16
System Process Document Creating or Updating a Routing Revision Department Responsibility/Role File Name 27761363.doc Revision Document Generation Date 18/01/2010 09:38:00 Date Modified 1/18/2010 09:38:00 AM Last Changed by Status Creating or Updating a Routing Revision Trigger: Concept You can use the Routing Revisions page to create or update a routing revision. You can also enter the effectivity date and the implementation date. The Effectivity Date is the first date and time the component or operation becomes effective. For components, the effective date is the first day a component becomes effective for a  bill. For routings, it is the first day an operation becomes effective in a routing. In this topic, you will create a routing revision. Required Field(s) Comments Output - Result(s) Comments Additional Information Last changed on: 1/18/2010 09:38:00 AM Page 1

Creating or Updating a Routing Revision_SPD

Embed Size (px)

Citation preview

Page 1: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 1/16

System Process DocumentCreating or Updating a Routing Revision

Department

Responsibility/Role

File Name 27761363.docRevision

Document Generation Date 18/01/2010 09:38:00

Date Modified 1/18/2010 09:38:00 AM

Last Changed by

Status

Creating or Updating a Routing Revision

Trigger:

Concept

You can use the Routing Revisions page to create or update a routing revision. You can also

enter the effectivity date and the implementation date. The Effectivity Date is the first date and

time the component or operation becomes effective.

• For components, the effective date is the first day a component becomes effective for a

 bill.

For routings, it is the first day an operation becomes effective in a routing.

In this topic, you will create a routing revision.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/18/2010 09:38:00 AM Page 1

Page 2: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 2/16

System Process DocumentCreating or Updating a Routing Revision

Procedure

Step Action

1. Begin by navigating to the Routings page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/18/2010 09:38:00 AM

Page 3: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 3/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/18/2010 09:38:00 AM Page 3

Page 4: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 4/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

3. Click the vertical scrollbar.

Step Action

4. Click the Routings link.

Page 4 Last changed on: 1/18/2010 09:38:00 AM

Page 5: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 5/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

5. Use the Organizations page to select your organization.

Last changed on: 1/18/2010 09:38:00 AM Page 5

Page 6: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 6/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

6. Click the M1 Seattle Manufacturing list item.

Step Action

7. Click the OK button.

or Press [Alt+O].

Page 6 Last changed on: 1/18/2010 09:38:00 AM

Page 7: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 7/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

8. Use the Routings page to define the operations for a routing and the sequence to

 perform them.

You can define a primary or an alternate routing.

You can also navigate to the Routing Details and Routing Revisions pages from

this page.

Last changed on: 1/18/2010 09:38:00 AM Page 7

Page 8: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 8/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

9. Click in the Item field.

Page 8 Last changed on: 1/18/2010 09:38:00 AM

Page 9: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 9/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

10. Press [F11].

Step Action

11. Enter the desired information into the Item field. Enter "RT1000".

Last changed on: 1/18/2010 09:38:00 AM Page 9

Page 10: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 10/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

12. Press [Ctrl+F11].

Step Action

13. Click the Routing Revisions button.

or Press [Alt+s].

Page 10 Last changed on: 1/18/2010 09:38:00 AM

Page 11: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 11/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

14. Use the Routing Revisions page to create or update a routing revision.

Last changed on: 1/18/2010 09:38:00 AM Page 11

Page 12: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 12/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

15. Click in the Revision field.

Step Action

16. Enter the desired information into the Revision field. Enter "A1".

Page 12 Last changed on: 1/18/2010 09:38:00 AM

Page 13: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 13/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

17. Click in the Effectivity Date field.

Last changed on: 1/18/2010 09:38:00 AM Page 13

Page 14: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 14/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

18. Enter the desired information into the Effectivity Date field. Enter "24-NOV-2008

03:49:11".

Step Action

19. The Implement Date, which is either the date the revision was added or the date

the routing was transferred from Oracle Engineering, is displayed. If the routingwas transferred from Engineering, the ECO text is displayed.

Click in the Implement Date field.

Page 14 Last changed on: 1/18/2010 09:38:00 AM

Page 15: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 15/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

20. Click the Save button.

Last changed on: 1/18/2010 09:38:00 AM Page 15

Page 16: Creating or Updating a Routing Revision_SPD

8/14/2019 Creating or Updating a Routing Revision_SPD

http://slidepdf.com/reader/full/creating-or-updating-a-routing-revisionspd 16/16

System Process DocumentCreating or Updating a Routing Revision

Step Action

21. You have completed the Creating or Updating a Routing Revision procedure.

End of Procedure.

Page 16 Last changed on: 1/18/2010 09:38:00 AM