  • CTLD 021

    Site Preparation Guide

    DPS

    7000/XTA

    NO

    VASC

    ALE

    7000

    Hardware: Cartridge Tapes

    REFERENCE77 A1 68UP 00

  • DPS7000/XTANOVASCALE 7000

    CTLD 021Site Preparation Guide

    Hardware: Cartridge Tapes

    May 1999

    BULL CEDOC

    357 AVENUE PATTON

    B.P.20845

    49008 ANGERS CEDEX 01

    FRANCE

    REFERENCE77 A1 68UP 00

  • The following copyright notice protects this book under Copyright laws which prohibit such actions as, but notlimited to, copying, distributing, modifying, and making derivative works.

    Copyright Bull SAS 1999

    Printed in France

    Suggestions and criticisms concerning the form, content, and presentation of thisbook are invited. A form is provided at the end of this book for this purpose.

    To order additional copies of this book or other Bull Technical Publications, youare invited to use the Ordering Form also provided at the end of this book.

    Trademarks and Acknowledgements

    We acknowledge the right of proprietors of trademarks mentioned in this book.

    Intel® and Itanium® are registered trademarks of Intel Corporation.

    Windows® and Microsoft® software are registered trademarks of Microsoft Corporation.

    UNIX® is a registered trademark in the United States of America and other countries licensed exclusively throughthe Open Group.

    Linux® is a registered trademark of Linus Torvalds.

    The information in this document is subject to change without notice. Bull will not be liable for errors containedherein, or for incidental or consequential damages in connection with the use of this material.

  • 77 A1 68UP Rev00 iii

    Preface

    This manual is designed to assist Bull customers in planning and preparing the sitefor installation of a CTLD021 Subsystem. Note that CTLD021 is the M.I.(commercial name) for CTL 9740 and CTCD001 the M.I. for CTS 9490. Bothnames are used in this manual.

    To help achieve an efficient system installation, the procedures, designrequirements, and recommendations in this manual should be observed. Asuccessful subsystem installation also depends on how individual responsibilitiesare allocated and how overall planning and follow-up work are performed.

    A technical publication remarks form is provided at the end of this manual for useby the customer to notify Bull or errors in the manual, or to offer suggestions for itsimprovement.

    Chapter 1 IntroductionChapter 2 The computer SiteChapter 3 CTLD021 and CTCD001 Specifics

    Scope andObjectives

    Structure

  • CTLD021 Site Preparation Guide

    iv 77 A1 68UP Rev00

  • 77 A1 68UP Rev00 v

    Table of Contents

    1. Before you start

    1.1 General information.....................................................................................................1-1

    1.2 Introduction .......................................................................................................1-1

    1.3 Computer Room Requirements ...................................................................................1-2

    1.4 Planning .......................................................................................................1-2

    2. The Computer site

    2.1 ACSLS Connection Architecture..................................................................................2-1

    2.2 Site Preparation Manual Reference.............................................................................2-2

    3. CTLD021 and CTCD001 Specifics

    3.1 Physical Specifications................................................................................................3-1

    3.2 Electrical and Power Requirements.............................................................................3-23.2.1 Power Consumption .......................................................................................3-2

    3.3 Environmental Limits...................................................................................................3-33.3.1 ACSLS Connection Environmental Limits .......................................................3-33.3.2 Operating Heat Output ...................................................................................3-4

    3.4 Floor space requirements............................................................................................3-4

    3.5 Relative Positions of Machines....................................................................................3-7

  • CTLD021 Site Preparation Guide

    vi 77 A1 68UP Rev00

    Table of Graphics

    Figure 2-1. ACSLS Connection Architecture..........................................................................2-1Figure 3-1 - Cable Cutout Locations and Service Clearances ................................................3-5Figure 3-2 - Service Clearances for 6 LSMs in CEM Configuration ........................................3-6

    Table 2-1. Site Preparation Manual Reference ......................................................................2-2Table 3-1. LSM with 9490-Physical Specifications.................................................................3-1Table 3-2. Total Power Consumption Quick Reference .........................................................3-2Table 3-3. ACSLS Connection Environmental Limits .............................................................3-3Table 3-4. Operating Heat Output .........................................................................................3-4

