    STATIONARY EQUIPENT INSPECTION REPORT

      !ate o" Inspection#$%'%($$

    Plant# P!) E*+ipment No,# C $-(% Re.en cooler /lo0er

    !escription# %12 !ischar.e No33le4N%5

    Reason "or Inspection#

    Operation notifed about the presence o crack on Blower’s dischargenozzle on 9.6.11.

    Inspection S+mmary#

     The subject blower’s nozzle was isuall! inspected and

    obsered about 1"# $$ transerse crack at %& pipe connection as can be seenin the below attached photographs.

    Inspection !etails 'e.g. fndings in details( pictures( ull description( attach$ents(etc)*

      +pon isual inspection( it was obsered that the crack hadinitiated ro$ the toe o weld at s$all bore pipe and propagated transersel! uptothe parent $etal. The length o the crack is appro,i$atel! 1"#$$. -eliabilit!

    section is inestigating the root cause o cracking.

    Our ref: REIR Form-RLB-SE-2009   age $ o -

  • 8/19/2019 Crack at Blower's Nozzle

    2/3

    SaharaPetrochemicals

    Company & Its Affiliates

    RELIABILITY SECTION

    STATIONARY EQUIPENT INSPECTION REPORT

     

    Our ref: REIR Form-RLB-SE-2009   age % o -

    /ocation

    o crack

     Transerse

  • 8/19/2019 Crack at Blower's Nozzle

    3/3

    SaharaPetrochemicals

    Company & Its Affiliates

    RELIABILITY SECTION

    STATIONARY EQUIPENT INSPECTION REPORT

    Recommen6ations#

    ince the re2uired $aterial is not aailable( we will go or te$porar! repair as$entioned below.

    1. 0arr! out T and $ark at the tip o the crack.". 3rill at the tip o the crack to stop propagation o crack during grinding.4. 5rind out and re$oe the pad. 5rind the crack and $ake beel or ull penetration butt weld#. 7eld using 8-:; fller wire6. 0arr! out T on each pass:.