Six Month Site Survey
__________________ County
__________/_______/200___
Manatron Representative: Robert Hanks
Office Phone (952) 858-1130
Mobile Phone (860) 478-4404
510 E Milham AvePortage, MI 49002
800-539-6262 Fax: 269-567-2930www.manatron.com
MCCC Representative: Lisa Meredith
Office Phone (651) 917-6996
Mobile Phone (612) 801-1689
Six Month Site Survey Version June 12 2008 Page 1 of 20
IntroductionThe Six Month (Prior to “Go Live”) Site Survey is used to provide an overview of the County’s Property Tax Implementation schedule, gather information necessary for the set up of the hardware, software & configuration, and to answer specific questions relating County’s Government Revenue Management (GRM) Implementation. Due to the number of locations and the aggressive deployment schedule, it is necessary to standardize and streamline the GRM implementation process. The Six Month Site Survey denotes the start of the implementation process for each County.
Overall TimelineThe first section of the Survey consists of a series of milestone dates that will be set for each County. Each milestone is based on a prescribed time period before the County go-live date. Note that this document only discusses the major milestones, there a many other (nonetheless critical) activities that must be performed for a successful implementation, that have been omitted for clarity.
Six Month Site Survey Approach. MCCC personnel will schedule a conference call with key County management personnel to complete the Six Month Site Survey. During the conference call the following will be accomplished:
review the contents of this packet review the overall implementation timeline complete the survey Develop list of “To Do’s”
Associated Documents: Several other documents are used during the implementation planning and execution. They will be provided to the County as a packet, at the same time as the 6-Month Survey:
GRM Conversion Process Guideline and Checklist. Implementation Guide One-County Training Plan Training Roster Template Policy and Procedure for GRM Remote Access Vendor User Agreement
Six Month Site Survey Version June 12 2008 Page 2 of 20
Overview of Survey Contents:The survey consists of a number of major sections that address specific topics during the implementation. Each section needs to be completed by the County, and returned to the MCCC and Manatron project managers at appropriate times. Several items include signature pages that authorize the implementation to move into its next phase.
The County project manager will need to monitor the status this document, and provide updates as required by the Timeline in order to keep the schedule on track. If there are any questions on completion of the survey, the County should contact its MCCC representative.
Cover Information: Information on the Survey Cover page defining County name and key contacts. These should be completed by the MCCC representative for the County.
Milestones: Completed jointly with MCCC and County project management. The milestone dates are included in the survey based on the Steering Committee approved rollout plan. The pre-defined lead times have been determined as effective based upon experience at the MCCC GRM Pilot Counties. Key County staff should be advised of the schedule with sufficient lead time so that elective time off can be scheduled to minimize impact on the project.
County Business and Data Contact Information: To be completed by County and returned to MCCC representative immediately. This defines the key contact people on the business functional areas and the IT functional areas of the County. It also gives instructions for setting up user accounts for County users of the Manatron ConneXions web site.
Network Information: This will be used by the GRM technical implementation team to correctly configure the GRM software for the County environment. Reference the Implementation guide for descriptions of the standard GRM network topology and network requirements. 3 to 4 network ports need to be available for support and conversion by Manatron. To be completed by County IT staff prior to hardware installation.
Hardware Information: As with the prior item, this information is critical for the implementation team and is needed before hardware is installed. Details are required for the GRM servers – database server web server, and batch server. Note that information can be copied and repeated as needed.
Remote Access Information: This section defines the information needed to obtain remote access to the County GRM resources during conversion. It must be provided prior to the site preparation activities. Note that passwords will be exchanged by secure means, and not recorded on this or other written documents
Site Preparation Information: Information on key people who will be working both on site and remotely to get the County ready to go live. Sections are provided for the County, and Manatron. This information should be repeated as needed for all personnel involved. This is required before the site preparation team starts work.
