Project : BARRY CALLEBAUT
GENERAL RECAPITULATION MECHANICAL WORKS
NO. L O C A T I O N S TOTAL (IDR) REMARKS
MECHANICAL WORKS
I GENERAL SITE PLAN 1,888,054,277.79
2 MAIN BUILDING 245,935,336.75
3 CANTEEN 55,119,535.55
4 LOCKERS 183,057,469.20
5 MEDICAL AND PRAY ROOM 49,030,561.10
6 TRAFO BUILDING 13,432,500.00
7 POTASH AND CHEMICAL BUILDING 13,376,216.30
8 BOILER BUILDING 3,790,110.20
9 OFFICE BUILDING 454,777,521.75
10 STORAGE AND MAINTENANCE BUILDING 32,787,194.20
11 GUARD HOUSE 17,296,491.90
12 WEIGHT BRIDGE 15,903,580
13 WWTP 8,671,216
T O T A L 2,981,232,010.54
Page 2 of 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS SITE PLAN
NO. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I SITE PLAN CLEAN WATER
A MAIN EQUIPMENT PLUMBING
Supply & Install & all Plumbing works complete with Equipment and accessories as shown on drawing and all as spesified
1 Booster Pump 1 set 85,000,000 85,000,000
Type : Booster Pump PackagedCapacity : 2 x 500 LPM (Paralel Alternate)Total Head : 50 MeterTotal Daya : 7,5 kW
Speed : 2900 rpm
Power : 380/415 V , 3 Ph , 50 HzComplete with : pressure tank & switch, cable control, control panel power cable, pressure gauge, pressure tank, accessories, etc
2 Pump room instllation & Acessories - Pressure tank cap : 1000 liter, head 7 bar (Adjustable) 1 set 25,000,000 25,000,000 - Gate Valve, Toyo/Kitz Ø 3" ( 8 kg/cm2 ) 3 unit 1,847,100 5,541,300
Ø 2 1/2" ( 8 kg/cm2 ) 11 unit 1,484,800 16,332,800 Ø 2 " ( 8 kg/cm2 ) 4 unit 129,700 518,800 Ø 1 1/2" ( 8 kg/cm2 ) 2 unit 1,162,900 2,325,800 Ø 1 " ( 8 kg/cm2 ) 1 unit 635,200 635,200 Ø 1 1/2" ( 8 kg/cm2 ) 1 unit 1,162,900 1,162,900
- Strainer, Tozen Ø 2 1/2" 6 unit 1,221,000 7,326,000 - Flexible Joint, Tozen Ø 2 1/2" 12 unit 331,500 3,978,000 - Check Valve, Tozen Ø 2 1/2" 6 unit 1,430,000 8,580,000 - Foot Valve, Mizu Ø 2 1/2" 6 unit 1,950,000 11,700,000 - Floating Valve Ø 2" 2 unit 715,000 1,430,000 - Over flow valve Ø 2" 1 unit 700,000 700,000 - Water meter Ø 2 1/2" 1 unit 1,235,000 1,235,000 - PRV Ø 3 " 1 unit 13,000,000 13,000,000 - PRV (for main building) Ø 2 1/2 " 2 unit 12,285,000 24,570,000 - Header steel + Flanges Ø 3" 2 set 3,000,000 6,000,000 - WLC 1 lot 500,000 500,000
3 Galvanized in plate (GIP) Ø 2 1/2 " 47.3 m 152,228 7,200,384 Plate, Medium class type Ø 1 1/4" 12 m 73,802 885,624
4 Fittings pipe 1 lot 1,212,901 1,212,901
5 Crossing Protection Clean Water pipe - Black Steell pipe dia 4" 27.5 m 343,220 9,438,550
6 Miscellaneus and material support 1 lot 2,021,502 2,021,502
B MAIN PIPE1 HDPE Pipe, S8 SDR 17 PN 10 Ø 3" 5 m 334,360 1,671,800
Ø 2 1/2" 265 m 245,180 64,972,700 Ø 2" 50 m 168,470 8,423,500 Ø 1 1/2" 165 m 110,890 18,296,850
2 Fittings pipe , Ex.TSP/HE 1 lot 14,004,728 14,004,728
3 Miscellaneus and support material 1 lot 23,341,213 23,341,213
Sub Total I 367,005,552
II SITE PLAN WASTE WATER1 PVC - AW Class Pipe2 Dia Ø 4 " 71.5 m' 117,810 8,423,415 3 Dia Ø 3 " 112.2 m' 79,500 8,919,900 4 Dia Ø 2 1/2 " 112.2 m' 56,410 6,329,202 5 Dia Ø 2 " 57.2 m' 45,380 2,595,736
6 Fittings Pipe 1 lot 3,940,238 3,940,238
