6
12/12/2008 1 Xypex Crystalline Products The Xypex product range has been specifically developed over the past 33 years to satisfy varying project requirements. Australia Bangladesh Belgium Argentina Brazil Brunei Bulgaria Canada Chile China Colombia Croatia Cyprus Czech Republic Denmark Ecuador Egypt Ethiopia Fiji France Germany Ghana Greece India Indonesia Iran Japan Jordan Kenya Korea Latvia Lithuania Malaysia Mexico Monaco Myanmar Nepal Netherlands New Zealand Norway Panama Peru Philippines Poland Portugal Puerto Rico Republic of Georgia Romania Russia Saudi Arabia Singapore Slovak Republic Spain Sri Lanka Switzerland Taiwan Tanzania Thailand Turkey Ukraine United States of America United Arab Emirates United Kingdom Venezuela Vietnam XYPEX Throughout the World Today. Essentials of Waterproofing Concrete 4. Some Case Studies XYPEX Concentrate ‘Mud Slurry’ Application at KLCC CC. XYPEX Crystallization Technology, Spray-Applied To Basement Slab At ZAQ-Nam Fatt JV Project Parcel E Putrajaya (June 2001) Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Crs c 2008 Case Studies

Embed Size (px)

DESCRIPTION

civil

Citation preview

Page 1: Crs c 2008 Case Studies

12/12/2008

1

Xypex Crystalline Products

The Xypex product range has been specifically developed over the past 33 years to satisfy varying project

requirements.

•Australia•Bangladesh•Belgium•Argentina•Brazil•Brunei•Bulgaria•Canada•Chile•China•Colombia•Croatia•Cyprus•Czech Republic•Denmark•Ecuador•Egypt•Ethiopia•Fiji•France•Germany•Ghana

•Greece•India•Indonesia•Iran•Japan•Jordan•Kenya•Korea•Latvia•Lithuania•Malaysia•Mexico•Monaco•Myanmar•Nepal•Netherlands•New Zealand•Norway•Panama•Peru•Philippines•Poland

•Portugal•Puerto Rico•Republic of Georgia•Romania•Russia•Saudi Arabia•Singapore•Slovak Republic•Spain•Sri Lanka•Switzerland•Taiwan•Tanzania•Thailand•Turkey•Ukraine•United States •of America•United Arab Emirates•United Kingdom•Venezuela•Vietnam

XYPEX Throughout the World Today.

Essentials of Waterproofing

Concrete

4. Some Case Studies

XYPEX Concentrate ‘Mud Slurry’ Application at KLCC CC.

XYPEX Crystallization Technology, Spray-Applied To Basement Slab

At ZAQ-Nam Fatt JV Project Parcel E Putrajaya (June 2001)

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Page 2: Crs c 2008 Case Studies

12/12/2008

2

KLCC Convention Centre

Located alongside the Mandarin Oriental Hotel in central Kuala Lumpur with the Petronas Twin Towers in the background, the lower basement covers almost 35,000 square meters

XYPEX Concentrate spray applications commenced April 2003

XYPEX Crystallization Technology, Spray-Applied To Basement Slab

At ZAQ-Nam Fatt JV Project Parcel E Putrajaya (June 2001)

The West Wing of KLCC Convention CentreThe West Wing of KLCC Convention Centrewith 1with 1stst, 2, 2ndnd and 3rd casting sites at left hand end.and 3rd casting sites at left hand end.

The lake in the background is around Suria KLCC, the The lake in the background is around Suria KLCC, the shopping complex at the base of the Petronas Twin Towersshopping complex at the base of the Petronas Twin Towers

Details of Kuala Lumpur Convention Centre

Project

Client: KLCC Projects Bhd

Architect: Arkitek Jururancang (M) Sdn Bhd

Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)

M&E Engineers: KTA Tenaga Sdn Bhd

Contractor: Sunway Constructions Berhad

Commencing April 2003, initial contract calls for application of approx. 35,000 sq. meters of XYPEX Concentrate Mud Slurry at base of basement slab as primary waterproofing. Also included in this contract is application of XYPEX Concentrate and Modified Two Coat system to external face of retaining walls.

Other Malaysian Projects

with

XYPEX Concentrate ‘Mud Slurry’ Application to Basement Slabs

Parcel 2G4, Precinct 2,

Putrajaya

(Home of Domestic Industry & Consumer Affairs Departments)

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Page 3: Crs c 2008 Case Studies

12/12/2008

3

Parcel 2G3, Precinct 2, Putrajaya(Home of Primary Industry & Immigration Departments)

Details ofLots 2G3 and 2G4

Precinct 2 at Putrajaya

Client: Putrajaya Holdings Sdn Bhd

Architect: ARC Partnership Lot 2G3 Arkitek Kitas Sdn Bhd Lot 2G4

Structural Engineers: LPH Consultant

M&E Engineers: Enmac Sekutu Sdn Bhd

Contractor: WCT Engineering Bhd

At completion of waterproofing contract, approx. 60,000 sq. meters of coatings will have been applied throughout these two structures, including Concentrate Mud Slurry to basement slab; Two-Coat systems to retaining walls, water tanks, water features and exposed decks. A single slurry coat application will be applied under topping and levelling screeds on reinforced concrete roofdecks

The XYPEX Concentrate Mud Slurry is sprayed down through and over the top level of steel, onto the bottom layer of steel and the ‘lean concrete’ casting site base.

