Institute of Wood Technology and Wood Biology (HTB),
Hamburg, Germany
PYROLYSISPYROLYSIS ActivitiesActivities in Germanyin Germany
IEA BIOENERGY Task 34 - Pyrolysis15 September, 2009, Sheraton Chicago Hotel & Towers
Dietrich Meier
8/10/2019 Country Report Germany - September 2009
2/28
Institute of Wood Technology and Wood Biology (HTB)
Status of PyrolysisStatus of Pyrolysis ActivitiesActivities in Germanyin Germany
Pyrolysis for syngas => Diesel, DME CHOREN
BIOLIQ (FZK)
Pyrolysis for liquid => Power/Heat PYTEC
Haloclean
PYREG
High pressure liquefaction IBH Engineering
8/10/2019 Country Report Germany - September 2009
3/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN -CHOREN -YesterdayYesterday
On 31.1.1990, 4 employees at the ORGREB Institute for Power Stations tookthe plunge into self-employed, setting up a company called Umwelt- und
Energietechnik Freiberg (UET) GmbH, the current CHOREN TechnologiesGmbH.
The portfolio of the young company included process technology forsteam fluidized bed drying, analyses services for optimizing power stationplant sand many other energy processes.A 1992 order to evaluate a
gasification process for waste products marked a turning point in the furtherdevelopment of the company. From that time on, the UET engineersconcentrated on refining and gasifying organic raw materials for energypurposes.
By 1993 the company was already applying for the first patents inthis field.The company changed direction. A joint venture between UET and a
mechanical engineering company in the state of Lower Saxony led to theformation of CRG Kohlenstoffrecycling Ges. mbH. It was the forerunner ofCHOREN. The companys declared aim was to make significant improvementsin using biomass for energy purposes through gasifying and refining. TheCarbo-V Process opened up an enormous opportunity. A new idea was born:putting "the Sun into your fuel tank"!
8/10/2019 Country Report Germany - September 2009
4/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN recentlyrecently
The construction and start-up of a 1MWth Carbo-V pilot plant (AlphaPlant) in Freiberg in 1998 marked an important milestone. The
process was then thoroughly tested. Our engineers successfullyexperimented with a wide variety of feedstock including untreatedwood, various types of recycled lumbar, what is known as drystabilate from waste processing, meat and bone meal, black coaland lignite.
By the end of 2004, the plant had been operatingsuccessfully for more than 22,500 hours.In 1997 CRG and key UETmanagers acquired the workshops of the German Fuel Institute.They were then able to bring on board important expertise formanufacturing core equipment for various types of gasification
technology from within their own group of companies. The companynow responsible is called TAF, Thermische Apparate Freiberg GmbH,the current CHOREN Components GmbH. CRG later changed itsname to CHOREN Industries GmbH to reflect its new fields ofbusiness and was by then in a position to manage the complete
value chain from idea conception through to production processes.
8/10/2019 Country Report Germany - September 2009
5/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN recentlyrecently
In 2001 the company demonstrated that it was possible to convert
biomass into a raw Fischer-Tropsch product, even though initialamounts were very small.
A 150 kW gas engine also successfully ran on Carbo-V gasfor 600 hours.Other developments followed rapidly. In November2002 the foundation stone was laid for the construction of the first
industrial-scale Carbo-V prototype plant (with an capacity of 45MWth) for refining biomass (char production plant) at the Freibergsite. The construction work took only 10 months and the plant(Beta Plant) went into operation in September 2003.
The Alpha Plant was expanded to include an automotivefuel synthesis facility. As a result, CHOREN was able to produce thefirst synthetic automotive fuel from wood chips in April 2003. This
took place within a combined research project sponsored by theGerman Federal Ministry of Economics and Labor. Our cooperationpartners DaimlerChrysler AG and Volkswagen AG also joined theproject.
8/10/2019 Country Report Germany - September 2009
6/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN -CHOREN - TodayToday
CHOREN now has extensive know-how in gasifying biomass andmanufacturing synthetic automotive fuels. The many years ofdevelopment work are now starting to bear fruit. CHOREN haspositioned itself as a future producer of renewable syntheticautomotive fuels and for this purpose has established projectcompanies such as CHOREN Fuel Freiberg GmbH & Co. KGcurrently in the process of building the first scale up productionfacility.The building phase of Worlds First Commercial Synthetic BiofuelProduction Plant has been successfully completed in April 2008.An important phase now follows - the commissioning of the plant,which will result in production of up to 18 million litres of BTL. Thecommissioning will take place in stages over several months. 113sub-systems in 26 main operating units will be put into operationindividually and then consequetively.But it is not only thecompanys goals that have grown. The number of personnel hasincreased too. The number of employees in the CHOREN Grouppassed the 230 mark in early 2008.
8/10/2019 Country Report Germany - September 2009
7/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN -CHOREN - 24 August 200924 August 2009
...Currently the worlds first commercial BTL
production plant, the so called Beta plant, isstarting up in Freiberg. The production ofsynthesis gas is due to start in autumn of
this year. Fuel production with an annualcapacity of 15,000 t of BTL is scheduled tobegin in early 2010...