Conversion Information: This is similar to the Site Preparation team information, only for the Manatron and County resources that will be performing the data extract from ACS and load to .GRM. This section includes an Approval Form that must be signed by the County and Manatron conversion lead, verifying that the data conversion has been started, and completed. It needs to be faxed to the MCCC and Manatron project managers.
Six Month Site Survey Version June 12 2008 Page 3 of 20
Milestones:
Survey Start Date: _____ / _____ / _____
Preliminary site preparation survey should be conducted (network, hardware, software) and purchase orders created 6 months in advance of County implementation date
Hardware Updates Identified and Budgeted Date: _____ / _____ / _____
Hardware updates to current environment budgeted and Purchase Orders approved to allow installation 2 months in advance of County intended training, installation and “go live” process.
Hardware Installation Date: _____ / _____ / _____
Hardware installation should be complete 2 months in advance of County intended training, installation and “go live” process.
Site Preparation Start Date: _____ / _____ / _____
A site preparation team of 1 - 2 will work with each County during the 2 months prior to training, installation and “go live” to process: Hardware / Software installation & set-up Configuration options Test conversion Final conversion
Business Configuration Approval Date: _____ / _____ / _____
County-specific GRM configurations are defined and approved. Includes Assessor's name, County mailing addresses, and any Tax, AA or financial configuration that will not be automatically generated by the conversion process.
Test Conversion Start Date: _____ / _____ / _____
Complete Conversion Preparation Checklist. Begin process of extracting data from ACS into pre-defined GRM conversion formats. - Data is cleansed and verified- Make additional cycles as needed.
Test Implementation Date: _____ / _____ / _____
Web server, Batch server and DB server are implemented on existing hardware. Manatron implementation team verifies software and network. Manatron conversion team makes available a suitable GRM database for county testing.
Final Conversion Date: _____ / _____ / _____
Each County will extract final set of data and the site preparation team will load database tables on weekend prior to installation.
Conversion Approval Date: _____ / _____ / _____
Final conversion is approved by County.
“Go Live Date: _____ / _____ / _____
Six Month Site Survey Version June 12 2008 Page 4 of 20
County Business Contact Information:
County Name _______________________________________
Auditor Name _______________________________________
Auditor Email Address ______________________@_______________
Auditor Phone Number ____ - ____ - _____________ Ext. _________ Office
Auditor Phone Number ____ - ____ - _____________ Mobile
Auditor Phone Number ____ - ____ - _____________ FAX
Auditor Mailing Address _______________________________________________
City, State, Zip Code _______________________________________________
Auditor and Treasurer’s Office occupied by same individual □
Treasurer Name _______________________________________
Treasurer Email Address ______________________@_______________
Treasurer Phone Number ____ - ____ - _____________ Ext. _________ Office
Treasurer Phone Number ____ - ____ - _____________ Mobile
Treasurer Phone Number ____ - ____ - _____________ FAX
Treasurer Mailing Address _______________________________________________
City, State, Zip Code _______________________________________________
Six Month Site Survey Version June 12 2008 Page 5 of 20
County Business Area Supervisor Contact Information:
(Copy and repeat as needed for all involved supervisors.)
