25

Cpt Photo Page

Embed Size (px)

DESCRIPTION

Fotos del ensayo CPT

Citation preview

Page 1: Cpt Photo Page
Page 2: Cpt Photo Page
Page 3: Cpt Photo Page

Above Left: Pushing Hogentogler digital piezocone using grout sealing while advancing technique with open surface casing and sacrificial friction reducer Above Right: Hogentogler digital piezocone data acquisition system Right: Hogentogler depth wheel

Page 4: Cpt Photo Page

Above Left: Track rig used under low clearance bridge. Above: AB Envi Memocone disassembled. Above Right: AB Envi CMON data acquisition system and depth counter. Right: AB Envi Memocone showing saturation with grease slot in cone tip.

Page 5: Cpt Photo Page
Page 6: Cpt Photo Page

Left (filecone reary.tif)Silicone oil oozes from fully saturated Vertek piezocone

Right (file cone start.tif)

Page 7: Cpt Photo Page

Left (file Piezocone2.tif)

Rigrt (file CPT computer.tif)

Page 8: Cpt Photo Page

Top (file cone cutaway.tif)

Right (file cone dis screen.tif) Pore pressure dissipation test screendisplay

Page 9: Cpt Photo Page

Top left (file: cpt inside left.jpg) Top right (file:cpt inside right.jpj) Bottom right (file:cpt cal equip.jpg) Thrust and pressure measuring transducers used to check cone calibrations

Page 10: Cpt Photo Page

Left (file CPT Screen.tif)

Right(file cone pressuremeter.tif) The conepressuremeter concept is still under experiment. The idea is the pressuremeter is mounted above the cone penetrometer so the CPT testcan be used to best position the Pressuremeter. With both tests being done in the same sounding!

Page 11: Cpt Photo Page

Left Top and Bottom (file SatCone2.tif)

Top (file CPT off drill rig.tif)

Bottom (file WORN OUT CONE.tif)

Page 12: Cpt Photo Page
Page 13: Cpt Photo Page
Page 14: Cpt Photo Page

Above: Carlos Echevarria of GeoCim and Dennis O’Meara with Morris Shea Bridge‘s tracked mounted CPT rig made by A.P. van den Berg. Right: A.P. van den Berg Push cylinders

Page 15: Cpt Photo Page

Below left file:UBC cross hole.jpg Set up for downhole & crosshole seismic testing Seismic hammer on CPT truck Trailer CPT rig uses “ball screw” push for lower head room

Above right file: UBC cones.jpg

Piezocones

Top: 10cm2 with U1 &U3 pore pressure Next: 10cm2 U2 pore pressure “standard” Next: 15cm2 U2, 225 cm2 friction sleeve Bottom: inside a standard 10cm2 CPTU With downhole amplification of each of 6 channels

Page 16: Cpt Photo Page

Top left (file:cpt at rutgers 2.jpg) Dr. Campanella center left and students from cpt short course Top right (file:cpt at rutgers cone truck.jpg) Center (file:cpt at rutgers jaws) Ram pushes rod while holding on to rod with gripping jaws Bottom right (file:cpt at rutgers outside truck jam.jpg

Page 17: Cpt Photo Page
Page 18: Cpt Photo Page
Page 19: Cpt Photo Page
Page 20: Cpt Photo Page
Page 21: Cpt Photo Page
Page 22: Cpt Photo Page

Top left (file:cpt trailer hy.jpg) Top right (file:cpt truck hy.jpg) Bottom (file:cpt track hy.jpg)

Page 23: Cpt Photo Page

Top (file:cpt truck apvdberg.jpg) Right (file:cpt crawler hy.jpg)

Page 24: Cpt Photo Page
Page 25: Cpt Photo Page