1
CORRIGENDUM IN COMPETITIVE e-bidding FOR Online e-tenders WILL BE AS UNDER
With reference to e-tender ref. No UPF/GMP/RamalaProject/17-18/685 dated 25/01/2018
regarding Supply, erection and commissioning of gravity flow type sugar plant by Modernisation
and Expansion of existing Sugar Mill plant of 2750 TCD capacity to 5000 TCD (expandable to 7500
TCD) on 22 hrs. basis along with 27 MW Cogeneration Power Plant including construction of
Foundation & Factory Buildings on EPC basis for production of plantation white sugar at The Kisan
Sahkari Chini Mills Ltd., Ramala, Distt. Bagpat, Uttar Pradesh and discussion during pre bid
meeting dated 07/02/2018, necessary amendments are as follows :-
01. Page No. 19
22.4 The Purchaser’s evaluation of a Financial bid shall be based on FOR rate quoted by the bidder
including the cost of Supply, erection and commissioning of gravity flow type sugar plant of 5000
TCD (expandable to 7500 TCD) on 22 hrs. basis along with 27 MW cogeneration power Plant
including civil construction of foundation & Factory Buildings on EPC basis including operation
and maintenance for production of plantation white sugar at The Kisan Sahkari Chini Mills Ltd.,
Ramala, Distt. Bagpat, Uttar Pradesh. The bidder shall quote such price to include all costs as
well as duties and taxes paid, payable on components and raw material incorporated or to be
incorporated in the goods, and GST on the finished goods, if payable and price of incidental
services, freight, insurance, loading and unloading expenses, transportation expenses and other
relevant costs incidental to the delivery of the goods to their final destination as mentioned in
para 8.2 of ITB.
AMENDED AS
22.4 The Purchaser’s evaluation of a Financial bid shall be based on FOR rate quoted by the bidder
including the cost of Supply, erection and commissioning of gravity flow type sugar plant of 5000
TCD (expandable to 7500 TCD) on 22 hrs. basis along with 27 MW cogeneration power Plant
including civil construction of foundation & Factory Buildings on EPC basis including operation
and maintenance for production of plantation white sugar at The Kisan Sahkari Chini Mills Ltd.,
Ramala, Distt. Bagpat, Uttar Pradesh. The bidder shall quote such price to include all costs as
well as duties and taxes paid, payable on components and raw material incorporated or to be
incorporated in the goods, and GST on the finished goods, if payable and price of incidental
services, freight, insurance, loading and unloading expenses, transportation expenses and other
relevant costs incidental to the delivery of the goods to their final destination as mentioned in
para 8.2 of ITB. For evaluation of Financial Bid the operation and maintenance rates quoted by
the bidder will be taken as total amount of season and off-season expenditure for the respective
period as mentioned in BOQ.
02. Page No. 33
tonnes capacity per day (22 hrs) and the plant should be capable for generation of 27
MW of electricity/power. The Machinery and Equipment shall produce commercial white
sugar by sulphurless sugar process. The machinery and equipment supplied will be for
achieving the guaranteed performance parameters (Annexure B-7) specified for each
section and steam & power consumption.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
2
AMENDED AS
tonnes capacity per day (22 hrs) and the plant should be capable for generation of 27
MW of electricity/power. The Machinery and Equipment shall produce below 100
ICUMSA commercial white sugar by double sulphitation process. The machinery and
equipment supplied will be for achieving the guaranteed performance parameters
(Annexure B-7) specified for each section and steam & power consumption.
03. Page no. 35
The capacity and efficiency of the Machinery and Equipment shall be deemed to
be fulfilled if (i) within not less than one month from the start of the crushing
operations on any three consecutive full working days, an average of 5000
tonnes/22 hours crush of sugarcane on each day has been achieved; (ii) during
the same three consecutive full working days the milling plant has given fairly an
average reduced mill extraction of 95% plus (Mittal formula) at maceration of
upto 220% on fibre; (iii) The plant while producing white sugar of any grade from
L-30, M-30, S-30, shall achieve an average reduced boiling house recovery
(Gundu Rao formula) of 90%; (iv) The steam generating plant shall give an
average thermal efficiency of 70% (IS code 13980-1995) on G.C.V. of bagasse
having 50% moisture; (v) The power generating plant shall give an average
steam consumption of 5.27 Kg per KW per hr during season and 4.1 kh per KW
per hr during off-season; and (vi) every unit including those in the boiling house
has performed according to the capacity and efficiency stipulated in the
Agreement including Annexures.
AMENDED AS
The capacity and efficiency of the Machinery and Equipment shall be deemed to be
fulfilled if (i) within not less than one month from the start of the crushing operations on
any five consecutive full working days, an average of 5000 tonnes/22 hours crush of
sugarcane on each day has been achieved; (ii) during the same five consecutive full
working days the milling plant has given fairly an average reduced mill extraction of 95%
plus (Mittal formula) at maceration of upto 270% on fibre; (iii) The plant while producing
white sugar of any grade from L-30, M-30/31, S-30/31, shall achieve an average
reduced boiling house recovery (Gundu Rao formula) of 90%; (iv) The steam generating
plant shall give an average thermal efficiency of 70% (IS code 13980-1995) on G.C.V. of
bagasse having 50% moisture; (v) The power generating plant shall give an average
steam consumption of 5.27 Kg per KW per hr during season and 4.1 kh per KW per hr
during off-season; and (vi) every unit including those in the boiling house has performed
according to the capacity and efficiency stipulated in the Agreement including
Annexures.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
3
04. Page No. 46
The above said committee would tabulate the results achieved during the trial period of
seven consecutive days for the Machinery and Equipment indicating clearly whether
performance has been achieved or not (reference format is given under Annexure-IX
and X to this Agreement)
AMENDED AS
The above said committee would tabulate the results achieved during the trial period of
seven consecutive days for the Machinery and Equipment indicating clearly whether
performance has been achieved or not (reference format is given under Annexure-B8 to
this Agreement).
05. Page 50
Clause 12.0 (m) will be added for Spare parts will be supplied for trouble free
operation of the plant as per new annexure B14.
Mill and Boiling house
Annexure B14
S. No. Equipment Spares Quantity
1 Cane weigh bridge
Electronic cards 1 no
2 Cane unloader
EH Thrusters 1 nos
Brake shoe liner 1 Set
3 Cane Carrier
Slats 20 nos
Chain 10 m
Bush pin 50 nos
4 Cane chopper
Fasteners 50 nos
Knives 08 nos
6 Cane leveller
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
4
Fasteners 50 nos
7 Fibrizor
Hammer 08 nos.
Fastners 50 nos
8 Rake elevator/IRC
Rakes 24
Chain 18 m
9 Bagasse belt conveyor (Discharge of last
mill)
Idlers 02 nos
10 Mill
Twin set packing &O ring 4 set
Polyester sling suitable 8 nos
11. Mill side roller and top roller bearings 1 set
12 Rotary screen
Guide roller 02 nos
13 Mill House Crane
Brake liner One set
Brass shim for hydraulic ram 36 nos
14 Juice heater
Neoprene rubber 1Set
Pressure gauge 1Set
15 Evaporator
Sight and light glass 06 Nos
Rubber joint 09 Nos
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
5
Pressure gauge 1Set
Sight glass frame 03 Nos
16 Vacuum pan
Pressure gauge 1Set
Cut over valve cylinder 1 Nos
Discharge valve cylinder 1 Nos
Proof stick 1 Nos
17 MOL Station
Lime elevator bucket with fastners 02 Nos
18 Air blower for sulphur burner
Oil seal 1 Set
Suction filter 1 set
19 Air Compressor
Oil filter 1 set
20 Clarifier and vacuum filter
Monarch nozzles 10 nos
Vacuum hose 04 Nos.
Rubber scraper 01 Lot
S.S Screen 08 nos
21 Batch type Centrifugal machine
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
6
Brass working screen 01 set
22 Continuous centrifugal machine
Nickel working screen for C-Fore 05 Set (O.06mm)
23 Grass hopper
Wooden strip 20 Nos
Wooden yoke one set
24 Fluidized sugar drier
Rubber spider for tensioner 20 nos
25 Sugar bag stiching machine 01 Nos.
26 Sugar elevator
Bucket 16 Nos
Fastners one set
27 SS Tube
Juice heater 200 nos
Semi kestner
Evaporator 105 nos
Vacuum pan 170 nos
Continuous pan
Tubes expanders 05 nos for 45mm & 09
nos for 102 mm
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
7
28 Spare for pumps
O ring and gasket for centrifugal pumps 1 Set
29 Valves, Packing, jointing sheet
Gland packing for globe valve 1 Set
Gland packing for sluice valve 1 Set
Rubber jointing sheet 1 bundle each (6mm,
8mm, 10mm&12mm)
Asbestos rope 06mm – 05 bundle
12mm – 05 bundle
Butterfly valve 65,150,300 mm One each type
Sluice valve 100 &200 mm One each type
Ball valve 20,25 &50 mm One each type
NRV 25,65,80,100,125 &150 mm One each type
30 Instrument
Pressure gauge 1 no of each type
Temperature gauge 1 no of each type
RTD 1 no of each type
Pressure transmitter 1 no of each type
Temperature Transmitter 1 nos.
Pipe ½ “ CS
Pipe ½ “ SS
20 Mtrs.
20 Mts.
SS Tube 6mm 20 Mtrs.
SS Union ½ “ 10 Nos.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
8
SS syphon ½ “ 05Nos.
SS Condensate pot 05 Nos.
3 way Manifold 08 Nos.
