Upload
khairy-khalil
View
4
Download
1
Embed Size (px)
Citation preview
KHAIRY AHMED SAEID KHALIL.
SENIOR MECHANICAL ENGINEER /
PROJECT ENGINEER, PMP, CEng
Email: [email protected]
Cellular No.:+2 01000076023
Executive Summary & Objective:
Certified PMP &Chartered Engineer (CEng) from Engineering Council, UK,
Member of Institute of Mechanical Engineers (IMECHE), with 14 years experience
in Oil & Gas Projects.
7 years spent as a Rotating Equipment Engineer in addition to another 7 years
spent as a Mechanical Project Engineer
Looking forward to develop my skills and gain experience in a healthy working
atmosphere.
Seeking an opportunity to direct my Knowledge and Expertise through a
Multinational organization.
Summary of Skills:
Comprehensive knowledge of mechanical engineering practices,
procedures, and delivery standards
Extensive knowledge of compressor design, rotating equipment
engineering, high-pressure fluids, and vibration analysis techniques
In-depth knowledge of conducting root cause analysis and solving
technical issues associated with rotating equipment
Possess sound knowledge of identifying defected parts and assembling
rotating equipment parts
Familiar with the applicable standard international codes of rotating
engineering
Posses an excellent analytical skills and ability to communicate
technical information, accurately and precisely
EDUCATION & PROFESSIONAL CERTIFICATION:
PMP Certificate from PMI (Project Management Institute),USA
Chartered Engineer (CEng) from Institute of Mechanical Engineers
(IMECHE), Engineering Council, UK Spec
B.Sc. in Mechanical Power Engineering, Faculty of Engineering,
Alexandria University.
Joining Date : Sept. 1996
Graduation Date : June 2001
Accumulated grade : GOOD
General secondary certificate From Victory College School.
Duties &Responsibilities:
Developing basic design, detailed engineering and procurement related
activities of Rotating Equipment/packages such as pumps, compressors,
blowers, and refrigeration units.
Developing rotating equipment specifications and commissioning guidelines
for the equipment.
Providing rotating equipment information throughout the various proposal,
engineering and construction phases to the project team.
Provide the technical expertise to assist in achieving accuracy in project piping
and instrumentation drawings (P&ID’s).
Issuing requests for quotations, purchase specifications, bid evaluations, and
purchase requisitions.
Reviewing and approving vendor documentation for rotating equipment on
assigned projects.
Participating in inspections and testing of equipment as required.
Participating in equipment check-out and commissioning as required.
Facilitate the definition of project scope, goals and deliverables
Develop full scale project plans
Track project deliverables using appropriate tools
Constantly monitor and report on progress of the project to all stakeholders
Implement and manage project changes and interventions to achieve project
outputs
Risks identification & assessment (opportunities & threats); creating response
plans, monitoring & controlling during execution.
Ensures technical compliance with the contract requirements
Intervention with technical disciplines in solving faced hurdles within
recognized/innovated engineering practices.
Handle communications with contractor, interface sister companies, lenders
Career Development
PMP PREPARATION COURSE
NEGOTIATION SKILLS WORKSHOP
MEETING SKILLS WORK SHOP
EFFECTIVE MANAGEMENT SKILLS
CONFLICT MANAGEMENT
RISK MANAGEMENT
EFFECTIVE MEETINGS WORKSHOP
TIME MANAGEMENT WORKSHOP
TECHNICAL REPORT WRITING
GAS PROCESSING & TREATMENT.
PUMP SCHOOL (GOULDS)
RECIPROCATING COMPRESSORS
ENGINEERING MATERIALS SELECTION
LNG & NGL AWARENESS SESSION.
LANGUAGE &COMPUTER SKILLS:
WINDOWS, MICROSOFT OFFICE, MS-PROJECT (BASICS)
ARABIC (MOTHER TONGUE)
ENGLISH (FLUENT)
Projects Experience:-
Egyptian Ethylene & Derivatives (Ethydco) Co, Alexandria
April 2012- Present
- Managing/Monitor the performance/execution of Joint venture of TOYO Int.