    Figures

    Tables

  • 77 A1 68UP Rev00 1-1

    1. Before you start

    1.1 General information

    The StorageTek® 9740 Library (part of Timberwolf family) is a derived fromCTL 9710 already introduced in Bull's catalogue, it is a fully automated cartridgestorage and retrieval subsystem. It is already proposed by GCOS8 Product Line,and will be proposed by GCOS7 as new offer in conjunction with StorageTek 9490(Timberline) Cartridge Subsystem. It uses both the Enhanced Capacity cartridgetape (E-Cartridge, also known as E-Tape) and standard length cartridges used in18-track and 36-track cartridge subsystem as the storage medium. In thisdocument, you will find only information relative to library connection to theDPS 7000.

    1.2 Introduction

    The installation of any computer implies the planning, initiation, and execution ofmany tasks. In addition to the tasks of general organization, programming andeducation, those concerning the preparation of the computer room (or site) and itsenvironment are to be considered.

    There are three principal categories of environmental work to be undertaken. Theyrelate to:

    • the building

    • the power supply

    • the air conditioning for the computer

    The purpose of this manual is to treat these problems by describing the technicalconsiderations necessary for a successful and efficient installation of the BullCTLD021 Library Subsystem.

  • CTLD021 Site Preparation Guide

    1-2 77 A1 68UP Rev00

    Throughout all phases of planning, site preparation and installation your Bull SitePreparation representatives will help you to interpret this manual and give thebenefit of their experience.

    1.3 Computer Room Requirements

    Refer to the Site Preparation Guide relevant to your host system.

    The data-processing environment needs to provide optimal operating conditions.General information concerning the physical characteristics of the building, airconditioning and the electrical installation are described in the General Guide toData Processing Site Preparation which is available on-line via the Web.

    You will find this at the following URL address:

    http://bbs.bull.net/aise

    1.4 Planning

    A successful installation requires careful consideration during the planning phase,and close supervision during the execution phase of site preparation. It is yourresponsibility as the customer to ensure that the site will be ready to receive thesystem at least one week before delivery.

    If the system is to be installed in an existing site, the schedule will depend largelyon the extent of the modifications necessary to meet the system requirements. Ifany doubts exist regarding the suitability of existing facilities, your Bull SitePreparation Representatives will examine the current site, and recommend thenecessary modifications for the installation.

    To help you with planning, the Bull Site Preparation and Maintenancerepresentatives have well-established planning procedures which can be tailored toparticular requirements. As no two installations are alike, no exact schedule can begiven here. However, the following recommendations will act as a rough guide tothe sequence and timing of major events.

    13 Weeks Before Delivery

    Approve layout plans of computer site, the surrounding areas and the equipment inthe computer room. Draw up specifications, and invite tenders for contracts.

  • Before you start

    77 A1 68UP Rev00 1-3

    11 Weeks Before Delivery

    Review tenders and award contracts. Site meeting of selected contractors, Bullrepresentatives and outside consultants.

    9 Weeks Before Delivery

    Place all orders for equipment and necessary furnishings. Establish a working planfor the modifications to be performed.

    8 Weeks Before Delivery

    Complete all structural modifications, rewiring and installation of the airconditioning. Check that corridor, door and window widths conform tospecifications.

    6 Weeks Before Delivery

    Install raised floor and suspended ceiling (where applicable). Check floor loading.

    5 Weeks Before Delivery

    Decorate and thoroughly clean the computer room. Commission the electrical andair conditioning equipment.

    NOTE:Air balancing of the air conditioning system should be performed by airbalancing specialists. Do this as soon as possible after the system installationhas been completed.

    Install any auxiliary equipment, such as terminals, modems, and so on. Ensure thatthey are operating correctly.

    2 Weeks Before Delivery

    Bull Site Preparation and Maintenance representatives will specify "preparationcomplete".