2 Way Manifold 10 Nos.
SS Elbow ½” 10 Nos.
31 Main turbine Rotor both end bearings 1 set each sde
32 Electrical
Amp. Meter 250/5 06 nos
No volt coil MNX 95-140,240V ,AC 03 Nos
No Volt Coil MNX 9-40,110V 02 Nos
No Volt Coil MNX 95-140,110V 01 Nos
Control Transformer For Cane Unloader
415/110V
1 Nos
Current collector for EOT Mill Crane 1 Set
Spare Part Kit MNX 110 L/T Make 1 Nos
Spare Part Kit for contactor MNX-25 L/T
Make
1 Nos
Spare Part Kit for contactor MNX -18 L/T
Make
1 Nos
Air Break Auxiliary Contactor 230 Volt L/T
Make
06 Nos
33 Antifriction Bearing nos
NU-226 1 Nos.
7228-BCBM 2 Nos.
NU-230 2 Nos.
Complete set of bearings for cont. machine 1 set
22218 1 Nos.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
9
Taper roller bearings for Hoppers with
sleeves
1 Set
Complete set of bearings for A messecute
centrifugal machine.
1 Set.
51222 1 Nos.
22220 1 Nos.
32211 2 Nos.
2213 1 Nos.
7307 2 Nos.
2215 1 Nos.
SPECIAL TOOLS AND TACKLE
S. no. Component Description Quantity
A For mill and boiling house
1 Spanner for head stock foundation bolt 1 no
2 Spanner for push pull screw 1 no
3 Mill setting tool 1 no
4 Straight edge of 5 meter length 1 no
5 Hydraulic Pipe winch 1 no.
6 Hydraulic testing Kit for Mill House 1 no
7 Torque winch for rotary screen 1 no
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
10
BOILER
S.no. Component Description Quantity
1 BOILER TUBES
Tube for furnace 6 m
Main bank 40 NB 16 nos
Superheater 07 nos
Air heater 1% of total quantity
2 Grate bar for travelling grate 5% of total quantity
3 FD, SA & ID fan bearing 01 no
4 BOILER FEED PUMP
Balancing and counter balancing disks
1 sets
Wearing ring
1 no.
Retaining ring
1 no.
Bearing
1 No.
Mechanical Seal
1 No.
5 Instrumentation control valve gland
packing
1 pkt.
6
Manhole gaskets for drum
1 set
7 SOOT BLOWER SPARE
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
11
Packing
2 set
Bearing 2 set
Geared unit with motor (LRSB) 1 no
8 Deaerator
Spray Nozzles 2 nos
Gaskets 2 set
9 VALVE
Globe valve 15 NB -1500 06 nos
Gate valve 15 NB -1500
05 nos
Globe valve 20 NB- 1500
03 nos
Globe valve 25 NB-1500
02 nos
Gate valve 25 NB- 1500 04 nos
Gate valve 40 NB-1500
01 no
Globe valve 40 NB-1500 01 no
NRV 50 NB-1500 01 nos
Gate valve 25 NB -800
03 nos
Globe valve 40 NB-800
06 nos
Gate valve 20 NB- 800 02 nos
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
12
10 INSTRUMENT
Pressure Transmitter 05 nos
Temperature Transmitter 02 nos
Thermocouple 03 nos
Pressure gauge( 0-2.5 kg/cm2)
01 no
Pressure gauge( 0-6 kg/cm2)
03 nos
Pressure gauge( 0-40 kg/cm2)
01 no
Pressure gauge( 0-160 kg/cm2)
01 no
Pressure gauge( 0-200 kg/cm2)
01 no
Pressure gauge( 0-250 kg/cm2)
01 no
S. no. Material Description Quantity
1 General consumables
Gland packing 6 mm 2 bundle
Gland packing 8 mm 2 bundle
Gland packing 10 mm 2 bundle
Gland packing 14 mm 2 bundle
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
13
Pull cord switch 2 nos
Belt sway 2 nos
Zero speed switches 2 nos
2 ASH HANDLING SYSTEM
Dome valve seals 24 nos
O Rings 6 nos
Y type angle valve seals 2 nos
Pressure gauge 4 nos
Pressure switches 2 nos
Air filter regulator 1 no
Solenoid valves 4 nos
Gear box oil seal 2 set
Gear box coupling spider 2 nos
Gear box coupling bolts 2 set
3 EOT Crane
Brake liner One set
Overload relay for limit switch 1 set
Contact point for limit switch 2 set
HRC fuse links for all motor 1 set
Seals for each thrusters brake 1 set
Fixed and moving type contacts 1 set
4 Cooling tower
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
14
O ring and oil seal for gear box 1 set
5 STG
RTD of journal bearing (Turbine) 2 nos
RTD for thrust bearing(Turbine) 2 nos
Speed probe(Turbine/Generator) 2 nos
O ring for governor 1 no
Gasket for Governor 1 no
Packing for governor 1 no
Packing for MOP,AOP,EOP 1 no each
Lube oil filter 1 no
Control oil filter 1 no
Antifriction bearing for
AOP,MOP,EOP,BLOWER,CENTRIFUGE,ACC
Fan, Drain pump
1 set each
4 Bearing
Bearing for raw water transfer pump. UF
backwash pump.RO feed pump, HP pump, MB
feed pump, MCW pump, ACW pump, DM
water transfer pump.
1 set each
5 Rubber O ring
O ring set box 1 box
6 Gasket
L P Steam joint gasket 4 sheet
7 Air Compressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
15
06. P
a
g
e
5
4
1
5
.
1
.
9
T
h
e
a
d
v
a
n
c
e
g
6. Page 54 15.1.9
The advance given under clause 15.1.1 and 15.1.2 shall carry interest @8% per annum
on reducing balance from the date of issue of cheque/bank draft till the progressive
adjustment in the bills under Clause 15.1.3.
AMENDED AS
15.1.9 The advance given under clause 15.1.1 and 15.1.2 shall carry interest @12% per
annum on reducing balance from the date of issue of cheque/bank draft till the
progressive adjustment in the bills under Clause 15.1.3.
7. Page No. 71
Suction filter element 1 no
Air/Oil Filter 1 no
All Gaskets 1 no
8 Bagasse elevator and MBC
Roller chain 30 m
9 Valve
Butter fly valve 150 mm 2 nos
Ball valve 15mm,50mm,80 mm 2 nos each
Globe valve 80 mm 04 nos
Gate valve 25mm,50mm 2 no. each
Sluice valve 50mm,100mm,150mm 1 no each
10 Belt conveyor
Idler roller - 350mm X 100 mm 3 nos
Idler roller- 200mm X 150 3 nos
Idler roller – 1800 mm 1 no
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
16
The fibrizor should have detachable domite tips made of special shock
resistance alloy steel and secured through 50 mm dia S.S. pins, the hammer
shank and fibrizer disc shall have SS bushes to suit S.S. pins. of minimum 60
mm, hubs shall be of cast steel fitted on rotter shaft. One complete spare set
of hammers with domoite tips shall also be provided.
AMENDED AS
The fibrizor should have detachable domite tips made of special shock
resistance alloy steel and secured through 60 mm dia S.S. pins, the hammer
shank and fibrizer disc shall have SS bushes to suit S.S. pins. of minimum 60
mm, hubs shall be of cast steel fitted on rotter shaft. One complete spare set
of hammers with domoite tips shall also be provided.
8. Page No. 72
Two no. of flywheel of CI grade FG 260, IS-210 machined and well balanced shall be provided at the either outer ends of the shaft.
AMENDED AS
“This statement is to be deleted”
9. Page 74.
The linear speed shall not be more than 25 m/minute.
AMENDED AS
The linear speed shall not be more than 30 m/minute.
10. Page No. 85 – Serial No. 2.1
2.1 Boiling House Design Philosophy
The Boiling house shall be designed for crushing 5000 Tons of cane per day (TCD) on 22
hrs. basis i.e. 227.27 TCH with a provision for future expansion to 7500 Tons of cane per
day (TCD) on 22 hrs. basis to produce direct consumption white plantation sugar on
turnkey basis. It shall be super gravity flow plant. Process of clarification shall be double
sulphitation. Syrup clarification process shall be considered. Three and half massecuite
boiling process shall be adopted. Overall steam consumption of sugar plant shall be
around 36.04% on cane at 270% imbibition on fiber. Live steam connection shall not be
provided in boiling house except at sulphur furnace for start up / emergency requirement.
Butter fly valves shall be used in the system except for special duty like cutover valves,
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
17
double beet valves, Massecuite suction line etc. Exhaust steam / vapour valves shall be
rubber seated right angle valves. Common vapour header valves of evaporator station
which are not approachable from main platform shall have motorised operation compatible
to DCS. The number of motorised valves required for these duty shall be decided by
purchaser as per the site condition, For B continuous pan steam valve shall be of Butterfly
type – auto control compatible to DCS. All pans shall have magnetic flow meter in hot
condensate line to pan feed headers.