7 Miscellaneus and support material 1 lot 6,567,063 6,567,063
Sub Total II 36,775,554
III SITE PLAN SEWAGE WATER
Supply & Install & all Sewage Treatment Plan (STP) works complete with Equipment and accessories as shown on drawing and all as spesified
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Page 3 of 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS SITE PLAN
NO. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
1 STP / IPAL kapasitas 8 m3 1 set 37,500,000 37,500,000
Sewage treatment Plant ( STP)Type Biocell Tank FRP MadeCap. 8 M3/dayAccessories Effluent Pump, Blower, Pipa Blower,
Control Panel Blower, ManholeChlorine Holder, iplc, testing & com
2 STP / IPAL kapasitas 1,2 m3 1 set 37,500,000 37,500,000
Sewage treatment Plant ( STP)Type Biocell Tank FRP MadeCap. 8 M3/dayAccessories Effluent Pump, Blower, Pipa Blower,
Control Panel Blower, ManholeChlorine Holder, iplc, testing & com
3 PVC - AW Ø 6" 144 m 220,550 31,759,200 Ø 4" 120 m 117,810 14,137,200 Ø 2 1/2" 36 m 56,410 2,030,760
4 Fitting Pipe PVC - AW 1 lot 7,189,074 7,189,074
5 Crossing Protection Sewage pipe - Black Steel pipe dia 8 " 20 m 904,420 18,088,400 - Black Steel pipe dia 6" 40 m 600,800 24,032,000
6 Collection Sump pit Box ( 100 x 100 x 200 ) mm w/ cover concrete or plate 1 lot 18,500,000 18,500,000 complete with : Summersible Pump and installation accessoriesCapacity :150 ltr/ mntHead : 20 mSystem Operational : Paralel Alternate
7 Miscellaneus and support material 1 lot 11,981,790 11,981,790
Sub Total III 202,718,424
IV SITE PLAN HYDRANT Supply & Install & all Hydrant Fir Fighting works complete with Equipment and accessories as shown on drawing and all as spesified
1 Diesel Fire Pump (DFP) 1 unit 398,000,000 398,000,000 Type : Horizontal Split Case NFPA 20/ UL ListedKapasitas : 750 GPMHead (M) : 80Power : 65 kW EnginePutaran : 2900 RpmSistem Operasi : Start Automatic, Stop Manualkontrol panel : NFPA 20/UL listed
2 Electric Fire Pump (EFP) 1 unit 265,000,000 265,000,000 Type : Horizontal Split Case NFPA 20 / UL Listed Kapasitas : 750 GPMHead (M) : 80Power : 65 kW EnginePutaran : 2900 RpmSistem Operasi : Start Automatic, Stop Manualkontrol panel : NFPA 20/UL listed
3 Jockey Fire Pump (JFP) 1 unit 65,000,000 65,000,000 Type : Vertical Inlet MultistageKapasitas : 25 GPMHead (M) : 80Power : 4 kWPutaran : 2900 Rpm/380V/3PhSistem Operasi : Start/Stop Automatickontrol panel : NFPA 20/UL listed
Piping installation1 Pipa Header Hydrant dia 10 inch termasuk Flanges 2 lot 5,323,205 10,646,410 2 Pipa Header Hydrant dia 8 inch termasuk Flanges 1 lot 3,753,343 3,753,343 3 Pipa Ø 6 inch 52.8 m 600,800 31,722,240 4 Pipa Ø 3 inch 5 m 241,730 1,208,650 5 Pipa Ø 2 inch 6 m 117,280 703,680 6 Gate Valve dia 6 inch (10K) 9 unit 15,938,300 143,444,700 7 Gate Valve dia 3 inch (10K) 1 unit 6,381,200 6,381,200 8 Gate Valve dia 2 inch (10K) 2 unit 4,090,800 8,181,600 9 Strainer dia 2 inch (10K) 1 unit 2,464,200 2,464,200
10 Strainer dia 6 inch (10K) 2 unit 22,997,600 45,995,200 11 Flexible Joint dia 6 inch (10K) 4 unit 1,358,500 5,434,000
technical specification.