    1 Week Before Delivery

    All work completed and the computer room thoroughly cleaned. Air conditioningand electrical plant test-run during this period. Use the shipping information in theproduct specific documentation to determine the "delivery trail", and check thatthis is obstacle-free. Procure any special materials and equipment needed fordelivery.

  • CTLD021 Site Preparation Guide

    1-4 77 A1 68UP Rev00

  • 77 A1 68UP Rev00 2-1

    2. The Computer site

    The precise details of the computer site where you install yourCTLD021/CTCD001 library subsystem depend on the connection architecture youhave chosen. The following sections describe the ACSLS connection architecture.

    2.1 ACSLS Connection Architecture

    UNIX SERVER ACSLS

    ET

    HE

    RN

    ET

    SCSI

    RS

    423

    ROBOT

    CTU0

    CTU1

    CTL 9740 LSM

    T

    T

    DPS 7000

    OPEN7

    CTS 9490 DRIVECABINET

    CTU3

    CTU2

    WSP

    WSP

    Figure 2-1. ACSLS Connection Architecture

  • CTLD021 Site Preparation Guide

    2-2 77 A1 68UP Rev00

    In ACSLS connection architecture you will be installing the library subsystem onthe same computer site as an existing DPS 7000 installation. For generalinstallation details, refer to the site preparation documentation for the DPS 7000installation as indicated in the Site Preparation Manual Reference Table. Specificsite preparation details for this connection architecture are given in "CTLD021 andCTCD001 Specifics".

    • Connection of CTS 9490 Drives to DPS 7000 through WSP Controller will bedone by SCSI interface (either 10 m or 20 m long cable).

    • Connection of ACSLS Server to DPS 7000 will use Ethernet Network interface.

    2.2 Site Preparation Manual Reference

    For general site details use the table below to identify the appropriate sitepreparation guide reference for your connection architecture and server.

    Table 2-1. Site Preparation Manual Reference

    Product Site Preparation Reference

    ESCALA DPX/20 86 A1 06WD 07

    DPS 7000 VEGA 4XX/CXX 77 A1 90UU

    DPS 7000 AURIGA 8XX/DXX/MXX 77 AA 93UU

    DPS 7000 (ARTEMIS LR) DPS 7000/MT 77 A1 61US

    DPS 7000 (ARTEMIS HR) DPS 7000/MT 77 A1 62US

    CTCD001 CTS 9490 00 A1 41UG Rev01

  • 77 A1 68UP Rev00 3-1

    3. CTLD021 and CTCD001 Specifics

    This chapter helps you to prepare your existing site for the installation andconnection of the CTLD021/CTCD001 library subsystem. The existing site canrange from an operational DPS 7000 installation in the case of the ACSLSarchitecture.

    3.1 Physical Specifications

    The following table gives the physical specifications for the library subsystem:

    Table 3-1. LSM WITH 9490-PHYSICAL SPECIFICATIONS

    2x9490 CTU 4x9490 CTUHeight 183 cm. (72 in.)* 183 cm. (72 in.)*Width w/covers 117 cm. (46 in.) 117 cm. (46 in.)Depth 137 cm. (54 in.) 137 cm. (54 in.)Depth with expansion door 163 cm. (64 in.) 163 cm. (64 in.)Weight 827 kg (1823 lbs) 904 kg (1993 lbs)Weight with expansion door 854 kg (1883 lbs) 931 kg (2053 lbs)Weight with expansion door & tapes 1008 kg (2221 lbs) 1085 kg (2391 lbs)

    * When the overhead display is installed, the overall height of the CTU variesfrom 2.2 m (7 ft.) to 2.4 m (8 ft.).Values for 1 LSM.

    NOTE: Weight is given without tape cartridges. Allow approximate 255 grams(9 ounces) for each cartridge.

  • CTLD021 Site Preparation Guide

    3-2 77 A1 68UP Rev00

    3.2 Electrical and Power Requirements

    3.2.1 Power Consumption

    The library subsystem has a single power supply.

    The CTLD021 is supplied with appropriate cable ends (56/60 Hz AC cords).

    The individual CTCD001 cabinet is supplied with appropriate cable ends(56/60 Hz AC cords).

