What is happening?The Minnesota Department of Transportation (MnDOT) has programmed repairs for the bridge over I-35W along County Road 42 this summer. This work will be coordinated with a Dakota County project to extend the eastbound turn lane to northbound I-35W. The combination of these two projects during construction will help reduce the inconvenience to traveling motorists. Work will include:• Repairing the County Road 42 bridge deck
• Replacing bridge joints
• Repairing sidewalks
• Extending the eastbound County Road 42 turn lane west of Buck Hill Road
• Reconstructing signal at Buck Hill Road/Southbound I-35W Ramp
Why is the work needed?County Road 42 is a vital connection in the heart of the “Burnsville Center” shopping area. The road carries an average of 50,000 vehicles per day and a majority of them use the I-35W eastbound ramp from County Road 42. This can cause back-ups as far back as the Aldrich Avenue intersection. This can become a safety issue.
What are the benefits?The bridge repairs will help improve the infrastructure and reduce the need for significantly larger maintenance repairs in the future while the turn lane extension will improve safety.
Work staging challenges:County Road 42 carries over 50,000 vehicles per day which means construction will have a significant impact on traffic. The work on the County Road 42 bridge will be done one side at a time in two stages:Stage 1: Full closure and detour of the westbound County Road 42 bridge spanning I-35W for up to 4 weeks.Stage 2: Full closure and detour of eastbound County Road 42 bridge spanning I-35W for up to 4 weeks.
Project Newsletter | March 2016
Inside • Why is Dakota County hosting this open house? • Bridge construction • Closure duration and staging • Detour routes identified • Whats next?
Project Newsletter | March 2016
Summer Bridge Repairs for Dakota County Road 42 over I-35W in Burnsville
OPEN HOUSE M E E T I N GThursday, April 21, 2016
3 to 7 PMBurnsville City Hall
100 Civic Center Parkway, Burnsville
Dakota County and the City of Burnsville invite you to attend the public open house for the 42 Bridge and Roadway Project at I-35W.
At the open house you will have the opportunity to:- Review Preliminary Plans- Review Official Detour Routes- Review Local Impacted Routes- Ask Questions- Provide feedback
The open house will be informal with no presentation. You can stop in at your convenience between 3 and 7 p.m.
I N S I D EThe BIG Picture -
Improving Safety on 42
Work Staging Challenges
Project Progress
Whats Next?
Project Contact:Dakota County Transportation DepartmentJohn SassTransportation Project Manager14955 Galaxie Avenue, 3rd FloorApple Valley, MN 55124Phone: [email protected]
OPEN HOUSEThursday, April 21, 2016 - 3 to 7 PM
Burnsville City Hall (100 Civic Center Parkway, Burnsville)For additional information and project updates, please visit the project website at:
www.dakotacounty.us - search “42 Bridge and Roadway Project”
COUNTY ROAD 42Bridge and Roadway Project at I-35W COUNTY ROAD 42
Bridge and Roadway Project at I-35W
G±WX
G±WX
%&c(
Sÿ
Bur
nsvi
lleA
pple
Val
ley
%&d(
!"̀$
?±A@?±A@
Burnsville Pkwy
Southcross Dr
McAndrews Rd
162nd St W
!"̀$
Sÿ
GdWX
GdWX
McAndrews RdG±WX
150th ST W
Map
Doc
umen
t: \\M
etro
sout
h1\g
is\D
AC
O\4
2 Tu
rn L
ane
Ext
ensi
on\1
0850
3 A
eria
l Loc
atio
n 8x
11.m
xdD
ate
Sav
ed: 3
/28/
2016
4:0
1:12
PM
Highway 42 Turn Lane ExtensionDakota County
G±WX
G±WX
%&c(
Bur
nsvi
lleA
pple
Val
ley
%&d(
!"̀$
?±A@
?±A@
Burnsville Pkwy
Southcross Dr
McAndrews Rd
162nd St W
!"̀$
Sÿ
Sÿ
Map
Doc
umen
t: \\M
etro
sout
h1\g
is\D
AC
O\4
2 Tu
rn L
ane
Ext
ensi
on\1
0850
3 A
eria
l Loc
atio
n 8x
11_w
estb
ound
.mxd
Dat
e S
aved
: 3/2
8/20
16 4
:01:
58 P
M
Highway 42 Turn Lane ExtensionDakota County
To Westbound 42 from:Southbound I-35E andNorthbound I-35
WESTBOUNDCLOSED
John SassDakota [email protected]
Kirsten KleinMinnesota Department of Transportation651-234-7506
COUNTY ROAD 42Bridge and Roadway Project at I-35W
Project Contacts
Stage 1: Westbound 42 Bridge Closure Detour Route
To Eastbound 42 from:Southbound I-35W
Eastbound 42 to Southbound I-35
Eastbound 42 to Northbound I-35W
Eastbound 42 to Northbound I-35E
EASTBOUNDCLOSED
Stage 2: Eastbound 42 Bridge Closure Detour Route
I-35W will also be signed for detour with turn-around at Highway 13
Access to I-35W Northbound will be Open
Westbound 42 Detour
Eastbound 42 Detour
Westbound 42 Detour
Eastbound 42 Detour
Legend42 Detour Route
Freeway Detour Connections
The BIG Picture Improving Safety on 42
What’s next? • Plans to be completed May 2016 • Construction - July to October 2016
Project Website:www.dakotacounty.us - search “42 Bridge and Roadway Project”