8
Set No. Project Location Maps 73513-16001A Tetra Tech Engineers, Architects & Landscape Architects, P.C. Architecture Engineering Planning High Performance Facilities for County of Oswego Window Replacements: Public Safety Center - 39 Churchill Road, Oswego, NY Health Complex - 74 Bunner Street, Oswego, NY Legislative Office Building - 46 East Bridge Street, Oswego, NY County Of Oswego Oswego, NY 13126 N 5 DRAWING REVISION NUMBER CENTER LINE CUT LINE NORTH ARROW PHOTO DETAIL WALL SECTION STANDARD REFERENCE BUBBLE DRAWING NUMBER DETAIL NUMBER DRAWING TITLE & SCALE METAL, STEEL CONCRETE BRICK CONCRETE MASONRY UNITS PLYWOOD ROUGH WOOD INSULATION (LOOSE OR BATT) RIGID INSULATION Floor Plan 1/8"=1'-0" N NOTE: REFER TO FINISH PLANS FOR ROOM FINISH KEY AND ADDITIONAL ABBREVIATIONS AAC ASBESTOS ABATEMENT CONTRACTOR AAD AUTOMATIC AIR DAMPER AB ANCHOR BOLT, AIR BARRIER AC AIR CONDITIONING, ALTERNATING CURRENT ACCMP ASPHALT COATED CORR METAL PIPE ACM ASBESTOS CONTAINING MATERIAL ACT ACOUSTICAL CEILING TILE ACU AIR CONDITIONING UNIT AD AREA DRAIN ADA AMERICAN DISABILITIES ACT ADD ADDENDUM ADDL ADDITIONAL ADDN ADDITION ADH ADHESIVE ADJ ADJACENT ADR ACCESS DOOR AESS ARCH EXPOSED STRUCTURAL STEEL AFF ABOVE FINISH FLOOR AH ACCESS HATCH AHU AIR HANDLING UNIT AIB AIR INFILTRATION BARRIER ALT ALTERNATE ALTB ACOUSTICALLY LINED TRANSFER BOX ALTN ALTERATION ALUM ALUMINUM AMP AMPERE ANOD ANODIZED ANT ACID NEUTRALIZATION TANK AP ACCESS PANEL APPROX APPROXIMATE (LY) APC ARCHITECTURAL PRECAST CONCRETE ARCH ARCHITECT (URAL) A/S AIR SEPARATOR ASB ASBESTOS ASPH ASPHALT ATV ATMOSPHERIC VENT AUD AUDITORIUM AUTO AUTOMATIC AV ACID VENT AVE AVERAGE AVTR ACID VENT THRU ROOF AW ACID WASTE B BOILER, BRICK, BOTTOM BB BASKETBALL BBD BOILER BLOWDOWN BC BOTTOM OF CURB BCU BLOWER COIL UNIT BCX BOTTOM CHORD EXTENSION BD BOARD BDD BACKDRAFT DAMPER BFP BACK FLOW PREVENTER BG BOTTOM GRILLE BIT BITUMINOUS BLDG BUILDING BLOCK BLK BLOCKING BLKG BM BEAM BO BY OTHERS BOD BOTTOM OF DUCT BOF BOTTOM OF FOOTING BOS BOTTOM OF STEEL BOT BOTTOM BPL BEARING PLATE BR BOTTOM REGISTER BRDG BRIDGING BRG BEARING BRK BRICK BRSH BRICKSHELF BRZ BRONZE BS BOTH SIDES, BOTTOM OF STAIR BSMT BASEMENT BSPL BACKSPLASH BT BENT BTU BRITISH THERMAL UNITS BTUH BRITISH THERMAL UNITS PER HOUR BUR BUILT-UP ROOFING BW BOTTOM OF WALL BWC BACK WATER CHECK VALVE C1 CARPET TYPE 1 C CONDUIT, CONVECTOR, CONDENSOR, COMMON CA COMPRESSED AIR CAB CABINET CATV CABLE TELEVISION CB CATCH BASIN, CIRCUIT BREAKER, CHALKBOARD CCTV CLOSED CIRCUIT TELEVISION CD CEILING DIFFUSER, CONDENSATE DRAIN CEM CEMENT CER CERAMIC CF CUBIC FEET, CEILING FAN CFM CUBIC FEET PER MINUTE CFMF COLD FORMED METAL FRAMING CFT1 CERAMIC FLOOR TILE TYPE 1 CG CEILING GRILLE CHAN CHANNEL CHUV CEILING HUNG UNIT VENTILATOR CI CAST IRON CIP CAST IN PLACE CIRC CIRCUMFERENCE CJ CONTROL JOINT CL CENTER LINE CLG CEILING CLKG CAULKING CLL CONTRACT LIMIT LINE CLR CLEAR (ING) (ENCE) CLRM CLASSROOM CMP CORRUGATED METAL PANEL CMT CERAMIC MOSAIC TILE CMU CONCRETE MASONRY UNIT CO CLEAN OUT CODP CLEAN OUT DECK PLATE COL COLUMN COMB COMBINATION COMP COMPRESS (ED) (ION) (IBLE), COMPOSITE CONC CONCRETE COND CONDENSATE CONN CONNECTION CONST CONSTRUCTION CONT CONTINOUS CONTR CONTRACT (OR) COORD COORDINATE CORR CORRUGATED, CORRIDOR COWP CLEAN OUT WALL PLATE CPVC CHLORINATED POLY VINYL CHLORIDE CR CEILING REGISTER CRS COURSE (S) CSK COUNTERSINK CSMT CASEMENT CT COMPUTER TERMINAL, CERAMIC BASE TILE CTD COATED CTOP COUNTER TOP CTR CENTER CU CUBIC CUH CABINET UNIT HEATER CV CONVECTOR, CURB VALVE CW COLD WATER CWR CHILLED WATER RETURN CWS CHILLED WATER SUPPLY CWT1 CERAMIC WALL TILE TYPE 1 D1 DANCE FLOORING TYPE 1 D DIESEL FUEL, DEPTH DB DRY BULB DC DIRECT CURRENT DDC DIRECT DIGITAL CONTROL DE DELONIZED WATER DEG DEGREES DEMO DEMOLISH DEP DEPRESS (ED) (ION) DET DETAIL (ED) DF DRINKING FOUNTAIN DH DOUBLE HUNG DHU DEHUMIDIFICATION UNIT DI DROP INLET, DUCTILE IRON, DISTILLED WATER DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DISP DISPENSER DIST DISTANCE DIV DIVISION DL DEAD LOAD DN DOWN DO DITTO DP DAMPPROOF (ING) DPR DAMPER DR DOOR, DEEP RIB DWG DRAWING DS DOWNSPOUT, DRAINAGE STRUCTURE DT DRAIN TILE DTA DOVETAIL ANCHOR DTL DETAIL DW DUMBWAITER, DISHWASHER DWL DOWEL DWR DRAWER E EAST EA EXHAUST AIR, EACH EAT ENTERING AIR TEMPERATURE EB EXPANSION BOLT EC ELECTRICAL CONTRACTOR ECF ENHANCED CONCRETE FLOORING EIFS EXTERIOR INSULATION FINISH SYSTEM EF EACH FACE, EXHAUST FAN EJ EXPANSION JOINT ELEC ELECTRIC (AL) ELEM ELEMENT ELEV ELEVATION, ELEVATOR EM EMERGENCY EMT ELECTRICAL METALLIC TUBING ENC ENCLOSURE EOD EDGE OF DECK EOS EDGE OF SLAB EQ EQUAL, EQUIVALENT EQC EQUIPMENT CONTRACTOR EQUIP EQUIPMENT ES EXPOSED SURFACE, EXPOSED STRUCTURE ESF ELASTIC SHEET FLASHING ESM ELASTIC SHEET MEMBRANE EW EACH WAY EWC ELECTRIC WATER COOLER EWT ENTERING WATER TEMPERATURE EXH EXHAUST EXG EXISTING EXP EXPANSION EXT EXTERIOR, EXTERNAL F FAHRENHEIT FA FIRE ALARM FAI FRESH AIR INTAKE FCU FAN COOLING UNIT FD FLOOR DRAIN, FIRE DAMPER FDC FIRE DEPARTMENT CONNECTION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISH FLOOR, FACTORY FINISH FFE FINISH FLOOR ELEVATION FFL FINISH FLOOR LINE FG FLOOR GRILLE FH FIRE HYDRANT FHC FIRE HOSE CABINET FIN FINISH (ED) FIXT FIXTURE FL FLUSH FLD FLOOR DUCT FLEX FLEXIBLE FLG FLASHING FLR FLOOR (ING) FLUOR FLUORESCENT FM FLOOR MOUNTED FMC FLEXIBLE METAL CONDUIT FND FOUNDATION FOB FREIGHT ON BOARD, FLAT ON BOTTOM FOG FUEL OIL GAUGE FOR FUEL OIL RETURN FOS FUEL OIL SUPPLY FOT FLAT ON TOP FP FIREPROOF (ING) FPM FEET PER MINUTE FR FRAME, FLOOR REGISTER FRA FRESH AIR FRC FIRE RESISTANT COATING FRP FIBERGLASS REINFORCED PANEL FRT FIRE RETARDANT FS FLOOR SINK FSD FIRE AND SMOKE DAMPER FT FEET, FLOOR TREATMENT FTG FOOTING FTR FIN TUBE RADIATION FV FLUSH VALVE G GAS, GLYCOL GA GAUGE GAL GALLON GALV GALVANIZED GASK GASKET (ED) GC GENERAL CONTRACT (OR) GCMU GLAZED CONCRETE MASONRY UNIT GCO GRADE CLEANOUT GF GROUND FACE GL GLASS, GLAZING GND GROUND GPM GALLONS PER MINUTE GR GRADE (ING), GLYCOL RETURN GS GLYCOL SUPPLY GVL GRAVEL GWB GYPSUM WALL BOARD GYP GYPSUM H HEIGHT HB HOSE BIB HBD HARD BOARD HC HEATING CONTRACT (OR), HANDICAP HCR HOT/CHILLED RETURN HCS HOT/CHILLED SUPPLY HD HEAVY DUTY HDPE HIGH DENSITY POLYETHYLENE HDR HEADER HDW HARDWARE HG HOT GLYCOL HIP HIGH IMPACT PANEL HM HOLLOW METAL HORZ HORIZONTAL HP HORSEPOWER, HIGH PRESSURE, HEAT PUMP HPC HIGH PERFORMANCE COATING HPL HIGH PRESSURE LAMINATE HR HANDRAIL, HOUR HT HEIGHT HTG HEATING HV HIGH VOLTAGE HVAC HEATING/VENTILATING/AIR CONDITIONING HVU HEATING AND VENTILATING UNIT HW HOT WATER HWH HOT WATER HEATER HWP HOT WATER PUMP HWR HOT WATER RETURN HWS HOT WATER SUPPLY ID INSIDE DIAMETER IE INVERT ELEVATION IN INCHES INCL INCLUDE (D) (ING) INS INSULATE (D) (ION) INT INTERIOR INV INVERT IP IRON PIPE IPS IRON PIPE SIZE IW INDIRECT WASTE J JANITORS CLOSET