Upload
geol
View
213
Download
1
Embed Size (px)
Citation preview
DATESC1 C2 C3 C4 C5 C6 T2 T3 T4 T5 T6 TOTALFLOW
26/11/201330/01/2014 27.00 32.00 41.00 50.00 32.00 182.00 *2flowmetersstilltobeinstalled03/02/2014 43.50 29.40 41.73 48.12 30.45 193.20 *2flowmetersstilltobeinstalled06/02/2014 43.21 29.69 41.15 48.23 30.03 192.31 *2flowmetersstilltobeinstalled10/02/2014 41.54 29.66 41.22 48.47 30.62 191.51 *2flowmetersstilltobeinstalled14/02/2014 45.37 25.68 29.98 41.37 48.54 30.33 221.27 *Thanetflowmetertobechanged17/02/2014 46.86 25.20 29.54 40.03 48.80 30.38 220.81 *Thanetflowmetertobechanged18/02/2014 44.48 26.59 29.73 41.75 48.40 30.54 0.02 0.79 0.59 0.11 0.38 1.90 223.39 *Thanetwellsmeasuredwithbucket20/02/2014 44.52 25.81 29.07 41.78 47.73 29.99 218.90 *Thanetflowmetertobechanged24/02/2014 47.55 25.91 29.06 41.80 48.21 30.04 222.57 *Thanetflowmetertobechanged27/02/2014 48.94 26.10 28.67 41.30 47.96 30.15 224.7004/03/2014 44.82 25.71 28.50 41.40 47.73 29.71 219.2806/03/2014 46.59 22.39 28.61 40.74 47.55 29.12 216.351.35
1.581.41
CHALKWELLS THANETWELLS
CROSSPASSAGE13
CONNECTIONDATE