75
CTF PACIFIC CTF PACIFIC Campaign Planning Process Campaign Planning Process Guide / Brief Template Guide / Brief Template UNCLASSIFIED Date

CTF PACIFIC

Embed Size (px)

DESCRIPTION

CTF PACIFIC. Campaign Planning Process Guide / Brief Template. Date. UNCLASSIFIED. Note. This guide has been developed as a tool to guide CCTF PACIFIC, Staff and Component Planners in the conduct of Campaign Planning. Refer to MNF SOP Part B, Chapter 2, Annex B, Appendix 4, Tab B. - PowerPoint PPT Presentation

Citation preview

Page 1: CTF PACIFIC

CTF PACIFICCTF PACIFIC

Campaign Planning Process Campaign Planning Process Guide / Brief TemplateGuide / Brief Template

UNCLASSIFIED

Date

Page 2: CTF PACIFIC

2UNCLASSIFIED

NoteNote

•This guide has been developed as a tool to guide CCTF PACIFIC, Staff and Component Planners in the conduct of Campaign Planning.–Refer to MNF SOP Part B, Chapter 2, Annex B, Appendix 4, Tab B.

Page 3: CTF PACIFIC

3UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Conduct scoping per the Step 1 Scoping Agenda

•Essential Strategic Guidance:–(Fill in)

Page 4: CTF PACIFIC

4UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Knowledge Gaps (what do we NOT know):–(Fill In)

Page 5: CTF PACIFIC

5UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Time Appreciation (deliverables):–Major Milestones to plan:

Capture my guidance for “Commander’s Scoping” in a confirmation brief to be developed during the allotted Step 1 Scoping time

Finalize the Actor / Stakeholder Matrix & update the draft OIPE Analysis during Step 2

Complete the Mission Analysis Template (all 3 sections) filled out during Step 3A

Complete the S-COG Analysis Template & conduct a confirmation brief with major info contained in Warning Order 2 (filled out during Step 3B)

Page 6: CTF PACIFIC

6UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Time Appreciation (deliverables):–Major Milestones to plan:

Short brief explaining the Campaign Plan Schematic & the Decisive Point Paragraphs

Completed Decisive Point Matrix identifying SEs (with SEs & other elements completed)

Brief the following items contained in the Campaign Plan Directive:

MissionCTF Intent & Operational End StateNarrative description of HOW the CTF & Components will conduct the Campaign Plan

Updated Command Relations

Page 7: CTF PACIFIC

7UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Time Appreciation (deliverables):–Major Milestones to plan:

Short confirmation planning session with CCTF for approval of prioritized SEs

Develop, analyze & compare COAs for a DRAFT Decision Brief no later than ______.

Page 8: CTF PACIFIC

8UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Operational / Battle Rhythm Guidance:–Fill In

Page 9: CTF PACIFIC

9UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Readiness Guidance:–Fill In

Page 10: CTF PACIFIC

10UNCLASSIFIED

Step 1 – Commander’s ScopingStep 1 – Commander’s Scoping

•Planning Process Guidance:–CTF Components (CFLCC, CFMCC, CFACC, CSOTF & NCEs) fully integrate into CTF HQ Planning Effort

–CTF C3 FOPS – conduct branch planning & back-brief the DCCTF & COS on your branch plans by ____.

–CTF C5 PLANS – will be the main focus of my efforts, I desire a pre-brief on the COA Decision Brief by ____.

Schedule other back-briefs as required per the timeline appreciation.

Page 11: CTF PACIFIC

11UNCLASSIFIED

Step 2 – Review of the Step 2 – Review of the SituationSituation

•Placeholder for Actor / Stakeholder Matrix

Page 12: CTF PACIFIC

12UNCLASSIFIED

Step 2 – Review of the Step 2 – Review of the SituationSituation

•Placeholder for update of relevant data in the OIPE

Page 13: CTF PACIFIC

13UNCLASSIFIED

Step 3A – Mission AnalysisStep 3A – Mission Analysis

•Placeholder for Mission Analysis Template–Mission Analysis Template section–Summary of Mission Analysis section–Issues Register section

Page 14: CTF PACIFIC

14UNCLASSIFIED

Step 3B – S-COG AnalysisStep 3B – S-COG Analysis

•Placeholder for S-COG Analysis Template

Page 15: CTF PACIFIC

15UNCLASSIFIED

Step 3B – S-COG AnalysisStep 3B – S-COG Analysis

•Major items contained in Warning Order 2

Page 16: CTF PACIFIC

16UNCLASSIFIED

Step 3C – Evaluation of FactorsStep 3C – Evaluation of Factors

•Major RELEVANT known facts & conditions that influence the development of the Concept of Operations–Are there any limitations that bound the CCTF’s CONOPS?

