· CPP of the Cement Plant by replacing the water cooled condensers with the air cooled...
31
· CPP of the Cement Plant by replacing the water cooled condensers with the air cooled condensers. Water requirement is 44S()m3/day of which 1300m3/day for the proposed 2x150 MW