JAN JANITORS CLOSET JB JUNCTION BOX JC JANITORS CLOSET JCT JUNCTION JT JOINT KW KILOWATT KWH KILOWATT PER HOUR KV KILOVOLT KVA KILOVOLT AMPERE L LENGTH, LONG LAB LABORATORY LAD LADDER LAM LAMINATE (D) LAT LEAVING AIR TEMPERATURE LAV LAVATORY LB POUND LBL LABEL LBP LEAD BASED PAINT LC LANDSCAPE CONTRACTOR (SITE) LCC LEAD COATED COPPER LDR LEADER LEV LEVEL LF LINEAR FOOT LFMC LIQUID-TIGHT FLEXIBLE METAL CONDUIT LFNC LIQUID-TIGHT FLEXIBLE NONMETALLIC CONDUIT LG LENGTH, LONG LGI LARGE GROUP INSTRUCTION LH LEFT HAND LIN LINEAR LKR LOCKER LL LIVE LOAD LP LOW PRESSURE LPC LOW PRESSURE CONDENSATE LPS LOW PRESSURE STEAM LPT LOW POINT LS LINOLEUM SHEET TYPE 1 LT LIGHT LT1 LINOLEUM TILE TYPE 1 LTL LINTEL LV LOW VOLTAGE LVR LOUVER LWT LEAVING WATER TEMPERATURE MAN MANUAL MAS MASONRY MAT MATERIAL MAU MAKE UP AIR UNIT MAX MAXIMUM MB MARKER BOARD MBH THOUSAND BTUH MBR MEMBER MD MOTORIZED DAMPER ME MECHANICAL EQUIPMENT MECH MECHANICAL (LY) MED MEDIUM MEMB MEMBRANE MEZZ MEZZANINE MF MIXING FAUCET MFR MANUFACTURE (R) MH MAN HOLE MIN MINIMUM MIR MIRROR MISC MISCELLANEOUS MO MASONRY OPENING MOD MODULE (OR), MODEL MR MOP RECEPTOR MP MULTICOLOR WALL COATING MT MOUNT MTD MOUNTED MTG MOUNTING MTL METAL MTH MARBLE THRESHOLD MTR METER MULL MULLION MVEJ MASONRY VENEER EXPANSION JOINT N NORTH, NO WORK REQUIRED NAT NATURAL NC NORMALLY CLOSED NEC NATIONAL ELECTRIC CODE NEG NEGATIVE NEUT NEUTRALIZATION NIC NOT IN CONTRACT NO NUMBER, NORMALLY OPEN NOM NOMINAL NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE OA OVERALL, OUTSIDE AIR OC ON CENTER OD OUTSIDE DIAMETER OH OVERHEAD OPNG OPENING OPP OPPOSITE OPP HD OPPOSITE HAND P PAINT SURFACE(S) INCLUDING SOFFITS PAR PARALLEL PART PARTITION PC PLUMBING CONTRACT (OR), PIGMENTED CONCRETE PCC PRECAST CONCRETE PE PORCELAIN ENAMEL PERF PERFORATE (ION) (ED) PERI PERIMETER PERP PERPENDICULAR PL PLATE, PROPERTY LINE PLAM PLASTIC LAMINATE PLAS PLASTER, PLASTIC PLF POUNDS PER LINEAR FOOT PLYWD PLYWOOD PM PLUGMOLD PNL PANEL POC POINT OF CURVATURE, POINT OF CONNECTION POL POLISHED POS POSITIVE POT POINT OF TANGENCY PR PAIR PRE POWER ROOF EXHAUSTER PREP PREPARE (ATION) PRF PREFORMED PROJ PROJECT PS PAINT EXPOSED STRUCTURE/DECK PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POINT PT1 PORCELAIN TILE TYPE 1 PTD PAINTED PTFR PRESSURE TREATED FIRE RETARDANT PTP PRESSURE TREATED PRESERVATIVE PVC POLYVINYL CHLORIDE PVMT PAVEMENT PWE POWER WALL EXHAUSTER QF QUARTZ FLOORING QT QUARRY TILE R RADIUS, RETURN, REFRIGERANT RA RETURN AIR RAD RADIATION RAF RETURN AIR FAN, RESILIENT ATHLETIC FLOORING RB RESILIENT BASE RC ROOFING CONTRACT (OR) RCA RECYCLED CONCRETE AGGREGATE RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN RCU REMOTE CONDENSING UNIT RD ROOF DRAIN RECEPT RECEPTACLE REF REFERENCE REFL REFLECT (ED) (IVE) (OR) REFR REFRIGERATOR REG REGISTER REINF REINFORCE (D) (ING) REM REMOVED REQD REQUIRED RESIL RESILIENT RET RETAINING, RETURN REV REVISION, REVISED, REVEAL RF RUBBER FLOORING TYPE 1 RFG ROOFING RFH ROOF HATCH RFM RECESSED FLOOR MAT RG RETURN GRILLE RGS RIGID GALVANIZED STEEL RH RIGHT HAND RHC REHEAT COIL RI ROUGH-IN RL RAIN LEADER RLG RAIL (ING) RM ROOM RMC RIGID METAL CONDUIT RNC RIGID NONMETALLIC CONDUIT RNT RUNNING TRAP RO ROUGH OPENING ROW RIGHT OF WAY RPM REVOLUTIONS PER MINUTE RR REMOVE EXISTING AND REPLACE WITH NEW RS RUBBER STAIR TREAD/RISER RTH ROOF TOP HOOD RTU ROOF TOP UNIT RW RAW WATER S SOUTH, SUPPLY, SURGE PROTECTED SA SUPPLY AIR SAN SANITARY SAS SMOOTH ALL SIDES SC SOLID CORE, SILL COCK, SEALED CONCRETE SCHED SCHEDULE SCT STRUCTURAL CLAY TILE SD STORM DRAIN, SPLITTER DAMPER, SMOKE DAMPER SEC SECTION SF SQUARE FEET SGI SMALL GROUP INSTRUCTION SGT STRUCTURAL GLAZED TILE SH SHELF, SHELVING, SMOKE HATCH SHR SHOWER, SHEAR WALL SHT SHEET SHTHG SHEATHING SIM SIMILAR SK SINK SL SOUND LINED, SKYLIGHT SLC SILLCOCK SLV SLEEVE SLVR STORM LOUVER SMH SANITARY MANHOLE SOG SLAB ON GRADE SP STATIC PRESSURE, STANDPIPE, SPACE (ING) (ES) SPEC SPECIFICATION (S) SPKR SPRINKLER SPL SPECIAL SQ SQUARE SS STAINLESS STEEL SST STRUCTURAL STEEL TUBING ST STORM, STORAGE STA STATION STC SHOWER TEMPERATURE CONTROLLER, STAINED CONCRETE STD STANDARD STG SEATING STL STEEL STN STAIN (ED) STOR STORAGE STRU STRUCTURAL SURF SURFACE SUSP SUSPENDED SV SHEET VINYL, STEAM VENT SW SWITCH, SOFTENED WATER SWCI SERVICE WEIGHT CAST IRON SYM SYMMETRICAL SYN SYNTHETIC SYS SYSTEM T TREAD, TOP, TOILET ROOM, TONS T1 TERRAZZO TYPE 1 TB TOP AND BOTTOM, TACK BOARD, TERRAZZO BASE TBD TO BE DETERMINED TC TEMPERATURE CONTROL, TEMPERED CLEAR, TELECOMMUNICATIONS CONTRACTOR, TOP OF CURB TCX TOP CHORD EXTENTION TDV TRIPLE DUTY VALVE TEL TELEPHONE TEMP TEMPERATURE TG TOP GRILLE, TONGUE AND GROOVE THK THICKNESS THR THRESHOLD TME TO MATCH EXISTING TMV THERMOSTATIC MIXING VALVE TOD TOP OF DUCT TOF TOP OF FASCIA, TOP OF FOOTING TOL TOLERANCE TOM TOP OF MASONRY TOP TOP OF PIPE, TOP OF PIER TOS TOP OF STEEL, TOP OF STAIR TPART TOILET PARTITION TR TOP REGISTER TRN TRANSOM TS TOP OF STAIR TV TELEVISION TW TEMPERED WATER, TOP OF WALL TYP TYPICAL UC UNDERCUT UD UNDERDRAIN UE UNDERGROUND ELECTRIC UG UNDERGROUND UH UNIT HEATER UNF UNFINISHED UNIF UNIFORM UNO UNLESS NOTED OTHERWISE UR URINAL UT UNDERGROUND TELEPHONE UV UNIT VENTILATOR V VENT, VOLT VAR VARIES, VARIABLE VARN VARNISH VAT VINYL ASBESTOS TILE VAV VARIABLE AIR VOLUME VB VACUUM BREAKER, VAPOR RETARDER BARRIER, VOLLEYBALL VCB VENTED COVE BASE VCT1 VINYL COMPOSITE TILE TYPE 1 VD VOLUME DAMPER VERM VERMICULITE VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD VIN VINYL VIT VITREOUS TILE VNR VENEER VOL VOLUME VTR VENT THROUGH ROOF VWC VINYL WALL COVERING W WEST, WIDTH, WIDE, WASTE, WATT WB WET BULB WC WATER CLOSET, WALL COVERING WD WOOD WD1 WOOD FLOORING - GYM WD2 WOOD FLOORING - STAGE WDW WINDOW WDWC WINDOW CONTRACTOR WF WASH FOUNTAIN WG WALL GRILLE, WATER GAUGE WH WALL HUNG, WALL HYDRANT WI WROUGHT IRON WM WIREMOLD WP WATER PROOFING, WORKING POINT WR WATER REPELLENT, WIDE RIB, WALL REGISTER WS WATER STOP WSCT WAINSCOT WT WEIGHT WWHP WATER TO WATER HEAT PUMP WWM WELDED WIRE MESH W/ WITH W/O WITHOUT XHCI EXTRA HEAVY CAST IRON YD YARD DRAIN, YARD Drawing List: Title Sheet, Symbols & Abbreviations Architectural Drawings: A100 Public Safety Center First Floor Plan A101 Public Safety Center Second and Third Floor Plans A200 Health Complex First Floor Plan A201 Health Complex Second Floor Plan A300 Legislative Office Building Floor Plans A400 Window And Curtain Wall Types A401 Window And Curtain Wall Details November 28, 2016 Oswego Map Oswego Health Complex Oswego Public Safety Center STAGING AREA MAP - PUBLIC SAFETY STAGING AREA MAP - HEALTH COMPLEX STAGING AREA STAGING AREA S M DUMPSTER LOCATIONS DUMPSTER LOCATIONS EXG CONCRETE BARRIERS Legislative Office Building STAGING AREA MAP - LEGISLATIVE OFFICE BUILDING DUMPSTER LOCATIONS STAGING AREA

