Council Regional Strategy and Development Committee Dec 13

Embed Size (px)

Citation preview

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    1/119

    Note: The reports contained within this agenda are for consideration and should not be construed as Council policyunless and until adopted. Should Members require further information relating to any reports, please contactthe relevant manager, Chairperson or Deputy Chairperson.

    I hereby give notice that an ordinary meeting of the Regional Strategy and Policy Committee willbe held on:

    Date:Time:Meeting Room:Venue:

    Thursday, 5 December 20139.30amReception LoungeAuckland Town Hall301-305 Queen StreetAuckland

    Regional Strategy and Policy Committee

    OPEN AGENDA

    MEMBERSHIP

    Chairperson Cr George Wood, CNZMDeputy Chairperson Cr Anae Arthur AnaeMembers Cr Cameron Brewer Kris MacDonald

    Mayor Len Brown, JP Cr Calum PenroseCr Dr Cathy Casey Cr Dick QuaxCr Bill Cashmore Cr Sharon Stewart, QSMCr Ross Clow Cr Sir John Walker, KNZM, CBECr Linda Cooper, JP Cr Wayne WalkerCr Chris Darby Cr John WatsonCr Alf Filipaina Cr Penny WebsterCr Hon Chris Fletcher, QSO Glenn WilcoxDeputy Mayor Penny HulseCr Denise KrumCr Mike Lee

    Independent Maori

    Statutory Board (alternate)

    David Taipari

    (Quorum 11 members)Barbara WatsonDemocracy Advisor

    29 November 2013

    Contact Telephone: (09) 307 7629Email: [email protected]: www.aucklandcouncil.govt.nz

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    2/119

    a)

    TERMS OF REFERENCE

    Responsibilities

    This committee will deal with all strategy and policy decision-making that is not the responsibility ofanother committee or the Governing Body i.e. strategies and policies associated with environmental,

    social, economic and cultural activities. Key responsibilities will include:

    Final approval of strategies and policies not the responsibility of other committees or theGoverning Body

    Setting/ approving the policy work programme for Reporting Committees

    Overviewing strategic projects, for example, the Southern Initiative (except those that are theresponsibility of the Auckland Development Committee)

    Implementation of the Waste Management and Minimisation Plan

    Operational matters including:

    o Acquisition and disposal of property relating to the committees responsibilitieso Stopping of roads

    o Public Works Act matters

    Powers

    (i) All powers necessary to perform the committees responsibilities.

    Except:

    (a) powers that the Governing Body cannot delegate or has retained to itself (seeGoverning Body responsibilities)

    (b) where the committees responsibility is limited to making a recommendation only

    (ii) Approval of a submission to an external body

    (iii) Powers belonging to another committee, where it is necessary to make a decision prior to thenext meeting of that other committee.

    (iv) Power to establish subcommittees.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    3/119

    Regional Strategy and Policy Committee

    05 December 2013

    Page 3

    ITEM TABLE OF CONTENTS PAGE

    1 Apologies 5

    2 Declaration of Interest 5

    3 Confirmation of Minutes 5

    4 Petitions 5

    5 Public Input 5

    6 Local Board Input 5

    7 Extraordinary Business 5

    8 Notices of Motion 6

    9 The Southern Initiative Progress Report 7

    10 Waste Management and Minimisation Plan Status Update Report 13

    11 Delegation of decision making on the Waste Minimisation and Innovation

    Fund 19

    12 Strategy and Policy Forward Programme: Quarterly Monitoring Report 23

    13 Economic Development Status Update Report 35

    14 Parks and Open Space Work Programme 41

    15 Update on Regional Social Policy work programme. 43

    16 Local Alcohol Policy development process update. 45

    17 Council responses to current and future proposals for reform of the class

    4 (pokie) gambling sector 47

    18 Local Government Act (2002) Amendment Bill (No 3) 115

    19 Update on commercial partnership and sponsorship opportunities

    This report was not available at the time the agenda went to print and will becirculated under separate cover.

    20 Consideration of Extraordinary Items

    PUBLIC EXCLUDED

    21 Procedural Motion to Exclude the Public 119

    C1 Proposed acquisition of land in Birkdale 119

    C2 Acquisition of open space at Hobsonville for the purpose of sport fields 119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    4/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    5/119

    Regional Strategy and Policy Committee

    05 December 2013

    Page 5

    1 Apologies

    Apologies have been received from Cr Penny Webster.

    2 Declaration of Interest

    Members are reminded of the need to be vigilant to stand aside from decision makingwhen a conflict arises between their role as a member and any private or other externalinterest they might have.

    3 Confirmation of Minutes

    There are no minutes to confirm.

    4 Petitions

    At the close of the agenda no requests to present petitions had been received.

    5 Public Input

    Standing Order 3.21 provides for Public Input. Applications to speak must be made to theCommittee Secretary, in writing, no later than two (2)working days prior to the meetingand must include the subject matter. The meeting Chairperson has the discretion todecline any application that does not meet the requirements of Standing Orders. Amaximum of thirty (30) minutes is allocated to the period for public input with five (5)minutes speaking time for each speaker.

    At the close of the agenda no requests for public input had been received.

    6 Local Board Input

    Standing Order 3.22 provides for Local Board Input. The Chairperson (or nominee of thatChairperson) is entitled to speak for up to five (5) minutes during this time. TheChairperson of the Local Board (or nominee of that Chairperson) shall wherever practical,give two (2) days notice of their wish to speak. The meeting Chairperson has thediscretion to decline any application that does not meet the requirements of StandingOrders.

    This right is in addition to the right under Standing Order 3.9.14 to speak to matters on theagenda.

    At the close of the agenda no requests for local board input had been received.

    7 Extraordinary Business

    Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (asamended) states:

    An item that is not on the agenda for a meeting may be dealt with at that meeting if-

    (a) The local authority by resolution so decides; and

    (b) The presiding member explains at the meeting, at a time when it is open to the

    public,-

    (i) The reason why the item is not on the agenda; and

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    6/119

    Regional Strategy and Policy Committee

    05 December 2013

    Page 6

    (ii) The reason why the discussion of the item cannot be delayed until asubsequent meeting.

    Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (asamended) states:

    Where an item is not on the agenda for a meeting,-

    (a) That item may be discussed at that meeting if-

    (i) That item is a minor matter relating to the general business of the localauthority; and

    (ii) the presiding member explains at the beginning of the meeting, at a timewhen it is open to the public, that the item will be discussed at the meeting;but

    (b) no resolution, decision or recommendation may be made in respect of that item

    except to refer that item to a subsequent meeting of the local authority for furtherdiscussion.

    8 Notices of Motion

    At the close of the agenda no requests for notices of motion had been received.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    7/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    8/119

    Item9

    Regional Strategy and Policy Committee

    05 December 2013

    The Southern Initiative Progress Report Page 8

    9. The Southern Initiative and Manukau Institute of Technology have signed a Memorandum ofUnderstanding to implement and promote a cadetship programme over the next five years. Itis targeted at local employers and encourages them to provide young people with trainingand employment opportunities.

    10. The Southern Initiative has formed an Infrastructure Consortium to bid for the recentlyannounced Maori and Pasifika trades training scheme, which aims to recruit and support

    Maori and Pasifika through to apprenticeships and sustainable jobs in the infrastructureindustry. The results of this Request for Proposals will be known shortly.

    Joint Government Co-operation

    11. The government has been supportive of this initiative. There is considerable opportunity towork together to achieve the Better Public Services targets and meet the Auckland Plantargets, particularly those identified for The Southern Initiative.

    12. To date, the government departments who have committed staff or other resources and areactive participants are:

    Ministry of Social Development

    Ministry of Business, Innovation and Employment

    Tertiary Education Commission

    Te Puni Kokiri

    Ministry of Pacific Island Affairs

    NZ Police.

    13. Other departments, such as Ministry of Education and Ministry of Health are also keen todevelop key relationships and work alongside The Southern Initiative. Developing andextending these relationships will be a key aspect of the work in 2014.

    Consideration

    Local Board Views

    14. The four local boards which comprise the Southern Initiative are Mangere-Otahuhu,Manurewa, Otara-Papatoetoe and Papakura. Regular meetings are held with the LocalBoard Chairs and the Local Boards about the general progress on the Southern Initiativeand consultation on specific initiatives in their local board areas.

    15. The four local board chairs will be in attendance at the committee meeting.

    Mori Impact Statement

    16. The Southern Initiative advocated to include two housing developments in the first tranche ofthe Special Housing Areas. The Tamaki Iwi Collective-led consortium for the Waimahia (Weymouth) Housing Development has now commenced earthworks. The first batch ofthese houses will be built by July 2014. This is a $100 million project over three years whichwill construct 282 affordable houses, most of which will be privately owned.

    17. The Kokiri Te Rahuitanga Trust papakainga housing development at Alexander Crescent inOtara is waiting on funding approval from central government.

