    Reconfiguration Method

    Release B10

    3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    2/32

    Status RELEASED

    Short title MPI84 / MDR5

    All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.

    BLANK PAGE BREAK

    2 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    3/32

    Contents

    Contents

    Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

    1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

    2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

    2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.3.2 Create Backup PRC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.3.3 Modify Logical Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.3.4 Start Traffic on Extended Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

    2.3.5 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.3.6 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292.3.7 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

    2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 302.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 302.4.2 Restore Logical Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 302.4.3 Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312.4.4 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312.4.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

    3BK 17430 0845 RJZZA Ed.05 3 / 32

  • 8/4/2019 Create Extended Cell

    4/32

    Contents

    4 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    5/32

    Preface

    Preface

    Purpose This document describes how to create extended cells on an 9100 BTS.

    This method applies to BSS and OMC-R at technical release B10.

    Whats New In Edition 05

    Improve Presentation (Section 1.1) due to 3 extended cells allowance onBTS and Multiple CCCH support.

    In Edition 04

    Update with the new equipment naming.

    In Edition 03

    Restriction 3BKA20FBR230654 added in Create Adjacencies (Section 2.3.6).

    In Edition 02

    Delivered in release.

    Update in Applicable Documents (Section 1.5.3)

    First official release of the document for B10 MR2.

    In Edition 01

    Overall document quality was improved following an editorial review.The following sections were updated:

    Create Extended Inner (Section 2.3.3.2)

    Create Extended Outer (Section 2.3.3.3).

    Start Traffic on Extended Cell (Section 2.3.4)

    First official release of the document for B10.

    Audience This document is intended for:

    Field service technicians

    Specialists

    3BK 17430 0845 RJZZA Ed.05 5 / 32

  • 8/4/2019 Create Extended Cell

    6/32

    Preface

    Project managers

    Foremen.

    6 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    7/32

    Preface

    Assumed Knowledge You must have a basic understanding of the following:

    Planning:

    Network architecture and reshuffling principles

    Scheduling.

    Implementation:

    Alcatel-Lucent operations and maintenance concepts for the BSS

    9153 OMC-R operation

    Equipment (BSC, BTS, MFS) hardware configurations

    Windows environment.

    3BK 17430 0845 RJZZA Ed.05 7 / 32

  • 8/4/2019 Create Extended Cell

    8/32

    Preface

    8 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    9/32

    1 Overview

    1 Overview

    This Overview gives information needed by project managers and foremen, forpresentation to the customer and for site planning.

    3BK 17430 0845 RJZZA Ed.05 9 / 32

  • 8/4/2019 Create Extended Cell

    10/32

    1 Overview

    1.1 Presentation

    This scenario describes how to create and configure extended cells.

    The maximum range defined in GSM for the access to a cell is 35 km. Thegoal of an extended cell is to increase the maximum distance between the

    BTS and the MS, without changing the Air interface, to 70 km. Two differentcells are combined in order to create the extended cell. One cell (ExtendedInner) covers the range from 0 to 35 km and another cell (Extended Outer)covers the range from 35 to 70 km.

    According to the engineering rules:

    For 9100 BTS, the extended cell allows for several non -hopping TRXs

    Extended cells are supported only on 9100 BTS with SUMA

    LCS is supported on extended cells

    GPRS is supported on extended cells

    Both GSM and DCS frequency bands are allowed for extended cells

    3 extended cells per BTS are allowed: 3 times (inner + outer)

    Multiple CCCH is not supported in Extended Cell.

    1.1.1 Cases

    The following cases apply:

    C1: Create Extended Cell

    C1.1: Create Extended Inner Cell

    C1.2: Create Extended Outer Cell.

    C2: Modify Single Cell to Extended Cell

    C2.1: Modify Single Cell to Extended Inner Cell

    C2.2: Modify Single Cell to Extended Outer Cell.

    Note: You can combine different cases to create the required configuration:

    To create an complete Extended Cell, use a combination of C1.1and C1.2

    If one cell is already created, use a combination of C1.1 and C2.2 or C1.2

    and C2.1

    If both cells must be modified, use a combination of C2.1 andC2.2.

    1.1.2 Options

    O1: GPRS on extended cell can apply.