Page 4 of 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS SITE PLAN
NO. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
12 Flexible Joint dia 2 inch (10K) 2 unit 344,500 689,000 13 Check Valve dia 6 inch (10K) 2 unit 14,800,500 29,601,000 14 Check Valve dia 2 inch (10K) 1 unit 5,566,500 5,566,500 15 Safety Valve dia 3 inch (10K) 1 unit 15,535,000 15,535,000 16 Pressure Gauge 5 unit 650,000 3,250,000 17 Pressure Switch 4 unit 1,500,000 6,000,000 18 Automatic Air vent 2 unit 6,515,000 13,030,000 19 Flow Meter 1 unit 1,850,000 1,850,000 20 Foot Valve dia 2 inch 1 unit 1,950,000 1,950,000 21 Foot Valve dia 6 inch 2 unit 5,850,000 11,700,000 22 Pressure Reducing Valve PN 16 CL 101-6 inch 1 unit 19,500,000 19,500,000 23 Fitting pipe 1 lot 7,205,148 7,205,148 24 Support & Material Bantu 1 lot 12,008,581 12,008,581
Main pipe feeder installation1 BSP Sch 40 ASTM A-53, Ex.PPI
Ø 6" 66 m 600,800 39,652,800 Ø 2 1/2 " 122 m 185,030 22,490,397
2 Fittings, Ex.TSP/HE/RICON, Schedule 40
3 Gate Vale Ø 6" 1 unit 15,938,300 15,938,300 Ø 2 1/2 " 5 unit 5,133,400 25,667,000
4 Pressure gauge Ø ½" 2 unit 650,000 1,300,000
5 Outdoor Hydrant Box ( OHB ) 5 unit 3,500,000 17,500,000 Size : 95x66x20cmKelengkapan :
- 1 Rol Fire Hose 2,5" x30 meter- 1 Pcs Hose Noozle 2 1/2 inch- 1 pcs Gate Valve dia 4 inch
6 Hydrant Pilar Two Way c/w Main Ball Valve 5 unit 2,500,000 12,500,000
7 Siamese Connection (SMC), complete set 1 set 2,650,000 2,650,000
8 Miscellaneus and support material 1 lot 15,535,799 15,535,799
Sub Total IV 1,269,054,748
V Testing & Commissioning 1 lot 12,500,000 12,500,000
Sub Total V 12,500,000
TOTAL I - II - III - IV - V 1,888,054,278
Project : BARRY CALLEBAUT
MECHANICAL WORKS - MAIN BUILDING
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I. VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 1 PK c/w : installation 2 Unit 7,776,790 15,553,580
Refrigerant pipe, isolation, drain, material support, etc
2 Air Conditioning Split Wall 1 1/2 PK c/w : installation 3 Unit 8,786,090 26,358,271
Refrigerant pipe, isolation, drain, material support, etc
3 Air Conditioning Free Floor Standing 3 PK 4 Unit 29,864,943 119,459,772
material support, etc
4 Exhaust Fan Wall type, 1200 CFM 1 Unit 4,050,000 4,050,000
c/w : installation, material support, etc
Sub Total I 165,421,622
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete
technical specification.
II CLEAN WATER INSTALLATION Clean Water
1 Header steel + flange 1 set 3,000,000 3,000,000
2 PVC - AW Class Pipedia Ø 1/2 " 3 m 11,825 39,023
dia Ø 3/4 " 7 m 13,545 89,397
dia Ø 1 1/4 " 31 m 25,405 782,474
3 Gate Valve
dia Ø 2 1/2 " 14 unit 582,100 8,149,400
4 Fittings Pipe 1 lot 136,634 136,634
5 Accessories & Material Support 1 lot 227,723 227,723
Sub Total II 12,424,651 III HOT WATER INSTALLATION
1 Electrical water heater cap : 30 liter complete set 3 set 3,245,760 9,737,280
2 PPR - PN 20 Class Pipedia Ø 1/2 " 33 m 28,680 946,440
dia Ø 3/4 " 20 m 42,290 837,342
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
c/w : installation, freon, Refrigerant pipe, isolation, drain,
with equipment and accessories as shown on drawing and all as spesified
3 Gate Valve
dia Ø 3/4 " 3 Unit 200,000 600,000
4 Fittings Pipe 3 lot 267,567 802,702
5 Accessories & Material Support 3 lot 445,946 1,337,837
Sub Total III 14,261,600
IV WASTE WATER INSTALLATION
Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 66 m 56,410 3,723,060
Dia Ø 2 " 22 m 45,380 998,360
2 Floor drain Ø 2 " 7 unit 250,000 1,750,000
3 Fittings Pipe 1 lot 708,213 708,213
4 Accessories & Support Material 1 Lot 1,180,355 1,180,355
Sub Total IV 8,359,988
V HYDRANT INSTALLATION
technical specification.