8/10/2019 Country Report Germany - September 2009
8/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN -CHOREN - TomorrowTomorrow
With a targeted production output of 1 million
t/a, CHOREN intends to capture a considerableshare of the future market for renewablesynthetic biofuels. Five large-scale industrialproduction units, each with an annual production of
200,000 t/a, will be built in Germany and at the
same time the Carbo-V Process will becommercialized for use in combined heat and
power plants.
8/10/2019 Country Report Germany - September 2009
9/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN IndustriesCHOREN Industries sundieselsundiesel (8000 kg/h) (8000 kg/h)
8/10/2019 Country Report Germany - September 2009
10/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN - Alpha plant (operationalCHOREN - Alpha plant (operational sincesince 2003)2003)
8/10/2019 Country Report Germany - September 2009
11/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN AlphaCHOREN Alpha PlantPlant
8/10/2019 Country Report Germany - September 2009
12/28
Institute of Wood Technology and Wood Biology (HTB)
CHOREN - Beta plantCHOREN - Beta plant
8/10/2019 Country Report Germany - September 2009
13/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN BetaBeta Plant 2008Plant 2008
8/10/2019 Country Report Germany - September 2009
14/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN PyrolyzerPyrolyzer
8/10/2019 Country Report Germany - September 2009
15/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN Hight TemperatureHight Temperature GasifierGasifierwith Tarwith TarOxidation andOxidation and Endothermic QuenchEndothermic Quench
8/10/2019 Country Report Germany - September 2009
16/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN Scale-upScale-up Beta=>Beta=>SigmaSigma
8/10/2019 Country Report Germany - September 2009
17/28
Institute of Wood Technology and Wood Biology (HTB)
CHORENCHOREN SigmaSigma 11 plannedplanned
8/10/2019 Country Report Germany - September 2009
18/28
Institute of Wood Technology and Wood Biology (HTB)
BioliqBioliqProcessProcess, FZK (500 kg/h), FZK (500 kg/h)
Status
Test phase of pyrolysis plant
Involved Partners FZK
Lurgi
8/10/2019 Country Report Germany - September 2009
19/28
Institute of Wood Technology and Wood Biology (HTB)
BioliqBioliq Plant ConstructionPlant Construction
8/10/2019 Country Report Germany - September 2009
20/28
Institute of Wood Technology and Wood Biology (HTB)
D.M.2 (Blue TowerD.M.2 (Blue Tower HertenHerten), 200 kg/h), 200 kg/h
Off-gases
Flue gases
Product gas
Steam
Biomass
PYROLYZER
REFORMER
PREHEATER
COMBUSTOR
Ash
Involved Partners H2NRW
D.M.2
Status
Test phase
New porject with 2600 kg/h)
8/10/2019 Country Report Germany - September 2009
21/28
Institute of Wood Technology and Wood Biology (HTB)
BTOBTOProcess pilotProcess pilot plant (250plant (250 kg/h)kg/h)
Involved Partners
PYTEC
TEC
vTI
Universities
Status
Optimization tests
Pyrolysis plant
Diesel engine
Malli Project ongoing (48 tpd)
8/10/2019 Country Report Germany - September 2009
22/28
Institute of Wood Technology and Wood Biology (HTB)
BTO Plant 2009BTO Plant 2009
8/10/2019 Country Report Germany - September 2009
23/28
Institute of Wood Technology and Wood Biology (HTB)
PYTECPYTECs Mallis Malli Project (48Project (48 tpdtpd))
Transformators
Gasifier
Pyrolyser
Product recovery
Pyrolyser
Office
Storage material
Storage biooil
Storage wood chips
Dryer
Product treatment
8 x CHP
Storage char coal
Storage wood chips
Control room
washroom
8/10/2019 Country Report Germany - September 2009
24/28
Institute of Wood Technology and Wood Biology (HTB)
HalocleanHalocleanforforElectronicElectronic WasteWaste andandBiomassBiomass
8/10/2019 Country Report Germany - September 2009
25/28
Institute of Wood Technology and Wood Biology (HTB)
HalocleanHaloclean (50 kg/h) (50 kg/h)
8/10/2019 Country Report Germany - September 2009
26/28
Institute of Wood Technology and Wood Biology (HTB)
PYREGPYREG for Sewage Sludgefor Sewage Sludge (40 kg/h)(40 kg/h)
8/10/2019 Country Report Germany - September 2009
27/28
Institute of Wood Technology and Wood Biology (HTB)
PYREGPYREG
8/10/2019 Country Report Germany - September 2009
28/28
Institute of Wood Technology and Wood Biology (HTB)
HPHP DoSDoSProcessProcess (50 kg/h)(50 kg/h)
Biomass
Grinding
Drying
Preheating
Slurry Phase
Reactor
Recycle
Oil
Multi-stage
Phase
Separation
Residue
H2
Condensation
Phase Separation
H2 Recovery
Distillation
Condensation
Phase
Separation
Crude Oil
Water
Water
Ash
CO2
H2
H2-Production
Gas
Involved Partners
IBH Engineering GmbH
Technische Werke Ludwigshafen AG (TWL)
Univ. Appl. Sci., Hamburg (Prof . Willner)
Status
Test phase