    1.1.3 Restrictions

    None.

    10 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    11/32

    1 Overview

    1.1.4 Grouped Task Sequence

    The following figure shows the grouped task sequence for this scenario.

    MSC OMCR

    Initial Checks

    BTS

    Create Backup PRC

    Create Extended Inner Cell

    Create Working PRC

    Call Tests

    Create Extended Outer Cell

    Check Working PRC

    Start Trafiic on Extended Cell

    Final Checks

    Create Adjancencies

    3BK 17430 0845 RJZZA Ed.05 11 / 32

  • 8/4/2019 Create Extended Cell

    12/32

    1 Overview

    1.2 Preparation

    1.2.1 Prerequisites

    The following prerequisites apply:

    9100 is installed and qualified

    Two sectors are needed: one for Extended Outer and one for Extended

    Inner cell

    Extended Outer Cell and Extended Inner Cell must have the same

    Frequency Range

    Enough resources (in terms of Abis timeslots and TCU)

    The antenna(e) are verified and functional.

    1.2.2 Site Specific InformationAt the OMC-R, a workstation must be available.

    1.2.3 External Tasks

    None.

    12 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    13/32

    1 Overview

    1.3 Scheduling

    Note: Time based on technical constraints

    In the following table, the number of resources shown does not take intoaccount individual customer or safety requirements.

    Grouped Task OMC-R Time/Task

    Initial Checks 1 ope.

    15 min.

    15 min.

    Create Backup PRC 1 ope.

    6 min.

    6 min.

    1 ope.

    3 min.

    3 min.Create Working PRC

    C2: + 11 min./ cell C2: + 11 min./cell

    1 ope.

    C1.1 13.5 min.

    C1.1 13.5 min.Create Extended Inner

    C2.1 1 min.

    C2.2 1 min.

    C2.1 +1 min.

    C2.2 1 min.

    Create Extended Outer 1 ope.

    C1.2 11.5 min.

    C1.2 11.5 min.

    Check working PRC 1 ope.

    1 min.

    1 min.

    1 ope.

    3 min. + 5 min./ cell

    31 min. + 5 min./ cellStart Traffic

    C2: +4 min./ cell C2: +4 min./ cell

    Call Tests 1 ope.

    10min./ cell

    10 min./ cell

    Create Adjacencies 1 ope.

    9min./ cell

    9 min./ cell

    3BK 17430 0845 RJZZA Ed.05 13 / 32

  • 8/4/2019 Create Extended Cell

    14/32

    1 Overview

    Grouped Task OMC-R Time/Task

    Final Checks 1 ope.

    15 min.

    15 min.

    Total time: 43 min. + 24 min./ cell

    C1.1 +13.5 min.

    C1.2 +11.5 min.

    C2 +1 min. + 15 min./ cell

    ope. : OMC-R Operator

    14 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    15/32

    1 Overview

    1.4 Telecom/Supervision Outage and Operating Impact

    The following table describes the traffic outage and loss of supervision causedby each grouped task.

    Out.Ref.

    GroupedTask Tel. Out GPRS Out Tel. Red Sup.Out

    Oper.Impact Impacts...

    - InitialChecks.

    - - - - - -

    - CreateBackupPRC

    - - - - - -

    - CreateworkingPRC.

    - - - - - -

    - CreateBackupPRC.

    - - - - - -

    - CreateExtendedInner

    - - - - - -

    - CreateExtendedOuter.

    - - - - - -

    - CheckWorkingPRC

    - - - - - -

    1 StartTraffic onExtendedCell

    C2: 3 min.+ 9 min./ cell

    - - 1 min. 30sec.

    - -

    - Call Tests. - - - - - -

    - Create

    Adjacencies

    - - - - - -

    - FinalChecks.

    - - - - - -

    - TOTAL C2: 3 min. +9 min./ /cell

    - - 1 min. 30sec.

    - -

    3BK 17430 0845 RJZZA Ed.05 15 / 32

  • 8/4/2019 Create Extended Cell

    16/32

    1 Overview

    1.5 Resources

    1.5.1 Tools

    The following tables describe the necessary hardware tools, software tools,

    and forms.