Hydrant Installation,
1 Black Steel Pipe, Sch 40, - Dia Ø 2 1/2 " 46 m 185,030 8,548,386
- Dia Ø 4 " 23 m 343,220 7,928,382
2 Indoor Hydrant Box (IHB) 8 set 2,550,000 20,400,000
Size : 125x75x18cmComplete set with :- 1 Rol Fire Hose 1,5"x30 meter- 1 Pcs Hose Rack 1,5"- 1 Pcs Hydrant Valve dia 1,5"- 1 Pcs Hydrant Valve dia 2,5"- 1 Pcs Nozle - 1 Pcs Orifice dia 65mm
3 Fitting Hydrant Pipe 1 lot 2,471,515 2,471,515
4 Accessories & Support Material 1 Lot 4,119,192 4,119,192
Sub Total V 43,467,475
VI TESTING COMMISIONING 1 Lot 2,000,000 2,000,000
Sub Total VI 2,000,000
TOTAL I - II - III - IV - V - VI 245,935,337
Supply & Install & all Hydrant Fir Fighting works complete with Equipment and accessories as shown on drawing and all as spesified
Project : BARRY CALLEBAUT
MECHANICAL WORKS - CANTEEN
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 1 PK c/w : installation 3 unit 7,776,790 23,330,369 Refrigerant pipe, isolation, drain, material support, etc
2 Exhaust Fan Wall type, 600 CFM 2 unit 3,037,500 6,075,000 c/w : installation, material support, etc
3 Propeller Fan 4 unit 4,500,000 18,000,000 c/w : installation, material support, etc
4 Holding / Cooker hood 1 unit 4,867,950 4,867,950 c/w : installation, material support, etc
Sub Total I 52,273,319
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water 1 PVC - AW Class Pipe
dia Ø 1/2 " 3 m 11,825 39,023 dia Ø 3/4 " 7 m 13,545 89,397 dia Ø 1 1/4 " 11 m 25,405 279,455
2 Gate Valve dia Ø 1 1/4 " 1 unit 143,400 143,400
3 Fittings Pipe 1 lot 61,181 61,181
4 Accessories & Material Support 1 lot 101,969 101,969
Sub Total II 714,424
III WASTE WATER INSTALLATION
Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 8 m 56,410 451,280
2 Floor drain Ø 2 " 2 unit 250,000 500,000
3 Fittings Pipe 1 lot 67,692 67,692
4 Accessories & Support Material 1 lot 112,820 112,820
Sub Total III 1,131,792
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
IV Testing Commisioning 1 lot 1,000,000 1,000,000
Sub Total IV 1,000,000
TOTAL I - II - III - IV 55,119,536
Project : BARRY CALLEBAUT
MECHANICAL WORKS - LOCKERS
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with Equipment and accessories as shown on drawing and all as spesified
1 Propeller Fan 4 unit 4,500,000 18,000,000 c/w : installation, material support, etc
2 Roof Mechanical Exhaust Fan 500 CFM 5 unit 3,847,500 19,237,500 c/w : installation, material support, etc
Sub Total I 37,237,500
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION 1 PVC - AW Class Pipe
dia Ø 1/2 " 24 m 11,825 286,165 dia Ø 3/4 " 30 m 13,545 402,287 dia Ø 2 " 23 m 45,380 1,048,278
2 Gate Valve dia Ø 2 " 1 unit 273,400 273,400
3 Fittings Pipe 1 lot 260,509 260,509
4 Accessories & Material Support 1 lot 434,182 434,182
Sub Total II 2,704,821
III HOT WATER 1 Solar Water Heater 1 set 105,800,000 105,800,000
c/w : 2 unit Water tank cap 1 m3,Solar panel, pump circulation and distribution, etc
2 PPR - PN 20 Class Pipedia Ø 1/2 " 24 m 28,680 694,056 dia Ø 3/4 " 17 m 42,290 697,785 dia Ø 2 " 33 m 243,470 8,034,510
3 Gate Valve dia Ø 2 " 1 unit 785,000 785,000
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
4 Fittings Pipe 1 lot 1,413,953 1,413,953
5 Accessories & Material Support 1 lot 2,356,588 2,356,588
Sub Total III 119,781,891
