IMAGES (FROM TOP TO BOTTOM) Aerial view of first tank base concrete pour. Aerial view of pre-cast wall panel installation. Stressing of wall hoop tendons. PROJECT Design pre-cast post tensioned tanks and supply installation of post tensioning to 2 NO 37.5 ML Water Tanks, Cunderdin CLIENT BGC Construction FORTEC CONTACT 08 6206 6999 DESCRIPTION The main water conduit from Perth to Kalgoorlie runs through Cunderdin, where a series of pump stations and an unroofed, rock-lined storage reservoir are located. The project involves the development of two 37.5 million litre water storage facilities on Water Corporation owned land approximately 5km west of the Cunderdin town site. Fortec was engaged by BGC Construction to design the 2 NO 37.5ML pre-cast post tensioned tanks and install post- tensioning to the two tanks. The scope included: Design and detail of the concrete ring beam, base slab and walls of 2 NO pre-cast post tensioned tanks Supply, install, stressing and grouting of the post- tensioned tendons to tank base and ring beam Supply, prefabrication, stressing and grouting of pre-cast wall panel vertical tendons Supply, reeving of strand, stressing and grouting of pre- cast wall panel horizontal tendons HIGHLIGHTS All works were self-performed by Fortec The project was completed on time First tank project delivered by Fortec in Western Australia CUNDERDIN WATER TANKS 2 X 37.5 MEGA LITRE WATER TANKS WHEATBELT, WA

CUNDERDIN WATER TANKS

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

IMAGES (FROM TOP TO BOTTOM)

� Aerial view of first tank base concrete pour. � Aerial view of pre-cast wall panel installation.

� Stressing of wall hoop tendons.

PROJECTDesign pre-cast post tensioned tanks and supply installation of post tensioning to 2NO 37.5 ML Water Tanks, Cunderdin

CLIENTBGC Construction

FORTEC CONTACT08 6206 6999

DESCRIPTION The main water conduit from Perth to Kalgoorlie runs through Cunderdin, where a series of pump stations and an unroofed, rock-lined storage reservoir are located.

The project involves the development of two 37.5 million litre water storage facilities on Water Corporation owned land approximately 5km west of the Cunderdin town site.

Fortec was engaged by BGC Construction to design the 2NO 37.5ML pre-cast post tensioned tanks and install post-tensioning to the two tanks.

The scope included:

� Design and detail of the concrete ring beam, base slab and walls of 2NO pre-cast post tensioned tanks

� Supply, install, stressing and grouting of the post-tensioned tendons to tank base and ring beam

� Supply, prefabrication, stressing and grouting of pre-cast wall panel vertical tendons

� Supply, reeving of strand, stressing and grouting of pre-cast wall panel horizontal tendons

HIGHLIGHTS � All works were self-performed by Fortec � The project was completed on time � First tank project delivered by Fortec in Western Australia

CUNDERDIN WATER TANKS

2 X 37.5 MEGA LITRE WATER TANKSWHEATBELT, WA