Crenshaw/LAX Transit Project

Construction Update Meeting February 20, 2014

Page 2: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Project Overview

2

Page 3: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Project Overview

• Advanced Utility Work - MetroBuilders

• Design-Build Contract - Walsh SheaCorridor Constructors

• 8.5 miles of light rail• 8.5 miles of light rail

• 8 new stations

• Southwestern Yard MaintenanceFacility – Separate Contract

• $2.058 billion budget

• Planned opening: 2019

• 24,400 daily project trips (2035)

3

Page 4: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro OverviewAdvanced Utility Relocation

Construction activities at:

Crenshaw /48th St, 50th St, 54th St, & Slauson Av: Water line relocations

Crenshaw/60th St: Sewer relocation activity

Crenshaw/67th St: Sewer relocation activity

44

Crenshaw/67 St: Sewer relocation activity

Crenshaw at Expo and MLK: DWP power and water line relocation work

Crenshaw/48th St, 54th St, Slauson: Time Warner telecom line relocation

Crenshaw/60th St: Tesoro gas line relocation

Page 5: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.LADWP Water Line Work

• On-going late night full closure of Crenshaw Blvd. at Rodeo Rd.

• Upcoming 24 hour closure of intersection of Crenshaw Blvd.at Rodeo Rd. in mid March

55

at Rodeo Rd. in mid March

Closure will occur Friday night to Saturday night Traffic signage and detours will be implemented

• Closures are required to complete water line connection at theRodeo Rd. intersection

Page 6: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tesoro Line Relocation

• Tesoro gas line relocation at 60th St/59th Pl

• Anticipated to begin in July 2014

6

• Anticipated five month construction duration

• Outreach being conducted to residents in theimmediate area

Page 7: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tesoro Utility Relocation

Cre

nsh

aw

Bl

77

Cre

nsh

aw

Bl

Page 8: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont. - Early Prep Work Activities

Northern Alignment (Exposition Bl to 67th St)

• Expo construction site preparation:- Demolition of properties at Expo Station Area site- Sound wall to be installed around construction yard

• Potholing along Crenshaw:- Identification of utilities along Crenshaw and side streets

88

- Identification of utilities along Crenshaw and side streets

• Geotechnical Work

• Removal of old railroad track near Crenshaw and 67th St.

• Tree removal for underground station construction

Page 9: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal

• Tree removal is necessary in order to accommodateconstruction of the rail line

• Tree pruning and removal will currently be conducted at fourproject area locations – Phase One

Exposition Station Area

99

Exposition Station Area MLK Station Area Vernon (Leimert Park) Station Area Crenshaw & 48th St

• Trees are currently in conflict with the following upcomingconstruction operations:

Pile installation to support underground station construction Construction yard staging for station construction operations Rail alignment construction

Page 10: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal

• Tree pruning and removal at all four project locations isanticipated to resume in the near future

• Anticipated work duration: Tree pruning approximately one week

1010

Tree pruning approximately one week Tree removal approximately two weeks

• Tree pruning and removal will require intermittent laneclosures on Crenshaw during day time hours

Page 11: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal

• Metro Construction Relations Team will continue toconduct outreach to community groups andbusinesses

• Additional tree removal to be conducted at a later

1111

• Additional tree removal to be conducted at a laterdate, additional phases of tree removal

• Tree replacement to occur around the completion ofconstruction

Page 12: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal – Crenshaw Bl near Expo Station

1212

Page 13: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal – MLK Station Area

1313

Page 14: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal – Leimert Park Station Area

1414

Page 15: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont.Tree Pruning and Removal – Crenshaw/48th St

1515

Page 16: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Overview cont. - Early Prep Work Activities

Southern Alignment (67th St to Aviation Bl)

• Potholing:- Identification of utilities along old railroad tracks in MetroRight-of-Way

• Geotechnical Work

1616

• Removal of old railroad track along old railroad tracksin Metro Right-of-Way

• Tree removal along old railroad tracks in MetroRight-of-Way

Page 17: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh-Shea Overview cont.Current Activities

Activity Projected Dates

Pre-Construction Survey of existing conditions Ongoing until end of May 2014

Pot-Holing Activities Ongoing until the of April 2014

Building Demolition at the Exposition Yard Complete by the end of February 2014

17

Survey Ongoing activity until the end of February 2014

Drill Soil Borings February 2014 to early March 2014

Install Geotechnical Instruments Early March 2014 to early April 2014

Design, Coordination, and Approval of Stage A ofWork Site Traffic Control Plan-Expo/MLK, Supportof Excavation (SOE)

