8

Coyote Connection - 2015: Week #2

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Coyote Connection - 2015: Week #2
Page 2: Coyote Connection - 2015: Week #2
Page 3: Coyote Connection - 2015: Week #2
Page 4: Coyote Connection - 2015: Week #2

WEEK #2Prototyping

3

Page 5: Coyote Connection - 2015: Week #2

After meticulously going through each design during our Friday design review meeting, our executives responsible for Design and Manufacturing locked themselves in a room and decided which subsystems would be put on the robot.

The rest of the students then continued develop-ing and improving the selected subsystems and pursuing multiple drive-train options. By the end of this week, we’ve been able to further refine these designs.

4

Page 6: Coyote Connection - 2015: Week #2
Page 7: Coyote Connection - 2015: Week #2
Page 8: Coyote Connection - 2015: Week #2