AMENDED AS
2.1 Boiling House Design Philosophy
The Boiling house shall be designed for crushing 5000 Tons of cane per day (TCD) on 22
hrs. basis i.e. 227.27 TCH with a provision for future expansion to 7500 Tons of cane per
day (TCD) on 22 hrs. basis to produce direct consumption white plantation sugar below
100 ICUMSA on turnkey basis. It shall be super gravity flow plant. Process of clarification
shall be double sulphitation. Syrup clarification process shall be considered. Three and
half massecuite boiling process shall be adopted. Overall steam consumption of sugar
plant shall be around 36.04% on cane at 270% imbibition on fiber. Live steam connection
shall not be provided in boiling house except at sulphur furnace for start up / emergency
requirement. Butter fly valves shall be used in the system except for special duty like
cutover valves, double beet valves, Massecuite suction line etc. Exhaust steam / vapour
valves shall be rubber seated right angle valves. vapour header valves of evaporator
station which are not approachable from main platform shall have motorised operation
compatible to DCS. The number of motorised valves required for these duty shall be
decided by purchaser as per the site condition, For B continuous pan steam valve shall be
of Butterfly type – auto control compatible to DCS. All pans shall have magnetic flow
meter in hot condensate line to pan feed headers. Magnetic flow meter with indicating,
integrating and recording facility shall be provided in exhaust steam condensate line from
boiling house to boiler.
11. Page No. 85
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
18
All the equipments and system shall be installed indoor. Span of boiling house
(Evaporator, Pans & drier house) shall not be less than 24 meter. Juice clarification
section shall have proper layout subjected to the approval of purchaser. Proposed FFE
shall be outdoor. Design of the FFE shall be proven one subjected to efficient operation in
the Industry. Vertical continuous crystallisers shall have proper coverage. Operator shall
have proper passage from boiling house to top of crystalliser and shall have safe
operation conditions.
AMENDED AS
All the equipments and system shall be installed indoor. Span of boiling house
including clarification house, pan house, centrifugal, drier house shall not be less than 24
meter. Juice clarification section shall have proper layout subjected to the approval of
purchaser. Proposed FFE and complete evaporator system shall be outdoor. Design of
the FFE shall be proven one subjected to efficient operation in the Industry. Vertical
continuous crystallisers shall have proper coverage. Operator shall have proper passage
from boiling house to top of crystalliser and shall have safe operation conditions.
12. Page No. 87
(viii) A maximum pressure drop of 2.0 kg/cm2 g. shall be allowed from boiler outlet
to the inlet of power turbine.
AMENDED AS
(viii) A maximum pressure drop of 1.0 kg/cm2 g shall be allowed from boiler outlet to
the inlet of power turbine.
(ix) No pressure drop is allowed in the exhaust steam pressure between Power
turbine station and at the inlet of evaporator station
AMENDED AS
(ix) No pressure drop is allowed in the exhaust steam pressure between Power
turbine station and at the inlet of evaporator station. Exhaust steam pressure at
FFE1 (evaporator station) shall be 1.5 kg/cm2 g to 2.0 kg/cm2 g.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
19
13. Page No. 92
i. 2.5 ata flow
AMENDED AS
i. 2.5 ata flow to 3.0 ata flow at evaporator station
14. Page No. 98
SS 304 grade pipe of desired size/ thickness (Schedule 20) for ultimate capacity shall be
provided from mill house to entry of evaporator first body.
AMENDED AS
SS 304 grade pipe of desired size/ thickness (Schedule 20) for 5000 TCD shall be
provided from mill house to entry of evaporator first body.
15. Page No. 101
Sulphited juice pumps
Two (2) nos. one as standby, centrifugal pumps each of 350 m3/hr, capacity 75 m head,
1440 rpm with VFD. Sulphited juice receiver level indication and pumps drive speed
shall be compatible for centralized control DCS system.
AMENDED AS
Sulphited juice pumps
Two (2) nos. one as standby, centrifugal pumps each of 350 m3/hr, capacity 75 m head,
1440 rpm with VFD. Sulphited juice receiver level indication and pumps drive speed of
C.I. construction with SS impeller, shaft & sleeve shall be compatible for centralized
control DCS system.
16. Page No. 119
Automation at Evaporator Station: One set of automation for each set shall be provided at evaporation station to control clear juice flow, exhaust steam flow and final brix at evaporation station without effecting pan working with centralised controlled DCS system.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
20
The evaporator control shall be DCS based with temperature, pressure, level and
brix control/monitoring.
Juice flow and recirculation system in FFE shall be monitored through magnetic flow meters
as per standard practice and shall be compatible to centrally controlled DCS system.
Requirement of motorised valves is provided in design philosophy.
AMENDED AS
Automation at Evaporator Station
One set of automation for each evaporator set independently shall be provided at evaporator
station to control screened juice flow, sulphited juice flow, clear juice tank level & its flow,
exhaust steam, vapour steam flow and final syrup brix at evaporator station without effecting
pan working with centralized controlled DCS system. All requirements shall be in the scope of
supplier.
Exhaust steam valves and vapour valves in the system shall have motorized controlled system
with auto operation compatible to DCS operation.
The evaporator control shall be DCS based with temperature, pressure, juice level and brix
controlled. Delta T & Delta P of evaporator bodies shall be monitored & recorded.
Juice flow & recirculation system in FFE shall be auto controlled & monitored through magnetic
flow meters as per standard practice and shall be compatible to central controlled DCS.
Motorised exhaust steam and vapour valves with auto operation shall be provided wherever
required in the system.
Emergency juice and hot water flow controlled loop shall be in place with centralized DCS
based auto operation to ensure desired level of wetting in tubes to avoid damage of tubes.
17. Page No. 119
Chemical Tank: : Quantity : One No. Type : Cylindrical Capacity : 250 HL
MOC : SS 304 Chemical Pumps : : Quantity : 2 Nos. (1 W + 1 SB) Capacity : 100 m3/hr Head : 17m MOC: :
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
21
Casing : CF8 Internals : CF8 Shaft : SS410 Drive : Motor : Suitable, 1440 rpm Type TEFC Sq. cage (IE3 Grade)
AMENDED AS
Chemical Tank: : Quantity : One No. Type : Cylindrical Capacity : 250 HL MOC : SS 304 Chemical Pumps : :
Quantity : 2 Nos. (1 W + 1 SB) Capacity : 300 m3/hr Head : 22m MOC: : Casing : CF8 Internals : CF8 Shaft : SS410 Drive : Motor : Suitable, 1440 rpm Type TEFC Sq. cage (IE3 Grade)
18. Page 122
Suitable pump with receiver bottle for exhaust condensate extraction with standby
arrangement shall be provided. Pump capacity not less than 80 cu.m./ hr., with AC VFD
drive RPM not exceeding 1500 and shall be compatible to centralized control DCS system.
AMENDED AS
Suitable pump with receiver bottle for exhaust condensate extraction with standby
arrangement shall be provided. Pump capacity not less than 100 cu.m./ hr., with AC drive
RPM not exceeding 1500 and shall be compatible to centralized control DCS system.
19. Page 122
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
22
The bottom saucer shall be welded to the calandria. The design must ensure that the
expansion of tubes in the bottom tube plate is carried out without any difficulty.
An efficient juice distribution system should be provided to ensure uniform distribution of
juice under the bottom tube plate.
All MS fabricated pipes for vapour shall be of 8 mm thickness upto 800mm dia size and of
10mm over 800mm size.
AMENDED AS
The bottom saucer shall be welded to the calandria. The design must ensure that the
expansion of tubes in the bottom tube plate is carried out without any difficulty.
An efficient juice distribution system should be provided to ensure uniform distribution of
juice under the bottom tube plate.
The Robert bodies shall have a vapour space height between the top tube plate and
bottom of the umbrella (cylindrical portion of the vapour space) not be less than 2.5 times
the calendria height.
All MS fabricated pipes for vapour shall be of 8 mm thickness upto 800mm dia size and of
10mm over 800mm size.
20. Page 124
2.8 Syrup Sulphitation Unit – 2 Nos. (One Standby)
Two continuous syrup sulphitation units each of 120 HL working capacity capable to
process syrup of 65 deg. Bx., with working height of 1.5 m. of syrup column above the
gas distribution, stack gas recovery unit constructed of 10 mm thick mild steel plate
complete with SO2 gas absorption arrangement and all necessary pipelines, valves etc,
shall be provided.
AMENDED AS
2.8 Syrup Sulphitation Unit – 2 Nos. (One Standby)
Two continuous syrup sulphitation units each of 120 HL working capacity capable to
process syrup of 65 deg. Bx., with working height of 1.5 m. of syrup column above the
gas distribution, stack gas recovery unit constructed of 10 mm thick mild steel plate and
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
23
bottom cone of 12 mm complete with SO2 gas absorption arrangement and all
necessary pipelines, valves etc, shall be provided.
Syrup extraction and sulphited syrup tanks indication along with auto control of pH of
sulphited syrup.
21. Page 124
Heat recovery from exhaust steam condensate through free flow plate type heat
exchange shall be done.
AMENDED AS
Heat recovery from exhaust steam condensate through free flow plate type heat
exchange shall be done by pass arrangement shall also be provided.
22. Page 125
02 Nos of plate type heat exchanger shall be provided (One working and one standby)
to heat suitable condensate for super heated wash water operating on exhaust steam to
maintain the final desired temperature of 120 deg. C of condensate for A centrifugals.
Arrangement shall be provided for raw juice 3rd heating and heat exchange unit for hot
air blower for sugar hopper using condensate of suitable temperature.
AMENDED AS
02 Nos of plate type heat exchanger shall be provided (One working and one standby) to
heat suitable condensate for super heated wash water operating on exhaust steam to
maintain the final desired temperature of 120 deg. C of condensate for A centrifugals
with suitable capacity pumps (1W+1S).
Arrangement shall be provided for heat exchange unit for hot air blower for sugar hopper
using condensate of suitable temperature.