    The quick reference table shows power consumption for different configurations.

    Table 3-2. Total Power Consumption Quick Reference

    LSM Requirements

    LSM Consumption:

    9490 Requirements

    Consumption:2 CTUs4 CTUs

    Each SSU

    100 - 240 VAC Nominal, Single Phase, 3-wire, 47 to63 Hz, 10 Amps (RMS) Service 3 wire0.209 kVA (0.200 kW)

    200 to 240 VAC Nominal, Single Phase, 3-wire, 47 to63 Hz, 10 Amps (RMS) Service 3 wire

    0.88 kVA (0.84 kW)1.46 kVA (1.40 kW)

    0.07 kVA (0.06 kW)

    NOTE:Please note that these values change for each additional LSM.

  • CTLD021 and CTCD001 Specifics

    77 A1 68UP Rev00 3-3

    3.3 Environmental Limits

    3.3.1 ACSLS Connection Environmental Limits

    The environmental limits given below serve as a reminder of limits specified for alibrary subsystem.

    Table 3-3. CTLD021/CTCD021 Environmental Limits

    Temperature:operatingstorage

    Relative humidity:operatingstorage

    Wet Bulb Maximum:operatingstorage

    Contamination limit:

    15° to 32°C (59° to 90°F)10° to 44°C (50° to 104°F)

    20% to 80% (noncondensing)10% to 95% (noncondensing)

    29.2°C (84.5°F)35°C (95°F)

    Not defined

    When the CTLD021 is considered as a component of a DPS 7000 System,environmental characteristics are the following ones:

    Temperature range: Relative humidity:

    Minimum 18°C Minimum 45%Maximum 25°C Maximum 55%Gradient max. 4°C/hr. Gradient max. 8%/hr.

    Contamination limit:• less than 4*106 particles (d ≥ 0,5 micron) per m3• less than 8*105 particles (d ≥ 1 micron) per m3• less than 2.5*104 particles (d ≥ 5 micron) per m3

    NOTE:The temperature and humidity of data cartridges brought in from outside thecomputer site must be allowed to stabilize in the specified ambient environmentfor 24 hours.

  • CTLD021 Site Preparation Guide

    3-4 77 A1 68UP Rev00

    3.3.2 Operating Heat Output

    The table below summarizes operating heat output for the various components andconfigurations of the library subsystem.

    Table 3-4. Operating Heat Output

    LSM 172 kcal/hr / 0.200 kW/hr (683 Btu/hr)

    2 CTUs4 CTUs

    730 kcal/hr / 0.850 kW/hr (2900 Btu/hr)1210 kcal/hr / 1.40 kW/hr (4800 Btu/hr)

    Each SSU 51 kcal/hr / 0.058 kW/hr (200 Btu/hr)

    3.4 Floor space requirements

    Site preparation

    The figures hereafter show the Floor-Space and Service Area requirements.

  • CTLD021 and CTCD001 Specifics

    77 A1 68UP Rev00 3-5

    Figure 3-1 - Cable Cutout Locations and Service Clearances

  • CTLD021 Site Preparation Guide

    3-6 77 A1 68UP Rev00

    Figure 3-2 - Service Clearances for 6 LSMs in CEM Configuration

  • CTLD021 and CTCD001 Specifics

    77 A1 68UP Rev00 3-7

    3.5 Relative Positions of Machines

    Within you computer site the actual position of the library subsystem will bedictated by physical space restrictions. The available cable lengths for connectionsbetween machines imposes additional restrictions on the relative positions ofmachines.

    The logic cables for connecting up the CTLD021 are only available in thefollowing lengths:

    Connection Cable Length

    DPS 7000 to Cabinet Drive Subsystem 10m or 20m

    UNIX Server to Library Subsystem 30m (100 feet)

    The power cable for the CTLD021 is 3 m long.

    Connection Cable Length

    Library Subsystem to Power Supply 3m (10 feet)

    Cabinet Drive Subsystem 3m (10 feet)

    NOTE:If you have a false floor, remember to allow 50 cm for the drop of the powercable, and 1m for the combined drop and ascent of a logic cable. If you do nothave a false floor, 20 cm and 40 cm are respectively sufficient.