    18. The Southern Initiative will be working with the Waimahia Housing development consortiumpartners in 2014 to facilitate social and health services, community development initiativesand apprenticeship training opportunities leading to employment for that community.

    General19. Progress reports will be provided to the Committee three times per year with the aim that by

    the end of the year the multi-sector Action Plan will be completed.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    9/119

    Item9

    Regional Strategy and Policy Committee

    05 December 2013

    The Southern Initiative Progress Report Page 9

    Attachments

    No. Title Page

    A The Southern Initiative Strategic Framework 11

    Signatories

    Authors John McEnteer - General Manager Southern Initiative

    Rebekah Stuart-Wilson - Principal Policy Analyst - Planning, Policies & Bylaws.

    Authorisers Penny Pirrit - Regional & Local Planning Manager

    Roger Blakeley - Chief Planning Officer

    Dean Kimpton - Chief Operating Officer

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    10/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    11/119

    AttachmentA

    Item9

    Regional Strategy and Policy Committee

    05 December 2013

    The Southern Initiative Progress Report Page 11

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    12/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    13/119

    Item1

    0

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 13

    Waste Management and Minimisation Plan Status Update Report

    File No.:CP2013/26278

    Purpose

    1. The purpose of this report is to provide the committee with a brief overview of the currentstatus of councils work in implementing the Auckland Waste Management and MinimisationPlan (WMMP). An overview of councils agreed WMMP work programme for 2014 and 2015on this project is also provided.

    Executive Summary2. The Auckland WMMP was approved by the governing body in June 2012, after extensive

    consultation with the public, key stakeholders and local boards.

    3. The vision of the plan is: to become the most liveable city in the world, Auckland will aim forthe long-term, aspirational goal of Zero Waste by 2040, turning its waste into resources.

    4. To help achieve this goal, the plan sets out a series of actions to be implemented by council.This report summarises the progress that has been made on key projects involved inimplementing the WMMP, including:

    the establishment of the Waste Minimisation and Innovation Fundadoption of the Solid Waste Bylaw and development of related waste controlsdevelopment and implementation of a comprehensive procurement plan to support themajor changes to kerbside waste collection services that were approved in the WMMPinitial work to develop a Resource Recovery Network (RRN) throughout the region.communication strategies and engagement activities to both prepare communities forchange and achieve our waste minimisation outcomes as defined in the WMMP

    5. The report also outlines which of these projects are likely to have major impacts on councils

    work programme throughout 2014 and 2015.

    Recommendation/sThat the Regional Strategy and Policy Committee:

    a) receive the Waste Management and Minimisation Plan Status Update Report.

    Discussion6. The Auckland Councils Waste Management and Minimisation Plan (WMMP) was approved

    by the governing body in June 2012, after extensive consultation with the public, keystakeholders and local boards.

    7. The vision of the plan is: to become the most liveable city in the world, Auckland will aim forthe long-term, aspirational goal of Zero Waste by 2040, turning its waste into resources.

    8. As a paradigm, zero waste is the complete opposite of sending waste to landfill sites. Itentails looking at the whole cycle of a resource, from how it is designed, why we buy it, howwe use it and then what happens when weve finished with it. Zero waste sees waste as aresource that can be used to create jobs and new products, and breathe new life into thingsthat would otherwise be thrown away.

    9. To help achieve our goal of zero waste, the plan also sets some bold targets. These are:to reduce the amount of domestic kerbside waste sent to landfill by 30% by 2018, from160 kg to 110 kg per capita per year.

    to reduce councils own in-house waste by 30% per capita by 2018to reduce total council and private sector influenced waste to landfill by 30% by 2027

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    14/119

    Item10

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 14

    10. To achieve this final target, council will have to work closely with the commercial sector ascouncil only directly influences approximately 17% of the waste stream.

    11. The WMMP identifies a series of key actions that will be needed to achieve these targetsand based on these, council officers have begun work on a series of major projects. Some ofthese projects, like establishing the Waste Minimisation and Innovation Fund (WMIF), havealready been completed successfully. For other projects, such as the procurement of new

    waste collection services, there is still a significant amount of work to be done. A summary ofprogress on each project is provided below, along with some insight into how they willimpact on councils future work programme for 2014 and 2015.

    The Waste Minimisation and Innovation Fund

    12. The WMIF is a grants scheme established under the WMMP to support initiatives that willhelp achieve the vision, targets and strategic objectives of the WMMP by minimising wasteto landfill. It is open to community groups, businesses, iwi, and educational institutions.

    13. The process for administering the fund was approved by the Regional Development andOperations Committee in February 2013. Since then officers have completed one successfulfunding round in April 2013, and have begun work on a second.

    14. The April 2013 funding round received 95 applications requesting total funding of $2.7million and awarded $495,783 out of a $500,000 funding pool. The second round of the fundclosed on 31 October 2013, and has received a further 65 applications. In both fundingrounds, officers have received relevant applications from a wide range of community groups,businesses and other organisations. Key topics include resource recovery enterprises,school organic systems, and technological innovations.

    15. Going forward, officers will continue to run two funding rounds a year. These consist of asmaller funding round in April, which is only open to small grant applications (less than$5,000) and distributes $25,000 in total and a larger funding round in October which is opento larger grant applications and distributes $475,000.

    Adoption of the Solid Waste Bylaw and related controls

    16. The Solid Waste Bylaw is a regulatory tool developed by council to help achieve the goals ofthe WMMP. It was adopted by Auckland Council in October 2012. As well as regulatingvarious aspects of waste management, such as the need for waste minimisation at events,the bylaw provides for council to create a series of detailed controls to regulate thecollection, transportation and disposal of waste within the Auckland region.

    17. In early 2013 council began work on developing the first controls under the bylaw. Thesecontrols, relating to the times and ways in which waste can be collected, and the levels ofcontamination allowed in refuse and recycling containers, were approved by the RegionalDevelopment and Operations Committee in September 2013. Further controls, on topicssuch as waste collection from multi-unit developments or the management of cleanfills and

    landfills, will be developed over the next two years. These controls will be developed inconsultation with the waste industry, local boards, the public and other key stakeholders tobecome operational in 2015.

    Major waste service changes

    18. The WMMP proposes that all Aucklanders should receive a regionally consistent level ofwaste collection services, which will contribute to achieving the goals of the WMMP. Theseinclude:

    Organics:Organic waste makes up 40% of the average Auckland rubbish bin. To helpdivert this waste from landfill, all Aucklanders living in urban areas will receive akerbside organics collection.

    Enhanced recycling:To increase recycling rates, all Aucklanders will receive a

    fortnightly collection of recycling in a larger bin. Typical bin size will be 240 litres (suchas those currently available in the legacy Auckland and Manukau City Council areas),with a choice from 140 to 360 litres.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    15/119

    Item1

    0

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 15

    Improved inorganics:An improved inorganics service will be provided to allAucklanders annually. Residents will make a booking in advance and have inorganicmaterial collected from their property, rather than from the kerb. This change willsignificantly increase the amount of material from the inorganics that can be reused orrecycled.User pays rubbish:A key objective of introducing a user pays rubbish system is to

    make people more accountable for the waste they produce. In line with this goal, afortnightly user pays rubbish collection will be offered to all Aucklanders. Typical binsize will be 120 litres, with a choice from 60 to 240 litres. Rural and Hauraki Gulf Islandresidents will have a choice of bins or bags.

    19. Under this system, households that respond to waste minimisation programmes andincrease their use of recycling and organic waste services should have lower costs for theircouncil-provided waste services.

    Procurement process

    20. A procurement plan for these major service changes was approved by the Tenders andProcurement sub-committee of council on 3 September 2013. Since then, two Requests forExpressions of Interest (REOIs) and a Request for Proposals (RFP) have been released bycouncil to the market, covering:

    The provision of refuse, recycling and organic collection servicesThe provision of organic waste processing servicesThe provision of solid waste disposal, transfer station, haulage and processingservices.

    21. Over the next 3 months, the following documents will be released to market:An REOI for the provision of inorganic collection servicesAn RFP for the provision of resource recovery centre operations services for WaiukuAn REOI for the supply, distribution and retrofitting of binsAn RFP for the development of a Radio Frequency Identification (RFID) system which

    will be used to place electronic tags in bins and record when they are emptied.22. Managing the procurement process and preparing for implementation of these contracts

    post July 2015 will be a major ongoing piece of work for the solid waste and procurementteams within council throughout 2014 and 2015.

    23. The implementation of some of these major waste service changes, especially theintroduction of a user pays refuse system, will also require many departments of council towork in a closely integrated fashion, including Communications and Public Affairs, CustomerService, Finance, and Information Services. A cross-departmental working group has beencreated to facilitate this integrated approach and is meeting regularly.

    Development of a Resource Recovery Network

    24. One key project identified in the WMMP was the need to establish a Resource RecoveryNetwork (RRN) for the Auckland region. This would consist of a network of facilities thatwould provide a convenient place for local residents and businesses to drop off their usedfurniture, clothes, whiteware, hazardous waste and other materials. In addition, recoveredmaterials from the inorganics collection service could also be dropped off at these facilities.These materials could then be recycled or reused, rather than being sent to landfill.