Parcel 2G5, Precinct 2, Putrajaya

Parcel 2G6, Precinct 2, Putrajaya

Details of Lots 2G5 and 2G6,

Precinct 2 at Putrajaya

Client: Putrajaya Holdings Sdn Bhd

Architect: Gerak Reka Akitek Sdn Bhd Lot 2G5 Khalid Johari Arkitek Sdn Bhd Lot 2G6

Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)

M&E Engineers: Petareka Perunding (M) Sdn Bhd Lot 2G5KTA Tenaga Sdn Bhd Lot 2G6

Contractor: Sunway Constructions Berhad

At completion of waterproofing contract, (sub-structure only) approx. 25,600 sq. meters of XYPEX Concentrate Mud Slurry had been applied to basement slabs, while approx. 9300 sq meters of XYPEX Two-Coat systems were applied to retaining walls.

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Page 4: Crs c 2008 Case Studies

12/12/2008

4

Parcel 3G1, Precinct 3, Putrajaya Details of

Lot 3G1,Precinct 3 at Putrajaya

Client: Putrajaya Holdings Sdn Bhd

Architect: MBA Akitek Sdn Bhd

Structural Engineers: Yakin Konsult &Zaidun Leeng Sdn Bhd

M&E Engineers: Jurutera Perunding Kuasanaga

Contractor: Road Builder (M) Sdn Bhd

At completion of waterproofing contract, (sub-structure only) approx. 8800 sq. meters of XYPEX Concentrate Mud Slurry had been applied to basement slabs, while approx. 7300 sq meters of XYPEX Two-Coat systems were applied to retaining walls.

Warisan Project, Putrajaya (Photo taken during second casting-April 2003. the concentrate Mud Slurry has been applied 1-2 hours in advance of the concrete placement)

Details ofAlam Warisan Project,Precinct 5 at Putrajaya

Client: KLCC Projects Bhd

Architect: Senibahri Akitek &Zaini Dubus Richez Sdn Bhd

Consulting Engineers: Zaidun-Leeng Sdn Bhd

Contractor: IJM Construction Sdn Bhd

The sub-structure waterproofing contract (now current – May 2003) calls for application of approx. 35,000 sq. meters of XYPEX Concentrate Mud Slurry to basement slabs. Further contracts for superstructure works, plus significant marine works now being negotiated.

Block E1, Precinct 1, Parcel E, Putrajaya(Putra Perdana Constructions)

Blocks E2, E3 & EA, Precinct 1, Parcel E, Putrajaya

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Page 5: Crs c 2008 Case Studies

12/12/2008

5

Blocks E2, E3 & EA, Precinct 1, Parcel E, PutrajayaBlocks E2, E3 & EAParcel E at Precinct 1, PutrajayaNote: This was the first major Concentrate Mud Slurry project in Malaysia, with XYPEX works completed in May, 2002

Client: Putrajaya Holdings Sdn Bhd

Architect: RSP Akitek &SNO Architect Sdn Bhd

Structural Engineers: Wan Husin & Associates Sdn Bhd &KL Prima Consult Sdn Bhd

M&E Engineers: Norman Disney & Young Sdn Bhd &SSP (E&M) Sdn Bhd

Contractor: ZAQ Num Fatt JV

Substantially completed by May 2002, the waterproofing contract (sub-structure only) saw application of approx. 13,660sq. meters of XYPEX Concentrate Mud Slurry applied to basement slabs, while approx. 4750 sq. meters of XYPEX Two-Coat systems were applied to retaining walls.

Block E5,Precinct 1, Parcel E, Putrajaya

(Putra Perdana Constructions)

The Curve Mutiara Damansara Project, Damansara, Selangor

The Curve,Damansara, Selangor

Client: Mutiara Rini Sdn Bhd

Architect: Arkitek MAA Sdn Bhd

Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)

M & E Engineers: Arup Jururunding Sdn Bhd

Contractor: WCT Construction Sdn Bhd

Project includes a five star hotel plus retail and commercial development. The sub-structure waterproofing contract (now current – May 2003) calls for application of approx. 30,000 sq. meters of XYPEX Concentrate Mud Slurry to basement slabs, plus XYPEX Tow-Coat system to retaining walls. Further contracts for superstructure works now being negotiated.

Proton City

A total of four new underpasses have been

built to facilitate one -way traffic low through busy intersections along the

outer ring road servicing this huge new motor vehicle production facility, located

approx 90 km north of Kuala Lumpur.

The 4 meter width structures are designed for small vehicles and motor

cycles.

The pavement slabs have been constructed with

XYPEX Concentrate Mud Slurry applied during

casting, whilst the retaining walls and roof slabs were treated externally with a XYPEX Concentrate &

Modified Two-Coat application.

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)

Page 6: Crs c 2008 Case Studies

12/12/2008

6

Mutiara Damansara Project, Damansara, Selangor

Note 1. Tesco Damansara

‘Slightly’ visible in background is the Tesco Damansara Project, in which XYPEX Concentrate and

Modified were applied as the XYPEX Two-Coat System to waterproof all water storage tanks. This is the third

and latest Tesco site to be similarly treated.

Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)