  • CTLD021 Site Preparation Guide

    3-8 77 A1 68UP Rev00

  • 77 A1 68UP Rev00 g-1

    Glossary

    A

    ACSLSAutomated Cartridge System Library Software

    B

    BTUBritish Thermal Unit

    C

    CEMCartridge Exchange Mechanism

    CTLCartridge Tape Library

    CTSCartridge Tape Subsystem

    CTUController Transport Unit

    E

    EMElectronics Module

    G

    GCOSGeneral Comprehensive Operating System

  • CTLD021 Site Preparation Guide

    g-2 77 A1 68UP Rev00

    L

    LSMLibrary Storage Module

    R

    RMSRemote Maintenance System

    S

    SSUSubsystem Support Unit

  • 77 A1 68UP Rev00 i-1

    Index

    AACSLS

    connection architecture,2-2environmental limits,3-3

    Air balancing,1-3

    DData cartridges

    temperature and humidity,3-3Delivery trail,1-3

    FFalse floor,3-7

    LLayout plans,1-2Library subsystem electrical requirements,3-2Library subsystem power requirements,3-2

    OOperating heat output,3-4Outside consultants,1-3

    PPhysical Specifications,3-1Power consumption,3-2

    SSelected contractors,1-3Site preparation guide reference,2-2

    TTenders for contracts,1-2The computer site,2-1

    WWSP

    Wide SCSI Processor,2-2

  • CTLD021 Site Preparation Guide

    i-2 77 A1 68UP Rev00

  • Technical publication remarks form

    Title : DPS7000/XTA NOVASCALE 7000 CTLD 021 Site Preparation Guide Hardware:Cartridge Tapes

    Reference Nº : 77 A1 68UP 00 Date: May 1999

    ERRORS IN PUBLICATION

    SUGGESTIONS FOR IMPROVEMENT TO PUBLICATION

    Your comments will be promptly investigated by qualified technical personnel and action will be taken as required.If you require a written reply, please include your complete mailing address below.

    NAME : Date :

    COMPANY :

    ADDRESS :

    Please give this technical publication remarks form to your BULL representative or mail to:

    Bull - Documentation Dept.

    1 Rue de ProvenceBP 20838432 ECHIROLLES [email protected]

  • Technical publications ordering form

    To order additional publications, please fill in a copy of this form and send it via mail to:

    BULL CEDOC357 AVENUE PATTONB.P.2084549008 ANGERS CEDEX 01FRANCE

    Phone: +33 (0) 2 41 73 72 66FAX: +33 (0) 2 41 73 70 66E-Mail: [email protected]

    CEDOC Reference # Designation Qty

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    _ _ _ _ _ _ _ _ _ [ _ _ ]

    [ _ _ ] : The latest revision will be provided if no revision number is given.

    NAME: Date:

    COMPANY:

    ADDRESS:

    PHONE: FAX:

    E-MAIL:

    For Bull Subsidiaries:

    Identification:

    For Bull Affiliated Customers:

    Customer Code:

    For Bull Internal Customers:

    Budgetary Section:

    For Others: Please ask your Bull representative.

  • BULL CEDOC

    357 AVENUE PATTON

    B.P.20845

    49008 ANGERS CEDEX 01

    FRANCE

    77 A1 68UP 00REFERENCE

    CTLD021 Site Preparation Guide - 77 A1 68UP Rev00PrefaceTable of ContentsTable of Graphics1. Before you start 1.1 General information1.2 Introduction1.3 Computer Room Requirements1.4 Planning

    2. The Computer site 2.1 ACSLS Connection Architecture2.2 Site Preparation Manual Reference

    3. CTLD021 and CTCD001 Specifics 3.1 Physical Specifications3.2 Electrical and Power Requirements3.2.1 Power Consumption

    3.3 Environmental Limits3.3.1 ACSLS Connection Environmental Limits3.3.2 Operating Heat Output

    3.4 Floor space requirements3.5 Relative Positions of Machines

    GlossaryIndex