23. Page 128
Horizontal U-shaped MS fabricated, open top crystallizer with sturdy ribbon type stirrer
conforming to following specification shall be supplied. The seed crystalliser shell shall
be min. of 8 mm thick and end plate 12 mm thick with stiffeners.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
24
AMENDED AS
Horizontal U-shaped MS fabricated, open top crystallizer with sturdy ribbon type stirrer
conforming to following specification shall be supplied. The seed crystalliser shell shall
be min. of 12 mm thick and end plate 16 mm thick with stiffeners.
24. Page 129
The vacuum crystallisers shell shall be min. of 10 mm thick and end plate 16 mm thick
with necessary stiffeners.
AMENDED AS
The vacuum crystallisers shell shall be min. of 12 mm thick and end plate 16 mm thick
with necessary stiffeners.
25. Page 132
A cylindrical vapour space of 2.5 m shall be provided having centrifugal type
catchall of efficient design. The vanes of entrainment separators shall be of
minimum 5 mm thick AISI-304.
AMENDED AS
A cylindrical vapour space of 2.5 m shall be provided in the cylindrical portion
above the strike level having centrifugal type catchall of efficient design. The
vanes of entrainment separators shall be of minimum 5 mm thick AISI-304.
26. Page 133
Provision shall be made in lay out for ultimate capacity of 7500 TCD.
AMENDED AS
Provision shall be made in lay out for ultimate capacity of 7500 TCD for B & C massecuite continuous pan.
27. Page 134
2.14.1Horizontal U – Shaped Crystallizers
C - massecuite : Air cooled 85 T each 01 No.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
25
AMENDED AS
2.14.1Horizontal U – Shaped Crystallizers C - massecuite : Air cooled 85 T each 02 Nos.
28. Page 144
Following continuous centrifugal machines shall be supplied.
A1– massecuites 01 no. 1500 mm dia, 0.06 mm screen,
AMENDED AS
Continuous centrifugal machines.
A1– massecuites NIL 1500 mm dia, 0.06 mm screen Note: Required 01 no. continuous centrifugal machine of 1500 mm dia, 0.06 mm screen
shall be used from the existing plant.
29. Page 145
Continuous Centrifugal Machines for B single curing shall be capable to cure B
massecuite of minimum 96 Brix and purity not exceeding 65.00 at the rate of 15 Tons
per hour.
Continuous Centrifugal Machines for C1 and A1 shall be capable to cure C1 and A1
massecuite of minimum 94-96 Brix at the rate of 12- 15 Tons per hour.
Continuous Centrifugal Machines for CAW magma curing shall be capable to cure CAW
magma at the rate of 15 Tons per hour.
AMENDED AS
Continuous Centrifugal Machines for B single curing shall be capable to cure B
massecuite of minimum 96 Brix and purity not exceeding 65.00 at the rate of 16-18 Tons
per hour.
Continuous Centrifugal Machines for C1 and A1 shall be capable to cure C1 and A1
massecuite of minimum 94-96 Brix at the rate of 12- 15 Tons per hour.
Continuous Centrifugal Machines for ‘CAW’ magna curing shall be capable to cure
‘CAW’ magna at a rate of 16-18 Tons per hour.
30. Page 148
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
26
Following grass hopper conveyors for sugar shall be supplied. The plain tray hopper
shall be placed below the centrifugal machines.
Plain tray type One no., 2000 wide, minimum 300 mm inside height,
12 m minimum effective length
Fluidised bed sugar drier for
ultimate capacity complete in all
respect for ultimate capacity
One no., 2000 wide, minimum 300 mm inside height,
12 m minimum effective length
Multi tray with rori separator One no.,2000 wide, minimum 300 mm inside height,
12 m minimum effective length
AMENDED AS
Following grass hopper conveyors for sugar shall be supplied. The plain tray hopper
shall be placed below the centrifugal machines.
Plain tray type One no., 2000 wide, minimum 300 mm inside height,
12 m minimum effective length
Multi tray hopper One no. , 2000 wide, maximum 300 mm inside height,
12 m effective length
Fluidised bed sugar drier
complete in all respect for
ultimate capacity
One no., 2000 wide, minimum 300 mm inside height,
12 m minimum effective length
Multi tray with rori separator One no.,2000 wide, minimum 300 mm inside height,
12 m minimum effective length
Fluidized bed sugar drier shall be placed after 2nd multi tray hopper.
31. Page 149
2.24 Sugar Storage Bins Existing Sugar Storage bins will be used.
AMENDED AS
2.24 Sugar Storage Bins
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
27
Existing Sugar Storage bins will not be used. Three (3) nos., sugar bins each
suitable for 12 hours holding capacity in mild steel construction, complete with suitable support
structure, platform railings, staircase etc., shall be provided. The bins shall be in round shape
with a conical bottom and shall be equipped with level controls. The capacity of bin shall be as
under –
• 250 Ton of net holding capacity of M Grade Sugar
• 100 Ton of net holding capacity for S Grade Sugar
• 50 Ton of net holding capacity for L Grade Sugar
32. Page 153
2.30.4 Sugar bags handling system
Suitable sugar bags handling system shall be provided. This shall include sugarbags
conveyors, elevators, stacks and re-claimers system, transfer of sugar bags in the
warehouse and to proposed sugar godowns as per layout.
AMENDED AS
2.30.4 Sugar bags handling system Suitable mechanised arrangement is to be provided for shifting of sugar bags from drier house to new sugar godowns through necessary belt conveyors. Suitable sugar bags handling system shall be provided. This shall include sugarbags
conveyors, elevators, stacks and re-claimers system, transfer of sugar bags in the
warehouse and to proposed sugar godowns as per layout.
33. Page 154
2.30.7 Modern laboratory shall be established for analysis required to be carried
out in sugar factory.
Well equipped laboratory with a facility to analyse water, Mill house, boiler, sugar
house products which includes ICUMSA value, all special analysis, boiler water,
condensate water, evaporator scaling and BOD, COD, TDS testing / analysis for
ETP plant etc. along with desired chemicals and apparatus shall be provided as per
annexure.
AMENDED AS
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
28
2.30.7 Modern laboratory shall be established for analysis required to be carried
out in sugar factory.
Well equipped laboratory with a facility to analyse water, Mill house, boiler, sugar
house products which includes ICUMSA value, all special analysis, boiler water,
condensate water, evaporator scaling and BOD, COD, TDS testing / analysis for
ETP plant etc. along with desired chemicals and apparatus shall be provided as
given below.
Standard Sugar Lab Equipment & Apparatus requirements:
SN Lab Equipment Purpose of the analysis
1 Mechanical Stirrer for sugar solution for 20 sample
Preparing Sugar Solution
2 Double Distillation Plant (5 litre) For preparation of Distilled Water for preparing Reagent
3 Hot Air Oven For Mositure
4 Viscometer For measurement of Viscosity of Massecuite
5 Digital Pipette For Titration analysis
6 Digital Burette For Titration analysis
7 Tyler Mesh For measurement of Grain Size
8 Lab Crusher For Cane Analysis & Juice Extraction
9 Vacuum Pump For Vacuum Filtration
10 Vacuum Filtration Assembly For filtration of Sugar Solution
11 Water Bath For maintaing temperature
12 Digital Weighing scale for weighing
13 pH Meter with Stirrer measuremnt of pH
14 Conductivity Meter measuremnt of conductivity
15 Spectrophotometer with double beam
For colour, pHosphate, Dextran, SO2, Absorbancy, etc.
16 Hot Plate with thermometer For Heating
17 Hand Refractometer For measuring Cane Brix
18 Digital Microscope Measuring the crystal size
19 Vacuum Oven For sugar Moisture
20 Rain Gauge For rain measurement
21 Dessicator For cooling of material
22 Turbidity Meter Turbidity Measurement
23 Rapi Pol Extractor Bagasse Pol measurement
24 Magnetic Stirrer with magnetic rod
For dissolving sugar.
25 Wet & Dry Bulb Thermometer/ Digital Humidity Meter
For Humidity Measurement
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
29
26 Maximum & Minimum Thermometer
Max. & Minimum temp measurement
27 Digital Thermometer For Temp measurement
28 BOD Incubator For BOD measurement
29 COD Photometer (Analyser) For COD measurement
30 Refrigerator- 250 Liter For storing Reagent
31 Sieve Shaker with speed regulator
for Grading measurement
32 Dirt Correction Apparatus For measuring Dirt in Juice
34. Page 165
Ash hoppers shall be provided below each furnace and boiler height shall be adjusted such that manually operated trolleys can be placed below the ash hoppers. The boiler furnace shall be placed at elevated height of about 6 m level from ground. M.S. chequered plate operating platform at 6 m level, M.S. beams and columns up to 6 m level shall also to be provided by the Seller. The furnace design shall incorporate necessary man holes, peep holes, and openings for fuel distributor etc. The down comers, supply pipes and risers sizing shall be based on circulation calculation. The furnace shall be located at 6.0 meters level above F.F.L. on R.C.C. Platform.
AMENDED AS
Ash hoppers shall be provided below each furnace and boiler height shall be adjusted such that manually operated trolleys can be placed below the ash hoppers. The boiler furnace shall be placed at elevated height of about 6 m level from ground. M.S. beams and columns up to 6 m level shall also to be provided by the Seller. The furnace design shall incorporate necessary man holes, peep holes, and openings for fuel distributor etc. The down comers, supply pipes and risers sizing shall be based on circulation calculation. The furnace shall be located at 6.0 meters level above F.F.L. on R.C.C. Platform.
35. Page 167
The Fan rated speed shall not be more than 750 RPM. AMENDED AS
The Fan rated speed shall be max 1000 RPM.
36. Page 182 4.2 Lubrication System –
The coolers shall be of shell and tube type with Admiralty quality brass tubes.