    25. Planning for the RRN is still underway but it is envisaged it would include:a small number of large Resource Recovery Parks focused predominantly oncommercial waste that would act as more substantial hubs of the networka larger number of smaller Community Recycling Centres (CRCs) focused on servinglocal households and businesses

    local Drop-off Depots for isolated areas or where there is limited space.26. These facilities would be spread across the region and could be run by businesses,

    community organisations, and iwi. They would create valuable opportunities for localemployment and enable large quantities of materials to be diverted from landfill.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    16/119

    Item10

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 16

    27. In the short-term, five council-owned sites have been identified as being priorities forredevelopment into resource recovery facilities from 2014. The sites approved in theProcurement Plan are the:1. Waiuku Transfer Station2. Waitakere Refuse and Recycling Centre3. Central isthmus site (location to be identified)

    4. Devonport Transfer Station5. Helensville Resource Recovery Centre

    28. It is envisaged that some of these community recycling facilities could be run as not-for-profitor social enterprises by community groups. Several local boards have also become involvedin funding or supporting feasibility studies for CRCs, and this may shape where othercentres are established in future.

    29. Council will take a holistic approach to the procurement process for the RRN, includingconsideration of the social and environmental benefits of different providers.

    Communication strategy and community engagement to prepare for change

    30. Council is in the process of finalising a region-wide communications strategy that will support

    the implementation of the major waste service changes proposed in the WMMP. Thiscommunications plan will be crucial to ensuring that Aucklanders understand what they needto do when new services, such as the kerbside organics collection, are introduced. It willalso be vital in ensuring that Aucklanders feel inspired to help achieve the aspirational goalof Zero Waste by 2040.

    31. In line with the priority areas identified in the WMMP, a tailored community engagement anddevelopment approach is also being used to support communities who are likely toexperience the greatest challenges in adapting to a user pays rubbish collection system. Thefocus is particularly on areas where there are vulnerable communities, such as SouthAuckland, the Maungakiekie-Tamaki area, and the Hauraki Gulf Islands.

    32. In these areas there has been engagement with over 800 residents, community leaders,

    organisations and businesses to determine the barriers and constraints to wasteminimisation and what will motivate people to change. This process is revealing theenthusiasm of residents and organisations to develop community-led solutions to wasteissues. Some key themes that will inspire people to engage include:

    Growing food, gardening and compostingNeighbourhood solutions and championsCommunity pride and safetyCreativity, fun and competitionsOpportunities for employment, training and social enterprise.

    33. As a result of the engagement process a number of initiatives and community led projectsare underway, for example Otara Health Charitable Trust is training street leaders from their

    125 Neighbourhood Support Groups to become waste champions.

    Waste minimisation programmes

    34. A wide range of waste minimisation programmes, which support the goals of the WMMP, arebeing delivered by Auckland Council. Highlights of this work are described below.

    Engagement with Maori and mana whenua:Council is working with Ngati Whatua oOrakei Trust Board on implementing a Zero Waste programme in 12 marae.WasteWise Schools programme:Council is supporting schools around the region toreduce their waste25 schools have graduated from the two year long WasteWiseprogramme and another 57 are actively enrolled.Schools outreach:In the last financial year, council provided 191 schools and

    kindergartens with educational resources and practical support to reduce waste.Educational visits to Waste Minimisation Learning Hubs:Over 10,000 Aucklandersparticipated in a free interactive waste education class and site tour at one of our threelearning centres in the last financial year.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    17/119

    Item1

    0

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 17

    Zero Waste Events:Council is working with the Auckland Zero Waste Association, acommunity partner, to support 15-20 events around the region to minimise their wastein the summer events season from September 2013 to April 2014.

    Cloth nappy programme:Council held workshops with more than 677 attendees toencourage them to use cloth rather than disposable nappies in the last financial year.Create Your Own Eden composting courses:Over the last financial year, 79 free

    composting workshops were held around the region with 1,585 participants.Composting for Communities:In the last financial year, 450 participants from diverseethnic communities attended 16 courses to learn about composting, bokashi and othermethods of waste reduction from community tutors.Litter prevention strategy: Council has signed a Memorandum of Understanding withkey stakeholders, such as Keep New Zealand Beautiful, the New Zealand TransportAgency and Kiwirail to develop a litter prevention strategy.

    Conclusion

    35. In summary, council has made good progress throughout 2013 towards implementing theWMMP. Some major projects included in the WMMP, such as the development of theWMIF, have already been completed and have become part of the councils business as

    usual work programme.

    36. Going forward into 2014 and 2015, implementation of the WMMP will continue to be ademanding task. In particular, the implementation of the major changes in waste servicesthat are scheduled to begin after July 2015 will be a major part of councils work programmeover the next three years. These changes will impact on almost all Auckland residents andso it is vital to ensure they are delivered as efficiently and effectively as possible. Thedevelopment and delivery of the RRN will also be a major project that will require anintegrated cross-departmental approach.

    Consideration

    Local Board Views37. Local boards receive regular reports on councils progress towards implementing the WMMP

    through the Infrastructure and Environmental Services quarterly update reports to the localboards. Local boards have also expressed support for many of the projects involved inimplementing the WMMP. For example, a number of boards have become involved infunding scoping or business studies for Community Recycling Centres.

    Maori Impact Statement

    38. It is recognised that the tangata whenua world view reflects the WMMPs emphasis on anintegrated life cycle approach to the management of natural resources and the concepts ofzero waste, waste recovery and waste minimisation. Some mana whenua and other Maori

    organisations have already indicated a strong interest in being involved in achieving theWMMPs objectives, through engagement on projects such as the RRN. Moving forward, it isenvisioned that many WMMP projects will provide opportunity for active Maori involvementas council moves towards the more holistic management of natural resources.

    General

    39. N/A

    Implementation Issues40. There are no legal or legislative implications arising from the activities detailed in this report.

    All programmes and activities are within budget for Auckland Council Annual Plan and Long

    Term Plan documents.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    18/119

    Item10

    Regional Strategy and Policy Committee

    05 December 2013

    Waste Management and Minimisation Plan Status Update Report Page 18

    AttachmentsThere are no attachments for this report.

    Signatories

    Authors Lucy Hawcroft - Relationship Advisor

    Parul Sood - Manager Waste PlanningIan Stupple, Manager Solid Waste

    Authorisers John Dragicevich - Manager Infrastructure and Environmental Services

    Dean Kimpton - Chief Operating Officer

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    19/119

    Item1

    1

    Regional Strategy and Policy Committee

    05 December 2013

    Delegation of decision making on the Waste Minimisation and Innovation Fund Page 19

    Delegation of decision making on the Waste Minimisation andInnovation Fund

    File No.:CP2013/26573

    Purpose1. To seek delegation for the Environment, Climate Change and Natural Heritage Committee to

    make decisions on applications to the Auckland Council Waste Minimisation and InnovationFund (WMIF) for medium ($5,000 to $25,000) and large (over $25,000) grant applications.

    Executive Summary2. The Waste Minimisation and Innovation Fund is a grant scheme which was established in

    February 2013 as one of the key initiatives of the Auckland Council Waste Management andMinimisation Plan (WMMP).

    3. The aim of the fund is to support initiatives that will help achieve the vision, targets and

    strategic objectives of the WMMP through reducing waste to landfill. The fund has a specificfocus on seed funding new initiatives, including developing business and community basedresource recovery centres and programmes.

    4. The fund has $500,000 to distribute annually. This funding comes from the waste levy whichis central government funding allocated to local government authorities to spend onachieving waste minimisation outcomes.

    5. This report asks the Regional Strategy and Policy Committee to delegate decision makingon medium ($5,000 to $25,000) and large (over $25,000) applications to the fund to theEnvironment, Climate Change and Natural Heritage committee.

    Recommendation

    That the Regional Strategy and Policy Committee:

    a) allocate the budget and delegate the decision-making responsibility for applicationsfor medium ($5,000 to $25,000) and large (over $25,000) grants from the WasteMinimisation and Innnovation Fund to the Environment, Climate Change and NaturalHeritage Committee.

    DiscussionBackground

    6. The Waste Minimisation and Innovation Fund is funded through the national waste levy.These are funds allocated by central government to local body authorities to enable them topromote or achieve waste minimisation as set out in the Waste Management andMinimisation Plan (WMMP), in accordance with section 47 of the Waste Minimisation Act2008.

    7. The Waste Minimisation Act also requires each local body authority to develop a local wastemanagement and minimisation plan.