Restraints – things the CTF cannot do Constraints – things the CTF must do Factors that impact ops (weather, ROE, infrastructure, forces available, etc.)

Page 17: CTF PACIFIC

17UNCLASSIFIED

Step 4A – Develop theStep 4A – Develop theCampaign Plan FrameworkCampaign Plan Framework

•Placeholder for the Campaign Schematic

Page 18: CTF PACIFIC

18UNCLASSIFIED

Step 4A – Develop theStep 4A – Develop theCampaign Plan FrameworkCampaign Plan Framework

•Narrative description of the Campaign Plan

Page 19: CTF PACIFIC

19UNCLASSIFIED

Step 4A – Develop theStep 4A – Develop theCampaign Plan FrameworkCampaign Plan Framework

•Placeholder for the DP Paragraph

Page 20: CTF PACIFIC

20UNCLASSIFIED

Step 4B – DP AnalysisStep 4B – DP Analysis& SE Identification& SE Identification

•Filled out DP Matrix–SE OPT (Lead OPT) identifies all SEs from DPs

–Subordinate OPTs analyze the SEs & identify the elements of the SE (see matrix)

Page 21: CTF PACIFIC

21UNCLASSIFIED

Step 4C – Campaign PlanStep 4C – Campaign PlanEvaluationEvaluation

•Validation conducted with CCTF (no brief required or specific product required)

Page 22: CTF PACIFIC

22UNCLASSIFIED

Step 4D – Produce theStep 4D – Produce theCampaign PlanCampaign Plan

•Brief the following items contained in the Campaign Plan Directive:–Mission–CCTF Intent & Operational End State–Narrative description of HOW the CTF & Components will conduct the Campaign Plan

–Updated Command Relations

Page 23: CTF PACIFIC

23UNCLASSIFIED

Step 4E – DetermineStep 4E – DeterminePrioritized SEsPrioritized SEs

•Short confirmation planning session with CCTF for approval of prioritized SEs

Page 24: CTF PACIFIC

24UNCLASSIFIED

Step 5 – Linking PlanningStep 5 – Linking Planningto Executionto Execution

•Develop, analyze & compare COAs for a DRAFT Decision Brief Thursday PM.–See following slides for format

Page 25: CTF PACIFIC

25UNCLASSIFIED

MPAT TEMPEST EXPRESS-11MPAT TEMPEST EXPRESS-11

Date

CTF PACIFICCTF PACIFICCourse of Action Development, Course of Action Development,

Analysis &Analysis &Comparison BriefComparison Brief

Page 26: CTF PACIFIC

26UNCLASSIFIED

COA COA DevelopmentDevelopment

Page 27: CTF PACIFIC

29UNCLASSIFIED

Purpose of BriefPurpose of Brief

•Present COAs in accordance with Comd guidance

•Seek guidance on:–COAs to be fully developed–COA Modifications–COAs to be Wargamed–Threat COAs to be wargamed against–COA Comparison criteria

Page 28: CTF PACIFIC

30UNCLASSIFIED

HHQ MISSION & INTENTHHQ MISSION & INTENT

• Mission –• Strategic End State – • Commander’s Intent

• Purpose – • Method –• End State –

Page 29: CTF PACIFIC

31UNCLASSIFIED

CTF MISSION & INTENTCTF MISSION & INTENT

• Restated Mission Statement –• Operational End State – • Commander’s Intent

• Purpose – • Method –• End State –

Page 30: CTF PACIFIC

32UNCLASSIFIED

ASSUMPTIONSASSUMPTIONS

Page 31: CTF PACIFIC

33UNCLASSIFIED

COA 1 StatementCOA 1 Statement

Page 32: CTF PACIFIC

34UNCLASSIFIED

COA 1 CONOPSCOA 1 CONOPS

• Narrative (systems approach)