AMENDED AS
4.2 Lubrication System – The coolers shall be of shell and tube type with Admiralty quality S.S tubes.
37. Page 185
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
30
The Condenser shall be designed to operate with 35°C inlet cooling water.
AMENDED AS
The Condenser shall be designed to operate with 32°C inlet cooling water.
38. Page 186 The outlet steam from the boiler to be conveyed through carbon steel main steam piping to a
common steam header and from the header with necessary valves and gauges etc. to the turbo
generator.
AMENDED AS
The outlet steam from the boiler to be conveyed through carbon steel main steam piping with necessary valves and gauges etc. to the turbo generator.
39. Page 193
The bus trunking shall also have a neutral bus bar of half the size of the phase bus. Suitable rating bus trunking, tie trunking etc. shall be provided for the installation of bus coupler for 2nd TG set, VCB panel distribution transformer and export transformer panel etc. for future expansion.
AMENDED AS
“to be deleted”
40. Page 266
vi) Moisture % last mill bagasse shall not be more than 49 + 0.5 with bagasse pol of 1.8 + 0.1.
AMENDED AS
vi) Moisture % last mill bagasse shall not be more than 49 + 0.5 with bagasse pol of
1.7 + 0.1.
41. Page 271
This is to certify that M/s………………………………….. have supplied,
supervised the erection and commissioning of plant & machinery having
crushing capacity of 5000.TCD (expandable to 7500 TCD) on 22 hrs basis
commissioned on date …………… and have given the successful performance
as per the laid down performance parameters given at Annexure-VII ____The
detail of performance parameters achieved during the performance trial for the----
-----------are as under:-
Sr.No. Detail of Performance Parameters PP laid down PP
Achieved
as per Annexures
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
31
AMENDED AS
This is to certify that M/s………………………………….. have supplied,
supervised the erection and commissioning of plant & machinery having crushing
capacity of 5000.TCD (expandable to 7500 TCD) on 22 hrs basis commissioned on
date …………… and have given the successful performance as per the laid down
performance parameters given at Annexure-B7 ____The detail of performance
parameters achieved during the performance trial for the---------------are as under:-
Sr.No. Detail of Performance Parameters PP laid down PP Achieved
as per Annexures B7 42. Page 399
2.31.2 CPCB & SPCB NORMS The water/ effluent management system shall be designed for achieving norms laid
down by central and state pollution control board / Govt. norms. Fifteen days storage
capacity of treated effluent shall be provided at ultimate capacity as per norms. vide
Environment Act 1986 and Amendment Rules 2016 as details given below:
AMENDED AS
2.31.2 CPCB & SPCB NORMS A leak proof brick lining storage pit (lagoon) for fifteen days effluent storage for
expandable capacity 7500 TCD during no irrigation demand period will be constructed.
The water/ effluent management system shall be designed for achieving norms laid down
by central and state pollution control board / Govt. norms vide Environment Act 1986 and
Amendment Rules 2016 as details given below:
43. Page 401
Clause 2.33 will be added
Irrigation Management Plan
Proper Irrigation Management Plan with necessary pipelines, valves and pumps will be provided.
Clause 2.34 will be added
Necessary infrastructure is to be provided in drier house for maintaining hygienic condition as per
the norms of fssai.
Clause 2.35 will be added
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
32
Existing plant and machinery of RAMALA CHINI MILL will not be disturbed as it will be operated
during crushing season 2018-19.
44. Page 414
3nos. x 65% of the boiler capacity (one as standby) boiler feed water pumps along
with ACVFD variable speed TEFC/CACA, IP-55, Class-V,
AMENDED AS
3nos. x 60% of the boiler capacity (one as standby) boiler feed water pumps along
with ACVFD variable speed TEFC/CACA, IP-55, Class-V,
45. Page 419
PRDS from 12.80 ata
AMENDED AS
PRDS from 21 ata
46. Page 420
• Commissioning spares for 2 years
• AMENDED AS
• Commissioning spares.
47. Page 492
13 RCC Chimney 1 No. Not less than 65 M
Height
AMENDED AS
13 RCC Chimney 1 No. Not less than 70 M
Height
48. Page 493
31. Workshop Shed with provision of 02
rooms for office purpose inside the
workshop.
1 lot 18 M x 12 m x 5 M
AMENDED AS
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
33
31 Workshop building with provision of 02
rooms for office purpose inside the
workshop.
1 lot 26 M x 15 M x 5 M
49. Page 493
36. Roads Internal as per layout with
Bitumenous carriage way of 3.75 mtr.&
minimum total width 6.00 meter
1 lot 1.5 KM length approx
AMENDED AS
36. Cement concrete roads Internal as per
layout with carriage way of 3.75 mtr.&
minimum total width 6.00 meter
1 lot 1.5 KM length approx
50. Page 501
Evaporation,
clarification,
boiling and
sugar house
Floor at
0.00m level
and
Working
platform at
4.0
RCC framed
structure for
mill platform
and control
panel room.
Steel
frames
structure for
house
Steel truss
with colour
coated
sheet
roofing
Brick
masonry 230
mm thick
with RCC
block jalli.
Sugar house
to have fixed
Aluminium
windows
Granolithic
floor
finish(IPS)
with tremix.
Sugar
house to
have Kotah
flooring
width of
the
house
26
mXlengt
h as
required
X height
as
required.
AMENDED AS
Evaporation,
clarification,
boiling and
sugar house
Floor at
0.00m level
and
Working
platform at
4.0
RCC framed
structure for
mill platform
and control
panel room.
Steel frames
structure for
house
Steel truss
with colour
coated
sheet
roofing
except
evaporatio
n house
Brick
masonry 230
mm thick
with RCC
block jalli.
Sugar house
to have fixed
Aluminium
windows
Granolithic
floor
finish(IPS)
with tremix.
Sugar
house to
have Kotah
flooring
width of
the
house
24 m in
addition
to
evaporat
ion
house X
length
as
required
X height
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
34
as
required.
51. Page 522
6.1 Stoppage due to Mechanical & Electrical Breakdowns:– Maximum 3 %
6.2 Stoppage Due to Process, General Cleaning & Others:– Maximum 2 %
(Excluding No cane stoppages)
6.4 Gross Capacity Utilization:- Minimum 90 % Gross capacity utilization (Excluding
No cane stoppages) should be achieved at the end of crushing season.
AMENDED AS
6.1 Stoppage due to Mechanical & Electrical Breakdowns:– Maximum 1.5%
6.2 Stoppage Due to Process, General Cleaning & Others:– Maximum 1.5%
(Excluding No cane stoppages)
6.4 Gross Capacity Utilization:- Minimum 95 % Gross capacity utilization (Excluding
No cane stoppages) should be achieved at the end of crushing season.
52. Page No. 517 – 528
DRAFT OPERATION & MAINTENANCE AGREEMENT
This agreement made on the day of………..2018 (…………two thousand eighteen) at
Ramala (distt. Bagpat) between The General Manager, Kisan Sahakari Chini Mills Ltd., Ramala,
Distt. Bagpat – 276 406, Uttar Pradesh, a cooperative society registered under the U. P.
Cooperative Societies Act , having its registered office at Ramala (Distt. Bagpat) (hereinafter
called the "MILLS"), which expression shall, unless repugnant to the subject or context, include
their successors and assignees represented by ………. of the Operation and Maintenance
Contractor of the ONE PART, and the M/s. …………… a company within the meaning of
companies act, 1956, having its registered office at ……………………hereinafter called the
‘PARTY’ which expression shall, unless repugnant to the subject or context, include their legal
representatives, administrators, successors or permitted assignees represented by
Sri………………., of the OTHER PART.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
35
WHERAS the Mill are going to purchase white sugar producing plant of crush rate of
5000 TCD expandable to 7500 TCD along with cogeneration of 27 MW at Ramala (Distt.
Bagpat), under the agreement between the mills and M/s. …………………….. (hereinafter
called the Supply contractor ).
WHEREAS
Mills- ______________________is desirous of having Repair & Maintenance in Off-season
____________and operation/production services for the crushing season ___________ &
_____________in its Sugar Factory at______________, ______________(hereinafter referred
to as “MILL”) in the areas with particular reference to off season repairing and maintenance of
complete plant, Cane Crushing, Operation of Cogeneration Plant, Production of Sugar,
Predictive & Preventive Maintenance, Breakdown Maintenance, civil works related to repair &
maintenance and Operation etc. (hereinafter referred to as “Services”).
AND WHEREAS
All the repair & maintenance during off season __________ and operation of 5000 TCD sugar
plant & 27 MW Cogeneration Plant during season ___________ and __________ including
operation of 27 MW Cogeneration Plant during off-season __________ and __________ at
_______________and to provide such services required by Unit- _________________at its site
on the terms and conditions hereinafter contained:-
NOW IT IS HEREBY AGREED TO BETWEEN THE _________________(PARTY) AND MILL
AS FOLLOWS: -
1.Scope of Work;
The Operation & Maintenance will only be done for Boiler House, Power House, all DCS
Control Systems including Mill House, Boiling House etc., Instrumentations and
Centrifugals.
