Upload
saad
View
34
Download
0
Tags:
Embed Size (px)
DESCRIPTION
HELLENIC NATIONAL METEOROLOGICAL SERVICE. COSMO GENERAL MEETING Athens , 18-21 September 2007. PLANS and EXPECTATIONS from COSMO-GR in HNMS. Ioannis Papageorgiou e-mail: [email protected]. Configuration of Cosmo-GR at HNMS. HARDWARE Machine : IBM Power4 - PowerPoint PPT Presentation
Citation preview
COSMO GENERAL MEETING
Athens, 18-21 September 2007
Ioannis Papageorgioue-mail: [email protected]
HELLENIC NATIONAL METEOROLOGICAL SERVICE
PLANS and EXPECTATIONS from COSMO-GR
in HNMS
Configuration of Cosmo-GR at HNMS
MODEL
Domain size: 40.5 x 24.5 deg
Horizontal grid spacing: 0.0625
Number of layers: 35
Time step: 30
Forecast range: 72 hrs
Initial time of model runs: 00:00
12:00
Initial state: From ECMWF
From DWD
Model version running: 4.0
HARDWARE
Machine: IBM Power4
Number of CPUs: 140 (~half CPUs from available total)
ECMWF/DWD Cosmo-GR
NMC
Initial fields
00:00 UTC, 12:00 UTC
6-7 km
MSLP
GPH
U
V
T
Td
Q
PRECI
The whole configuration of COSMO-GR
The operational domains of SKIRON-Εta and COSMO-GR
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 3 hrs
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 24 hrs
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 48 hrs
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 72 hrs
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 96 hrs
Applications in HNMS for the next COSMO-year
using Cosmo-GR
1. Incorporation in Nudging AMDAR’s buoys and AMS information
2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO)
3. Detailed verification of Cosmo-GR over all the country
4. Use of the Common Verification developed as a priority project
5. Use of SREPS results
6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea
+ 108 hrs
Thank you
for your attention
HELLENIC NATIONAL METEOROLOGICAL SERVICE
NUMERICAL FORECASTING-RESEARCH DIVISION
http://www.hnsm.gr