Page 33: CTF PACIFIC

35UNCLASSIFIED

COA 1 Task OrganizationCOA 1 Task Organization

Page 34: CTF PACIFIC

36UNCLASSIFIED

COA 1 Phase ICOA 1 Phase I

•DPs influenced in this phase•SEs achieved in this phase

Page 35: CTF PACIFIC

37UNCLASSIFIED

COA 1 Phase ICOA 1 Phase I

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 36: CTF PACIFIC

38UNCLASSIFIED

COA 1 Phase IICOA 1 Phase II

•DPs influenced in this phase•SEs achieved in this phase

Page 37: CTF PACIFIC

39UNCLASSIFIED

COA 1 Phase IICOA 1 Phase II

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 38: CTF PACIFIC

40UNCLASSIFIED

COA 1 Phase IIICOA 1 Phase III

•DPs influenced in this phase•SEs achieved in this phase

Page 39: CTF PACIFIC

41UNCLASSIFIED

COA 1 Phase IIICOA 1 Phase III

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 40: CTF PACIFIC

42UNCLASSIFIED

COA 1 Phase IVCOA 1 Phase IV

•DPs influenced in this phase•SEs achieved in this phase

Page 41: CTF PACIFIC

43UNCLASSIFIED

COA 1 Phase IVCOA 1 Phase IV

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 42: CTF PACIFIC

44UNCLASSIFIED

COA 1 Phase VCOA 1 Phase V

•DPs influenced in this phase•SEs achieved in this phase

Page 43: CTF PACIFIC

45UNCLASSIFIED

COA 1 Phase VCOA 1 Phase V

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 44: CTF PACIFIC

46UNCLASSIFIED

COA 1 RisksCOA 1 Risks

Page 45: CTF PACIFIC

47UNCLASSIFIED

COA 2 StatementCOA 2 Statement

Page 46: CTF PACIFIC

48UNCLASSIFIED

COA 2 CONOPSCOA 2 CONOPS

• Narrative (systems approach)

Page 47: CTF PACIFIC

49UNCLASSIFIED

COA 2 Task OrganizationCOA 2 Task Organization

Page 48: CTF PACIFIC

50UNCLASSIFIED

COA 2 Phase ICOA 2 Phase I

•DPs influenced in this phase•SEs achieved in this phase

Page 49: CTF PACIFIC

51UNCLASSIFIED

COA 2 Phase ICOA 2 Phase I

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 50: CTF PACIFIC

52UNCLASSIFIED

COA 2 Phase IICOA 2 Phase II

•DPs influenced in this phase•SEs achieved in this phase

Page 51: CTF PACIFIC

53UNCLASSIFIED

COA 2 Phase IICOA 2 Phase II

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 52: CTF PACIFIC

54UNCLASSIFIED

COA 2 Phase IIICOA 2 Phase III

•DPs influenced in this phase•SEs achieved in this phase

Page 53: CTF PACIFIC

55UNCLASSIFIED

COA 2 Phase IIICOA 2 Phase III

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 54: CTF PACIFIC

56UNCLASSIFIED

COA 2 Phase IVCOA 2 Phase IV

•DPs influenced in this phase•SEs achieved in this phase

Page 55: CTF PACIFIC

57UNCLASSIFIED

COA 2 Phase IVCOA 2 Phase IV

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 56: CTF PACIFIC

58UNCLASSIFIED

COA 2 Phase VCOA 2 Phase V

•DPs influenced in this phase•SEs achieved in this phase

Page 57: CTF PACIFIC

59UNCLASSIFIED

COA 2 Phase VCOA 2 Phase V

Phase begins with……. Purpose is to ………….. Main Effort is to ………….. Phase ends when …………….

• CTF HQ:

• Component:

• Component:

• Component:

• Component:

• Component:

Page 58: CTF PACIFIC

60UNCLASSIFIED

COA 2 RisksCOA 2 Risks

Page 59: CTF PACIFIC

61UNCLASSIFIED

COA AnalysisCOA Analysis

Page 60: CTF PACIFIC

62UNCLASSIFIED

Staff RecommendationsStaff Recommendations

• Threat COAs to be Wargamed Against:

– COA 1 (Most Likely):

– COA 2 (Most dangerous):