County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

  • Upload
    vucong

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

Set No.

Project Location Maps

73513-16001ATetra Tech Engineers, Architects & Landscape Architects, P.C.

ArchitectureEngineeringPlanningHighPerformanceFacilitiesfo

r

County of Oswego Window Replacements:Public Safety Center - 39 Churchill Road, Oswego, NYHealth Complex - 74 Bunner Street, Oswego, NYLegislative Office Building - 46 East Bridge Street, Oswego, NY

County Of OswegoOswego, NY 13126

N

5 DRAWING REVISION NUMBER

CENTER LINE

CUT LINE

NORTH ARROW

PHOTO

DETAIL

WALL SECTION

STANDARD REFERENCE BUBBLE

DRAWING NUMBER

DETAIL NUMBER

DRAWING TITLE & SCALE

METAL, STEEL

CONCRETE

BRICK

CONCRETE MASONRY UNITS

PLYWOOD

ROUGH WOOD

INSULATION (LOOSE OR BATT)

RIGID INSULATION

Floor Plan1/8"=1'-0"

N

NOTE: REFER TO FINISH PLANS FOR ROOM FINISH KEYAND ADDITIONAL ABBREVIATIONS

AAC ASBESTOS ABATEMENT CONTRACTORAAD AUTOMATIC AIR DAMPERAB ANCHOR BOLT, AIR BARRIERAC AIR CONDITIONING, ALTERNATING CURRENTACCMP ASPHALT COATED CORR METAL PIPEACM ASBESTOS CONTAINING MATERIALACT ACOUSTICAL CEILING TILEACU AIR CONDITIONING UNITAD AREA DRAINADA AMERICAN DISABILITIES ACTADD ADDENDUMADDL ADDITIONALADDN ADDITIONADH ADHESIVEADJ ADJACENTADR ACCESS DOORAESS ARCH EXPOSED STRUCTURAL STEELAFF ABOVE FINISH FLOORAH ACCESS HATCHAHU AIR HANDLING UNITAIB AIR INFILTRATION BARRIERALT ALTERNATEALTB ACOUSTICALLY LINED TRANSFER BOXALTN ALTERATION ALUM ALUMINUMAMP AMPEREANOD ANODIZEDANT ACID NEUTRALIZATION TANKAP ACCESS PANELAPPROX APPROXIMATE (LY)APC ARCHITECTURAL PRECAST CONCRETEARCH ARCHITECT (URAL)A/S AIR SEPARATORASB ASBESTOSASPH ASPHALTATV ATMOSPHERIC VENTAUD AUDITORIUMAUTO AUTOMATICAV ACID VENTAVE AVERAGEAVTR ACID VENT THRU ROOFAW ACID WASTE

B BOILER, BRICK, BOTTOMBB BASKETBALLBBD BOILER BLOWDOWNBC BOTTOM OF CURBBCU BLOWER COIL UNITBCX BOTTOM CHORD EXTENSIONBD BOARDBDD BACKDRAFT DAMPERBFP BACK FLOW PREVENTERBG BOTTOM GRILLEBIT BITUMINOUSBLDG BUILDING BLOCKBLK BLOCKING BLKGBM BEAMBO BY OTHERSBOD BOTTOM OF DUCTBOF BOTTOM OF FOOTINGBOS BOTTOM OF STEELBOT BOTTOMBPL BEARING PLATEBR BOTTOM REGISTERBRDG BRIDGINGBRG BEARINGBRK BRICK

BRSH BRICKSHELFBRZ BRONZEBS BOTH SIDES, BOTTOM OF STAIRBSMT BASEMENTBSPL BACKSPLASHBT BENTBTU BRITISH THERMAL UNITSBTUH BRITISH THERMAL UNITS PER HOURBUR BUILT-UP ROOFINGBW BOTTOM OF WALLBWC BACK WATER CHECK VALVE

C1 CARPET TYPE 1C CONDUIT, CONVECTOR, CONDENSOR,

COMMONCA COMPRESSED AIRCAB CABINETCATV CABLE TELEVISIONCB CATCH BASIN, CIRCUIT BREAKER, CHALKBOARDCCTV CLOSED CIRCUIT TELEVISIONCD CEILING DIFFUSER, CONDENSATE DRAINCEM CEMENTCER CERAMIC CF CUBIC FEET, CEILING FANCFM CUBIC FEET PER MINUTECFMF COLD FORMED METAL FRAMINGCFT1 CERAMIC FLOOR TILE TYPE 1CG CEILING GRILLECHAN CHANNELCHUV CEILING HUNG UNIT VENTILATORCI CAST IRONCIP CAST IN PLACECIRC CIRCUMFERENCECJ CONTROL JOINTCL CENTER LINECLG CEILINGCLKG CAULKINGCLL CONTRACT LIMIT LINECLR CLEAR (ING) (ENCE)CLRM CLASSROOMCMP CORRUGATED METAL PANELCMT CERAMIC MOSAIC TILECMU CONCRETE MASONRY UNITCO CLEAN OUTCODP CLEAN OUT DECK PLATECOL COLUMNCOMB COMBINATIONCOMP COMPRESS (ED) (ION) (IBLE), COMPOSITECONC CONCRETECOND CONDENSATECONN CONNECTIONCONST CONSTRUCTIONCONT CONTINOUSCONTR CONTRACT (OR)COORD COORDINATECORR CORRUGATED, CORRIDORCOWP CLEAN OUT WALL PLATECPVC CHLORINATED POLY VINYL CHLORIDECR CEILING REGISTERCRS COURSE (S)CSK COUNTERSINKCSMT CASEMENTCT COMPUTER TERMINAL, CERAMIC BASE TILECTD COATEDCTOP COUNTER TOPCTR CENTERCU CUBICCUH CABINET UNIT HEATERCV CONVECTOR, CURB VALVECW COLD WATER