    1.5.1.1 Hardware Tools

    Item Part Number Use at ...

    Installation tools - BTS

    Mobile phone (bi-band, if possible) for call tests. - BTS

    1.5.1.2 Software Tools

    Item Part Number Use at ...

    Customer Documentation CD with the versionassociated with the current document edition.Remember that the document you are readingcannot be used as a paper version. It is onlinedocumentation using hypertext links which takeyou to other parts of a document on the sameCD-ROM. All words in italics are hypertext links.

    - BTS, OMC-R

    1.5.1.3 FormsNone.

    1.5.2 Supplies

    None.

    1.5.3 Applicable Documents

    You must have the following documents or have electronic access to thefollowing documents:

    B10 BSS Methods Handbook

    BSS Configuration Handbook

    BSS Surveillance Handbook

    Network Reconfiguration Recommendations

    BTS NEM User Guide.

    16 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    17/32

    2 Scenario

    2 Scenario

    This Scenario presents all checks needed before beginning the scenario, andall detailed tasks to be performed on each site.

    3BK 17430 0845 RJZZA Ed.05 17 / 32

  • 8/4/2019 Create Extended Cell

    18/32

    2 Scenario

    2.1 Before Going Onsite

    Before going onsite, you must check that the following information and suppliesare available:

    All Prerequisites (Section 1.2.1) are met

    The customer has been informed of the:

    Date and time

    Site name and address

    Purpose of operation.

    Personnel are available (refer to Scheduling (Section 1.3))

    Site Specific Information (Section 1.2.2) is available

    Tools (Section 1.5.1) are available and ready for operation

    Supplies (Section 1.5.2) are available and ready for operationApplicable Documents (Section 1.5.3) are available.

    Ensure that the technical release level of the delivered board is in accordancewith the BSS hardware technical release document.

    Ensure that the method used at the BSS site is at the same level as at theOMC-R.

    18 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    19/32

    2 Scenario

    2.2 Before You Start

    2.2.1 Checks

    Perform the following operations:

    Check that all Prerequisites (Section 1.2.1) are met

    Check the availability of all necessary Tools (Section 1.5.1) and Supplies

    (Section 1.5.2)

    Inform the operator.

    Among the cases described in Cases (Section 1.1.1) and the options describedin Options (Section 1.1.2), identify which cases and options apply to you.

    2.2.2 Required KnowledgeYou must be familiar with the following:

    Safety Rules and Precautions

    Telecom/Supervision Outage and Operating Impact (Section 1.4)

    The Reverse Procedure

    Grouped Task Sequence (Section 1.1.4)

    Operating Hints

    How to document Faults and Anomalies.

    3BK 17430 0845 RJZZA Ed.05 19 / 32

  • 8/4/2019 Create Extended Cell

    20/32

    2 Scenario

    2.3 Scenario Description

    This section describes how to create or configure an external cell.

    Note: Case-specific tasks are marked with C1, C2 in the Note column. Detailed tasksthat do not have C1, C2 in the Note column are common to all cases and

    must always be performed.

    2.3.1 Initial Checks

    Note Task Description Site To Do Outage

    - Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.

    - View Status of Managed Objects and Alarms on allthe impacted TSUs (BTSs and Abis, if necessary).

    Print the reports and close the windows.

    OMC-R 5 min. None.

    2.3.2 Create Backup PRC

    Note Task Description Site To do Outage

    OMC-R 1 min. None.- Create PRC(Backup PRC), in restricted mode.

    The PRC opens automatically.This task creates a backup PRC for theReverse Procedure (Section 2.4).

    - Copy BTS to PRC. OMC-R 2 min. None.

    OMC-R 1 min. None.- Copy OMC Cells to PRC, if any.

    Copy impacted cell(s) to Backup PRC;the cells belonging to the impacted BTS.

    - Check PRC (check all, without forcing the CellAdministrative State).

    If the check produces error messages, correct theconfiguration as required and re-attempt the check.Continue corrections and checks until no error

    messages appear.

    OMC-R 1 min. None.

    - Close PRC (Backup PRC). OMC-R 1 min. None.