The scope of work will involve complete repair & maintenance of plant during off season
____________ & ________ and trial, testing & operation (along with repair &
maintenance of plant during season) of the MILL during the season ___________,
_______ and_________. The Scope of repair and maintenance work during Off season
and operation of MILL during crushing season shall include but not limited to the
followings:-
1.1 Repair & Maintenance Work during Off season_________ & _______:
1.1(1) For smooth functioning of the MILL, off season repair & maintenance of all
sections/stations from cane unloading to final sugar bagging involving all mechanical,
electrical& instrumentation work from cane unloader to final molasses storage tank
including sugar stacker, belt conveyor system, ETP & all weighing scales have to be
checked and repaired by the PARTY.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
36
1.1(2) Servicing of various equipments and machinery such as DG sets, Turbo sets, Turbines,
Compressors, Electrical Panels, tubewells etc which is normally done by manufacturer/
outside agency will be in the scope of the PARTY.
1.1(3) The PARTY will prepare a report of assessment of work and will supply a copy of report
along with required consumables/spare & machinery parts /store materials/ machinery
etc. to MILL with a copy to UP Co operative Sugar Factories Federtaion Ltd. Lucknow
(herein after called as “Federation’) at the earliest after receiving final work order.
1.1(4) All consumables and material (required by the PARTY to repair the Plant will be
arranged by the MILL.
1.1(5) Any other repair/modification work including all fabrication/ erection & commissioning
work which is required for smooth functioning of the MILL, will be done by the PARTY.
This will be applicable after final handover of plant after successful performance trials
by plant supplier.
1.1(6) All the repair & maintenance work of the MILL in Off season _________ should be
completed by the PARTY latest by end of September__________.
1.1(7) If any of the machinery item is required to be replaced by new one, the same shall be
decided jointly by PARTY Senior Technical person as nominated by them and a
Technical Staff of MILL and MILL will take approval for the same from Federation. In
case any dispute /disagreement amongst the two, the decision of MD, Federation shall
be final.
1.1(8) Quality of purchased material required for repair, maintenance and replacement shall
be inspected jointly by Chief Engineer and Chief Chemist of MILL and Sr. Technical
representative of the PARTY, and in case of any dispute with respect to quality of the
new material, the decision of MD, Federation shall be final.
1.1(9) During Off season and season expenditure incurred on labour component of rewinding
of motor and alternators (including spare and standby) will be in the scope of work of
PARTY. PARTY shall ensure that all burnt / damaged motors shall be repaired it by
their own staff or by reputed rewinder/ authorized works before start of season. New
motor will be purchased only when it is beyond repairable and for this necessary
approval from Federation must be taken.
1.1(10) Work related with cleaning of cane carrier and different houses, different drains in
plants, cleaning of Quad bodies/ Juice Heaters/ Pans etc. and shifting of scrap from
different houses to scrap yard during off season and crushing season shall be in the
scope of work of PARTY.
1.1(11) Workshop will be run & managed by PARTY in season and off-season both. Reshelled
rollers (with grooving and journal machining) will be provided by MILL but sheveron
grooving and other related workshop jobs will be in scope of PARTY. Similarly only
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
37
material of Trash Plates, scrappers & others CI/CS/GM casting material will be
arranged by MILL but related workshop jobs such as machining and grooving will be in
scope of work of PARTY. Mills & transmission gears bearings will be arranged by MILL
as per drawing.
1.1(12) Handling of material from the store to site, like lubricants, lime, sulphur, gunny bags
and chemicals etc shall be in the scope of work of PARTY.
1.1(13) To obtain NOC from Air and Water Pollution Control Board / Boiler Inspector will be in
the scope of work of the PARTY and the required Fees will be deposited by MILL.
1.1(14) Factory has got a contract Industrial power load of _____ from UP Power Corporation
Ltd (herein after referred to as UPPCL). This power is used only to start the plant and
to perform the test and trial of the plant. PARTY should utilize this grid power with
installed DG sets in such a way that maximum demand should not be exceed to
contracted load otherwise penalty will be charged by UPPCL on this account. If in any
month penalty on account of additional Maximum Demand is charged by UPPCL, same
will be borne by PARTY. However, if the demand exceeds the contract demand due to
instructions of the MILL, the penalty charged by UPPCL will be to the account of the
MILL.
1.1(15) All DG sets/Tubewells will be maintained and run by the PARTY as per direction of
MILL Technical Staff but requisite spares/parts/HSD etc will be provided by MILL.
1.1(16) During off season and season, if any machinery / machinery parts are repaired by
PARTY in outside agency 's workshop then expenditure incurred in transportation will
be born by PARTY.
1.2 Operation of MILL during crushing season ______, _____and_________:
The scope of work for smooth and fuel efficient operation of the MILL (which includes
5000 TCD sugar plant & 27 MW Cogeneration Plant during the crushing season
_________and _________ including operation of 27 MW Cogeneration Plant during off-
season ___________ and______________) will involve all jobs required for operation of
plant at all the stations and sections including civil jobs from unloading of sugarcane to
bagging of sugar including Operation of De- Mineralisation Plant, Workshop, handling of
baggase, handling of boiler ash, shifting of press mud, shifting of sugar bags to godown,
Operation of Air and Water pollution control system, Co-gen Plant and Switch yard, DG
sets, Tubewell etc. except for following jobs which will be done by MILL.
1. Sale of Sugar
2. Sale of Molasses
3. Sale of Baggase and press mud
4. Sale of scrap
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
38
5. Unloading of store material
6. Supply of sugar cane upto Cane carrier.
1.2(1) Analysis of the laboratory shall be done by MILL and DMR (Daily Manufacturing
Report) and other laboratory reports are jointly signed by both the parties. Party may
depute their laboratory staff independently to counter check the analysis report.
1.2(2) In order to achieve consistent CPT (cane per tank) during season and to avoid any
dispute regarding cane weighment and cane crushed during season PARTY may
depute their cane checking staff in all cane weighing scales at factory gate.
2.0 Manpower:
2.1 The PARTY should have technically sound and well qualified experts and staff as per
norms of Sugar Industry/Sugar Wage Board.
2.2 The PARTY should provide a list of key technical experts, maintenance and operating
staff station wise indicating their qualification/experience to the MILL at the time of
engaging at site.
2.3 All persons engaged by the PARTY directly or indirectly shall be employees of the PARTY
and it is obligatory on the part of the PARTY to cover all their employees under Workman
Compensation Act 1923.
2.4 The PARTY will be responsible for deduction of EPF/ any other such liability from their
employees and MILL will not be responsible for any monetary claim or payment to the
PARTY employees or statutory authorities under the Employees Provident Fund, Family
Pension Fund or any other liabilities.
2.5 Group Insurance of the employees of the PARTY will be the responsibility of the PARTY
and MILL will not be responsible for any claim / compensation which may be made under
the Workmen Compensation Act, 1923 .
2.6 In the event of any accident/casualty etc. of the employees of the PARTY, MILL will not be
responsible and PARTY will ensure all safety measures for its employees.
2.7 The PARTY shall ensure that the age of their employees will not be less than 18 years in
any case.
2.8 The PARTY shall withdraw/ replace those employees, who are not performing the work to
the satisfaction of MILL or for their misconduct and for any other reason, as indicated by
the MILL in writing to the PARTY within 48 hours of the said communication. In order to
ensure quality repair/ maintenance of the plant, PARTY should not replace/ withdraw the
maintenance staff without consulting to MILL.
2.9 In case due to shortage of manpower, some maintenance jobs are not likely to complete
in time, MILL will have the right to out source the same to the third Party at the cost and
risk of the PARTY.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
39
2.10 The PARTY shall duly comply with the provisions of the Apprentices Act 1961 (III of 1961),
the rules made there under and the orders that may be issued from time to time under
said Act and the said rules and on his failure or neglect to do so the PARTY shall be
subject to all liabilities and penalties provided by the said Act and Rules.
2.11 PARTY will also ensure 100 % reprocessing of brown/BSS and scrapping sugar of
previous year including shifting of same from place of storage to curing house.
2.12 During continuance of this Agreement, the PARTY shall abide at all times by all existing
enactments and rules made there under, regulations, notifications and bye-laws of the
State or Central Government or Authority and all Labour Law (including rules), regulations,
by laws that are applicable, The PARTY shall keep the MILL indemnified in case any
action is taken against the MILL by the competent authority on account of contravention of
any of the provisions of any Act or rules made there under, the regulation or notifications
including amendments. Thereof if the MILL is caused to pay or reimburse, such amounts
as may be necessary to cause or observe, or for non observance of the provisions
stipulated in the notifications/ by laws/ Acts/ Rules/ Regulations including amendments if
any, due to any act or omission on the part of the PARTY, the MILL shall have the right to
deduct money due to the PARTY including invocation of Performance Security. The MILL
shall have right to recover from the PARTY any sum required or estimated to be required
for making good the loss or damages suffered by the MILL. The employees of the PARTY
or any person employed for any work indicated in this Agreement or indicated thereto, in
no case shall be treated as the employees of the MILL at any point of time, in any manner
whatsoever.
3.0 Accommodation
3.1 As per availability, accommodation for staff of the PARTY will be made available free of
rent by the MILL.
3.2 The electricity will be provided for staff Quarters of PARTY on payment basis and water
will be provided at the cost of MILL. Staff of PARTY should not misuse the electricity and
water.
3.3 All other arrangements for food etc will be made by the PARTY.
4.0 Arrangement of Materials and consumables
4.1 A list of all material and consumables /spare & machinery parts / store materials/
machinery etc. with technical specification and estimated cost will be provided by the
PARTY to the General Manager of MILL with a copy to Federation within one month from
the date of signing of this agreement for _________season and within one month from the
date of closure of Season __________ for ______________ season. Keeping in view that
progress of repair work may not suffer, the PARTY should submit the indents of long
delivery /critical items within one month from the date of signing of this agreement for
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
40
__________season and within one month from the date of closure of Season
____________ for _____________ season so that they may be arranged by MILL in time.
4.2 The PARTY must provide all the indents (except for emergency purchase) to MILL in
consultation with MILL Technical Staff within two months of signing of this Agreement so
that MILL can procure store items well in time. MILL will procure material and
consumables /spare & machinery parts / store materials/ machinery/civil material etc after
receiving the indent/requirement from the PARTY. Any delay in the supply of material due
to late submission of indents by PARTY or due to any reason will not entitle the PARTY to
any claim. PARTY should ensure that inventory of the store should not be increase after
the end of the season.