CWR CHILLED WATER RETURNCWS CHILLED WATER SUPPLYCWT1 CERAMIC WALL TILE TYPE 1

D1 DANCE FLOORING TYPE 1D DIESEL FUEL, DEPTHDB DRY BULBDC DIRECT CURRENTDDC DIRECT DIGITAL CONTROLDE DELONIZED WATERDEG DEGREESDEMO DEMOLISHDEP DEPRESS (ED) (ION)DET DETAIL (ED)DF DRINKING FOUNTAINDH DOUBLE HUNGDHU DEHUMIDIFICATION UNITDI DROP INLET, DUCTILE IRON, DISTILLED WATERDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDISP DISPENSERDIST DISTANCEDIV DIVISIONDL DEAD LOADDN DOWNDO DITTODP DAMPPROOF (ING)DPR DAMPERDR DOOR, DEEP RIBDWG DRAWINGDS DOWNSPOUT, DRAINAGE STRUCTUREDT DRAIN TILEDTA DOVETAIL ANCHORDTL DETAILDW DUMBWAITER, DISHWASHERDWL DOWELDWR DRAWER

E EASTEA EXHAUST AIR, EACHEAT ENTERING AIR TEMPERATUREEB EXPANSION BOLTEC ELECTRICAL CONTRACTORECF ENHANCED CONCRETE FLOORINGEIFS EXTERIOR INSULATION FINISH SYSTEMEF EACH FACE, EXHAUST FANEJ EXPANSION JOINTELEC ELECTRIC (AL)ELEM ELEMENTELEV ELEVATION, ELEVATOREM EMERGENCYEMT ELECTRICAL METALLIC TUBINGENC ENCLOSUREEOD EDGE OF DECKEOS EDGE OF SLABEQ EQUAL, EQUIVALENTEQC EQUIPMENT CONTRACTOREQUIP EQUIPMENTES EXPOSED SURFACE, EXPOSED STRUCTUREESF ELASTIC SHEET FLASHINGESM ELASTIC SHEET MEMBRANEEW EACH WAYEWC ELECTRIC WATER COOLEREWT ENTERING WATER TEMPERATUREEXH EXHAUSTEXG EXISTINGEXP EXPANSIONEXT EXTERIOR, EXTERNAL

F FAHRENHEITFA FIRE ALARMFAI FRESH AIR INTAKEFCU FAN COOLING UNITFD FLOOR DRAIN, FIRE DAMPERFDC FIRE DEPARTMENT CONNECTIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOOR, FACTORY FINISHFFE FINISH FLOOR ELEVATIONFFL FINISH FLOOR LINEFG FLOOR GRILLEFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN FINISH (ED)FIXT FIXTUREFL FLUSHFLD FLOOR DUCTFLEX FLEXIBLEFLG FLASHINGFLR FLOOR (ING)FLUOR FLUORESCENTFM FLOOR MOUNTEDFMC FLEXIBLE METAL CONDUITFND FOUNDATIONFOB FREIGHT ON BOARD, FLAT ON BOTTOMFOG FUEL OIL GAUGEFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFOT FLAT ON TOPFP FIREPROOF (ING)FPM FEET PER MINUTEFR FRAME, FLOOR REGISTERFRA FRESH AIRFRC FIRE RESISTANT COATINGFRP FIBERGLASS REINFORCED PANELFRT FIRE RETARDANTFS FLOOR SINKFSD FIRE AND SMOKE DAMPERFT FEET, FLOOR TREATMENTFTG FOOTINGFTR FIN TUBE RADIATIONFV FLUSH VALVE

G GAS, GLYCOLGA GAUGEGAL GALLONGALV GALVANIZEDGASK GASKET (ED)GC GENERAL CONTRACT (OR)GCMU GLAZED CONCRETE MASONRY UNITGCO GRADE CLEANOUT GF GROUND FACEGL GLASS, GLAZINGGND GROUNDGPM GALLONS PER MINUTEGR GRADE (ING), GLYCOL RETURNGS GLYCOL SUPPLYGVL GRAVELGWB GYPSUM WALL BOARDGYP GYPSUM

H HEIGHTHB HOSE BIBHBD HARD BOARDHC HEATING CONTRACT (OR), HANDICAPHCR HOT/CHILLED RETURNHCS HOT/CHILLED SUPPLYHD HEAVY DUTY

HDPE HIGH DENSITY POLYETHYLENEHDR HEADERHDW HARDWAREHG HOT GLYCOLHIP HIGH IMPACT PANELHM HOLLOW METALHORZ HORIZONTALHP HORSEPOWER, HIGH PRESSURE, HEAT PUMPHPC HIGH PERFORMANCE COATINGHPL HIGH PRESSURE LAMINATEHR HANDRAIL, HOURHT HEIGHTHTG HEATINGHV HIGH VOLTAGEHVAC HEATING/VENTILATING/AIR CONDITIONINGHVU HEATING AND VENTILATING UNITHW HOT WATERHWH HOT WATER HEATERHWP HOT WATER PUMPHWR HOT WATER RETURNHWS HOT WATER SUPPLY

ID INSIDE DIAMETERIE INVERT ELEVATIONIN INCHESINCL INCLUDE (D) (ING)INS INSULATE (D) (ION)INT INTERIORINV INVERTIP IRON PIPEIPS IRON PIPE SIZEIW INDIRECT WASTE

J JANITORS CLOSETJAN JANITORS CLOSETJB JUNCTION BOXJC JANITORS CLOSETJCT JUNCTIONJT JOINT

KW KILOWATTKWH KILOWATT PER HOURKV KILOVOLTKVA KILOVOLT AMPERE

L LENGTH, LONGLAB LABORATORYLAD LADDERLAM LAMINATE (D)LAT LEAVING AIR TEMPERATURELAV LAVATORYLB POUNDLBL LABELLBP LEAD BASED PAINTLC LANDSCAPE CONTRACTOR (SITE)LCC LEAD COATED COPPERLDR LEADERLEV LEVELLF LINEAR FOOTLFMC LIQUID-TIGHT FLEXIBLE METAL CONDUITLFNC LIQUID-TIGHT FLEXIBLE NONMETALLIC CONDUITLG LENGTH, LONGLGI LARGE GROUP INSTRUCTIONLH LEFT HANDLIN LINEARLKR LOCKERLL LIVE LOADLP LOW PRESSURELPC LOW PRESSURE CONDENSATE

LPS LOW PRESSURE STEAMLPT LOW POINTLS LINOLEUM SHEET TYPE 1LT LIGHTLT1 LINOLEUM TILE TYPE 1LTL LINTELLV LOW VOLTAGELVR LOUVERLWT LEAVING WATER TEMPERATURE

MAN MANUALMAS MASONRYMAT MATERIALMAU MAKE UP AIR UNITMAX MAXIMUMMB MARKER BOARDMBH THOUSAND BTUHMBR MEMBERMD MOTORIZED DAMPERME MECHANICAL EQUIPMENTMECH MECHANICAL (LY)MED MEDIUMMEMB MEMBRANEMEZZ MEZZANINEMF MIXING FAUCETMFR MANUFACTURE (R)MH MAN HOLEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSMO MASONRY OPENINGMOD MODULE (OR), MODELMR MOP RECEPTORMP MULTICOLOR WALL COATINGMT MOUNTMTD MOUNTEDMTG MOUNTINGMTL METALMTH MARBLE THRESHOLDMTR METERMULL MULLIONMVEJ MASONRY VENEER EXPANSION JOINT

N NORTH, NO WORK REQUIREDNAT NATURALNC NORMALLY CLOSEDNEC NATIONAL ELECTRIC CODENEG NEGATIVENEUT NEUTRALIZATIONNIC NOT IN CONTRACTNO NUMBER, NORMALLY OPENNOM NOMINALNRC NOISE REDUCTION COEFFICIENTNTS NOT TO SCALE

