Upload
lydang
View
216
Download
2
Embed Size (px)
Citation preview
1
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Cummins Next Generation Manufacturing Process Intelligence
Robert D. Borchelt, Ph.D.,
Director, Manufacturing IT Systems and Industrial Controls Corporate Manufacturing
Apriso Community Summit | Germany June 19 & 20, 2013
2
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
About Cummins
• Cummins Inc., a global power leader, is a corporation of complementary business units that design, manufacture, distribute and service diesel and natural gas engines and related technologies.
• Headquartered in Columbus, Indiana, (USA) Cummins employs approximately 44,000 people worldwide and serves customers in 190 countries.
• Cummins earned $1.66 billion on
sales of $17.3 billion in 2012, www.cummins.com.
5
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
NGMES Project Milestones
Cummins Public
2008: Columbus In. –
Global CORE System Definition
2008: Darlington UK –
1st Engine Assembly – Significant performance increase in quality / efficiency
2010: Beijing China –
1st JV Engine Assembly – 500% larger plant / deployment $$ ~ 50% less cost
2011: Wuhan China –
1st Fuel System plant – 85% reuse of CORE / deployment $$ ~ 90% less cost
2011: Phaltan India –
2nd JV Engine Assembly – Size = Darlington / Deployment cost ~ 75% less cost
2012: Houston Texas -
Specialty Apps – 1st site for ‘Mobile MES’ deployment
2012: Izmir Turkey –
Filtration – 1st filtration - > 80% reuse of CORE solution @ 10% of 1st site $$
6
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
NGMES Benefits to Cummins
Efficiency Quality Process Global
25+% throughput
increase realized in 1st
plant deployment
Order of magnitude
improvement (90%+) in Defects to Customer
metric
Cross-plant and BU
process reuse 95%+ for engine
assembly and 85% for
component operations
Initial deployments
outside of U.S. aligned to Corporate Growth Plan
10+ plants deployed ongoing per year across all business units
7
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Original NGMES Reporting Requirements
Accuracy • Integrated reporting for efficiency, quality and availability
Availability • Real-time reporting access from within and outside the
plant
Impact • No impact on production operations from report requests
History ● Immediate access to production history
8
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Today’s Reporting
• Operational Reporting • What parts I need for pending assembly operations for the
engines on-line? • What are the BOM/Item Assembly changes that happened
over a period of time? • What are the production faults open at this moment? • What are the changes required for Engine Conversion? • What is the status of Engines on the line? • What is the next “N” number of work orders to be
processed?
• Aggregate / Analytical Reporting • How does Plant 1 compare to Plant 2 for: • Delivery performance • Quality performance • Capacity utilization • People/Engine/Day • What’s my total production in a given period of time? • What’s the overall delivery performance?
9
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Why Change NGMES Reporting Plan?
• Corporate BI report s are premium cost
• Focus skilled Mfg resources on NGMES process improvement & deployment
• IT storage costs reduced
• Business users do their own Ad-hoc development w/o local IT support
• Dashboards and standard KPI’s improve data availability for management decision-making
• Simplifies support and accelerates global deployment of NGMES
10
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Next Step: Manufacturing Intelligence
Analytics
Com
petit
ive
Adva
ntag
e
Degree of Intelligence
Reporting
Transactional Data
Align reporting to needs for maximum ROI
What actions are needed? What “exactly” is the problem? Static, fixed layout Doesn’t address different scenarios Hour, shift, day, week, month
What truly happened? Drilldown with Slice and Dice What if these trends continue? Hour, shift, day, week, month, year
Decision Optimization Flexibility Statistical models Time Frame
Alerts Query/ limited drill down Ad hoc reports Standard reports Timeframe
12
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
MPI Advantages as Defined by Cummins
• “Out of the box” pre-defined Intelligence Packs
• Off the shelf product that is Manufacturing focused
• Improved global deployment of reports
• Dashboards will strengthen visibility and performance
• Improved sharing of common analysis, KPI’s and reports globally
• Provides global view of operations
• Mobile AND fixed UI device support
13
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Cummins MPI Deployment Update
• MPI deployment plans being developed
• Q114 launch for new plant deployments targeted • Includes operational and executive information
requirements • Includes UI platform consideration across fixed
workstations, laptop PCs, tablets & smartphones
• Deployment Considerations • Central Level 2 Support team process changes • ETL modifications to use MPI DB instead of TODS • RAP development for Cummins built functions
14
Community Summit 2013
© Apriso Corporation 2013, All rights reserved.
Summary of Expected Benefits
• Leveraging People, Process & Tools • Off the shelf reporting and dashboards • No need to build Ad-Hoc queries for big data analysis • Reduce development, maintenance and storage costs • Cross-functional tool supporting shop-floor to top-floor global
manufacturing intelligence requirements • Re-affirms executive support for NGMES program
• Engaged Cummins Leadership (CMO, SVP) in ‘real-world‘ requirements gathering for FlexNet EIC mobile app