    8. In accordance with these requirements, the Auckland Council WMMP was adopted on 20June 2012.

    9. The vision of the WMMP: to become the most liveable city in the world Auckland will aim forthe long-term, aspirational goal of Zero Waste by 2040 by turning its waste into resources isdirectly linked with the Auckland Plan target to achieve zero waste to landfill by 2040. The

    WMMP has three targets and eight strategic objectives which work towards the zero wastevision. Some of the objectives of the WMMP are to target priority waste streams, reduceharm to the environment and improve efficiency of resource use.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    20/119

    Item11

    Regional Strategy and Policy Committee

    05 December 2013

    Delegation of decision making on the Waste Minimisation and Innovation Fund Page 20

    10. To help achieve these goals, the Governing Body also resolved to establish a grantsscheme as part of the waste policy and operational actions of the WMMP. They specifiedthat the fund should function as follows:

    Part C Action Plan: C9. Grants scheme. That the Governing Body supports:i. An annual grants scheme, noting the potential of a funding partnership with the

    government waste levy fund (Ministry for the Environment) in some instances.

    ii. The grants scheme being open to business, the community and voluntary sector andMaori organisations.

    iii. The initial set up of a small political subgroup of Council to allocate funds under thegrants scheme.

    iv. The criteria for the Fund to be focused on the seeding of new initiatives includingdeveloping business and community based resource recovery centres andprogrammes.

    11. In accordance with this, council officers developed the Waste Minimisation and InnovationFund. A proposal for how this fund should be administered was approved by the RegionalDevelopment and Operations Committee of council in February 2013.

    Overview of Waste Minimisation and Innovation Fund

    12. The fund aims to either complement and enhance existing programmes, address gaps oropportunities for waste minimisation, or result in a significant expansion in the scope orcoverage of existing activities.

    13. It prioritises applications under four key funding outcome areas:1. Resource recovery initiatives and facilities2. Commercial waste3. Organic waste4. Community action and behaviour change.

    14. These outcome areas are waste minimisation priorities for the Auckland region and linkclosely with, and complement, other actions in the WMMP.

    15. The outcome areas for the fund may change each year in line with implementation workcarried out under the WMMP. The decision was made that these outcome areas will bereviewed each year to ensure they are consistently aligned with the WMMP implementationwork.

    16. Only projects that promote or achieve waste minimisation are eligible for funding through theWMIF. Waste minimisation covers the reduction of waste, and the reuse, recycling andrecovery of waste and diverted material. The fund does not cover projects that focus onwaste disposal or on the treatment of waste for disposal or clean ups. It also does not coverprojects that do not involve waste generated from within the Auckland region.

    17. Successful applications will be assessed against the following weighted criteria:

    Waste minimisation - 40 percentValue for investment - 20 percentAlignment with the strategic objectives and guiding principles of the WMMP - 15 percentCommunity participation and community benefit - 20 percentQuality of proposal - 5 percent.

    18. The fund will cover up to 50 percent of the cost of each project. Applicants need todemonstrate adequate sources of additional funding from their own or other resources, oroffer value in kind.

    19. The scheme has an annual funding pool of $500,000. If funds are not fully allocated in oneyear they will roll over into the following year.

    20. The sub-categories for funding allocation are:Small and simple projects (open twice per year) : Grants from $250 to $5,000Medium projects (open once per year) : Grants over $5,000 and up to $25,000Large projects (open once per year) : Grants over $25,000

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    21/119

    Item1

    1

    Regional Strategy and Policy Committee

    05 December 2013

    Delegation of decision making on the Waste Minimisation and Innovation Fund Page 21

    Decision making processes for the fund

    21. A total of $50,000 is allocated to the small projects sub-category in any year to be allocatedin two funding rounds (held in April and October).

    22. Local board members are asked to give input and local feedback on small grant applicationsbefore a final decision is made by the Tier Four Manager Solid Waste (who is the delegated

    decision maker for these applications).23. There is one funding round per year for medium and large grants which can distribute a total

    value of $450,000 (held in October). The maximum amount for the large projects is $50,000per project, but larger grants might be considered on merit at the discretion of the council.

    24. These applications are considered by subject matter experts who then make arecommendation to the relevant committee of council as to which grants should be funded.The final decision on medium and large grants is made by a committee or sub-committee ofthe governing body which has been delegated this responsibility.

    25. This report recommends that allocation of this budget and delegation over decision makingfor these medium and large grants should be allocated to the Environment, Climate Changeand Natural Heritage committee. As the committee of council that has primary responsibility

    for dealing with matters relating to the natural environment, this committee seems the mostappropriate decision making body to be responsible for the fund.

    26. This committee is also responsible for decision making on the Environmental InitiativesFund. This is a similar fund, in that it supports Aucklanders to be actively engaged in theenhancement and conservation of local environments and heritage.

    Consideration

    Local Board Views

    27. Local board members will be asked to give input and feedback on small grant applications to

    the fund from their local area. This feedback will help inform decision making over the smallgrant decision making, delegation for which is allocated to the Tier Four Manager SolidWaste.

    Maori Impact Statement

    28. As noted in the WMMP the tangata whenua world view reflects the WMMPs emphasis onan integrated life cycle approach to the management of natural resources and the conceptsof Zero Waste, waste recovery and waste minimisation. The WMIF provides funding to helpachieve the targets of the WMMP which longer term will create a closer relationship betweenhumans and the natural environment, while fostering new economic opportunities.

    29. Some Maori organisations have already indicated a strong interest in being involved in

    helping achieve the WMMPs objectives. The WMIF provides one potential opportunity foractive Maori involvement in starting to move towards the more holistic management ofnatural resources and the longer term benefits of designing differently to minimise waste.

    General

    30. The recommendations contained within this report fall within the Committees delegatedauthority.

    31. This report does not trigger the Significance Policy.

    Implementation Issues32. No specific implementation issues have been identified.

    33. Finance and resourcing requirements for the delivery of the WMIF for the next three yearsare within current budgets provided in the 2012-2022 Long-Term Plan.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    22/119

    Item11

    Regional Strategy and Policy Committee

    05 December 2013

    Delegation of decision making on the Waste Minimisation and Innovation Fund Page 22

    34. Regular reports on the outcomes of the fund will be provided to the proposed WMIF sub-committee of the Regional Strategy and Policy Committee.

    35. There are no specific legal implications relating to this decision

    AttachmentsThere are no attachments for this report.

    Signatories

    Authors Lucy Hawcroft - Relationship Advisor

    Ian Stupple, Manager Solid Waste

    Parul Sood - Manager Waste Planning

    Authorisers John Dragicevich - Manager Infrastructure and Environmental Services

    Dean Kimpton - Chief Operating Officer

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    23/119

    Item1

    2

    Regional Strategy and Policy Committee

    05 December 2013

    Strategy and Policy Forward Programme: Quarterly Monitoring Report Page 23

    Strategy and Policy Forward Programme: Quarterly Monitoring Report

    File No.:CP2013/26522

    Purpose

    1. This report provides a quarterly progress update on the Strategy and Policy ForwardProgramme.

    Executive Summary2. The Auckland Plan Committee adopted the Strategy and Policy Forward Programme in

    December 2012 to ensure that the council focuses on those areas of greatest strategicpriority. The Committee requested quarterly status updates on the programme and thisreport provides an update for September-December 2013.

    3. Three documents have been adopted this quarter: Children and Young Peoples StrategicAction, Public Art Policy, and Sport and Recreation Strategic Action Plan.

    Recommendation/sThat the Regional Strategy and Policy Committee:

    a) note the Strategy and Policy Forward Programme, and progress being made

    b) agree to review and reconfirm the Strategy and Policy Forward Programme for thenext three years at the committee meeting in March 2014, and to receive regularquarterly monitoring reports in June, September and December thereafter in line withthe previous Auckland Plan Committee resolution (CP2013/26522).

    DiscussionBackground

    4. The Strategy and Policy Forward Programme contains 26 statutory and non-statutorydocuments. The programme has been designed to ensure that the council focuses on thoseareas of greatest strategic priority. In doing so, the programme helps to give electedmembers certainty on the key work required to implement the Auckland Plan.

    5. It is recommended that the Committee uses the March 2014 meeting to review theprogramme overall, decide if any changes need to be made to reflect current priorities, andreconfirm the programme for the next three years.

    Progress Reporting

    6. Attachment A presents a high-level overview of the context within which the forward

    programme is developing and summarises the timelines of some of councils key strategicdocuments and work programmes. Attachment B provides a quarterly summary of progresson the items in the forward programme.

    7. The following documents were adopted this quarter:

    Children and Young Peoples Strategic Action Plan (September 2013)Public Art Policy (September 2013)Sport and Recreation Strategic Action Plan (September 2013).

    8. Eighteen items on the forward programme have been adopted and are being implemented.Most of the remaining documents that are still to be adopted are on track and areprogressing well.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    24/119

    Item12

    Regional Strategy and Policy Committee

    05 December 2013

    Strategy and Policy Forward Programme: Quarterly Monitoring Report Page 24

    Consideration

    Local Board Views

    9. A copy of the adopted forward programme was sent to all local boards and a briefingprovided to local board chairs in 2012. A copy of this update report will be sent to all localboards for their information. A series of briefings for local boards on the forward programme

    is planned for the first quarter of 2014.