    20 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    21/32

    2 Scenario

    2.3.3 Modify Logical Parameters

    2.3.3.1 Create Working PRC

    Note Task Description Site To do Outage

    C2 Lock GPRS on Cell for the cell which will becomeExtended Inner or Extended Outer, if the cell isconfigured with GPRS.

    OMC-R 4 min. / cell

    None.

    - Create PRC (Working PRC). The PRC opensautomatically.

    OMC-R 1 min. None.

    - Copy BTS to PRC OMC-R 2 min. None.

    OMC-R 2 min./cell None.C2 Copy OMC Cells to PRC.

    Note:Copy all the cells of the BTS,

    including the ones which will becomeExtended Inner or Extended Outer, intothe PRC.

    OMC-R 1 min./cell None.C2 If the Hopping Type on the cell which will becomeExtended Inner or Extended Outer is different thanNH, use Configure Logical Channels. Note:The TRX channel hopping law

    will be removed.

    OMC-R 1 min./cell NoneC2 Delete Frequency Hopping System.

    Note:In the "Frequencies View"window, put NH for the Hopping Type

    and Altern. Hop. Type fields.

    C2 Change Cell Type to Extended Inner for the cellwhich will become Extended Inner, or to ExtendedOuter for the cell which will become ExtendedOuter.

    OMC-R 1 min./cell None

    OMC-R 2 min./ cell None.C2

    O1

    If the Extended Inner or Outer Cell has GPRS, useSet Cell Telecom Parameters to check and modify(if necessary) the GPRS parameters as follows:

    MAX_PDCH, MAX_PDCH_HIGH_LOAD and

    MIN_PDCH must have even valuesNB_TS_MPDCH must be set to 0 when the cell

    type is Extended Inner / Outer

    MAX_EGPRS_MCS is MCS4 for Extended

    Outer and MCS9 is for Extended Inner

    EN_NACC, EN_PSI_STATUS and

    EN_STREAMING are disabled.

    Note:If LCS was activated on thecell, and the operator wants to keep itactivated, do not set MAX_PDCH=0 on

    these cells.

    3BK 17430 0845 RJZZA Ed.05 21 / 32

  • 8/4/2019 Create Extended Cell

    22/32

    2 Scenario

    2.3.3.2 Create Extended Inner

    Note Task Description Site To do Outage

    C1.1 Create Provisioning Cell.

    The cell is created in Working PRC and is in alocked state.

    OMC-R 2 min. None.

    OMC-R 2 min. None.C1.1 Use Set Cell Telecom Parameters.

    Note:

    Set EN_PBGT_FILTERING to

    Disabled

    To have LCS on the cell, set

    MAX_PDCH>0

    If the Extended Inner / Outercells are PS capable, they must

    have the same value for the

    ACCESS_BURST_TYPE parameter.

    22 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    23/32

    2 Scenario

    Note Task Description Site To do Outage

    OMC-R 2 min. None.C1.1

    O1

    To configure GPRS on a cell:

    Set the Routing Area Code

    Set the Routing Area Color

    MAX_PDCH, MAX_PDCH_HIGH_LOAD and

    MIN_PDCH must have even values

    NB_TS_MPDCH must be set to 0 when the cell

    type is Extended Inner / Outer

    MAX_EGPRS_MCS is MCS9

    EN_NACC, EN_PSI_STATUS and

    EN_STREAMING are disabled

    When GPRS is created on the cell, you can alsomodify the following parameters:

    Min_PDCH

    NB_TS_MPDCH

    Max_Pdch_High_Load

    En_fast_initial_GPRS_access

    Ps_Pref_Bcch_Trx

    max_GPRS_Cs

    max _EGPRS_Mcs

    En_EGPRS

    If LCS with AGPS is activated, you can also modifythe EN_CONV_GPS, EN_MS_Assisted_AGPSand EN_MS_BASED_AGPS parameters.

    To have EGPRS on the extended cell:

    Both inner and outer cells must have EGPRS

    declared (the EN-EGPRS parameter is set to

    Enable)

    All TRXs from inner and outer cells mustsupport EDGE (all TRXs are TRAs).

