31

 · CPP of the Cement Plant by replacing the water cooled condensers with the air cooled condensers. Water requirement is 44S()m3/day of which 1300m3/day for the proposed 2x150 MW

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview