Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Costpoint Interim/Final Rates and Consolidated Billing Review
PCW12 Chesapeake L, Nov 14, 9am – 12pm
Our Workshop Scenario
©2016 Deltek, Inc. All Rights Reserved 2
©2016 Deltek, Inc. All Rights Reserved 3
Our Scenario
� Your company receives DCAA audit adjustments for 2015 that need to be recorded on your books for 2015, when the current fiscal year is 2020.
� Management needs to see the effect of the DCAA audit changes on financial statements and project profitability for 2015, without restating published 2015 financials and project reports.
� Costpoint to use the 2015 ceilings, project owning org, etc. to calculate the 2015 revenue.
� Project accountants need to be able to recognize revenue changes from the 2015 year in 2020, and bill final amounts to the customer, based on the final rates, with their current billing.
� Management also needs to better understand the financial basis of the company’s indirect rates as a basis for negotiating bids with government.
©2016 Deltek, Inc. All Rights Reserved 4
Our Scenario – Audit Adjustment DetailsFrom the 2015 DCAA Audit of Project VENUS.00.01.01 Revenue formula is Loaded Labor Plus Non-Labor with Burden and Fee at 5%
� Labor to be reclassed as Unallowable Labor
– 50 hours for PLC P-LEN, Employee GP005 Diedre Drayson
– 50 hours for PLC P-LEN, Employee GP102 Billy Joe Gregory
– 75 hours for PLC P-AST, Employee GP004 Devon Strathcliffe
� Professional Services of $62,000 to be reclassed as Unallowable Consulting
� Adjustments to be made in 2015 Pd13 Interim Adjustment Period
The Setup – Checklist
Our Scenario – Exercise 1 – The Setup Review and some ‘To Do’s’
To begin our workshop scenario we will follow the setup steps
©2016 Deltek, Inc. All Rights Reserved 5
©2016 Deltek, Inc. All Rights Reserved 6
The SetupStep Description
1 To DoIn Company 1 Open Fiscal Year 2015. Add Adjustment Period 13, Interim, to Prior Year
2 ReviewGo to GreenPines LLC Company. Review General Ledger Settings
3 To Do Configure Project Settings (Add Check as shown)
4 Review Configure Billing Settings
5 Link A/cReview ‘R+B’ Project Account Group: find unique account with PY Rev function (Link Account to all Orgs)
6 Review Configure Consolidation Settings
©2016 Deltek, Inc. All Rights Reserved 7
Step 1 - In Co 1, Open Fiscal Year 2015
©2016 Deltek, Inc. All Rights Reserved 8
Step 1 – Add Adjustment Period 13 to 2015 in Company 1
Add Period 13, 12/31/2015, the Status should be ‘Open’, the ‘Adjustment Period’ checked and the Adjustment Rate Type should be Interim. Save.
©2016 Deltek, Inc. All Rights Reserved 9
Step 1 - ‘Save’ will change Entry Edit Status to ‘Open’. Subperiod 1 is opened automatically.
The following Journal Types will Open:
AJE – Adj JEBLJ – Billing JournalMJE – Multi-Job AllocsPAJ – Pool Alloc JournalREV – Reversal Adj JE’sSJ – Sales Journal
©2016 Deltek, Inc. All Rights Reserved 10
Step 1 – Go to GreenPines LLC company
Review that2015 Pd 13 and Subpd 1are open
©2016 Deltek, Inc. All Rights Reserved 11
Step 2 – Review Configure GL Settings in transaction Company
©2016 Deltek, Inc. All Rights Reserved 12
Step 3 – Review Configure Project Ledger Settings
ADD THIS CHECK and Save
©2016 Deltek, Inc. All Rights Reserved 13
Step 4 – Review Configure Billing Settings
©2016 Deltek, Inc. All Rights Reserved 14
Step 5 – Review Manage Project Account Group
Link the PY Rev account to ALL Orgs
©2016 Deltek, Inc. All Rights Reserved 15
Step 5 – TO DO –Link Account 411-10 to All Transaction Level OrgsTo allow for Owning and Performing Org Revenue
©2016 Deltek, Inc. All Rights Reserved 16
Step 6 – Review Configure Consolidation Settings
The Process
©2016 Deltek, Inc. All Rights Reserved 17
©2016 Deltek, Inc. All Rights Reserved 18
The Process
Step Description
1 Enter and post audit adjustments in the prior year Adjustment Period
2
Revenue - Recognize revenue from that prior year in the current year, using the prior year PLC rates, project owning org, and formulas to calculate the prior year revenue
3Billing - Create retroactive bills for the prior year and combine that bill with the current bill in the current year
4
Evaluate the effect of the adjustments on indirect pool rates, project costs/revenue and the financial statements for the prior year
Our Scenario – Exercise 2 –The Revenue Process
©2016 Deltek, Inc. All Rights Reserved 19
Complete the steps in your handout for our workshop scenario
©2016 Deltek, Inc. All Rights Reserved 20
The Process
Step Description
Pre-Exercise Check that 2020 Pd1 Revenue is posted
1 Enter and post audit adjustments in 2015 Pd13
2
Build RAT, Compute and Post Pools and print SIE for 2015 Pd13. Add Target and Provisional Rates (Actuals if Final) to Pd13 in the Pools
3 Compute Burden Cost for 2015 pd13
4 Load Labor Rates, Compute and Post Revenue for 2015 pd13
©2016 Deltek, Inc. All Rights Reserved 21
The Process
Step Description
5 Update PSR/Create Project Report Tables for 2015 pd1
6Print PSR – Query ‘PSR1 – Venus’ for parameters - change date to 2015 pd13
7 Print Revenue Worksheet for 2015 pd13
8Print Comparative Income Statement for Org G, FY2015, Pd 12 & Adj Pd 13.