WASTE & SEWAGE WATER INSTALLATION
IV Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 17 m 56,410 930,765 Dia Ø 3 " 22 m 79,500 1,749,000
2 Floor drain Ø 2 " 19 unit 250,000 4,750,000
3 Fittings PVC - AW class 1 lot 401,965 401,965
4 Accessories & Support Material 1 lot 669,941 669,941
Sub Total IV 8,501,671
V Sewage water1 PVC - AW Class Pipe
Dia Ø 4 " 66 m 117,810 7,775,460 Dia Ø 1 1/2 " 38.5 m 32,485 1,250,673
2 Clean Out
Dia Ø 3 " 1 unit 195,000 195,000
3 Fittings PVC - AW class 1 lot 1,353,920 1,353,920
4 Accessories & Support Material 1 lot 2,256,533 2,256,533
Sub Total V 12,831,586
VI Testing Commisioning 1 lot 2,000,000 2,000,000
Sub Total VI 2,000,000
TOTAL I - II - III - IV-V-VI
MECHANICAL WORKS - LOCKERS
REMARKS
(7)
183,057,469
Page 13 of 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - MEDICAL & PRAY ROOM
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with Equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 3/4 PK c/w : installation 4 unit 7,336,838 29,347,353 Refrigerant pipe, isolation, drain, material support, etc
2 Propeller Fan 1 unit 4,500,000 4,500,000 c/w : installation, material support, etc
Sub Total I 33,847,353
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water
1 PVC - AW Class Pipedia Ø 1/2 " 3 m 11,825 39,023 dia Ø 3/4 " 7 m 13,545 89,397 dia Ø 1 1/4 " 11 m 25,405 279,455
2 Gate Valve dia Ø 1 1/4 " 1 unit 143,400 143,400
3 Fittings Pipe 1 lot 61,181 61,181
4 Accessories & Material Support 1 lot 101,969 101,969
Sub Total II 714,424
III HOT WATER INSTALLATION 1 Electrical water heater cap : 30 liter complete set 1 set 3,245,760 3,245,760
2 PPR - PN 20 Class Pipedia Ø 1/2 " 10 m 28,680 286,800 dia Ø 3/4 " 4 m 42,290 169,160
3 Gate Valve dia Ø 3/4 " 1 unit 200,000 200,000
4 Fittings Pipe 1 lot 68,394 68,394
5 Accessories & Material Support 1 lot 113,990 113,990
Sub Total III 4,084,104
IV WASTE & SEWAGE WATER INSTALLATION
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Page 14 of 34
Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 8 m 56,410 451,280
2 Floor drain Ø 2 " 6 unit 250,000 1,500,000
3 Fittings Pipe 1 lot 67,692 67,692
4 Accessories & Support Material 1 lot 112,820 112,820
Sub Total IV 2,131,792
V Waste Water & Sewage water1 PVC - AW Class Pipe
Dia Ø 4 " 16.5 m 117,810 1,943,865 Dia Ø 3 " 8 m 79,500 636,000 Dia Ø 2 1/ 2 " 3.3 m 56,410 186,153 Dia Ø 2 " 3.3 m 45,380 149,754 Dia Ø 1 1/5 " 33 m 32,485 1,072,005
2 Clean Out Dia Ø 3 " 6 unit 195,000 1,170,000
3 Fittings Pipe 1 lot 598,167 598,167
4 Accessories & Support Material 1 lot 996,944 996,944
Sub Total V 6,752,888
VI Testing Commisioning 1 lot 1,500,000 1,500,000
Sub Total VI 1,500,000
TOTAL I - II - III - IV - V - IV 49,030,561
Project : BARRY CALLEBAUT
MECHANICAL WORKS - TRAFO ROOM
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with Equipment and accessories as shown on drawing and all as spesified
1 Exhaust Fan Wall type, 500 CFM 3 unit 2,835,000 8,505,000 c/w : installation, material support, etc
2 Exhaust Fan Wall type, 300 CFM 2 unit 2,463,750 4,927,500 c/w : installation, material support, etc
Sub Total I 13,432,500
TOTAL I
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
MECHANICAL WORKS - TRAFO ROOM
REMARKS
(7)
13,432,500
Project : BARRY CALLEBAUT
MECHANICAL WORKS - POTASH & CHEMICAL ROOM