    Note:

    To have GPRS on the cell,

    Trx_Pref_Mark must be 0 for at least

    one TRX.To modify it for a block of TRX,use the Java Script Set/UpdateCircuit/Packet Mark ConfigurationUsing Script.

    To modify only one cell, use the

    edit cell command (see Set Cell

    Telecom Parameters)

    If En_fast_initial_GPRS_access isset to Enable, respect the following

    rule:Min_PDCH >=En_fast_initial_GPRS_access +NB_TS_MPDCH.

    OMC-R 0.5 min. None.C1.1 Create Radio Frequency.

    Note:Use only Non Hopping for theHopping Type.

    C1.1 Create TRX. OMC-R 0.5min./TRX

    None.

    C1.1 Configure Logical Channels. OMC-R 1 min. None.

    3BK 17430 0845 RJZZA Ed.05 23 / 32

  • 8/4/2019 Create Extended Cell

    24/32

    2 Scenario

    Note Task Description Site To do Outage

    C1.1 Configure TRX. OMC-R 0.5min./TRX

    None.

    OMC-R 0.5 min./ TRX None.C1.1 Specify TRX Preference.

    Note:Select a non-null value.

    C1.1 Click on [ Apply and check ] in the "Edit Cell"window to save cell modifications in the WorkingPRC.

    Wait for the No error or warning message andclick on [ Ok ].

    If the check produces error messages, correctthe configuration as required and re-attempt the

    check. Continue corrections and checks until noerror messages occur.

    OMC-R 0.5 min. None.

    C1.1 Change Cell Type of the single cell to ExtendedInner.

    OMC-R 1 min. None

    OMC-R 1 min. NoneC2.2 Use Change Mate Cellto set Mate Cell parametersfor the Extended Inner Cell.

    Note:Set the Mate Cell parameter toPresent

    Mate cells must have the same LACand the same BSIC.

    OMC-R 1 min. None.C1.1 Map Cell to a BTS Sector.

    Note:Map the Extended Inner Cell.

    24 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    25/32

    2 Scenario

    2.3.3.3 Create Extended Outer

    Note Task Description Site To do Outage

    OMC-R 2 min. None.C1.2 Use Create Mate Cell to create anExtended Outer Cell.

    Note:Extended Inner and Extended Outer mate cellsmust have the same LAC and the same BSIC

    Select ExtendedOuter for the Cell Type parameter.

    OMC-R 2 min. None.C1.2 Use Set Cell Telecom Parameters.

    Note:Set EN_PBGT_FILTERING to Disabled

    To have LCS on the cell, set MAX_PDCH>0

    If the Extended Inner / Outer cells are PScapable, they must have the same value for theACCESS_BURST_TYPE parameter.

    3BK 17430 0845 RJZZA Ed.05 25 / 32

  • 8/4/2019 Create Extended Cell

    26/32

    2 Scenario

    Note Task Description Site To do Outage

    OMC-R 2 min. NoneC1.2

    O1

    To configure GPRS on a cell:

    Set the Routing Area Code

    Set the Routing Area Color

    MAX_PDCH,

    MAX_PDCH_HIGH_LOAD

    and MIN_PDCH must have even

    values

    NB_TS_MPDCH must be set to

    0 when the cell type is Extended

    Inner / Outer

    MAX_EGPRS_MCS is MCS4 for

    Extended Outer

    EN_NACC, EN_PSI_STATUS

    and EN_STREAMING are

    disabled.

    When GPRS is created on the cell,you can also modify the followingparameters:

    Min_PDCH

    NB_TS_MPDCH

    Max_Pdch_High_Load

    En_fast_initial_GPRS_access

    Ps_Pref_Bcch_Trx

    max_GPRS_Cs

    max _EGPRS_Mcs

    En_EGPRS

    If LCS with AGPS isactivated, you can alsomodify the EN_CONV_GPS,EN_MS_Assisted_AGPS andEN_MS_BASED_AGPS parameters.

    To have EGPRS on the extendedcell:

    Both inner and outer cells must

    have EGPRS declared (the

    EN-EGPRS parameter is set to

    Enable)

    All TRXs from inner and outer

    cells must support EDGE (allTRXs are TRAs).