Ongoing activity until the end of April 2014

Page 18: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Activity Projected Dates

Implementation of Stage A Traffic Control at ExpoStation

April 2014 (Weekend work)

Implementation of Stage A Traffic Control at MLKStation

April 2014 (Weekend work)

Walsh-Shea Overview cont.90 Day Look Ahead Schedule

Walsh-Shea

1818

Installation Support of Excavation (SOE) (DrillingOperation) at Expo Station

Mid-April 2014 to June 2014

Installation Support of Excavation (SOE) (DrillingOperation) at MLK Station

May 2014 to June 2014

Utility Relocation/Instrumentation Mid-April 2014 to June 2014

Walsh-Shea

Page 19: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh-Shea Overview cont.Expo Station Traffic Control Stage A

Work zone Work zone

Ro

deo

Rd

N

191919

Work zone Work zone

Crenshaw Blvd. Expo StationArea

Construction Site

Ro

deo

Pl E

xp

ositio

nB

lvd

Page 20: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

NCrenshaw/BaldwinHills Shopping Center

Walsh-Shea Overview cont.MLK Station Traffic Control Stage A

2020202020

No leftturn lane

Work zone

No leftturn lane Crenshaw Blvd.

Sto

cker

St.

ML

KB

lvd

.

Page 21: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh Shea Overview cont.Station Box Construction

• Work occurs behind K-rail (concrete barriers) andseparated from the public

• Vehicular and pedestrian traffic maintained

• Business access maintained

212121

• Business access maintained

• Piles installed around the perimeter of the station box

• Maintains station integrity

Page 22: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh-Shea Overview cont.Support of Excavation Installation

Open Roadway

2222

Protective ConcreteTraffic Barrier

Work Zone

ConstructionFence

Page 23: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh-Shea Overview cont.Support of Excavation Installation Cont.

2323

Page 24: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Walsh-Shea Overview cont.Station Box Construction

24242424

Box Construction

Page 25: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Systemwide Station Design

2525

Systemwide Station Design

Page 26: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

26

Page 27: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

27

Page 28: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Durable Materials

Durable Materials

2828

Page 29: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Design Principles

• Contemporary architectural design

• Elegant, streamlined palette of materials

• Systemwide identity

• Legibility

2929

• Legibility

• Functionality and adaptability

• Improved signage and wayfinding

• Highly durable materials

• Variability through art program

Page 30: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Typical Station

3030

Page 31: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Metro Art Program

3131

Metro Art Program

Page 32: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Overview

• 0.5% of construction costs• 25 years• 2nd largest transit art collection in country

3232

• 2nd largest transit art collection in country• 100+ stations and many more under design• 300+ artists commissioned• Permanent and temporary programs• 50+ awards

Page 33: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Federal Requirements

• Procurement requirements

• Station integration requirements

3333

Page 34: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

System Station Design & Art Program

3434

Page 35: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Typical Artwork Opportunities

• Platforms• Intermediate Landings and Concourses

3535

• Intermediate Landings and Concourses• Pavilions• Plazas• Construction Phase Projects

Page 36: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Platforms

3636

Platforms

Page 37: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

MARGARET LAZZARIOwensmouth/Canoga ParkSherman Way Station, Metro, LA

Page 38: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

MICHAEL MASSENBURGAll in a DayFarmdale Station, Metro, LA

Page 39: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

ROY LICHTENSTEINTimes Square MuralTimes Square/42nd St. Station. NYC MTA

Page 40: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

FRANZ AKERMANThe Great JourneyGeorg Brauchle Ring Station, U-bahn, DE

Page 41: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Intermediate Landings

4141

Intermediate Landings& Concourses

Page 42: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

NOBUHO NAGASAWALandingsSoto Station, Metro, LA

Page 43: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

RICHARD WYATTPeople Coming People GoingWilshire/Western Station, Metro LA

Page 44: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

STEPHEN JOHNSONUniversal DelightsUniversal City/Studio City, Metro, LA

Page 45: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

4545

Entry Pavilions

Page 46: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

LARRY KIRKLANDAmerican Chestnut, 2009Lehigh University, Bethlehem, PA

46

Page 47: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

OLAFUR ELIASSONPanoramic Awareness PavilionDes Moines Art Center, IA

47

Page 48: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

CORINNE ULMANNCroton-HarmanCroton-Harman Station, MTA NYC

Page 49: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Plazas

4949

Plazas

Page 50: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

WILLIE MIDDLEBROOKPortrait of My People #619Avalon Station, Metro, LA

Page 51: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

PAUL BOTELLOSyncretic ManifestationsIndiana Station, Metro, LA

Page 52: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

BEATRICE CORONThe Melody853 Macy Place, The Bronx, NYC

Page 53: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Engaging the Community