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Ventilation works complete with Equipment and accessories as shown on drawing and all as spesified
1 Roof Mechanical Exhaust Fan 500 CFM 2 unit 3,847,500 7,695,000 c/w : installation, material support, etc
2 Exhaust Fan Wall type, 500 CFM, Water Proof type 1 unit 2,835,000 2,835,000 c/w : installation, material support, etc
Sub Total I 10,530,000
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water 1 PVC - AW Class Pipe
dia Ø 1/2 " 3 m 11,825 39,023 dia Ø 3/4 " 7 m 13,545 89,397 dia Ø 1 1/4 " 11 m 25,405 279,455
2 Gate Valve dia Ø 1 1/4 " 1 unit 143,400 143,400
3 Fittings Pipe 1 lot 61,181 61,181
4 Accessories & Material Support 1 lot 101,969 101,969
Sub Total II 714,424
III WASTE WATER INSTALLATION
Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 8 m 56,410 451,280
2 Floor drain Ø 2 " 2 unit 250,000 500,000
3 Fittings Pipe 1 lot 67,692 67,692
4 Accessories & Support Material 1 lot 112,820 112,820
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Sub Total III 1,131,792
IV Testing Commisioning 1 lot 1,000,000 1,000,000
Sub Total IV 1,000,000
TOTAL I - II - III - IV 13,376,216
Project : BARRY CALLEBAUT
MECHANICAL WORKS - BOILER
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION 1 PVC - AW Class Pipe
dia Ø 1 1/2 " 11 m 32,485 357,335 dia Ø 2 " 11 m 45,380 499,180
2 Gate Valve dia Ø 2 " 1 unit 273,400 273,400
3 Fittings Pipe 1 lot 128,477 128,477
4 Accessories & Material Support 1 lot 214,129 214,129
Sub Total I 1,472,521
II Waste water
1 PVC - AW Class Pipe Dia Ø 2 " 23.1 m 45,380 1,048,278
2 Fittings Pipe 1 lot 157,242 157,242
3 Accessories & Support Material 1 lot 262,070 262,070
Sub Total II 1,467,589
III Testing Commisioning 1 lot 850,000 850,000
Sub Total III 850,000
TOTAL I - II - III 3,790,110
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
Main Building 20 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - OFFICE
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 3/4 PK c/w : installation 4 unit 7,336,838 29,347,353 Refrigerant pipe, isolation, drain, material support, etc
2 Air Conditioning Split Wall 1 PK c/w : installation 3 unit 7,776,790 23,330,369 Refrigerant pipe, isolation, drain, material support, etc
3 Air Conditioning Split Wall 1 1/2 PK c/w : installation 5 unit 8,786,090 43,930,451 Refrigerant pipe, isolation, drain, material support, etc
4 Air Conditioning Ceiling Cassete 2 PK c/w : installation 1 unit 24,145,574 24,145,574 Refrigerant pipe, isolation, drain, material support, etc
5 Air Conditioning Ceiling Cassete 2 1/2 PK c/w : installati 2 unit 25,801,862 51,603,723 Refrigerant pipe, isolation, drain, material support, etc
6 Air Conditioning Ceiling Cassete 3 PK c/w : installation 5 unit 34,367,976 171,839,880 Refrigerant pipe, isolation, drain, material support, etc
7 Air Conditioning Ceiling Cassete 4 PK c/w : installation 1 unit 35,856,047 35,856,047 Refrigerant pipe, isolation, drain, material support, etc
8 Axial Fan Exhaust cap : 1000 CFM, 1 unit 3,712,500 3,712,500
9 Air Ducting for exhaust fan - Dia 40 cm x 30 cm 44 m' 193,991 8,535,604 - Dia 20 cm x 20 cm 12 m' 97,300 1,177,330 - Dia 15 cm x 15 cm 47 m' 72,975 3,451,718
10 Grille Exhaust ukuran 30 x 30 cm 25 set 154,800 3,870,000
