Upload
cory-smith
View
48
Download
3
Embed Size (px)
Citation preview
Cory Vincent Smith3100 west 16th street APT 1D Yuma, AZ 85369
Cell phone: [email protected]
KEY QUALIFICATIONS
Training Public speaking Attention to detail Respect for others Teamwork Time management Handle uncertainty
well
Adaptability Performance under
pressure Scenario planning Critical thinking Oral communication
skills strategic thinking delegation
Problem solving Change management Cultural and global
competence Ability to plan and
prepare ahead
OBJECTIVE
To obtain a position at a good company with room for growth
SUMMARY
Accomplished work center supervisor, collateral duty inspector, production control and project manager with experience in fields such as diesel mechanics, electrical wiring, lighting and marking runways and conducting training scenarios including everything from classroom education to field testing equipment. Brings passion and motivation to the work place, Loves to work with others and in groups. Interested in an engineering career that will accommodate my drive and passion for the job at hand
WORK EXPERIENCE
WORK CENTER SUPERVISOR Supervised 24 people throughout the normal workday making sure that the work
center moved flawlessly and the work load was completed in a timely manner Maintained daily scheduling and assured employees were accomplishing the task’s at
hand COLLATERAL DUTY INSPECTOR
Certified over 300 maintenance actions with a grand total of 1700 man hours of labor. Inspected torque requirements, safety wire, electrical wiring, oil levels, inventory’s, PH
values, pull test requirements and anything involving preventative maintenance and unscheduled maintenance on the M-31 arresting gear (MCEAGS), Fresnel lens optical landing system(FLOLS), AM-2 airfield matting and multiple other aspects of Marine Corps gear.
PRODUCTION CONTROLL Maintained kept track of and issued over 350 maintenance actions resulting in the
upkeep of over three million dollars of Marine Corps equipment Created monthly maintenance plans for the work center through Excel
Insured all maintenance actions were completed on time as required by the monthly maintenance plan
Directly affected the work center and unit by ensuring all equipment was in a constant state of readiness
PROJECT MANAGER Over saw the installation of 250,000 square feet of AM-2 airfield matting on the runway
at Marine Corps Base 29 Palms Took charge of 50 people and ensured they were equipped with the knowledge and
skills to complete the task at hand Ensured that workers were given proper breaks and safety precautions. Directly improved a multimillion dollar airfield for use in training and daily operations
EDUCATION
Marine Corps Fundamentals of diesel engines Corporals residence course Recruit training Pistol marksman Marine expeditionary airfield equipment
Civilian High school diploma
ADDITIONAL INFORMATION Available to begin work on 14 June 2016 Expeditionary airfield system technician (2011/11/14-present) Collateral duty inspector (2/2013-present) Production control (2/2013-present