    Note:

    To have GPRS on the cell, Trx_Pref_Mark must be 0

    for at least one TRX.To modify it for a block of TRX, use the Java Script Set

    / Update Circuit / Packet Mark Configuration UsingScript.

    To modify only one cell, use the edit cell command

    (see Set Cell Telecom Parameters)

    If En_fast_initial_GPRS_access is set to Enable,

    respect the following rule:Min_PDCH >= En_fast_initial_GPRS_access +

    NB_TS_MPDCH.

    26 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    27/32

    2 Scenario

    Note Task Description Site To do Outage

    OMC-R 0.5 min. None.C1.2 Create Radio Frequency.

    Note:Use only Non Hopping for the Hopping Type.

    C1.2 Create TRX. OMC-R 0.5 min./ TRX None.

    C1.2 Configure Logical Channels. OMC-R 1 min. None.

    C1.2 Configure TRX. OMC-R 0.5 min./TRX None.

    C1.2 Specify TRX Preference. OMC-R 0.5 min./ TRX None.

    C1.2 Click on [ Apply and check ] inthe "Edit Cell" window to save cellmodifications in the Working PRC.

    Wait for the No error or warningmessage and click on [ Ok ].

    If the check produces errormessages, correct the configurationas required and re-attempt thecheck. Continue corrections andchecks until no error messagesoccur.

    OMC-R 0.5 min. None.

    OMC-R 1 min. None.C1.2 Map Cell to a BTS Sector.

    Note:Map the Extended Outer cell.

    2.3.3.4 Check Working PRC

    Note Task Description Site To do Outage

    OMC-R 1 min. None.Use the Check All option in Check PRC(WorkingPRC) (without forcing the Cell Administrative State)to check the parameters, hardware, and telecomimpact of your PRC.

    If the check produces error messages, correct theconfiguration as required and re-attempt the check.

    Continue corrections and checks until no errormessages appear.

    Note:For C2: For the cell which wasmodified from single to Extended Inneror Outer, ignore the following errormessage:

    Cell should be locked.

    3BK 17430 0845 RJZZA Ed.05 27 / 32

  • 8/4/2019 Create Extended Cell

    28/32

    2 Scenario

    2.3.4 Start Traffic on Extended Cell

    Note Task Description Site To Do Outage

    OMC-R 4 min./ Cell START1C2 Shutdown Cell (WTC = 3 min.)

    Note:Shut down the cell which wasmodified from single to Extended Inner orOuter.

    OMC-R 5 min./ cell Outage 1- Activate PRC(Working PRC) in queued mode,with cell clean-up, without forcing the CellAdministrative State.

    Display Pending Activations List to see whenthe activation is finished.

    The activation time depends on the numberof cells activated.

    During the activation, supervision outage: 1min. 30 sec.

    - Close PRC (Working PRC). OMC-R 1 min. Outage 1

    - Perform Bar Cell for all extended inner cells. OMC-R 1 min. Outage 1

    - Use Unlock Cell for all the cells that were shutdown and for the new cells.

    OMC-R 2 min. Outage 1

    O1 If GPRS is locked Unlock GPRS Traffic on Cellfor the extended cell.

    OMC-R 2 min. END1

    2.3.5 Call Tests

    Note Task Description Site To Do Outage

    BTS 5 min./ cell None.- Perform Call Test for the Extended Inner andOuter cell.

    This task must be done in parallel with thenext task.

    Unlock Cell from Call Test is not necessaryhere.

    CHECK Display USD Detailed Cell Information.

    Check that calls are performed on the newcells. If calls fail, go to the Reverse Procedure(Section 2.4).

    OMC-R 5 min./ cell None.

    O1 Perform GPRS calls on the extended cell(Inner / Outer).

    Check in the DTC report that each GPRS callis successful and print the DTC-report.

    OMC-R 15 min. None.

    28 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    29/32

    2 Scenario

    2.3.6 Create Adjacencies

    RESTRICTION3BKA20FBR230654

    When creating adjacencies, make sure to take into account that for one BSConly a maximum of 64 HOs are allowed.

    Note Task Description Site To Do Outage

    OMC-R 5 min./ newcell(s)

    None.- Create Adjacency for the new cells.

    Note:Create adjacencies between the ExtendedInner and Extended Outer Cell.