Sub Total I 400,800,549
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION1 Clean Water
PVC - AW Class Pipedia Ø 1/2 " 29 m 11,825 338,195 dia Ø 3/4 " 12 m 13,545 163,895 dia Ø 1 1/4 " 29 m 25,405 726,583
Gate Valve
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Main Building 21 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - OFFICE
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
dia Ø 1 1/4 " 1 unit 143,400 143,400
Fittings Pipe 1 lot 184,301 184,301
Accessories & Material Support 1 lot 307,168 307,168
Sub Total II 1,863,542
III HOT WATER INSTALLATION Electrical water heater cap : 100 liter complete set 1.00 set 4,414,896 4,414,896
1 PPR - PN 20 Class Pipedia Ø 1/2 " 26 m 28,680 757,152 dia Ø 3/4 " 24 m 42,290 1,023,418 dia Ø 1 1/4 " 22 m 103,280 2,272,160
2 Gate Valve dia Ø 1 1/4 " 1 unit 287,000 287,000
3 Fittings Pipe 1 lot 607,910 607,910
4 Accessories & Material Support 1 lot 1,013,183 1,013,183
Sub Total III 10,375,718
WASTE & SEWAGE WATER INSTALLATION
IV Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 12 m 56,410 682,561 Dia Ø 2 1/2 " 23 m 56,410 1,303,071 Dia Ø 3 " 31 m 79,500 2,448,600 Dia Ø 4" 17 m 117,810 1,943,865 Dia Ø 6 " 33 m 220,550 7,278,150 Dia Ø 1 1/2 " (vent pipe) 34 m 32,485 1,107,739
2 Floor drain Ø 2 " 7 unit 250,000 1,750,000
3 Fittings Pipe 1 lot 2,214,598 2,214,598
4 Accessories & Support Material 1 lot 3,690,996 3,690,996
Sub Total IV 22,419,580
V Sewage water
1 PVC - AW Class Pipe Dia Ø 2 1/2 " 23 m 56,410 1,303,071 Dia Ø 4 " 17 m 117,810 1,943,865 Dia Ø 6 " 33 m 220,550 7,278,150 Dia Ø 2 1/2 " Vent pipe 34 m 56,410 1,923,581
Main Building 22 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - OFFICE
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
2 Floor Clean Out Dia Ø 3 " 2 unit 195,000 390,000
3 Fittings Pipe 1 lot 1,867,300 1,867,300
4 Accessories & Support Material 1 lot 3,112,167 3,112,167
Sub Total V 17,818,134
VI Testing Commisioning 1 lot 1,500,000 1,500,000
Sub Total VI 1,500,000
TOTAL I - II - III - IV - V - VI
Main Building 23 OF 34
MECHANICAL WORKS - OFFICE
REMARKS
(7)
Main Building 24 OF 34
MECHANICAL WORKS - OFFICE
REMARKS
(7)
Main Building 25 OF 34
MECHANICAL WORKS - OFFICE
REMARKS
(7)
454,777,522
Utility Building 26 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - STORAGE & MAINTENANCE
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 3/4 PK c/w : installation 4 unit 7,336,838 29,347,353 Refrigerant pipe, isolation, drain, material support, etc
Sub Total I 29,347,353
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water 1 PVC - AW Class Pipe
dia Ø 2 " 11 m 45,380 499,180
2 Gate Valve dia Ø 2 " 1 unit 273,400 273,400
3 Fittings Pipe 1 lot 74,877 74,877
4 Accessories & Material Support 1 lot 124,795 124,795
Sub Total II 972,252
III WASTE WATER INSTALLATION
Waste water 1 PVC - AW Class Pipe
Dia Ø 2 " 23.1 m 45,380 1,048,278
2 Fittings Pipe 1 lot 157,242 157,242
3 Accessories & Support Material 1 lot 262,070 262,070
Sub Total III 1,467,589
IV Testing Commisioning 1 lot 1,000,000 1,000,000
Sub Total IV 1,000,000
TOTAL I - II - III - IV 32,787,194
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Security Office 27 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - GUARD HOUSE
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 1 PK c/w : installation 1 unit 6,598,125 6,598,125 Refrigerant pipe, isolation, drain, material support, etc
2 Propeller Fan 1 unit 4,500,000 4,500,000 c/w : installation, material support, etc
Sub Total I 11,098,125
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water 1 PVC - AW Class Pipe
dia Ø 1/2 " 17 m 11,825 195,113 dia Ø 3/4 " 12 m 13,545 163,895 dia Ø 1 1/4 " 12 m 25,405 307,401
2 Gate Valve dia Ø 1 1/4 " 1 unit 143,400 143,400
3 Fittings Pipe 1 lot 99,961 99,961
4 Accessories & Material Support 1 lot 166,602 166,602
Sub Total II 1,076,371 -
III WASTE & SEWAGE WATER INSTALLATION
Waste water
1 PVC - AW Class Pipe Dia Ø 2 1/2 " 12 m 56,410 682,561
2 Floor drain Ø 2 " 1 unit 250,000 250,000
3 Fittings Pipe 1 lot 102,384 102,384
4 Accessories & Support Material 1 lot 170,640 170,640
Sub Total III 1,205,585 IV Sewage water
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Security Office 28 OF 34
Project : BARRY CALLEBAUT
MECHANICAL WORKS - GUARD HOUSE
No. DESCRIPTION QTY REMARKS
(1) (2) (3) (4) (5) (6) = (3) x (5) (7)
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
1 PVC - AW Class Pipe Dia Ø 4 " 17 m 117,810 1,943,865
2 Clean Out
Dia Ø 3 " 1 unit 195,000 195,000
3 Fittings Pipe 1 lot 291,580 291,580
6 Accessories & Support Material 1 lot 485,966 485,966
Sub Total IV 2,916,411
V Testing Commisioning 1 lot 1,000,000 1,000,000
Sub Total V 1,000,000
TOTAL I - II - III - IV - V 17,296,492
Project : BARRY CALLEBAUT
MECHANICAL WORKS - WEIGHT BRIDGE
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Air Conditioning Split Wall 1 PK c/w : installation 2 unit 7,776,790 15,553,580 Refrigerant pipe, isolation, drain, material support, etc
Sub Total I 15,553,580
II Testing Commisioning 1 lot 350,000 350,000
Sub Total II 350,000
TOTAL I - II
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
MECHANICAL WORKS - WEIGHT BRIDGE
REMARKS
(7)
15,903,580
Project : BARRY CALLEBAUT
MECHANICAL WORKS - WWTP
No. DESCRIPTION QTY
(1) (2) (3) (4) (5) (6) = (3) x (5)
I VENTILATION AND AIR CONDITIONING
Supply & Install & all Air Conditioning & Ventilation works complete with equipment and accessories as shown on drawing and all as spesified
1 Exhaust Fan Wall type, 600 CFM 2 unit 3,037,500 6,075,000 c/w : installation, material support, etc
Sub Total I 6,075,000
PLUMBING SYSTEM
Supply & Install & all Plumbing works complete with equipment and accessories as shown on drawing and all as spesified
II CLEAN WATER INSTALLATION Clean Water
1 PVC - AW Class Pipedia Ø 1/2 " 3 m 11,825 39,023 dia Ø 3/4 " 7 m 13,545 89,397 dia Ø 1 1/4 " 11 m 25,405 279,455
2 Gate Valve dia Ø 1 1/4 " 1 unit 143,400 143,400
3 Fittings Pipe 1 lot 61,181 61,181
4 Accessories & Material Support 1 lot 101,969 101,969
Sub Total II 714,424
WASTE WATER INSTALLATION
III Waste water 1 PVC - AW Class Pipe
Dia Ø 2 1/2 " 8 m 56,410 451,280
2 Floor drain Ø 2 " 1 unit 250,000 250,000
3 Fittings Pipe 1 lot 67,692 67,692
4 Accessories & Support Material 1 lot 112,820 112,820
UNIT UNIT RATE
(Rp.) AMOUNT
(Rp.)
technical specification.
technical specification.
Sub Total III 881,792
IV Testing Commisioning 1 lot 1,000,000 1,000,000
Sub Total IV 1,000,000
TOTAL I - II - III - IV
MECHANICAL WORKS - WWTP
REMARKS
(7)
8,671,216