Supervisor Title: _______________________________________
Supervisor Name _______________________________________
Supervisor Email Address ______________________@_______________
Supervisor Phone Number ____ - ____ - ________ Ext. _________ Office
Supervisor Phone Number ____ - ____ - _____________ Mobile
Supervisor Phone Number ____ - ____ - _____________ FAX
County Data Contact Information:
IT Contact Name _______________________________________
IT Contact Email Address ______________________@_______________
IT Contact Phone Number ____ - ____ - _____________ Ext. _________ Office
IT Contact Phone Number ____ - ____ - _____________ Mobile
IT Contact Phone Number ____ - ____ - _____________ FAX
Secondary Contact Name
IT Contact Email Address ______________________@_______________
IT Contact Phone Number ____ - ____ - _____________ Ext. _________ Office
IT Contact Phone Number ____ - ____ - _____________ Mobile
IT Contact Phone Number ____ - ____ - _____________ FAX
If network is administered by a different party than IT Contact above:
Network Admin Contact Name _______________________________________
Network Admin Contact Email Address ______________________@_______________
Network Admin Contact Phone Number ____ - ____ - _____________ Ext. ________ Office
Network Admin Contact Phone Number ____ - ____ - _____________ Mobile
Network Admin Contact Phone Number ____ - ____ - _____________ FAX
If Internet (ISP) is administered by a different party than IT Contact above:
ISP Contact Name _______________________________________
Six Month Site Survey Version June 12 2008 Page 6 of 20
ISP Contact Email Address ______________________@_______________
ISP Contact Phone Number ____ - ____ - _____________ Ext. ________ Office
ISP Contact Phone Number ____ - ____ - _____________ Mobile
ISP Contact Phone Number ____ - ____ - _____________ FAX
County User Training and Security RosterThe training and security roster is a separate spreadsheet. Complete the Roster for all employees who will be using GRM. This spreadsheet will be used:
to set security roles within GRM, to determine Manatron GRM training classes and
If you want to set up generic users for those offices that will use GRM for inquiry purposes only, include them in the Roster and leave the email field blank. This will alert us not to account for those users in training classes. If you want the user to attend roll-out training, include an email address and specify the courses.
County user information for Manatron ConneXions Web SiteThe Manatron Customer ConneXions website provides training materials and other useful information for GRM users and administrators. All ConneXions users need to be registered on the site, and Manatron needs to be informed so they can assign the correct level of access for each user. To provide access of your county's individuals to the Manatron ConneXion website please follow these steps:
1) Each person should log on to ConneXions at https://ConneXion.manatron.com and register themselves by clicking on the "Register" link in the login area.
2) The County project manager needs to go to the MNCCC web site (all MCCC Manatron counties should have access) and download the ConneXion user tracking spreadsheet by clicking on the link “ConneXion Sign Up” and save the spreadsheet on your system. Enter a complete list of your county's individuals that need access to the Manatron ConneXion website. Be sure to indicate if the person will need software download rights. Typically there will be one or more IT persons at your county that will need to be able to download. Once the form is complete, please email it to [email protected].
3) The Manatron ConneXion site administrator will assign the appropriate access rights to each user.
Six Month Site Survey Version June 12 2008 Page 7 of 20
Network Information:
Office Location(s):
Main Office _______________________________________________________
Address _______________________________________________________
City, State, Zip Code _______________________________________________________
Contact Name _______________________________________
Contact Email Address ______________________@_______________
Contact Phone Number ____ - ____ - _____________ Ext. ________ Office
Internet Provider ___________________________________________
High Speed Internet: Yes ____ / No _____ / Don’t Know _____
Security Check Required for Access Yes ____ / No _____ / Don’t Know _____
Virtual Private Network (VPN) Yes_____ / No_____ / Don’t Know _____
Remote Access:
High Speed Internet: Yes ____ / No _____ / Don’t Know _____
Security Check Required for Access Yes ____ / No _____ / Don’t Know _____
Virtual Private Network (VPN) Yes_____ / No_____ / Don’t Know _____
Number of Ports available ______
VPN Client: Nortel _____, Cisco_____, Microsoft_____, Other_____________________________
VPN IP Address _____ . _____ . _____ . _____
VPN User Name / Password (To be provided separately by IT department using secure means).
Remote Client:
Microsoft Remote Access______, VNC_____, Citrix GoToMyPC_____, Other____________________
Six Month Site Survey Version June 12 2008 Page 8 of 20
Office Location: (cont.)