    Maori Impact Statement

    10. The development and implementation of documents within the forward programme includesconsideration of how the work will contribute to the delivery of Mori outcomes and theAuckland Plan transformational shifts including Significantly lift Mori social and economicwell-being. Strategy and policy leads are expected to ensure that the goals of the MoriResponsiveness Framework are integrated into strategy and policy development. Corporateperformance standards are in place in order to ensure that documents are drafted inconsultation with Mori and include Mori outcomes. Officers areexpected to consider theMori Plan for Tmaki Makaurau as part of policy development. A copy of this report will be

    sent to the Independent Mori Statutory Board for its information.

    Implementation Issues11. Development and implementation of items on the forward programme requires ongoing

    resource. Adopted strategies and policies remain on the programme to reflect their role inimplementing the Auckland Plan and the significant activities associated with theirimplementation.

    Attachments

    No. Title Page

    A Strategy and Policy Forward Programme: Quarterly Progress Update(September - December 2013)

    25

    Signatories

    Authors Craig Glover - Principal Strategy Analyst

    Authorisers Grant Barnes - Manager - Auckland Strategy and Research

    Roger Blakeley - Chief Planning Officer

    Dean Kimpton - Chief Operating Officer

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    25/119

    AttachmentA

    Item1

    2

    Regional Strategy and Policy Committee

    05 December 2013

    Strategy and Policy Forward Programme: Quarterly Monitoring Report Page 25

    CONTEXT OVERVIEWOVERARCHING STRATEGICDOCUMENTS

    CURRENT STATUS

    Auckland Plan The Auckland Plan was adopted in 2012 and sets the strategic direction forcouncils implementation plans including items in the Strategy and PolicyForward programme.

    Local Board Plans Local Board Plans describe the local communities aspirations, and theirpreferences and priorities for the next three years and beyond. The plans informand influence the development of the Long Term Plan and will be reviewed overthe next financial year in order to inform the 2015-2025 Long Term Plan.

    Proposed AucklandUnitary Plan

    The draft Auckland Unitary Plan was released for public engagement in March2013.

    The Proposed Auckland Unitary Plan was notified on 30 September 2013 and isopen for submissions until 28 February 2014.

    Following further submissions, hearings and appeals it is expected that theUnitary Plan will become operative in 2016.

    Long Term Plan Councils first Long Term Plan was adopted in 2012. This covers the period2012 to 2022.

    Planning is underway in preparation for the delivery of the 2015-2025 Long TermPlan.

    OTHER KEY WORKPROGRAMMES

    CURRENT STATUS

    Bylaw ReviewProgramme

    A bylaw review programme is in place to bring together the 158 existing bylawsmade by the legacy councils and create consistent rules across Auckland.

    So far over 70 legacy bylaws have been revoked with new bylaws adoptedcovering: Dog Management; Local Dog Access Areas; General Administration;Offensive Trades; Solid Waste; Solid Waste Controls; Transport (Roads,

    Auckland Transport); Food Safety; Election Signs (Auckland Transport); Healthand Hygiene; Public Safety and Trade Waste.

    The following bylaws are expected to be adopted or have statutory consultationcompleted between 2013 and 2014: Navigation Safety, Personal FlotationDevices (Life Jackets), Outdoor Fires, Stormwater Management, Signs, AlcoholLicensing Fees, Alcohol Controls (Liquor Bans), Animal Management, AirQuality, Boarding Houses and Hostels, Cemeteries and Crematoria, CommercialSex Industry.

    The following bylaws are expected to be adopted between 2014 and 2016:Street Trading, Construction and Development, Onsite Wastewater, HazardousSubstances, Orakei Basin, Recreation and Cultural Facilities, Transport (Parks

    etc), Water Supply / Wastewater, Wharfs and Marinas.Local Area Plans Local Area Plans for Mangere-Otahuhu and Hibiscus & Bays have been

    completed.

    Work is commencing on Devonport-Takapuna and Otara-Papatoetoe AreaPlans.

    A report is being prepared for the Auckland Development Committee which willset out a revised methodology and sequence for area plans.

    Financial Strategies andPolicies

    As part of the Long Term Plan, council adopts a number of financial strategiesand policies including: Airport Shareholding Policy; CCO Accountability Policy;Financial Strategy; Public Private Partnership Policy; Local Board FundingPolicy; Significance Policy; Rates Transition Management Policy; Rating Policy;

    and Revenue and Financing Policy

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    26/119

    AttachmentA

    Item12

    Regional Strategy and Policy Committee

    05 December 2013

    Strategy and Policy Forward Programme: Quarterly Monitoring Report Page 26

    STRATEGY AND POLICY FORWARD PROGRAMME PROGRESSUPDATE: DASHBOARD VIEW

    FORWARD PROGRAMME ITEM ITEMSTATUS

    1.Children and Young Peoples Strategic Action Plan

    2.Alcohol Harm Reduction Programme

    Alcohol Harm Reduction Strategy

    Alcohol Control Bylaw

    Local Alcohol Policy

    3.Smokefree Policy

    4.Community Development Strategic Action Plan

    5.Community Funding Policy

    6.Gambling Venues Policy

    7.Libraries Future Direction

    8.Family and Sexual Violence Strategic Action Plan

    9.MoriResponsiveness Framework

    10.Arts and Culture Strategic Action Plan

    11.Events Policy

    12.Public Art Policy and Guidelines Work Programme

    13.Historic Heritage Action Plan

    14.Sport and Recreation Strategic Action Plan

    15.Economic Development Strategy

    16.Environment Strategic Action Plan17.Natural Hazard Risk Management Action Plan

    18.Marine Spatial Plans

    19.Waste Management and Minimisation Plan

    20.Indigenous Biodiversity Strategy

    21.Energy and Climate Change Mitigation Strategic Action Plan

    22.Housing Action Plan

    23.Community Facilities Network Plan

    24.Water Strategic Action Plan

    25.Public Open Space Strategic Programme

    Open Space Strategic Action Plan

    Open Space Levels of Provision Targets

    Open Space Acquisition and Divestment Policy KEY

    Parks and Reserves Management Plan methodology Adopted

    On-track

    Weed Management Policy Minor (6 months)slippage likely

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    27/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page27

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    1.ChildrenandYoungPeoplesS

    trategic

    ActionPlan

    AdoptedSeptember2013

    DocumentadoptedinSeptember2013.

    Stageoneimplementationhasaregionwidefocusandisunderwa

    y.TheYouth

    AdvisoryPanelhasestablishedgroupsofyoungpeopletosupporteachofthe

    sevengoalsofthe

    actionplan.

    Stagetwoimplementationwillbefocusedonworkingwithlocalbo

    ards,youth

    councilsandcomm

    unityorganisationstodeveloplocalactionspla

    ns.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    2.AlcoholHarmReductionProgramme

    AlcoholHarmReductionStrategy

    AdoptedJuly2012

    AlcoholControlBylaw

    OriginalexpectedadoptionJanuary

    -March

    2014

    Revisedexpectedadoptiondate:

    August2014

    LocalAlcoholPolicy

    ExpectedadoptiondateOctober-D

    ecember

    2014

    AlcoholHarmReduc

    tionStrategy

    StrategyadoptedinJuly2012.

    ImplementationreviewtobereportedtoCommitteeduringthe201

    3/14financial

    year.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    AlcoholControlByla

    w

    Areviewiscurrentlyunderwayofmorethan1800existingalcohol

    controlareas.

    Thisworkisbeing

    carriedoutinpartnershipwiththePoliceandotheragencies.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    LocalAlcoholPolicy

    Projecttimelineap

    provedbytheGoverningBodyon31January2

    013.

    Stakeholderandcommunityengagementondiscussiondocumentcompleted.

    Workcommencing

    tointegratefeedbackintofinaldraft.

    Legislativechange

    sareexpectedfrom18Decemberandadrafto

    fthepolicywith

    thesechangesincorporatedwillbebroughttoCommitteeinFebru

    ary.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    3.SmokefreePolicy

    AdoptedJuly2013

    DocumentadoptedinJuly2013.

    Implementationplancompleted.Implementationistobea3stage

    rollout.

    Implementationof

    phase1hascommencedandthisincludesmos

    tparksand

    councilfacilities.P

    hase2and3rolloutincludesmalls,towncentres,shared

    spaces,outdoordiningandbeaches.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    4.CommunityDevelopmentStrategic

    ActionPlan(ThrivingCommunities)

    DocumentadoptedinJune2013

    Currentfocusison

    consultingwithcommunitiesandlocalboardsanddeveloping

    theimplementationplanforyearone.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    28/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page28

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    AdoptedJune2013

    5.CommunityFundingPolicy

    Expectedadoptiondate:

    July-September2014

    Financialinvestiga

    tionintoCouncilsinvestmentincommunityservicesexpectedto

    becompletedbyD

    ecember2013forpresentationinearly2014.