OA OVERALL, OUTSIDE AIROC ON CENTEROD OUTSIDE DIAMETEROH OVERHEADOPNG OPENINGOPP OPPOSITEOPP HD OPPOSITE HAND

P PAINT SURFACE(S) INCLUDING SOFFITSPAR PARALLELPART PARTITIONPC PLUMBING CONTRACT (OR),

PIGMENTED CONCRETEPCC PRECAST CONCRETE

PE PORCELAIN ENAMELPERF PERFORATE (ION) (ED)PERI PERIMETERPERP PERPENDICULARPL PLATE, PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTER, PLASTICPLF POUNDS PER LINEAR FOOTPLYWD PLYWOODPM PLUGMOLDPNL PANELPOC POINT OF CURVATURE, POINT OF CONNECTIONPOL POLISHEDPOS POSITIVEPOT POINT OF TANGENCYPR PAIRPRE POWER ROOF EXHAUSTERPREP PREPARE (ATION)PRF PREFORMEDPROJ PROJECTPS PAINT EXPOSED STRUCTURE/DECKPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINTPT1 PORCELAIN TILE TYPE 1PTD PAINTEDPTFR PRESSURE TREATED FIRE RETARDANTPTP PRESSURE TREATED PRESERVATIVEPVC POLYVINYL CHLORIDEPVMT PAVEMENTPWE POWER WALL EXHAUSTER

QF QUARTZ FLOORINGQT QUARRY TILE

R RADIUS, RETURN, REFRIGERANTRA RETURN AIRRAD RADIATIONRAF RETURN AIR FAN, RESILIENT ATHLETIC FLOORINGRB RESILIENT BASERC ROOFING CONTRACT (OR)RCA RECYCLED CONCRETE AGGREGATERCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLANRCU REMOTE CONDENSING UNITRD ROOF DRAINRECEPT RECEPTACLEREF REFERENCEREFL REFLECT (ED) (IVE) (OR)REFR REFRIGERATORREG REGISTERREINF REINFORCE (D) (ING)REM REMOVEDREQD REQUIREDRESIL RESILIENTRET RETAINING, RETURNREV REVISION, REVISED, REVEALRF RUBBER FLOORING TYPE 1RFG ROOFINGRFH ROOF HATCHRFM RECESSED FLOOR MATRG RETURN GRILLERGS RIGID GALVANIZED STEELRH RIGHT HANDRHC REHEAT COILRI ROUGH-INRL RAIN LEADERRLG RAIL (ING)RM ROOM

RMC RIGID METAL CONDUITRNC RIGID NONMETALLIC CONDUITRNT RUNNING TRAPRO ROUGH OPENINGROW RIGHT OF WAYRPM REVOLUTIONS PER MINUTERR REMOVE EXISTING AND REPLACE WITH NEWRS RUBBER STAIR TREAD/RISERRTH ROOF TOP HOODRTU ROOF TOP UNITRW RAW WATER

S SOUTH, SUPPLY, SURGE PROTECTEDSA SUPPLY AIRSAN SANITARYSAS SMOOTH ALL SIDESSC SOLID CORE, SILL COCK, SEALED CONCRETESCHED SCHEDULESCT STRUCTURAL CLAY TILESD STORM DRAIN, SPLITTER DAMPER,

SMOKE DAMPERSEC SECTIONSF SQUARE FEETSGI SMALL GROUP INSTRUCTIONSGT STRUCTURAL GLAZED TILESH SHELF, SHELVING, SMOKE HATCHSHR SHOWER, SHEAR WALLSHT SHEETSHTHG SHEATHINGSIM SIMILARSK SINKSL SOUND LINED, SKYLIGHTSLC SILLCOCKSLV SLEEVESLVR STORM LOUVERSMH SANITARY MANHOLESOG SLAB ON GRADESP STATIC PRESSURE, STANDPIPE,

SPACE (ING) (ES)SPEC SPECIFICATION (S)SPKR SPRINKLERSPL SPECIALSQ SQUARESS STAINLESS STEELSST STRUCTURAL STEEL TUBINGST STORM, STORAGESTA STATIONSTC SHOWER TEMPERATURE CONTROLLER,

STAINED CONCRETESTD STANDARDSTG SEATINGSTL STEELSTN STAIN (ED)STOR STORAGESTRU STRUCTURALSURF SURFACESUSP SUSPENDEDSV SHEET VINYL, STEAM VENTSW SWITCH, SOFTENED WATERSWCI SERVICE WEIGHT CAST IRONSYM SYMMETRICALSYN SYNTHETICSYS SYSTEM

T TREAD, TOP, TOILET ROOM, TONST1 TERRAZZO TYPE 1TB TOP AND BOTTOM, TACK BOARD,

TERRAZZO BASE

TBD TO BE DETERMINEDTC TEMPERATURE CONTROL, TEMPERED CLEAR,

TELECOMMUNICATIONS CONTRACTOR,TOP OF CURB

TCX TOP CHORD EXTENTIONTDV TRIPLE DUTY VALVETEL TELEPHONETEMP TEMPERATURETG TOP GRILLE, TONGUE AND GROOVETHK THICKNESSTHR THRESHOLDTME TO MATCH EXISTINGTMV THERMOSTATIC MIXING VALVETOD TOP OF DUCTTOF TOP OF FASCIA, TOP OF FOOTINGTOL TOLERANCETOM TOP OF MASONRYTOP TOP OF PIPE, TOP OF PIERTOS TOP OF STEEL, TOP OF STAIRTPART TOILET PARTITIONTR TOP REGISTERTRN TRANSOMTS TOP OF STAIRTV TELEVISIONTW TEMPERED WATER, TOP OF WALLTYP TYPICAL

UC UNDERCUTUD UNDERDRAINUE UNDERGROUND ELECTRICUG UNDERGROUNDUH UNIT HEATERUNF UNFINISHEDUNIF UNIFORMUNO UNLESS NOTED OTHERWISEUR URINALUT UNDERGROUND TELEPHONEUV UNIT VENTILATOR

V VENT, VOLTVAR VARIES, VARIABLEVARN VARNISHVAT VINYL ASBESTOS TILEVAV VARIABLE AIR VOLUMEVB VACUUM BREAKER, VAPOR RETARDER BARRIER,

VOLLEYBALLVCB VENTED COVE BASEVCT1 VINYL COMPOSITE TILE TYPE 1VD VOLUME DAMPERVERM VERMICULITEVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVIN VINYLVIT VITREOUS TILEVNR VENEERVOL VOLUMEVTR VENT THROUGH ROOFVWC VINYL WALL COVERING

W WEST, WIDTH, WIDE, WASTE, WATTWB WET BULBWC WATER CLOSET, WALL COVERINGWD WOODWD1 WOOD FLOORING - GYMWD2 WOOD FLOORING - STAGEWDW WINDOWWDWC WINDOW CONTRACTORWF WASH FOUNTAIN

WG WALL GRILLE, WATER GAUGEWH WALL HUNG, WALL HYDRANTWI WROUGHT IRONWM WIREMOLDWP WATER PROOFING, WORKING POINTWR WATER REPELLENT, WIDE RIB, WALL REGISTERWS WATER STOPWSCT WAINSCOTWT WEIGHTWWHP WATER TO WATER HEAT PUMPWWM WELDED WIRE MESHW/ WITHW/O WITHOUT

XHCI EXTRA HEAVY CAST IRON

YD YARD DRAIN, YARD

Drawing List:

Title Sheet, Symbols & Abbreviations

Architectural Drawings:A100 Public Safety Center First Floor PlanA101 Public Safety Center Second and

Third Floor PlansA200 Health Complex First Floor PlanA201 Health Complex Second Floor PlanA300 Legislative Office Building Floor PlansA400 Window And Curtain Wall TypesA401 Window And Curtain Wall Details

November 28, 2016

Oswego Map

Oswego Health Complex

Oswego Public Safety Center

STAGING AREA MAP - PUBLIC SAFETY STAGING AREA MAP - HEALTH COMPLEX

STAGING AREASTAGINGAREA

S

M

DUMPSTERLOCATIONS

DUMPSTERLOCATIONS

EXG CONCRETEBARRIERS

Legislative Office Building

STAGING AREA MAP - LEGISLATIVE OFFICE BUILDING

DUMPSTERLOCATIONS

STAGINGAREA

Page 2: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

11B 1C

1B 1B

1B

1D

1B

1B1B1B1B1B1D

1B

1D 1D

1B 1B 1B 1B 1B

3

5 1K3

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Public Safety CenterFirst Floor Plan

TLE

A1001 Public Safety Center First Floor Plan1/16" = 1'-0"

N

Project No.:

Date:

73513-16001A

Key PlanNTS

County of OswegoWindow Replacements

AB

C D

OPEN

OPEN

County of OswegoOswego, NY 13126

November 28, 2016

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Keyed Notes:EXISTING CURTAIN WALL TO BE RE-GLAZED1