Remote Office _______________________________________________________
Address _______________________________________________________
City, State, Zip Code _______________________________________________________
Contact Name _______________________________________
Contact Email Address ______________________@_______________
Contact Phone Number ____ - ____ - _____________ Ext. ________ Office
Internet Provider ___________________________________________
High Speed Internet: Yes ____ / No _____ / Don’t Know _____
Security Check Required for Access Yes ____ / No _____ / Don’t Know _____
Virtual Private Network (VPN) Yes_____ / No_____ / Don’t Know _____
Remote Access:
High Speed Internet: Yes ____ / No _____ / Don’t Know _____
Security Check Required for Access Yes ____ / No _____ / Don’t Know _____
Virtual Private Network (VPN) Yes_____ / No_____ / Don’t Know _____
VPN Client: Nortel _____, Cisco_____, Microsoft_____, Other_____________________________
VPN IP Address _____ . _____ . _____ . _____
VPN User Name / Password (To be provided separately by IT department using secure means).
Remote Client:
Microsoft Remote Access______, VNC_____, Citrix GoToMyPC_____, Other____________________
(Copy as necessary)
Six Month Site Survey Version June 12 2008 Page 9 of 20
Hardware Information:
Database Server:
Database Server Name _________________________
Database Server IP Address _____ . _____ . _____ . _____
Database Server User Name / Password (To be provided separately by IT department using secure means).
Database Server Domain Name ______________________________
Runs as a Virtual Instance, using VM Ware or a similar product? Yes ____ / No _____
Is Data storage on this server implemented on a SAN? Yes ____ / No _____
Database Sever Brand ____________________________
Database Server Model ____________________________
Database Server Processor _____ Core(s) _____GHz _____GB RAM
Database Server Disk (available) _____ GB _____ RAID Level _____ RPM
Database Server Operating System ____________________________________
Database Engine:
Microsoft SQL Server 2005 (installed) Yes ____ / No _____ / Don’t Know _____
Microsoft SQL Reporting Services (installed) Yes ____ / No _____ / Don’t Know _____
Database Server Sharing:
List all other database applications that will share this server.
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Six Month Site Survey Version June 12 2008 Page 10 of 20
Hardware Information: (cont.)
If Microsoft Internet Information Services server(s) for implementation are different than database server; please list each IIS server on a separate sheet.
IIS Server:
IIS Server Name _________________________
IIS Server IP Address _____ . _____ . _____ . _____
IIS Server User Name / Password (To be provided separately by IT department using secure means).
IIS Server Domain Name ________________________
Runs as a Virtual Instance, using VM Ware or a similar product? Yes ____ / No _____ IIS Sever Brand ____________________________
Is Data storage on this server implemented on a SAN? Yes ____ / No _____
IIS Server Model ____________________________
IIS Server Processor _____ Core(s) _____GHz _____GB RAM
IIS Server Disk (available) _____ GB _____ RAID Level _____ RPM
IIS Server Operating System ____________________________________
Microsoft Internet Information Services (IIS):
Microsoft IIS (installed) Yes ____ / No _____ / Don’t Know _____
Microsoft IIS Version ____________________
Crystal Web 11.5 (installed) Yes ____ / No _____ / Don’t Know _____
IIS Server Sharing:
List all other applications that will share this server.
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
(copy as necessary)
Six Month Site Survey Version June 12 2008 Page 11 of 20
Hardware Information: (cont.)
If GRM Batch server(s) for implementation are different than database or IIS server(s); please list each Batch server on a separate sheet.
GRM Batch Server:
Batch Server Name _________________________
Batch Server IP Address _____ . _____ . _____ . _____
Batch Server User Name / Password (To be provided separately by IT department using secure means).
Batch Server Domain Name ________________________
Runs as a Virtual Instance, using VM Ware or a similar product? Yes ____ / No _____
Is Data storage on this server implemented on a SAN? Yes ____ / No _____
Batch Sever Brand ____________________________
Batch Server Model ____________________________
Batch Server Processor _____ Core(s) _____GHz _____GB RAM
Batch Server Disk (available) _____ GB _____ RAID Level _____ RPM
Batch Server Operating System ____________________________________
Batch Server Sharing:
List all other applications that will share this server.