    Followingthisinve

    stigationthecommunityfundingpolicywillbere

    -draftedfor

    consultationwiththegoverningbody,localboardsandotherstake

    holders.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    6.GamblingVenuesPolicy

    AdoptedJuly2013

    DocumentadoptedJuly2013.

    Implementationof

    policyunderway.

    Developmentofanon-regulatorygamblingharmreductionframew

    orkto

    supplementandsupportthewiderpolicyobjectivesalsounderway

    .

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    7.LibrariesFutureDirections

    AdoptedDecember2012

    DocumentadoptedinDecember2012andlaunchedinMarch201

    3.

    Developmentofth

    eTeKauroaimplementationplaniscurrentlyun

    derwaywithan

    expecteddeliverydateofMarch2014.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    8.FamilyandSexualViolenceStr

    ategic

    ActionPlan

    Expectedadoptiondate:

    December2014

    Researchisunderwaytosupportthedevelopmentofthismulti-sectoractionplan.

    Theproposedapproachtothedevelopmentoftheactionplanwill

    bepresentedto

    familyandsexualviolencesectorrepresentativesandtheAucklan

    dSocialSector

    LeadershipGroup

    inDecemberfortheirendorsement.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

    9.MoriResponsivenessFramew

    ork

    AdoptedDecember2012

    MoriResponsivenessFrameworkcompletedandadoptedbythe

    governingbody

    inDecember2012

    .

    Anumberofprogrammesareindevelopmentincluding:theMori

    Land

    Programme,TeReo,andRelationshipAgreementsprogramme

    Workiscontinuing

    tointegratetheMoriResponsivenessFramew

    orkthroughout

    Council.

    10.ArtsandCultureStrategicActionPlan

    Expectedadoptiondate:

    June2014

    Targetedstakeholderengagement,includingwithManaWhenuaisexpectedtobe

    completedinDece

    mberwithadraftofthedocumentgoingtoCom

    mitteein

    February2014.

    Arts,CultureandEvents

    Committee

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    29/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page29

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    11.EventsPolicy

    AdoptedMay2013

    DocumentadoptedMay2013.

    TheEventsPolicy

    isbeingusedintheassessmentofregionaleve

    ntsfunding

    applications.

    Arts,CultureandEvents

    Committee

    12.PublicArtPolicyandGuidelin

    esWork

    Programme

    Expectedadoptiondate:

    September2013

    Policycompleteda

    ndadoptedbytheRegionalDevelopmentandOperations

    CommitteeinSeptember2013

    Implementationplanningisunderway.

    Arts,CultureandEvents

    Committee

    13.HistoricHeritageActionPlan

    Expectedadoptiondate:

    March2014

    Theactionplanha

    sbeendraftedandpresentedtotheHeritageAdvisoryPanelfor

    comment.

    Actionsarecurrentlybeingreviewedandconsolidated.

    UrbanandRural

    DevelopmentCommittee

    14.SportandRecreationStrategicAction

    Plan

    AdoptedSeptember2013

    DocumentadoptedSeptember2013.

    Finalratificationby

    AucklandSportandRecreationReferenceGro

    upandtheir

    memberorganisationsistakingplacethroughDecemberandase

    ctorwidelaunch

    isplannedforearly2014.

    Animplementation

    frameworkiscurrentlybeingdevelopedwhichincludesthe

    establishmentofa

    governancestructurewithrepresentativesfrom

    leadagencies.

    Parks,RecreationandSpo

    15.EconomicDevelopmentStrategy

    AdoptedJuly2012

    StrategyadoptedJuly2012.

    Implementationisontrack.Quarterlyprogressreportshavebeen

    providedandan

    annualimplementationreportreportedtotheRegionalDevelopme

    ntand

    OperationsCommitteeinSeptember2013.Highlightsinclude:the

    establishmentof

    thestrategyImplementationCoordinationGroupcomprisingseniorofficialsfrom

    government,ATEE

    DandAucklandCouncil;thegovernmentannouncementofa

    jointbusinessplan

    fortheCityRailLink;supportingruralandultrafastbroadband

    deployment;estab

    lishmentoftheAucklandTertiaryEducationNetwork;

    developmentofyo

    uthskillsandtransitionsinitiatives;launchofadomestictourism

    campaignandagrowthinAucklandsmajoreventportfolioandrecognitionatthe

    InternationalSportsEventManagementAwards.

    EconomyRuralandUrb

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    30/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page30

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    16.EnvironmentStrategicAction

    Plan

    Expectedadoptiondate:

    July-September2014

    Businesscaseofthedocumenthasbeenconfirmedanddetailedplanningis

    underway.TheplanwillfocusontheAucklandPlanTransformationalShiftof

    environmentalactionandgreengrowth.

    Internalengageme

    ntacrossCouncilandCCOsonenvironmentalactionswillbegin

    in2014,followedb

    yexternalengagement.

    Environment,Climate

    ChangeandNatural

    Heritage

    17.NaturalHazardRiskManagem

    ent

    ActionPlan

    Expectedadoptiondate:

    November2015

    Detailedprojectplanninghasbeencompletedandtheprojectexecutionplanwas

    signedoffinJulyb

    ythesteeringgroupandprojectsponsor.

    TheprojectwasofficiallylaunchedandprojectworkcommencedinAugust.

    Thefirststagefocusesonthecurrentstateofnaturalhazardriskm

    anagementin

    AucklandCouncilinparticularfocusingon:legislationandinformation;risk

    managementtools

    andriskassessment.

    CivilDefenceand

    EmergencyManagement

    Environment,Climate

    ChangeandNatural

    Heritage

    18.MarineSpatialPlans

    Expectedadoptiondates:

    HaurakiGulfMSPandKaiparaMSP

    March

    2015,ManukauandWestCoastMS

    Psin2017

    TheHaurakiGulfM

    arineSpatialPlanproject(SeaChange)was

    officially

    launchedbytheM

    inisterofConservationandsteeringgroupco-chairsin

    September2013.

    Aprojectboardan

    dprojectmanagementteamhasbeenestablish

    edandjoint

    forumsheldinOctober2013toidentifystakeholdergroups.

    Widerpublicawarenessraisingandearlystakeholderengagemen

    tisduetotake

    placein2014.

    Workiscontinuing

    ontheIntegratedKaiparaHarbourManagementGrouptoscope

    outthemarinespa

    tialplanningcomponentofthisworkstreaminpreparationforthe

    KaiparaHarbourM

    arineSpatialPlan.

    Environment,Climate

    ChangeandNatural

    Heritage

    19.WasteManagementandMinim

    isation

    Plan

    AdoptedJune2012

    TheplanwasadoptedinJune2012.

    Sinceadoptionthe

    focushasbeenonimplementationandanumb

    erofactions

    havebeenprogres

    sedincludingthedevelopmentofaprocuremen

    tplanforthe

    changestowastecollectionservices.Afullimplementationupdatewasreportedto

    theRegionalDeve

    lopmentandOperationsCommitteeinSeptemb

    er2013.

    Pleasenotethatprogressonthisdocumentisthesubjectofaseparateagenda

    itemforthe5Dece

    mberRegionalStrategyandPolicyCommittee.

    Environment,Climate

    ChangeandNatural

    Heritage

    20.IndigenousBiodiversityStrategy

    AdoptedApril2012

    ThisstrategywasadoptedinApril2012.

    ImplementationprogressisontrackandwaslastreportedtotheP

    arks,Recreation

    andHeritageForuminNovember2012.Thestrategyisbeingdeliveredthrougha

    seriesofworkingg

    roups.

    Environment,Climate

    ChangeandNatural

    Heritage

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    31/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page31

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    Astocktakeofexis

    tingworkprogrammeshasrecentlybeencompleted,a

    biodiversityresearchprospectushasbeendraftedandthedevelopmentofa

    communicationstrategyhasbeeninitiated.

    21.EnergyandClimateChangeM

    itigation

    StrategicActionPlan(AucklandE

    nergy

    ResilienceandLowCarbonActionP

    lan)

    Expectedadoptiondate:

    June2014

    Thedraftactionpla

    nwasdiscussedwithCouncillorsandlocalboa

    rd

    representativesinJune.

    Recentfocushasb

    eenontheimplementationofearlyCouncilactions,completion

    oftechnicalanalysisandtargetedengagementofkeytechnicalsta

    keholders.

    TheproposeddraftActionPlan,governancearrangementsandtec

    hnicalanalysis

    willbediscussedw

    ithCouncillorsandlocalboardrepresentativeson12December,

    priortoseekingits

    adoptionbyCommitteeinFebruaryforthepurp

    oseofwider

    publicengagementinMarch2014.

    Environment,Climate

    ChangeandNatural

    Heritage

    22.HousingActionPlan

    Stage1adoptedinDecember2012

    Currentfocushasbeenondeliveringthe32actionsinstage1oftheHousing

    ActionPlanthatwasadoptedinlate2012.Crosscouncilprojectte

    amsforeach

    workstreamhaveb

    eensetupandthemajorityoftheactionsareu

    nderway.

    TheHousingProje

    ctOfficehasbeenestablishedasaconsequenceoftheHASHA

    legislationandHousingAccordandactionplandeliverynowsitsw

    ithintheHPO.

    Thisimpactsupon

    theadoptionofthescopeofStage2oftheactionplanand

    somepartsofStag

    e1.

    ItisexpectedthatanupdatereportonthescopeofStage2willbe

    reportedto

    Committeeinthefirstquarterof2014.

    UrbanandRural

    DevelopmentCommittee

    23.CommunityFacilitiesNetwork

    Plan

    Originalexpectedcompletionofstage1:

    October2013

    Revisedexpectedcompletionofstage1:

    March2014

    Originalexpectedadoptionofstage

    2:

    July2014

    Revisedexpectedcompletionofstage2:

    December2014

    Phaseone(analys

    isofcurrentstate)ofthisworkisprogressingandduefor

    completionbyDec

    ember2013forpresentationtolocalboardsandgoverningbody

    infirstquarterof2014.

    Phasetwo(longte

    rmfutureprovisionplanning)iscontingentupon

    completionof

    stageone.DraftnetworkplanisplannedtobecompletedbyAugu

    st2014(toallow

    anybudgetimplica

    tionstoalignwithLTPprocess),withfinalplanduebyendof

    2014.

    CommunityDevelopment,

    SafetyandSocial

    Infrastructure

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    32/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page32

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    24.WaterStrategicActionPlan

    Expectedadoptiondate:

    July-September2015

    Thisdocumentanditsbusinesscaseiscurrentlybeingscoped.

    Environment,Climate

    ChangeandNatural

    Heritage

    PhysicalInfrastructure

    Committee

    25.PublicOpenSpaceStrategic

    Programme

    OpenSpaceStrategicActionPlan

    AdoptedSeptember2013

    OpenSpaceLevelsofProvisionT

    argets

    Expectedadoptiondate:

    July2014

    OpenSpaceAcquisitionandDive

    stment

    Policy

    AdoptedJune2013

    ParksandReservesManagementPlan

    methodology

    Expectedadoptiondate:June2014

    OpenSpaceStrategicActionPlan

    Documentadopted

    inSeptember2013

    Mostshorttermac

    tionsareinprogress.Animplementationmonitoringreportwill

    bepresentedtotheParks,SportandRecreationCommitteeinearly2014

    Parks,RecreationandSpo

    OpenSpaceLevelso

    fProvisionTargets

    Aregionwidenetworkanalysishasbeencompletedandinitialdraf

    ttargetsand

    methodologywere

    reportedtotheParksandHeritageForum.The

    refineddraft

    targetsandmethodologyareduetobereportedtotheParks,SportandRecreation

    Committeeandloc

    alboardsinearly2014.

    Parks,RecreationandSpo

    OpenSpaceAcquisitionandDivestmentPolicy

    Documentadopted

    inJune2013

    Policyisinforming

    ongoingdecisionswithregardtoopenspaceac

    quisitions.

    Parks,RecreationandSpo

    ParksandReserves

    ManagementPlanmethodology

    Collationofexistingreservemanagementplanscompleteandmappingofexisting

    managementplansisongoing.

    Initialengagement

    withlocalboardscomplete.

    Proposalforfuture

    reservemanagementplanningtobepresented

    tolocalboards

    andParks,Sporta

    ndRecreationCommitteeinearly2014

    Parks,RecreationandSpo

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    33/119

    AttachmentAItem12

    RegionalStrategyandPolicyCommittee

    05December2013

    StrategyandPolicyForwardProgra

    mme:QuarterlyMonitoringReport

    Page33

    STRATEGYANDPOLICYFO

    RWARDPROGRAMME:QUARTERLYPROGRESSUPDATE(SEPTEMBER

    -DECEMBER2013)

    FORWARDPROGRAMMEITEM

    ITEM

    STATUS

    PROGRESSSINCEL

    ASTQUARTER/COMMENTARY

    REPORTING

    COMMITTEE(S)TO

    REGIONALSTRATEGY

    ANDPOLICYCOMMITTE

    WeedManagementPolicy

    AdoptedAugust2013

    WeedManagementP

    olicy

    Documentadopted

    inAugust2013.

    Actionsarisingfromadoptedpolicyhavebeenassignedtorelevan

    tdepartments

    withinCouncil.

    ImplementationmonitoringreporttobepresentedtoParks,SportandRecreation

    Committeeinearly

    2014.

    Parks,RecreationandSpo

    Environment,Climate

    ChangeandNatural

    Heritage

    26.ProcurementStrategyandPro

    curement

    Policy

    AdoptedMay2013

    TheProcurementStrategyandPolicywereadoptedbyCommittee

    inMay.

    Implementationis

    ongoingwithrecentactivitiesincludinginter

    nalandexternal

    communications,

    engagement

    with

    CCOs,

    developmento

    f

    local

    impact

    assessmentsandarewriteoftheprocurementmanual.

    TendersandProcurement

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    34/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    35/119

    Item1

    3

    Regional Strategy and Policy Committee

    05 December 2013

    Economic Development Status Update Report Page 35

    Economic Development Status Update Report

    File No.:CP2013/27582

    Purpose

    1. Providing an overview of the key economic issues for Auckland, and briefly outlines some ofthe key initiatives being progressed under Aucklands Economic Development Strategy(EDS).

    Executive Summary2. After introductory comment on the Auckland economy, this short summary/status update

    report identifies key opportunities and challenges before outlining how they are beingaddressed through the framework of the EDS and the ambitious targets it seeks to achieve.

    3. The EDS targets will not be achieved by the council alone and we are working closely withour partners; ATEED and COMET, central government and business and industry. Theinitiatives underway are outlined in the context of the EDS themes; Business Friendly and

    Well Connected, Innovation, internationalization, skills and a vibrant, creative internationalcity.

    Recommendation/sThat the Regional Strategy and Policy Committee:

    a) note the contents of this report.

    Discussion4. The EDS was launched in September 2012 and is a comprehensive strategy with five

    priorities and four underpinning themes. It formally acknowledges the need for economic

    step change in Auckland through its ambitious targets around internationalization. It seeks toachieve this through an average annual increase in regional exports of greater than 6%, anaverage annual real GDP increase of greater than 5% and average annual productivitygrowth of greater than 2%.

    Opportunities

    5. Auckland is New Zealands main commercial centre and most internationally connected city,providing many of the services for the rest of New Zealand. For New Zealand to do well, it isimportant that Auckland does well.

    6. The Auckland economy is showing signs of a more sustained and broad based recoveryfollowing the turmoil of the global financial crisis. For the year to July 2013, Auckland has

    experienced real GDP growth of 2.9%. Unemployment has been declining with someemployment growth. Net migration, house sales, dwelling consents, tourism guest nightsand business confidence are trending upwards. Retail sales remain strong supported byconsumers with the rise in house prices buoying consumer confidence.

    7. The construction sector has led the way with the increasing number of consents, a pre-cursor for the still-to-come build phase. Demand is picking up across finance, property, realestate and construction services, which in turn will be a catalyst to domestic manufacturingand retail.

    8. Auckland has a number of sectors which are significant contributors to the New Zealandeconomy. Manufacturing is Aucklands largest industry, and a significant proportion of NewZealands high-tech manufacturing is located here. Tourism is also major earner receiving

    about 37% of New Zealands international visitor expenditure and 21% of domesticexpenditure. Migration has, and continues to, make a significant contribution to Aucklandsgrowth. There is an increasing interest in the potential to leverage greater economicoutcomes for the region and New Zealand.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    36/119

    Item13

    Regional Strategy and Policy Committee

    05 December 2013

    Economic Development Status Update Report Page 36

    Challenges

    9. Even so, challenges remain. The Auckland economy is domestically focused and exportsare proportionately less than the New Zealand average. While Auckland earns a productivitypremium over the rest of New Zealand, reflecting the mix of industries and sectors andemployment density, GDP per capita is low relative to comparator cities. Despite many higheducational achievements there are many school leavers with only low level or no

    qualifications, contributing to the number of young people not in employment education ortraining (NEET), the skills gap and mismatches with vacancies.

    10. In addition to contributing to New Zealands financial vulnerability (OECD 2013 EconomicOutlook), the increase in Auckland house prices raises the issue of affordability. It alsoholds implications for the supply of already scarce, larger tracts of land suitable for businessuse.

    Auckland Council Economic Development Initiatives

    11. Through the Auckland Plan and the EDS five priorities have been identified:

    1. Grow a business-friendlyand well-functioning city

    2. Develop an innovationhub of the Asia Pacific Rim

    3. Become internationallyconnected and export driven

    4. Enhance investment in people to grow skillsand a local workforce

    5. Develop a vibrant, creative international city.

    12. These five priorities areas are supported by four cross-cutting themes:

    i creating a sustain able eco-economy

    ii facilitating an iwi/mori economic powerhouse

    iii developing and enhancing an innovative rural and maritime economy

    iv supporting a diverse ethnic economy

    13. The EDS cannot be implemented by Auckland Council alone. Our key implementationpartners are the councils CCOs: ATEED and COMET, central government, and importantly,business and industry. ATEED is developing a Growth and Competiveness Framework thatsets out how ATEED will implement the economic development priorities of the EDS. Boththe EDS and Growth and Competitiveness Framework are well aligned with theGovernments Business Growth agenda

    14. Local economic developmentsupports the regional economy and the Auckland Council ispreparing Economic Development Overviews for Local Boards. These outline the baselineeconomic data for each Local Board area and an understanding of the strengths, challengesand opportunities within their local economies. Following this work, Local EconomicDevelopment Action Plans will be developed together with key business and economic

    stakeholders.15. The Auckland Council is focused primarily on two priority areas: Business Friendly and

    Well Functioning Cityand Skills. Ensuring the Auckland Council embeds/adopts aBusiness Friendly approach is a key activity, and a Business Friendly Dashboard to monitorcouncils business-friendliness is currently being developed to assist in measuring ourperformance in this area. The Dashboard will be reported to the Economy Rural and UrbanCommittee in July 2014.

    16. The Proposed Auckland Unitary Plan (PAUP) is a key tool and sets Auckland Councilsplanning policy framework. The Economic Development department (ED) is working closelywith the PAUP and Spatial Strategy Teams to ensure this framework is business friendlyprovides for sufficient business land to meet future growth. An important aspect of next

    years work programme is to review and update the estimates of future business landdemand that were used to underpin the Auckland Plan. ATEED is also working withAuckland Council to ensure the Unitary Plan is business friendly as it relates to major eventsand filming activities.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    37/119

    Item1

    3

    Regional Strategy and Policy Committee

    05 December 2013

    Economic Development Status Update Report Page 37

    17. The Auckland Council has also contributed strongly to the Core Cities networksdevelopment of Business Friendly Guidelines to be applied by across the network. TheGuidelines are to be launched and will be brought before the Auckland Council in early2014. (The Core Cities network is Auckland Council, Tauranga, Hamilton, Wellington,Christchurch and Dunedin City Councils, led and facilitated by LGNZ and MBIE under theauspices of the Metropolitan Mayors.)

    18. Ensuring that Auckland functions well is of primary importance to business. AucklandCouncil is continuing to actively progress the City Rail Link, the East-West Link between SH1 and SH 20 and the linkages and services provided to major industrial concentrations.

    19. Skillsare a priority for Aucklands businesses. Auckland Council is working with businesses,their representative organisations across the region to build capability, and to deliverinitiatives to better match skills supply and demand.

    20. The Auckland Skills Steering Group has initiated a multi-agency project to better connectyouth transition initiatives in the Auckland region. This aims to deliver improved skills andemployment outcomes for Mori and Pacifica youth, with an initial focus on Mangere-Otahuhu.

    21. The Auckland Council is participating in the development of an Auckland Construction andInfrastructure Workforce Roadmap with UNITEC, MIT and an alliance of providers to betterintegrate local and central government, education and business/industry objectives. A keymilestone is the development of an Auckland Construction and Infrastructure: Occupationand Skills Model, which is currently being tested with key stakeholders and has been builtusing the Auckland Economic Futures Model owned by Auckland Council.

    22. The Mayors Youth Employment Action Plan is on track to be delivered to the Mayors officeby the end of 2013. It will also incorporate ATEEDs Skills Action Plan, recently approved bythe ATEEDs Board.

    23. Achieving Aucklands target for productivity will require moreinnovation. The AucklandCouncil is working with the Auckland tertiary sector on its stock take of business innovation

    enhancing programmes, services and facilities to develop a broad picture of engagementtertiary institutions with business on innovation. A stock take of innovation programmes,products and services focused on building the international capability of Aucklandbusinesses is also currently underway.

    24. Auckland Councils digital policy provides a significant platform forinnovation. Council isworking with mobile telecommunications network operators to plan for the future rollout ofcellphone infrastructure, in partnership withAucklands 46 Business Improvement Districts,to communicate the benefits and processes of connecting to Ultrafast Broadband andassociated technologies. Auckland Council is also mobilising political and communityleadership around Chorus Gigatown competition to provide gigabit internet to one NewZealand town.

    25. ATEEDs implementation of the Wynyard Quarter Innovation Precinct has been broughtforward by 2 years in response to the level of interest and a hub operator will be appointedshortly. ATEED and Callaghan Innovation have refreshed the funding and strategy for theFood Bowl so it is on a sound footing and better able to support its operations andcontribution to the food and beverage sector. ATEEDs Regional Partners programmecontinues to deliver strong results with Callaghan Innovation R&D investment of $1,840,138and $42,178 worth of NZTE capability development vouchers issued.

    26. The Mayors review of Auckland Councils civic model of international relations with a moreeconomic and investment oriented approach with increased links with Aucklands majortrading partners in the Asia Pacific region is a key internationalisationinitiative.

    27. Similarly, ATEEDs Auckland Investment Office will package major infrastructure andinvestment opportunities and act as one-stop-shop for off and on-shore investors. This willsignificantly support investor attraction, particularly in combination with the Aroha Auckland,ATEEDs multinational aftercare investor programme.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    38/119

    Item13

    Regional Strategy and Policy Committee

    05 December 2013

    Economic Development Status Update Report Page 38

    28. ATEED is complementing and enhancing the role of its Conventions Bureau with thedevelopment an Auckland Business Events Plan to ensure Auckland reaches its potential asa destination for business events. Attracting international conventions will play a significantrole, especially in supporting the New Zealand International Convention Centre.

    29. Internationally, creative, vibrant citiesare popular places to live and enjoy strongcontributions from tourism to their local economy. Auckland Council will support this vitality

    through the development of the Arts and Culture Strategic Action Plan. ATEEDs portfolio ofevents will be enhanced by the refresh of its Major Events Strategy and leveragingupcoming economic anchor events (Dick Smith NRL Auckland Nines, ITM500 V8 supercars)in the new year. ATEEDs preparations continue for the ICC Cricket World Cup 2015, FIFAU20 Mens World Cup 2015 and the World Masters Games 2017.

    30. ATEED is participating in the establishment of Regional Film Offices New Zealand (RFONZ)a unified body for the six regional offices that will enable research, marketing, screenattraction activities and advocacy. ATEED is also taking a lead role working with centralgovernment and the film industry in the wake of the industrys downturn.

    31. Marketing is a key activity. ATEEDs domestic campaigns continue to support Aucklandsprofile and attractiveness, including the current campaign with Heart of the City, AKL: the

    Show Never Stops, and recently with the six upper North Island RTOs, Tourism NewZealand, Qantas and Flight Centre Australia, Everyday a different story.

    32. Auckland Council and ATEEDs commitment to accelerating Aucklands economicdevelopment will be supported by bringing cities expert Greg Clark to Auckland in January2014. This will result in a stock take of how delivery partners and industry are making thechanges required to achieve the targets set out in the EDS, and agree priorities for thefuture. The outcome of this stocktake is expected to be a refreshed joint agenda for the next2 years between the Auckland Council, ATEED, central government and business.

    Consideration

    Local Board Views

    33. Auckland Councils Economic Development department (ED) is working directly with LocalBoards and there are no specific local implications associated with this report. ED reports toLocal Boards six monthly on the activities delivering the agreed local economic developmentwork programme.

    Maori Impact Statement

    34. There are no specific implications for Mori associated with this status report. ED andATEED are leading aspects of the EDS to facilitate an iwi/Mori economic powerhouse inAuckland. In partnership with Te Waka Angamua, ED are leading the development of theMori Economic Development Strategic Framework to assist Mori achieve their economic

    aspirations. Developed in three stages, Stage One (Establishment) will detail the scope,workshop with key stakeholders and establish the projects governance. Stage Two(Framework Development), involves preparation of an Auckland Mori Economic Snapshot2013 to 2040, the draft Mori Economic Development Framework and establishing anongoing engagement framework to assist implementation. Stage 3 (Implementation) willinvolve running education and awareness programmes and potential work with CCOs thatrequire assistance to align with Mori ED priorities and evaluation.

    Implementation Issues35. There are no financing or resourcing implications associated with this report.

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    39/119

    Item1

    3

    Regional Strategy and Policy Committee

    05 December 2013

    Economic Development Status Update Report Page 39

    AttachmentsThere are no attachments for this report.

    Signatories

    Authors Wayne Brown - Economic development

    Authorisers David Hawkey - Acting Manager Economic Development

    Dean Kimpton - Chief Operating Officer

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    40/119

  • 8/13/2019 Council Regional Strategy and Development Committee Dec 13

    41/119

    Item1

    4

    Regional Strategy and Policy Committee

    05 December 2013

    Parks and Open Space Work Programme Page 41

    Parks and Open Space Work Programme

    File No.:CP2013/27059

    Purpose

    1. To provide a brief overview of councils current and future work programme in relation toparks and open space.

    Executive Summary2. Officers will make