PUBLIC SAFETY CENTER

PROVIDE FIXED GLAZING AND NO BLIND AND THIRD GLAZING PANELREQUIRED WHERE VIEW IS OBSTRUCTED BY CHASE WALLCONSTRUCTION

2

BLIND AND REMOVABLE INTERIOR GLAZING PANEL NOT REQUIRED3

MODIFY AND SEAL EXISTING WALL TO WINDOW MULLION, REFER TODETAIL 18/A401

4

WINDOW OR CURTAIN WALL TYPE EXTENDS TO UPPER OR LOWERFLOOR

5

Page 3: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

1B

1B

1B

1D 1B 1B1D

1B1A1B

1D 1D 1B1B 1D

1A 1A 1D 1B 1D1A1D

1A

1B

1D

1B

1B

1B1B

1B1B1B1B

1B1B1B1B1B1B

1B

1B

1D

1B1A1B 1B 1B 1B 1B1A1B 1B1A1B 1B1A1B 1B1A1B

1B 1B 1B

1B1A1B 1B1A1B 1B1B1A1B

1D1D1D

3 3 3 3 3

13 1K5

1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G 1G1H 1I 1F 1F 1E 1B 1F1B 1F 1H 1I

1G

1G

1G

1G

1G1G1G1G1G1G1G1G1G1A1A1J1J1J1J1J1J1J1J1J1J1J1J1J1J1J1G1G1G1G1G1G1G1G

1G1G1G1G1G

1G

1G

1G

1G

1G

1G

1E

1E1E3 3

3

1

424244

2 4 2 2 2 2

4 4 4 4 4

2

3

4 4

1K5

2

4

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Public Safety CenterSecond and Third Floor Plans

TLE

A101

1 Public Safety Center Third Floor Plan1/16" = 1'-0"

N

Project No.:

Date:

73513-16001A

Key PlanNTS

County of OswegoWindow Replacements

AB

C D

OPEN

OPEN

County of OswegoOswego, NY 13126

November 28, 20162 Public Safety Center Second Floor Plan1/16" = 1'-0"

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Keyed Notes:EXISTING CURTAIN WALL TO BE RE-GLAZED1

PUBLIC SAFETY CENTER

PROVIDE FIXED GLAZING AND NO BLIND AND THIRD GLAZING PANELREQUIRED WHERE VIEW IS OBSTRUCTED BY CHASE WALLCONSTRUCTION

2

BLIND AND REMOVABLE INTERIOR GLAZING PANEL NOT REQUIRED3

MODIFY AND SEAL EXISTING WALL TO WINDOW MULLION, REFER TODETAIL 18/A401

4

WINDOW OR CURTAIN WALL TYPE EXTENDS TO UPPER OR LOWERFLOOR

5

Page 4: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

2A 2A 2A 2A 2A

2J

2B

2A 2B

2A

2A

2B2A

2A

2A2A

2A

2A

2A

2B2A2A2A2B2B

2L 2M 2K

2V 2V 2V

2A

2V

2U

2G

2B2D 2D

2V

2A

2A

2A

2B 2B

2A2A

2A 2U

2V2V2V2V

2U

2U

2U

2B

2V

2V

2V

2U

2U

2U

2U

1 1 1

4

2A

2B

5

A

A

A A A

A A

A

A

A A A A A A

A

A

A

A

A

A A A A

A

A

AA

A

AA

A A A

A A A

A

A

A

A

AAAAA

B

B

B

B

B

A

A

A

A

A

AA

A A

AA

A

A

A

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Health Complex First Floor Plan

TLE

A2001 First Floor Plan

1/16" = 1'-0"

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Keyed Notes:EXISTING LOUVERS BELOW WINDOWS TO REMAIN1

HEALTH COMPLEX

BLIND AND REMOVABLE INTERIOR GLAZING PANEL NOT REQUIRED2

SEAL EXISTING WALL TO WINDOW MULLION3

WINDOW OR CURTAIN WALL TYPE EXTENDS TO UPPER OR LOWERFLOOR

4

BLIND AND REMOVABLE INTERIOR GLAZING PANEL REQUIRED ATBOTTOM GLAZING ONLY

5

BLIND NOT REQUIRED PROVIDE INTERIOR GLAZING PANEL TYPEHCL.

6

PROVIDE INTERIOR GLAZING PANEL TYPE HCL.7

Project No.:

Date:

County of OswegoOswego, NY 13126

County of OswegoWindow Replacements

N

Key PlanNTS

A

BC

73513-16001A

November 28, 2016

1. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING ASBESTOS ISSHOWN, REMOVE AND DISPOSE OF WINDOW SYSTEM AS ASBESTOSCONTAINING OR CONTAMINATED MATERIALS (SECTION 02 82 00).

2. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING MERCURY ISSHOWN, REMOVE AND DISPOSE OF WINDOW SYSTEM AS HAZARDOUSMATERIAL (SECTION 02 84 00).

3. WINDOW SYSTEMS INCLUDE, WITHOUT LIMITATION, ANY AND ALL OFTHE FOLLOWING (INCLUDING COMBINATIONS OF TWO OR MORE):

a. WINDOWS j. CAULKINGb. DOORS k. GLAZING COMPOUNDSc. FLASHING l. GLASSd. WINDOW PANELS m. SEALANTSe. FRAMING n. SILLSf. SASHES o. SCREENSg. HARDWARE p. STOOLSh. INSULATION q. MULLIONSi. ALL FINISHES r. MUNTINS

4. REMOVE THE ENTIRE WINDOW SYSTEM BETWEEN THEMASONRY/CONCRETE/STRUCTURAL STEEL THAT SURROUNDS THEM,EXCEPT AS FOLLOWS:

a. LINTELSb. MASONRY OR STONE SILLSc. STRUCTURAL SUPPORTSd. ITEMS SCHEDULED FOR REUSE BY OTHER CONTRACTORS.

5. REMOVE CAULK FROM THE WINDOW OR DOOR ASSEMBLY FRAME ANDTHE SURROUNDING WALL SURFACES.

6. MULTIPLE LAYERS/APPLICATIONS OF CAULKING MAY BE PRESENT ONWINDOW SYSTEMS.

8. AFTER THE WINDOW OR DOOR SYSTEM HAS BEEN REMOVED ANDAFTER CLEARANCE AIR SAMPLES HAVE BEEN COLLECTED OR IF NO AIRSAMPLES ARE REQUIRED, ONCE SATISFACTORY CLEARANCE CRITERIAARE ACHIEVED, COORDINATE WITH CONTRACTOR RESPONSIBLE FORINSTALLATION OF NEW WINDOW AND PROVIDE HARD WALL BARRIERSTO THE INTERIOR OF THE BUILDING, AS SPECIFIED IN SECTION 01 50 00,IF NEW WINDOWS WILL NOT BE INSTALLED IMMEDIATELY FOLLOWINGREMOVALS.

Window System and Caulk Abatement NotesAbatement Legend:REMOVE WINDOW SYSTEM WITH ASBESTOS CONTAININGCAULKING

REMOVE WINDOW SYSTEM WITH MERCURY CONTAINING CAULKING

HEALTH COMPLEX

A

B

1. CONTRACTOR PERFORMING ANY AND ALL ASBESTOS ABATEMENTWORK SHALL BE A NYSDOL LICENSED ASBESTOS CONTRACTOR.

2. PERFORM ALL WORK IN ACCORDANCE WITH SECTION 02 82 00 -ASBESTOS ABATEMENT.

3. ASBESTOS CONTAINING MATERIALS SHALL BE ABATED INACCORDANCE WITH THE DRAWINGS AND SECTION 02 82 00 PRIOR TOANY GENERAL DEMOLITION WORK THAT COULD DISTURB THOSEMATERIALS.

4. DO NOT SCALE DRAWINGS.

5. COORDINATE ALL WORK WITH OTHER CONTRACTORS.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALLVARIANCES FROM INDUSTRIAL CODE RULE 56, WHICH ARE DESIREDOR NECESSARY TO PERFORM THE WORK.

7. REMOVE ALL ABATED MATERIALS FROM THE WORK AREA AND /ORBUILDING IN SEALED BAGS, DRUMS OR PLASTIC SHEETING.

Asbestos Abatement General Notes

Page 5: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

2I 2I 2I 2I 2I 2I

2L 2M 2K

2M

2R 2O 2R

2T

2Q

2Q

2T

2T

2Q 2Q

2T

2T

2Q

2T

2O

2N

2S

2N

2N

2S

2N

2O

2R

2N

2R

2N

2R

2N

2R

2N

2R2O

2O

2R

2R

2S2N

2R

2O

2S

2N

2N

2R2P

2N

2W

2W

2H

2BB

2BB

2BB

2AA

2W

2H

2W

2C

2W2D

2W

2BB

2BB

2BB

2AA

2BB

2BB

2BB

2AA

2BB

2BB

2BB

2AA

2B

2W

1

1 2

4

3

222222

2F

6

6

6

66

66

66

6666

6

6

6

A

A

A

A

A

A A A A A A

A A A

A A A

A

A

A

A

A

A

A A

A

B

B

B

B

B

B

B

B

BBBBBBB

B B B B B B

A

A

A

A

A

A

A

A

A

A

AA

A

A

A

A

AAAA

A

A

A

A

A

A

A

A

A

AAAAA

A

AA

6 6

77

6

6

66

7

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Health Complex Second Floor Plan

TLE

A2011 Second Floor Plan

1/16" = 1'-0"

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Keyed Notes:EXISTING LOUVERS BELOW WINDOWS TO REMAIN1

HEALTH COMPLEX

BLIND AND REMOVABLE INTERIOR GLAZING PANEL NOT REQUIRED2

SEAL EXISTING WALL TO WINDOW MULLION3

WINDOW OR CURTAIN WALL TYPE EXTENDS TO UPPER OR LOWERFLOOR

4

BLIND AND REMOVABLE INTERIOR GLAZING PANEL REQUIRED ATBOTTOM GLAZING ONLY

5

BLIND NOT REQUIRED PROVIDE INTERIOR GLAZING PANEL TYPEHCL.