Page 61: CTF PACIFIC

63UNCLASSIFIED

ACTIONREACTION/CONSEQUENCE COUNTERACTION

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA AnalysisCOA Analysis

Example Action / Reaction / Counteraction

Page 62: CTF PACIFIC

64UNCLASSIFIED

ACTOR

CTF

CARFOR

CNAVFOR

CAFFOR

CMARFOR

CSOTF

CPOTF

EVENT EVENT EVENT EVENTCOMMENT COMMENT COMMENT COMMENT

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA AnalysisCOA Analysis

Example Simplified Synchronization Matrix

Page 63: CTF PACIFIC

65UNCLASSIFIED

TIME CONTINUOUS OR SINGLE EVENT

PROBABLE THREAT

DECISION POINTS

CRITICAL INFORMATION REQUIREMENTS

OPN MOVEMENT AND MANEUVER

OPN FIREPOWER

OPN PROTECTION

OPN INFORMATION

OPN INTEL

OPN SUPPORT

ARFOR/LAND COMPONENT/CFLCC

MARFOR/LAND COMPONENT/CFLCC

NAVFOR/MARITIME/CFMCC

AFFOR/AIR COMPONENT/CFACC

CSOTF

OTHERS

FUNCTION

AREAS

COMPONENTS

D-DAY/H-HOUR

D + 1 D + 2

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA AnalysisCOA Analysis

Example Synchronization Matrix

Page 64: CTF PACIFIC

66UNCLASSIFIED

SEQ-UENCENUMBER

ACTION REACTION/THREAT CONSE-QUENCES

COUNTER-ACTION

ASSETS TIME DECISION POINT

CCIR REMARKS

CRITICAL EVENT:

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA AnalysisCOA Analysis

Example Analysis Worksheet

Page 65: CTF PACIFIC

67UNCLASSIFIED

COA ComparisonCOA Comparison

Page 66: CTF PACIFIC

68UNCLASSIFIED

Test the Validity of Each COA

• Test for suitability

• Test for feasibility

• Test for acceptability

• Ensure COAs are distinct (variety)

• Test for completeness

Page 67: CTF PACIFIC

69UNCLASSIFIED

Test the Validity of Each COA

Validity Criteria COA 1Name

COA 2Name

Suitable Y/N Y/N

Feasible Y/N Y/N

Acceptable Y/N Y/N

Distinct Y/N Y/N

Complete Y/N Y/N

Page 68: CTF PACIFIC

70UNCLASSIFIED

SEs Met by each COA

SEs Met COA 1Name

COA 2Name

SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?SE Y / N / ? Y / N / ?

Page 69: CTF PACIFIC

71UNCLASSIFIED

COA Advantages& Disadvantages

COA Advantages Disadvantages

COA 1

COA 2

Page 70: CTF PACIFIC

72UNCLASSIFIED

Staff RecommendationsStaff Recommendations

•Recommended COA Comparison Criteria:

Page 71: CTF PACIFIC

73UNCLASSIFIED

COA # 1 COA # 2 COA # 3

Rapid DeliveryCritical NeedsSmooth IntegrationSmooth TransitionSimplicityForce ProtectionFlexibility

Comparison Criteria

Totals

Remarks

00-

0-

-+

-2

0+

0

0

0

0

0

1

-

+

0

-

+

0

0

0

Positive / Neutral / Negative Comparison

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA ComparisonCOA Comparison

Example

Page 72: CTF PACIFIC

74UNCLASSIFIED

COA # 1 COA # 2 COA # 3

Rapid DeliveryCritical NeedsSmooth IntegrationSmooth TransitionSimplicityForce ProtectionFlexibility

Governing Criteria

Totals

Remarks

332

21

22

33

2

3

2

3

2

2

3

3

2

3

3

3

1915 18

Unweighted Scale

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA ComparisonCOA Comparison

Example

Page 73: CTF PACIFIC

75UNCLASSIFIED

COA # 1 COA # 2 COA # 3

Rapid DeliveryCritical NeedsSmooth IntegrationSmooth TransitionSimplicityForce ProtectionFlexibility

WT. Governing Criteria

Totals

Remarks

3 93

22

21

2

6

64

21

2 2

3

15 26

3

26

63 3

3

33

22

42

3

3

3 322

9 6

3

2 2111

3 3

18 30

3 6

19 28

2

1 2

Weighted Criteria & Scale

Step 5 – Linking Planning to Execution Step 5 – Linking Planning to Execution COA ComparisonCOA Comparison

Example

Page 74: CTF PACIFIC

76UNCLASSIFIED

CTF Commander’s GuidanceCTF Commander’s Guidance

•COA _ approved

Page 75: CTF PACIFIC

77UNCLASSIFIED

DiscussionDiscussion