4.3 All the tools & tackles will be provided by the MILL.
5.0 Supply of Sugarcane:-
5.1 The arrangement for the procurement and supply of sugar cane shall be done by the
MILL. The supply of sugarcane as per indent of the PARTY up to the Cane Carrier will be
the responsibility of the MILL. The indent will be issued by the PARTY in advance.
5.2 The arrangement for the procurement and supply of bagasse for running Cogeneration
plant in off-season shall be done by the MILL. The supply of bagasse as per indent of the
PARTY up to the Bagasse Yard will be the responsibility of the MILL. The indent will be
issued by the PARTY in advance.
6.0 Performance parameters to be achieved by PARTY:
The overall performance of the PARTY will be judged on the basis of following parameters
in the first year :
6.1 Stoppage due to Mechanical & Electrical Breakdowns:– Maximum 3 %
6.2 Stoppage Due to Process, General Cleaning & Others:– Maximum 2 % (Excluding No
cane stoppages)
6.3 Loss: – Maximum 2% on cane is admissible on account of loss in Bagasse, Press Mud,
Molasses and unknown.
6.4 Gross Capacity Utilization:- Minimum 90 % Gross capacity utilization (Excluding No cane
stoppages) should be achieved at the end of crushing season.
6.5 Quality of Sugar:- The quality of sugar will be of 100 color with minimum 80 % medium
size bold grain.
6.6 RME (Mittal Formula) 95% + at maceration % Fibre upto 250.
6.7 RBHR (Gunndu Rao Formla) 90%+
6.8 The Steam generating plant shall give an average thermal efficiency of 71% (IS Code) on
G.C.V. of Bagasse having 50% moisture.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
41
6.9 The power generating plant shall give an average steam consumption of 6.0 kg per kw per
Hr in season and 4.2 kg/hr in Off season for new TG set.
6.10 The Cogeneration plant must be operated in a way to maximise power export to the grid
upto __ MW during season and ___ MW during Off season.
(Parameters nos. 6.5 to 6.10 to be in line with the Agreement for Supply)
NOTE: The above performance parameters shall be applicable after successful completion of
Performance Trials and Guarantee Test of the plant.
07 Damage to Machinery:-
7.1 Any damage of machinery/machinery parts during operation, if it has occurred due to
negligence of staff of the PARTY, will be recovered from the PARTY.
7.2 If any machinery/parts is damaged during repairing work in off-season or during operation
in season, a committee headed by General Manager of the MILL will review. If damage
took place due to manufacturing defects then loss will be borne by the MILL. If machinery
get damaged solely due to negligence of any staff of PARTY then loss liabilities will be
born by the PARTY. The decision with respect to fixing of responsibility/ loss responsibility
shall be determined by the committee headed by MD, Federation whose decision shall be
final and binding.
08.0 Penalties:
8.1 Repair and Maintenance:
In case it is found that work is not being completed in the time schedule resulting delay in
start of the season then penalty will be imposed @ of 1 % of Total Off Season Repair cost
for every fortnight delay. For the purpose of calculation of penalty, parts of fortnight shall
be treated as full fortnight.
8.2 Operation of the MILL:
In the event of not achieving any of the above mentioned performance parameters,
penalty of Rs 2.00 lac (Rs. Two lacs) only per parameter will be recovered from PARTY. It
may be recovered from the dues of the PARTY subject to maximum 5 % of operation cost.
09.0 BANK GUARANTEE (BG)
To secure the contractual obligations of the PARTY at their own cost shall furnish to the
MILL, a Performance Bank Guarantee (BG) as per the format enclosed as Annexure
___for Rs ------------------- only of any nationalized/scheduled bank prior to the signing of
the Agreement. This BG shall be valid for a period of 24 months or 60 days after the
actual date of end of season, whichever is later. If PARTY fails to submit the above said
Bank Guarantee within stipulated period EMD deposited by PARTY will be forfeited.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
42
In the event of breach of contract / failure of contractual responsibilities / if repairs work
are left unfinished & incomplete/ unable to operate the plant in complete season etc by the
PARTY then MILL shall have the full rights to invoke the BG.
The earnest money deposited with bid will be returned on submission of Performance
Bank Guarantee of validity for a period of 14 months or 60 days after the actual date of
end of season, whichever is later.
BG shall be released on successfully completion of all the contractual obligations of the
PARTY after finalization of RT(8)C
10.0 CHARGES
10.1 A lump sum charge per month during Season _________ and ______________ for
operation of the MILL (which includes 5000 TCD sugar plant & 27 MW Cogeneration Plant
during the crushing season ________, _______ and _________ (03 seasons) including
operation of 27 MW Cogeneration Plant during off-season _________, _______
and______( 03 off-seasons)) and for Repair and Maintenance, a Lump Sum charges for
the Off-season ______ & ______ (02 off-seasons) shall be payable for all the services of
annual overhauling and repair and maintenance as as under:-
Sr.No. Particular’s Basic ( Rs.)
1. Repair & Maintenance of Sugar Mill &
Cogeneration Plant during Off-
season.
_______ per off-season
(GST extra as applicable)
2. Operation of Sugar Mill and
Cogeneration plant during crushing
season.
_______per month
(GST extra as applicable)
3. Operation of Cogeneration Plant
during off-season.
________per month
(GST extra as applicable)
Note: TDS (Tax deduction at source) at prevailing rates shall be deducted by MILL while
releasing payment to PARTY.
10.2 GST, duties and other levies as applicable shall be charged extra to MILL, at actual.
10.3 Price shall be given based on 6 month of season and 6 month of off-season. If season
shall be of 4 months and off season will be 8 month then, the cost of off season will be
increase as per prorate of month increase.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
43
10.4 Season shall be considered before 7 days start of RT 8© formation.
11.0 Payment Terms
11.1 DURING OFF SEASON____________:-
a) The PARTY will supply the price break up and time schedule of the dismantling and repair
& maintenance station wise along with civil work immediately after signing of this
Agreement with consultation of MILL staff. This price break will be approved by MILL
within one week of submission of price break up. Payment will be released accordingly on
the submission of invoice after deducting the advance as mentioned in para 11.1(b) The
PARTY will submit the invoice for payment on the basis of actual work done at each
station corresponding to approved price break-up once in a month after completion of the
month within the first week of the next month. Bill will be verified by Technical staff of MILL
as per actual work done at each station corresponding to approved price break-up.
b) An advance of Rs. -------------- may be given to the PARTY against the Bank Guarantee of
any Scheduled Bank for off season repair and it will carry interest @ 12% p.a. This
advance guarantee shall be valid for a period of 6 month. Aforesaid advance shall be
repaid by PARTY in the following manner:-
“30%, 30% and 40% of advance of Rs. --------------- will be deducted in successive first
three bills of Off Season. If any advance is left un-recovered than the validity of above BG
should be extended for a suitable period by the party at their own cost.
c) During Off Season maximum payment of 20 % of approved price break-up of each station
shall be made for dismantling work and payment will be made as per percentage
dismantling progress of each station.
d) Maximum payment of 50% of approved price break-up of each station shall be made for
the repairing and overhauling and payment will be made as per percentage repair
progress of each station.
e) Payment of 15 % of approved price break-up of each station shall be made after the trial
of each station of the plant and payment will be made as per percentage trial progress of
each station.
f) Balance 05% payment of approved price break-up of each station shall be made after 7
days of successful running of the plant from the date of start of the cane crushing.
g) Payment of balance 10 % will be made within 15 days of end of crushing season and on
finalization of final manufacturing Report { R.T. (8) C}.
Note:- R.T.8(C) is final manufacturing report for the cane crushing season prepared in
prescribed format of Central Excise Rule 83. It is authentic document of any sugar factory
having mandatory disclosure of technical performance of the factory.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
44
11.2 DURING SEASON ________and__________:-
The rates for operation of plant during the season will be decided and paid on per month
basis. The PARTY will submit the invoice for payment once in a month after completion of
the month within the first week of the next month.
Ninety percent payment of monthly Season bill will be made within seven days after
submission of invoice/bill. Payment of balance Ten percent along with EMD will be made
after finalization of R.T. (8) C latest by three one months from the end of the Crushing
Season.
11.3 All taxes as applicable will be deducted at source.
11.4 After closure of crushing season ___________and ______________ a few jobs should
be completed which are mandatory for any sugar factory like: Boiling Off process,
production of Brown /BSS Sugar, cleaning of complete plant, washing of all boiling house
vessels, scrapping of sugar , weighing & shifting of brown sugar to storage place,
dismantling of cane carrier chain and mill rollers etc will be off season work. PARTY will
insured that these jobs to be completed prior to submission of final bill for payment.
11.5 Final payment shall be made by the MILL within 15 days of receiving the proof of payment
of all government dues and all labour/ workmen dues, including PF, GST etc. by the
PARTY.
11.6 In drier House, register of sugar bagging shall be jointly signed by PARTY and MILL.
12 SETTLEMENT OF DISPUTES
12.1 Amicable settlement
The Parties shall use their best efforts to settle amicably all disputes arising out of or in
connection with this Agreement or the interpretation thereof.
