmogo Cooperative).

Optic Fibre Infrastructure Network, City of Cape Town Municipality – BA (for Dark Fibre Africa

(Pty) Ltd).

Optic Fibre Infrastructure Network, Swartland Municipality – BA (for Dark Fibre Africa).

Construction and refurbishment of the existing 66kV network between Ruigtevallei Substation

and Reddersburg Substation – EMP (for Eskom).

Lower Kruisvallei Hydroelectric Power Scheme (Ash river) – EIA (for Kruisvallei Hydro (Pty)

Ltd).

Construction of egg hatchery and associated infrastructure – BA (For Supreme Poultry).

Construction of the Klipplaatdrif flow gauging (Vaal river) – EMP (DWAF).

ENVIRONMENTAL COMPLIANCE AUDITING AND ECO

National long haul optic fibre infrastructure network project, Bloemfontein to Laingsburg –

ECO.

National long haul optic fibre infrastructure network project, Wolmaransstad to Klerksdorp –

ECO.

Construction and refurbishment of the existing 66kV network between Ruigtevallei Substation

and Reddersburg Substation – ECO.

Construction and refurbishment of the Vredefort/Nooitgedacht 11kV power line – ECO

Environmental compliance audit and botanical account of Afrisam’s premises in Bloemfontein

– Environmental Compliance Auditing.

Page 17: CURRICULUM VITAE - SAHRIS · 2018-01-20 · 1 CURRICULUM VITAE TEBOGO MAPINGA Profession : Principal Environmental Manager for Savannah Environmental Consultants Specialisation :

6

OTHER PROJECTS:

Keeping and breeding of lions (Panthera leo) on the farm Maxico 135, Ficksburg –

Management and Business Plan (for Enviroworks (Pty) Ltd.)

Keeping and breeding of lions (Panthera leo) on the farm Mooihoek 292, Theunissen –

Management and Business Plan (for Enviroworks (Pty) Ltd.)

Keeping and breeding of wild dogs (Lycaon pictus) on the farm Mooihoek 292, Theunissen –

Management and Business Plan (for Enviroworks (Pty) Ltd.)

Existing underground and aboveground fuel storage tanks, TWK AGRI: Pongola –

Environmental Management Plan (for TWK Agricultural Ltd).

Existing underground fuel storage tanks on Erf 171, TWK AGRI: Amsterdam – Environmental

Management Plan (for TWK Agricultural Ltd).

Proposed storage of 14 000 L of fuel (diesel) aboveground on Erf 32, TWK AGRI: Carolina –

Environmental Management Plan (for TWK Agricultural Ltd).

Proposed storage of 23 000 L of fuel (diesel) above ground on Portion 10 of the Farm Oude

Bosch, Humansdorp – Environmental Management Plan (for TWK Agricultural Ltd).

Proposed storage of 16 000 L of fuel (diesel) aboveground at Panbult Depot – Environmental

Management Plan (for TWK Agricultural Ltd).

Existing underground fuel storage tanks, TWK AGRI: Mechanisation and Engineering, Piet

Retief – Environmental Management Plan (for TWK Agricultural Ltd).

Existing underground fuel storage tanks on Portion 38 of the Farm Lothair, TWK AGRI:

Lothair – Environmental Management Plan (for TWK Agricultural Ltd).