9 Do not Update GL Beginning Balances
©2016 Deltek, Inc. All Rights Reserved 22
The Process
Step Description
10 Update Prior Year History
11
Jump to 2020 process Pools, Compute Burden, Load Labor Rates and compute and post Revenue Pd 2 with prior year adjustment period at Target
12 Print Income Statement for 2020 pd2, review PY Revenue
13 Update and Print PSR and Project Reports for 2020 pd2
©2016 Deltek, Inc. All Rights Reserved 23
Step 1 – Enter, Approve and Post Adjusting JE’s in FY2015 Pd13For Project VENUS.00.01.01
©2016 Deltek, Inc. All Rights Reserved 24
Step 2 - Pools
Build Rate Application Tables, Compute and Print Pools for 2015 pd13. Add Target and Provisional (Actual if final) Rates to Pd13
©2016 Deltek, Inc. All Rights Reserved 25
Step 3 – Compute Burden Cost
For 2015 Pd13
©2016 Deltek, Inc. All Rights Reserved 26
Step 4 – Load Labor Rates
©2016 Deltek, Inc. All Rights Reserved 27
Step 4 – Compute Revenue
©2016 Deltek, Inc. All Rights Reserved 28
Step 4 – Post Revenue
©2016 Deltek, Inc. All Rights Reserved 29
Step 5 – Update PSR/Create Project Reports
Do not check this box or Revenue will be double counted in our scenario
©2016 Deltek, Inc. All Rights Reserved 30
Step 6 – Print PSRGo to Query>PSR1, Venus’ Change date to 2015 pd13
©2016 Deltek, Inc. All Rights Reserved 31
Step 7 – Print Revenue Worksheet
©2016 Deltek, Inc. All Rights Reserved 32
Step 8 – Comparative Income Statement for Org G
©2016 Deltek, Inc. All Rights Reserved 33
©2016 Deltek, Inc. All Rights Reserved 34
Step 9 – Do Not Update GL Beginning Balances
• In our scenario, our DCAA audit adjustments were ‘reclass’ adjustments
• We are going to recognize 2015 revenue in our current year 2020
• Our costs have not changed, therefore there is no need to Update GL Beginning Balances
• IF our DCAA audit adjustments had moved say expenses to capital, then we would probably want to roll the new GL balances forward
Step 10 - Update Prior Year History
35 CONFIDENTIAL ©2014 Deltek, Inc. All Rights Reserved
Note: If prior year revenue from adjustment periods (2015) will be included in current period revenue (2020) calculation, do not include revenue in ‘Adjustment Period Data to Include’
©2016 Deltek, Inc. All Rights Reserved 36
Step 11 – Process as usual, then Compute 2020 pd2 Revenue with Adjustment Period for 2015
Revenue was posted at Target in 2015 pd13
©2016 Deltek, Inc. All Rights Reserved 37
Step 11 – Post 2020 pd2 Revenue with Adjustment Period for 2015
©2016 Deltek, Inc. All Rights Reserved 38
Step 12 – Print IS for 2020 Pd2
©2016 Deltek, Inc. All Rights Reserved 39
Step 12 – Print IS for 2020 Pd2
©2016 Deltek, Inc. All Rights Reserved 40
Step 13 – Update and Print PSR and Revenue Worksheet
©2016 Deltek, Inc. All Rights Reserved 41
Step 13 – Update and Print PSR and Revenue Worksheet
Our Scenario – Exercise 3 –Combination Billing
©2016 Deltek, Inc. All Rights Reserved 42
Complete the steps in your handout for our workshop scenario
©2016 Deltek, Inc. All Rights Reserved 43
The Process – Combination Billing
Step Description
1Load Labor Rates and Calculate Standard Bills – include Consolidated Standard Bill Options
2 Review Bill and Supporting Schedules
3 Select for Posting and Post
©2016 Deltek, Inc. All Rights Reserved 44
Step 1 – Load Labor Rates, Calculate Bill
©2016 Deltek, Inc. All Rights Reserved 45
Step 2 – Review Bill and Supporting Schedules
©2016 Deltek, Inc. All Rights Reserved 46
Step 2 –Review Bill and Supporting Schedules
©2016 Deltek, Inc. All Rights Reserved 47
©2016 Deltek, Inc. All Rights Reserved 48
©2016 Deltek, Inc. All Rights Reserved 49
©2016 Deltek, Inc. All Rights Reserved 50
©2016 Deltek, Inc. All Rights Reserved 51
Step 3 – Select for Posting and Post Billing