6

PROVIDE INTERIOR GLAZING PANEL TYPE HCL.7

Project No.:

Date:

County of OswegoOswego, NY 13126

County of OswegoWindow Replacements

N

Key PlanNTS

A

BC

73513-16001A

November 28, 2016

1. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING ASBESTOS ISSHOWN, REMOVE AND DISPOSE OF WINDOW SYSTEM AS ASBESTOSCONTAINING OR CONTAMINATED MATERIALS (SECTION 02 82 00).

2. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING MERCURY ISSHOWN, REMOVE AND DISPOSE OF WINDOW SYSTEM AS HAZARDOUSMATERIAL (SECTION 02 84 00).

3. WINDOW SYSTEMS INCLUDE, WITHOUT LIMITATION, ANY AND ALL OFTHE FOLLOWING (INCLUDING COMBINATIONS OF TWO OR MORE):

a. WINDOWS j. CAULKINGb. DOORS k. GLAZING COMPOUNDSc. FLASHING l. GLASSd. WINDOW PANELS m. SEALANTSe. FRAMING n. SILLSf. SASHES o. SCREENSg. HARDWARE p. STOOLSh. INSULATION q. MULLIONSi. ALL FINISHES r. MUNTINS

4. REMOVE THE ENTIRE WINDOW SYSTEM BETWEEN THEMASONRY/CONCRETE/STRUCTURAL STEEL THAT SURROUNDS THEM,EXCEPT AS FOLLOWS:

a. LINTELSb. MASONRY OR STONE SILLSc. STRUCTURAL SUPPORTSd. ITEMS SCHEDULED FOR REUSE BY OTHER CONTRACTORS.

5. REMOVE CAULK FROM THE WINDOW OR DOOR ASSEMBLY FRAME ANDTHE SURROUNDING WALL SURFACES.

6. MULTIPLE LAYERS/APPLICATIONS OF CAULKING MAY BE PRESENT ONWINDOW SYSTEMS.

8. AFTER THE WINDOW OR DOOR SYSTEM HAS BEEN REMOVED ANDAFTER CLEARANCE AIR SAMPLES HAVE BEEN COLLECTED OR IF NO AIRSAMPLES ARE REQUIRED, ONCE SATISFACTORY CLEARANCE CRITERIAARE ACHIEVED, COORDINATE WITH CONTRACTOR RESPONSIBLE FORINSTALLATION OF NEW WINDOW AND PROVIDE HARD WALL BARRIERSTO THE INTERIOR OF THE BUILDING, AS SPECIFIED IN SECTION 01 50 00,IF NEW WINDOWS WILL NOT BE INSTALLED IMMEDIATELY FOLLOWINGREMOVALS.

Window System and Caulk Abatement NotesAbatement Legend:REMOVE WINDOW SYSTEM WITH ASBESTOS CONTAININGCAULKING

REMOVE WINDOW SYSTEM WITH MERCURY CONTAINING CAULKING

HEALTH COMPLEX

A

B

1. CONTRACTOR PERFORMING ANY AND ALL ASBESTOS ABATEMENTWORK SHALL BE A NYSDOL LICENSED ASBESTOS CONTRACTOR.

2. PERFORM ALL WORK IN ACCORDANCE WITH SECTION 02 82 00 -ASBESTOS ABATEMENT.

3. ASBESTOS CONTAINING MATERIALS SHALL BE ABATED INACCORDANCE WITH THE DRAWINGS AND SECTION 02 82 00 PRIOR TOANY GENERAL DEMOLITION WORK THAT COULD DISTURB THOSEMATERIALS.

4. DO NOT SCALE DRAWINGS.

5. COORDINATE ALL WORK WITH OTHER CONTRACTORS.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALLVARIANCES FROM INDUSTRIAL CODE RULE 56, WHICH ARE DESIREDOR NECESSARY TO PERFORM THE WORK.

7. REMOVE ALL ABATED MATERIALS FROM THE WORK AREA AND /ORBUILDING IN SEALED BAGS, DRUMS OR PLASTIC SHEETING.

Asbestos Abatement General Notes

Page 6: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

3M3S

3M 3N 3N 3M 3M3S

5555A

AAAAA

B B B

3MA

A

A

A

A

AB B B B B3M

3M

3M

3M

3M

3S 3S

3S 3S 3S 3S

6 6

3O

3C 3BB3O

3G

3B

3A

3O 3P 3P3L 3I

3O

1 1

1

1

A A A A A

B B B B B B B

A

A

A

A

A

A

A A AB B B B B B

3I 3I 3I 3I 3I

3I 3I 3I 3I 3I 3I

3O 3O

3O

3O

3O

3O

3O 3O

3H

7

3R3F

3E 3E

3A

3D

3F 3BB

3B

1

1

1

1

3K3R

3R

3R3K

2

2

2

22

A A A A

B B B B B B

A

A

A

A

A

A

A A AB B B B B B

3K3K3K3K3K

3K3K3K3K3K3R3R3R

3R

3R

3R

3R

3R3R

3Q

3A

3Q

3D

3C 3BB

3B

1 1

1

1

1

3Q

3

3Q

3J

2

A A A A

B B B B B B B

A

A

A

A

A

A

A A AB B B B B B

3J

3J3J3J3J3J3J

3J3J3J3J3J

3Q 3Q 3Q

3Q

3Q

3Q

3Q

3Q3Q

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Legislative Office Building Floor Plans

TLE

A300

1 First Floor Plan1/16" = 1'-0"

2 Second Floor Plan1/16" = 1'-0"

3 Third Floor Plan1/16" = 1'-0"

4 Fourth Floor Plan1/16" = 1'-0"

Key PlanNTS

N

Project No.:

Date:

73513-16001A

County of OswegoWindow Replacements

County of OswegoOswego, NY 13126

November 28, 2016

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Keyed Notes:WINDOW OR CURTAIN WALL TYPE EXTENDS TO UPPPER OR LOWERFLOOR

1

LEGISLATIVE OFFICE BUILDING

2

DISCONNECT, REMOVE, REINSTALL AND RECONNECT EXISTINGVENT HOOD TO DUCT ABOVE CEILING. PROVIDE CUT-OUT ININSULATED SPANDREL PANEL.

3

REMOVE, MODIFY AND REINSTALL EXISTING SUSPENDED CEILINGSYSTEM AS REQUIRED TO PERFORM WORK. PROVIDE BRAKEFORMED METAL TRIM TO MATCH CEILING GRID WHERE CLOSURE ISREQUIRED BETWEEN CEILING AND WINDOW, TYPICAL WHEREREQUIRED, VIF.

4

REMOVE AND REINSTALL EXISTING EXTERIOR GRATING PANEL5

BLIND AND REMOVABLE INTERIOR GLAZING PANEL NOT REQUIREDAT RADIUS GLAZING PANEL

REMOVE EXISTING METAL HEADER PANEL AND PROVIDE .060"FORMED ALUMINUM HEADER PANEL TO MATCH WINDOW ANDEXISTING HEADER (APPROX. 18" HIGH X 6'-8" LONG) WITH FORMEDDRIP EDGE HEM AND PERIMETER RETURNS SEALED INTO EXISTINGMORTAR JOINTS.

6

GENERAL DEMOLITION NOTE A (SIMILAR) REMOVE EXISTING DOOR,FRAME, SIDELIGHT, TRANSOM, HARDWARE & THRESHOLD.

7

1. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING BOTH ASBESTOSAND RCRA METALS ARE SHOWN, REMOVE AND DISPOSE OF WINDOWSYSTEM AS HAZARDOUS MATERIAL (SECTION 02 84 00) AND ASBESTOSCONTAINING OR CONTAMINATED MATERIALS (SECTION 02 82 00).

2. WHERE REMOVAL OF WINDOW SYSTEM CONTAINING ONLY RCRAMETALS ARE SHOWN, REMOVE AND DISPOSE OF WINDOW SYSTEM ASHAZARDOUS MATERIAL (SECTION 02 84 00).