    - For each cell on the same OMC-R thatmust be adjacent to the new cells, ModifyAdjacencyto include the new cells.

    OMC-R 2 min./ cell None.

    - For each cell on the neighboring OMC-Rsthat must be adjacent to the new cells,Modify Adjacency on neighboringOMC-Rs to include the new cells.

    neighborOMC-R

    2 min./ cell None.

    2.3.7 Final Checks

    Note Task Description Site To Do Outage

    - Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.

    CHECK View Status of Managed Objects and Alarmson all the impacted TSUs (Abis and BTSs).

    Compare with reports from Initial Checks(Section 2.3.1).

    OMC-R 5 min. None.

    3BK 17430 0845 RJZZA Ed.05 29 / 32

  • 8/4/2019 Create Extended Cell

    30/32

    2 Scenario

    2.4 Reverse Procedure

    This section describes how to reverse the Create Extended Cell.

    2.4.1 Lock Cells

    Note Task Description Site To Do Outage

    - In the SC, use Shut Down Cell Traffic to shutdown all cells of the downstream BTSs (WTC = 3min.). The GSM and GPRS traffic stops.

    OMC-R 4 min./ cell -

    2.4.2 Restore Logical Configuration

    Note Task Description Site To do Outage

    C1 Create PRC (Delete_cell PRC).

    The PRC opens automatically.

    OMC-R 1 min. -

    C1 Copy BTS to PRC OMC-R 2 min. -

    OMC-R 2 min. -C1 Copy OMC Cells to PRC

    Note:Copy Extended Inner and ExtendedOuter cells.

    C1 Use Delete OMC Cell from PRC to delete

    Extended Outer and Extended Inner cells.

    OMC-R 1 min. -

    C1 Use the Check All option in Check PRC(Delete_cell PRC) (without forcing the CellAdministrative State) to check the parameters,hardware, and telecom impact of your PRC.

    OMC-R 1 min. -

    OMC-R 5 min./ cell -C1 Activate PRC(Working PRC) in queued mode,with cell clean-up, without forcing the CellAdministrative State.

    Display Pending Activations List to see whenthe activation is finished.

    The activation time depends on the numberof cells activated.

    During the activation, supervision outage: 1

    min. 30 sec.

    C1 Close PRC (Delete_cell PRC). OMC-R 1 min. -

    - Open PRC (Backup PRC). OMC-R 1 min. -

    OMC-R 5 min./ cell -- Activate PRC (Backup PRC) in queued mode,without cell clean-up, without forcing the CellAdministrative State.

    Display Pending Activations List to see whenthe activation is finished.

    The activation time depends on the numberof cells activated.

    30 / 32 3BK 17430 0845 RJZZA Ed.05

  • 8/4/2019 Create Extended Cell

    31/32

    2 Scenario

    Note Task Description Site To do Outage

    - Close PRC (Backup PRC). OMC-R 1 min. -

    - Delete PRC.

    (Delete both the Backup PRC and WorkingPRC).

    OMC-R 2 min./ PRC -

    2.4.3 Unlock Cells

    Note Task Description Site To Do Outage

    - In the SC, use Unlock Cellto unlock all cells. Trafficis restarted on the cells.

    OMC-R 1 min. -

    O1 If GPRS is locked Unlock GPRS Traffic on Cell forthe extended cell.

    OMC-R 2 min. -

    2.4.4 Call Tests

    Note Task Description Site To Do Outage

    BTS 5 min./ cell -- Perform Call Tests.

    Perform call tests for all impacted cells.

    CHECK Display USD Detailed Cell Information. OMC-R 5 min./ cell -

    O1 Perform GPRS calls on the extended cell (Inner/ Outer).

    Check in the DTC report that each GPRS call issuccessful and print the DTC report.

    OMC-R 15 min. None.

    2.4.5 Final Checks

    Note Task Description Site To Do Outage

    - Perform an Audit Alarm State on the BSS. OMC-R 10 min. -

    CHECK View Status of Managed Objects and Alarms onall the impacted TSUs (Abis and BTSs).

    Compare with reports from Initial Checks (Section2.3.1).

    OMC-R 5 min. -