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
(copy as necessary)
Six Month Site Survey Version June 12 2008 Page 12 of 20
Hardware Information: (cont.)
Workstation / Desktop / Notebook:
Manatron GRM requires the following minimum configuration for user workstations:
Software Hardware Windows 2000 Professional or
Windows XP Professional SP2 Internet Explorer 6.0 Adobe Reader , current version Microsoft Word (Recommended for
mail-merge functions.) VNC
1 GHZ Pentium III 512 MB of RAM 17” Monitor (1024 X 768 resolution) 40 GB Disk Drive 100 Mb Ethernet Card 24X CD ROM Drive
How many GRM workstations will be implemented that meet the configuration? _____________
How many GRM workstations do not meet the minimum configuration? ___________________
For the machines that do not meet the minimum, please list the typical configuration:
Computer Brand ____________________________
Computer Model ____________________________
Computer Processor _____ Core(s) _____GHz _____MB / GB RAM
Computer Disk (available) _____ GB
Computer Operating System ____________________________________
Browser Information:
Microsoft Internet Explorer Yes ______ / Version _____
Netscape Yes ______ / Version _____
Firefox Yes ______ / Version _____
Other __________ / Version _____
Don’t Know __________
Additional office productivity applications loaded on typical workstation / desktop / notebook:
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
Six Month Site Survey Version June 12 2008 Page 13 of 20
If a workstation will be accessed by Manatron for remote support please supply the following information.
Computer Name _________________________
Computer IP Address _____ . _____ . _____ . _____
Computer User Name / Password (To be provided separately by IT department using secure means).
Computer Domain Name ________________________
(copy as necessary)
Remote Access Information:
Manatron will require Full Access to the County’s GRM servers in order to perform conversion activities. The web server, database server and batch server will all need to have access established. On the database server, conversion activities will include the rights to create directories, copy files to shared directories, create SQL databases and run SQL queries.
VPN Access Allowed Yes ____ / No _____ / Don’t Know _____
Remote Desktop Access Allowed Yes ____ / No _____ / Don’t Know _____
Shared Data Location(s):
Local FTP Site Available Yes ____ / No _____ / Don’t Know _____
Local FTP Site Name _________________________
Local FTP Site IP Address _____ . _____ . _____ . _____
Local FTP Site User Name / Password (To be provided separately by IT department using secure means).
Local FTP Site Domain Name ________________________
(fax for approvals)
Six Month Site Survey Version June 12 2008 Page 14 of 20
Site Preparation Information:
Site Preparation Team:
Manatron Contact (1) Gary Paldan
Manatron Contact (1) Email Address [email protected]
Manatron Contact (1) Phone Number 866 - 471 – 2900 Ext. 7175 Office
Manatron Contact (1) Phone Number 269 - 217 - 3673 Mobile
Manatron Contact (1) Phone Number ____ - ____ - _____________ FAX
Manatron Contact (2) _______________________________________
Manatron Contact (2) Email Address ______________________@_______________
Manatron Contact (2) Phone Number ____ - ____ - _____________ Ext. _________ Office
Manatron Contact (2) Phone Number ____ - ____ - _____________ Mobile
Manatron Contact (2) Phone Number ____ - ____ - _____________ FAX
County Contact (1) _______________________________________
County Contact (1) Email Address ______________________@_______________
County Contact (1) Phone Number ____ - ____ - _____________ Ext. _________ Office
County Contact (1) Phone Number ____ - ____ - _____________ Mobile
County Contact (1) Phone Number ____ - ____ - _____________ FAX
Site Preparation Start Date: ______ / _____ / _________
Start Date Approval:
Manatron Contact (1) __________________________________ _____ / _____ / _______Signature Date
Manatron Contact (2) __________________________________ _____ / _____ / _______Signature Date
County Contact (1) __________________________________ _____ / _____ / _______Signature Date
(fax for approvals)
Six Month Site Survey Version June 12 2008 Page 15 of 20
Conversion Information:
Conversion Team:
Manatron Conversion Contact (1) Chris Rivard
Manatron Conversion Contact (1) Email Address [email protected]
Manatron Conversion Contact (1) Phone Number 952 - 858 - 1131 Office
Manatron Conversion Contact (1) Phone Number 715 – 497 - 9967 Mobile
Manatron Conversion Contact (2) Rodney Patterson
Manatron Conversion Contact (2) Email Address [email protected]
Manatron Conversion Contact (2) Phone Number N/A Office
Manatron Conversion Contact (2) Phone Number (757) 241-0112 Mobile
County Conversion Contact (1) _______________________________________
County Conversion Contact (1) Email Address ______________________@_______________
County Conversion Contact (1) Phone Number ____ - ____ - _____________ Ext. _________ Office
County Conversion Contact (1) Phone Number ____ - ____ - _____________ Mobile
County Conversion Contact (1) Phone Number ____ - ____ - _____________ FAX
Six Month Site Survey Version June 12 2008 Page 16 of 20
Conversion Information: (cont.)