3. WINDOW SYSTEMS INCLUDE, WITHOUT LIMITATION, ANY AND ALL OFTHE FOLLOWING (INCLUDING COMBINATIONS OF TWO OR MORE):

a. WINDOWS j. CAULKINGb. DOORS k. GLAZING COMPOUNDSc. FLASHING l. GLASSd. WINDOW PANELS m. SEALANTSe. FRAMING n. SILLSf. SASHES o. SCREENSg. HARDWARE p. STOOLSh. INSULATION q. MULLIONSi. ALL FINISHES r. MUNTINS

4. REMOVE THE ENTIRE WINDOW SYSTEM BETWEEN THEMASONRY/CONCRETE/STRUCTURAL STEEL THAT SURROUNDS THEM,EXCEPT AS FOLLOWS:

a. LINTELSb. MASONRY OR STONE SILLSc. STRUCTURAL SUPPORTSd. ITEMS SCHEDULED FOR REUSE BY OTHER CONTRACTORS.

5. REMOVE CAULK FROM THE WINDOW OR DOOR ASSEMBLY FRAME ANDTHE SURROUNDING WALL SURFACES.

6. MULTIPLE LAYERS/APPLICATIONS OF CAULKING MAY BE PRESENT ONWINDOW SYSTEMS.

7. AT LOCATIONS WHERE A SECONDARY WINDOW SYSTEM IS LOCATEDBEHIND THE EXTERIOR WINDOW SYSTEM SCHEDULED FOR REMOVAL,AND THE SECONDARY WINDOW SYSTEM IS SCHEDULED TO REMAIN -REMOVE ALL CAULKING FROM THE SECONDARY SYSTEM TO THEEXTENT ACCESSIBLE. IF ALL CAULKING LOCATED ON THE SECONDARYSYSTEM IS NOT ABLE TO BE REMOVED, ENCAPSULATE REMAININGCAULKING COMPOUND WITH 2 INDEPENDENT COATS OF BRIDGINGENCAPSULANT. EACH COAT SHALL BE OF A DIFFERENT COLOR.

8. AFTER THE WINDOW OR DOOR SYSTEM HAS BEEN REMOVED ANDAFTER CLEARANCE AIR SAMPLES HAVE BEEN COLLECTED OR IF NO AIRSAMPLES ARE REQUIRED, ONCE SATISFACTORY CLEARANCE CRITERIAARE ACHIEVED, COORDINATE WITH CONTRACTOR RESPONSIBLE FORINSTALLATION OF NEW WINDOW AND PROVIDE HARD WALL BARRIERSTO THE INTERIOR OF THE BUILDING, AS SPECIFIED IN SECTION 01 50 00,IF NEW WINDOWS WILL NOT BE INSTALLED IMMEDIATELY FOLLOWINGREMOVALS.

Window System and Caulk Abatement NotesAbatement Legend:REMOVE WINDOW SYSTEM WITH ASBESTOS, BARIUM, CHROMIUM,AND LEAD CONTAINING CAULKING

REMOVE WINDOW SYSTEM WITH BARIUM, CHROMIUM, AND LEADCONTAINING CAULKING

A

B

LEGISLATIVE OFFICE BUILDING

1. CONTRACTOR PERFORMING ANY AND ALL ASBESTOS ABATEMENTWORK SHALL BE A NYSDOL LICENSED ASBESTOS CONTRACTOR.

2. PERFORM ALL WORK IN ACCORDANCE WITH SECTION 02 82 00 -ASBESTOS ABATEMENT.

3. ASBESTOS CONTAINING MATERIALS SHALL BE ABATED INACCORDANCE WITH THE DRAWINGS AND SECTION 02 82 00 PRIOR TOANY GENERAL DEMOLITION WORK THAT COULD DISTURB THOSEMATERIALS.

4. DO NOT SCALE DRAWINGS.

5. COORDINATE ALL WORK WITH OTHER CONTRACTORS.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALLVARIANCES FROM INDUSTRIAL CODE RULE 56, WHICH ARE DESIREDOR NECESSARY TO PERFORM THE WORK.

7. REMOVE ALL ABATED MATERIALS FROM THE WORK AREA AND /ORBUILDING IN SEALED BAGS, DRUMS OR PLASTIC SHEETING.

Asbestos Abatement General Notes

Page 7: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

3A 3B 3C 3D

3F 3G 3I 3J 3K 3L

3M 3N 3O 3P 3Q 3R 3S3E

(CURTAIN WALL SYSTEM)MATCH EXISTING MULLION DIMENSIONS

VERIFY IN FIELD

3BB

(CURTAIN WALL SYSTEM)TYPE FC SINGLE GLAZING

AT THIS WINDOW

PATTERNED GLAZINGTYPE FY/FCP

PATTERNED GLAZINGTYPE FY/FCP

FIXED GLASS, TYP

22

22

22 22 22 22

21 2121

21

20 20

20

2020

2020

20

20

20

19

19

19 19

19

19 19

19

19

FIXED GLASS, TYP

PROVIDE ADDITIONALJAMB WIDTH TO MATCHEXISTING PROFILE,BOTH SIDES

21

26

20

20

20

202025

19191919

23

19

24

REFER TO A401FOR DETAILS, TYP.

27

27 27 SIM. 27 SIM.

27 SIM. 27 SIM. 27 SIM.

27 SIM.

21 21

21

21

21

20

19

21

20

19

SIM.

19

21

20

19

SIM.

SIM.

3H

ALIGN, V.I.F.EXISTING STEELFRAME, TO REMAIN

28

29

30

31

1A 1B 1C 1D 1E 1F 1G 1H 1J1I

1K

(EXISTING CURTAIN WALL SYSTEM TO REMAIN)

REMOVE ALL EXISTING GLAZING AND PROVIDE GLAZINGTYPES AS INDICATED. NO WORK AT EXISTING DOOR.

FIXED GLAZING, TYP.2

3

1

5

6

4

2

1

3

2

3

1

5

4

6

5

4

6

5

6

4 4

5

6

4

5

6

4

5

6

1

2

3

REFER TO A401FOR DETAILS, TYP.

2A 2B 2D 2F 2G 2H 2I 2J

2K

2L

2M 2N 2O 2P 2Q 2R 2S 2T 2U 2V

(CURTAIN WALL SYSTEM)

2C

2W

(CURTAIN WALL SYSTEM) (CURTAIN WALL SYSTEM)

2AA 2BB

FIXED GLAZING, TYP

11

13

1011

108

9

7

11

16

10

11

16

10

11

16

10

17

15

16

10

14

15

16

14

15

16

15

16

15

16

14

15

16

14

15

16 16

12

13

10

11

13

10

10

11

13

11

13

10

11

13

10

11

11

1613

11

10

11

11

11

10

16

11

10

1613

11

10 1010

10 1010

10

10

10

11

11

11

13

SIM.

SIM.2ENOT USED

REFER TO A401FOR DETAILS, TYP.

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Window and Curtain Wall Types

TLE

A400Project No.:

Date:

County of OswegoWindow Replacements

County of OswegoOswego, NY 13126

73513-16001A

November 28, 2016

3 Legislative Office Building - Window and Curtain Wall Types1/4" = 1'-0"

2 Health Complex - Window Types1/4" = 1'-0"

1 Public Safety Center - Window Types1/4" = 1'-0"

General Notes

General Demolition Notes:

APPLIES TO ALL DRAWINGS

Legend

xxxINDICATES WINDOW TYPE

INDICATES OPERABLE AWNING SASH

INDICATES METAL SKIN INSULATED SPANDREL PANEL

INDICATES 2" GLAZED SKIN INSULATED SPANDREL PANEL

INDICATES 1" GLAZED SKIN INSULATED SPANDREL PANEL

Page 8: County of Oswego Window Replacements 52-16 Drawings County of... · kwh kilowatt per hour ... mtr meter mull mullion mvej masonry veneer expansion joint n north, no work required

Drawn by: Drawing No.:

Description:Rev. No.: Date:

Tetra Tech Engineers, Architects& Landscape Architects, P.C.

1

A

2 43 5 6 7 8

BC

D

9 10 11 12 13 14 15 16 17

EF

GH

IN N

ML

JI

HG

FE

DC

BA

ML

KJ

K

Window And Curtain Wall Details

TLE

A401

19Head Detail

21Sill Detail

22Sill Detail

23Top of Curtain Wall Detail

24Curtain Wall Head Detail

20Jamb Detail

8Jamb Detail

7Head Detail

9Sill Detail

1Head Detail

2Jamb Detail

3Sill Detail

Project No.:

Date:

County of OswegoWindow Replacements

County of OswegoOswego, NY 13126

73513-16001A

November 28, 2016

10Head Detail

11Jamb Detail

14Jamb Detail

15Jamb Detail

17Sill Detail

16Sill Detail

13Sill Detail

4Head Detail

5Jamb Detail

6Sill Detail

12Jamb Detail

18Mullion Detail at Partition

26Curtain Wall Sill Detail

25Curtain Wall Jamb Detail

27Floor Section/Spandrel

28Head Detail

29Horizontal Mullion Detail

30Jamb Detail

31Sill Detail