& Enppi Co (JV Contractor) for 400,000 ton/year Poly Ethylene project.
- Responsible for Preparing Complex Interface Project Report (Showing all
Interfaces between Complex Projects)
- Responsible for Creating Additional Scope work packages for Interfaces,
Tender Evaluation, Monitor Execution/performance.
- Presenting Reports & Areas of concerns to Nexant (Loaner’s Technical
Advisor), Ethydco Executive Managemet, Client & Contractor Project Teams
- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)
for 3 Ethylene Compressors driven by Steam Turbines.
- Witnessed Supplier FAT tests (Mechanical Run) for 2 General Purpose
Turbines
- Witnessed Supplier FAT tests (Mechanical Run) for 2 Turbo expanders.
- Supervised Installation works (Foundation Leveling, Mechanical Leveling,
Pre-alignment, Final Alignment)
East Bahyeria (EBAH) Power Station Project, Qarun
Company, Egypt (Share Holder: APACHE, USA & Egyptian
Petroleum CO.)
Mar. 2011- April 2012
- Project Engineering Management of a Detailed Engineering Services Cost
Reimbursable contract for 24 MW Power Station
KHAFJI Field Development Project, PHASE 1-OFFSHORE,
Saudi Arabia (Share Holder: Saudi Aramco & Kuwait Oil
Co.)
June 2008 – Mar. 2011
- Participate in Project Management for the Performance/Execution of Egyptian
Consortium (Enppi, Petrojet & PMS) companies for 6 New Platforms (3
power Distribution platforms + 2 Production Platforms + 1 Integrated Well
heads platform)
- Project Manager/Site representive for Modification of 8 Existing Platforms
(Deck Extensions + Replacement of existing commodities) & 2 Pipelines
laying (36” & 42”-32 KM) + 6 Submarine cables laying (Total Length = 150
Km)
Egyptian Linear Alkyl Benzene Project, Egypt
Jan. 2006 – May. 2008
- Participate in Project Management for the Performance/Execution of
Consortium (GS E&C, Enppi & Petrojet) for new Linear Alkyl benzene
Petrochemical Plant in Alexandria.
- Supervising/Monitoring Execution of Enppi scope as limited to Detailed
Engineering of Utilities Area, Tankage area (32 Tanks) & Off Plot Area (Tie-
In with 6 Sister companies in petroleum Sector for Feed supply + off spec.
product return) .
- Participated in Construction Supervision as Leading Installation works
(Foundation Leveling, Mechanical Leveling, Pre-alignment, Final Alignment)
for several Pumps, Air compressor
PETROBEL Pumping Station, Ismailia, Egypt (Share
Holder: Eni Cooperation)
Sept.2004 – Dec. 2005
- Performed all Engineering activities (Issuing Material requisitions, Evaluating
Offers, Vendor prints review) for 2 Barrel Multi stage pumps, Power rating =
1.3 MW
- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)
- Supervised Installation works (Foundation Leveling, Mechanical Leveling,
Pre-alignment, Final Alignment)
- Participated in commissioning activities
United Gas Derivatives (UGD), Port Said, Egypt (Share
Holder: BP Co.)
April. 2004 – Aug. 2004
- Supervised Installation works (Foundation Leveling, Mechanical Leveling) for
Fire Fighting Pumps & Emergency Diesel Generator.
- Supervised Pre-commissioning activities for Fire Fighting Pumps (Jockey,
Main Electric/Diesel Pumps)
- Participated in commissioning activities
Fajr Compression station, Jordan
May 2003 – April 2004
- Participated with Mechanical leader in all Engineering activities (Issuing
Material requisitions, Evaluating Offers, Vendor prints review) for 3 Turbo
compressors, Power rating = 3 MW/Each
- Witnessed Supplier FAT tests (Hydrostatic, Performance, Mechanical Run)
- Supervised Installation works (Foundation Leveling, Mechanical Leveling,
Pre-alignment, Final Alignment)
- Participated in commissioning activities