5353

Engaging the Community

Page 54: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

MAN ONEConstruction FencesSoto Station Site, Metro, LA

Page 55: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

LA COMMONSLight pole banners

Page 56: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

NOE MONTES AND LYNELL GEORGECommunity Portraits

Page 57: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

TODD GRAYPortraits of Artists

Page 58: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

MOBOLAJI OLAMBIWONNUCrenshaw Community Films Series

Page 59: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

VINCENT RAMOSArtwork exhibition, Rio Hondo College

Page 60: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Artist Engagement

• Database of nearly 5,000 artists

• Established and emerging artists

• Ongoing artist outreach

• Notifications via artist listservs, website, e-blasts, social

6060

• Notifications via artist listservs, website, e-blasts, socialmedia, art journals, community newspapers,community art centers, etc.

• Free artist workshops

• User friendly application process

• Artists can join mailing list: metro.net/art

Page 61: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Community

• Encourage artists to apply

• Provide input on cultural context to share withartists for their proposal development

• Representation on artist selection panel

6161

• Representation on artist selection panel

• Advise art program staff on artist talk locations,exhibit/update venues, etc.

• Connections to local cultural organizations

Page 62: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Artist Selection Panel

• Local arts professionals, artists and communityrepresentatives

• Advance review of materials + 2-3 full day on-sitemeetings

6262

meetings

• Demonstrated knowledge of contemporary visual art

• Previous experience serving on artist selection panels

• No conflict of interest (relation or business)

Page 63: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Artist Workshops

Multiple art program opportunities; identical content at each workshop:

February 10: 1019 West- Artist Studios (Inglewood)

February 24: Rio Hondo College (San Gabriel Valley)

February 26: Japanese American National Museum (Little Tokyo)

6363

February 26: Japanese American National Museum (Little Tokyo)

March 7: Vincent Price Art Museum (East LA)

March 10: Broad Art Foundation (Santa Monica)

March 17: Museum of African American Art (South LA)

March 24: Los Angeles County Museum of Art (Miracle Mile)

Page 64: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

For More Information

• Program Information

Visit metro.net/art

6464

• Program Information

• Tours

• Artist Workshops

• Artist Opportunities

• Events

Page 65: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Park Mesa Heights Parking

• Background

• Parking Strategy

6565

• Parking Strategy

• Parking Study

• Next Steps

Page 66: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Background

• EIR identified the loss of 308 on-streetparking spaces

6666

• EIR concluded the remaining totalsupply was adequate

• Community concerns remained about localparking impacts

Page 67: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Parking Strategy

• Maintain at least one row of parking oneach side of Crenshaw Blvd.

6767

• Prioritize on-street parking for customersand visitors (2-hour limit)

• Utilize off-street parking for employeesand residents (more than 2 hours)

Page 68: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Parking Study

• Comprehensive study of existing demandto support final strategy

6868

• Study area: 46th to 60th Streets, Victoriato 11th Avenues (on- & off-street)

• Study days: Thu, Fri, and Sat (Nov 13-16,2013) from 7:00 AM to 8:00 PM

Page 69: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

6969

Page 70: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Parking Study

• Report is currently being prepared

• Initial results show parking strategy is

7070

• Initial results show parking strategy isfeasible

• Additional off-street parking (about 125spaces) is being identified

Page 71: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Parking Study Update

Next Steps

• Finalize parking study report and findings

• Contractor to identify additional lots and

7171

• Contractor to identify additional lots andparking impact during construction

• Future meeting to present and discussparking management strategy

Page 72: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Project Labor Agreement/ConstructionCareers Policy

7272

Page 73: Crenshaw/LAX Transit Projectmedia.metro.net/projects_studies/crenshaw/images/meeting_crensh… · anticipated to resume in the near future • Anticipated work duration: Tree pruning

Crenshaw/LAX Transit Project

Contact Us:

> Telephone: 213-922-2736

> Email: [email protected]

73

> Email: [email protected]

> Web site: metro.net/crenshaw

> Facebook.com/crenshawrail

> Twitter.com/crenshawrail