Test Conversion Start Date (estimated): ______ / _____ / _________
Test Conversion Start Date: (actual) ______ / _____ / _________
Start Date Approval:
Manatron Contact (1) __________________________________ _____ / _____ / _______Signature Date
Manatron Contact (2) __________________________________ _____ / _____ / _______Signature Date
County Contact (1) __________________________________ _____ / _____ / _______Signature Date
Final Conversion Date (estimated): ______ / _____ / _________
Final Conversion Completion Date: (actual) ______ / _____ / _________
Final Conversion Approval:
Manatron Contact (1) __________________________________ _____ / _____ / _______Signature Date
County Contact (1) __________________________________ _____ / _____ / _______Signature Date
(fax for approvals)
Six Month Site Survey Version June 12 2008 Page 17 of 20
Appendix A
GRM CONVERSION PROCESS
GUIDELINE & CHECKLIST
Six Month Site Survey Version June 12 2008 Page 18 of 20
Appendix B
GRM INSTALLATION SOFTWARE
Six Month Site Survey Version June 12 2008 Page 19 of 20
GRM Installation Software
As part of the implementation process, the Manatron implementation team will load the Manatron GRM application on appropriate County Database, Web and Batch servers. In preparation for this task, The County will be responsible for loading certain third party system software on County Database, Web and Batch servers.
Database Server System Software Microsoft Windows Server 2003 Standard Edition sufficient licensing for all County users Microsoft SQL Server 2005 Standard Edition sufficient licensing for all County users ETrust InoculateIT Anti-virus Software or equivalent Veritas Backup Exec Server Edition or equivalent Adobe Reader 8.0 Microsoft Enterprise Instrumentation Microsoft Framework .Net 2.0 Microsoft Framework .Net 3.0 County SQL 2005 database
Web Server System Software Microsoft Windows Server 2003 Standard Edition ETrust InoculateIT Anti-virus Software or equivalent Crystal Developer XI one copy required Microsoft Office current version Adobe Reader 8.0 Microsoft Enterprise Instrumentation Microsoft Framework .Net 2.0 Microsoft Framework .Net 3.0 Manatron GRM application Installed by Manatron
Batch Server System Software Microsoft Windows Server 2003 Standard Edition ETrust InoculateIT Anti-virus Software or equivalent Crystal Developer XI one copy required Microsoft Office current version Adobe Reader 8.0 Microsoft Enterprise Instrumentation Microsoft Framework .Net 2.0 Microsoft Framework .Net 3.0 Manatron GRM application Installed by Manatron
Desktop System Software Microsoft Windows XP Professional SP2 Microsoft Office current version Crystal Developer XI optional ETrust InoculateIT Anti-virus Software or equivalent Adobe Reader 8.0
Six Month Site Survey Version June 12 2008 Page 20 of 20