12.2 Dispute resolution
12.2.1 Any dispute, difference or controversy of whatever nature howsoever arising under or out
of or in relation to this Agreement (including its interpretation) between the Parties, and so
notified in writing by either Party to the other Party (the “Dispute”) shall, in the first
instance, be attempted to be resolved amicably in accordance with the conciliation
procedure set forth in Clause 12.3.
12.2.2 The Parties agree to use their best efforts for resolving all Disputes arising under or in
respect of this Agreement promptly, equitably and in good faith, and further agree to
provide each other with reasonable access during normal business hours to all non-
privileged records, information and data pertaining to any Dispute.
12.3 Conciliation
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
45
In the event of any Dispute between the Parties, either Party may call upon, Managing
Director, UP Cooperative Sugar Factories Federation Ltd and upon such reference, the
said persons shall meet no later than 10 (ten) days from the date of reference to discuss
and attempt to amicably resolve the Dispute. If such meeting does not take place within
the 10 (ten) day period or the Dispute is not amicably settled within 15 (fifteen) days of the
meeting or the Dispute is not resolved as evidenced by the signing of written terms of
settlement within 30 (thirty) days of the notice in writing referred to in Clause 12.2.1 or
such longer period as may be mutually agreed by the Parties, either Party may refer the
Dispute to arbitration in accordance with the provisions of Clause 13.
13.0 Arbitration Clause
If at any time there should be any question, dispute or difference between the parties in
respect of any matter arising out of or in relation to this Agreement, either party may give
to the other party notice in writing of the existence of such question, dispute or difference
and the same shall be referred to arbitration of a single arbitrator, when the parties may
agree upon, otherwise two arbitrators, one to be nominated by each party. The two
arbitrators appointed by the parties shall before proceeding with the reference, appoint a
third arbitrator with mutual consent, who will act as the presiding Arbitrator. The arbitrator
should not be associated with either of the parties to the agreement in any of the
capacities as mentioned in the 7th Schedule of the The Arbitration and Conciliation Act
1996. The award of the arbitrators shall be final and binding on the parties and be
accepted by them.
The arbitration proceedings shall be governed by the provisions of The Arbitration and
Conciliation Act, 1996 and the rules framed there under, read with all statutory
amendments and modifications thereof. Cost of Arbitration shall be borne by the parties
as may be decided upon by the arbitrators.
14.0 Juridiction of Court
All dispute arising are subject to the jurisdiction of High Court Lucknow and Court
subordinate to it at Lucknow, Uttar Pradesh.
15.0 Validity of Offer not applicable in agreement
Offer of the tender should be valid for the 90 days from the date of opening the tender.
16.0 Period of Agreement
The Agreement to be executed between the Successful Tenderer and Mill shall be valid
up to finalization of R.T. (8) C for crushing season __________, ________ and
__________ and Off season__________ & ________.
Note: Since __________season will be the 1st season and man power will be required for
new plant trial and commissioning, therefore the period/duration of crushing season
___________ will be calculated from three weeks before the actual date of start of
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
46
crushing and seven days after the actual closure of crushing. However, for season
____________ the period/duration of crushing season will be calculated from seven days
before the actual date of start of crushing and seven days after the actual close of
crushing.
17.0 Force Majeure
17.1 Definition
(a) The right of the PARTY to proceed with the work shall not be terminated because of any
delay in the completion of the work due to unforeseen causes beyond the control and
without the fault or negligence of the Seller or their sub-contractors including (but not
restricted to) Act of God or Public enemy, action of Govt. in its sovereign capacity, floods,
epidemics, quarantine, strike, lock-outs, fires, explosions, accident, stoppage in the supply
of power, civil commotion, riots, etc. In the event of any of the aforesaid contingencies,
unusual or extra ordinarily prolonged, the Purchaser will be promptly kept informed by the
Seller by Fax/ E-mail followed by confirmation in writing with documentary proof within 15
days of the commencement and completion of force majeure circumstances. This force
majeure clause shall also apply to major sub-contractors of seller.
(b) Force Majeure shall not include (i) any event which is caused by the negligence or
intentional action of a Party or such Party’s Sub- Consultant or agents or employees, nor
(ii) any event which a diligent Party could reasonably have been expected to both (A) take
into account at the time of the conclusion of this Agreement, and (B) avoid or overcome in
the carrying out of its obligations hereunder.
(c) Force Majeure shall not include insufficiency of funds or failure to make any payment
required hereunder.
17.2 Measures to be taken
(a) A Party affected by an event of Force Majeure shall take all reasonable measures to
remove such Party’s inability to fulfill its obligations hereunder with a minimum of delay.
(b) A Party affected by an event of Force Majeure shall notify the other Party of such event as
soon as possible, and in any event not later than 14 (fourteen) days following the
occurrence of such event, providing evidence of the nature and cause of such event, and
shall similarly give notice of the restoration of normal conditions as soon as possible.
(c) The Parties shall take all reasonable measures to minimize the consequences of any
event of Force Majeure.
18.0 Extension of Contract
On completion of contract period, the contract for repair and maintenance and operation
of the mill with the Party can be extended yearly further for next two season after
assessing satisfactory performance for preceding crushing seasons. However contract
may be extended with same terms and condition but Escalation in rates (Both in Off
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
47
Season Repairs cost and Operation cost during season) is granted on the basis of
percentage increase of Labour Price Index (All India Consumer Price Index for Industrial
Workers) at the time of extension of Agreement .
IN WITNESS WHERE OF THE PARTIES HERE TO AFFIXED THEIR HAND AND SEALS ON
THIS _________DAY OF, _________ TWO THOUSAND AND EIGHTTEEN.
GENERAL MANAGER FOR
( ) ( )
WITNESS: WITNESS:
1. 1.
2.
Amended as
AGREEMENT
This agreement is made on the 2018 between The Kisan Sahkari Chini Mill Ltd. Ramala, Distt-Bagpat through Shri , General Manager,Ramala Mill (hereinafter referred as “MILL”, which expression shall, unless repugnant to the subject or context include their successors and assignees) of the One Part.
AND The Party
WHEREAS
The Kisan Sahkari Chini Mill Ltd.Ramala, Distt-Bagpat (U.P.) is desirous of outsourcing Technical staff and skilled, unskilled workers for operation and maintenance of equipments/machinery during season 2018-19 , 2019-20 and 2020-21, off season repair and maintenance work after season 2018-19 & season 2019-20 for 5000TCD sugar mill with DCS based plant having 145TPH, 110 bar boiler with 27MW co-gen plant at Ramala situated in District Bagpat, Uttar Pradesh on the terms and conditions herein after contained:-
NOW IT IS HEREBY AGREED TO BETWEEN THE (The Party) AND RAMALA CHINI MILL AS
FOLLOWS:-
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
48
1.0 Scope of Work; The scope of work will be for Outsourcing of Technical staff and skilled, unskilled workers for operation and maintenance of various equipments/machinery during season 2018-19, 2019-20 and 2020-21, off season repair and maintenance work after season 2018-19 & 2019-20 and operation of co-generation plant during off-season for newly erected 5000TCD sugar mill with DCS based plant having 145TPH, 110 bar boiler with 27MW co-gen plant at Ramala situated in District Bagpat, Uttar Pradesh.
The overall scope of work is outlined below:-
1.1(1) Operation of Plant during crushing season 2018-19, 2019-20 and 2020-21: The scope of work for smooth and fuel efficient operation and maintenance of the Plant during the crushing season will involve all jobs required for operation of Mill and co-generation plant at all the stations and sections from cane unloader to bagging of sugar and final molasses weighment and molasses storage system including Operation of De-Mineralization Plant, Laboratory, Workshop, handling of bagasse, storage of molasses, handling of boiler ash, shifting of press mud, shifting of sugar bags to godown with stacking, unloading of store material, shifting of chemicals like lime,Sulphur and gunny bags etc. from store to concerned station, Operation of Air and Water pollution control system as per norms of CPCB/state pollution board, DG sets/ Tubewell operation and all other related work/job etc. which are necessary for smooth running of sugar factory and co-generation plant. except following jobs which will be in the scope of Ramala Sugar Mill 1. Arrangement of sugar cane as per requirement of sugar mill 2. Procurement of all inputs like Lime, Sulphur, Gunny Bags, Chemicals, Consumables
Store material except spare part machinery. 3. Sale of Sugar/Molasses/ Bagasse/ Press Mud /Scrap 4. Staff in Accounts Department, General Office, Staff in the office of General Manager
/Chie Engineer/ Chief Chemist/Chief Cane Officer/Store/Purchase 5. Head Time Keeper/Security. 6. Analysis of the laboratory shall be under the General Manager of Ramala Chini Mills
which shall be binding on both the parties. However the arrangement of technical staff required for it shall be managed by the party.
1.1(2) Work related with cleaning and sweeping inside factory area, offices, public toilets, cane carrier/inside cane yard, different houses, different drains in plant, cleaning of all tubular vessels like evaporator bodies, juice heaters, pans, boiler tube external and internal cleaning and shifting of scrap from different houses to scrap yard during off season and season shall be in the scope of tenderer.
1.1(3) After closure of crushing season, dismantling of cane carrier chain, dismantling of mill rollers, bagasse elevators, return bagasse carrier, external and internal cleaning of boilers, cleaning of complete plant, scraping and washing in boiling house shall be in scope of party. Brown sugar production after season,filling,weighing and dispatch to godowns will be in the scope of the party.
1.1(4) Handling of material from the store to site like lubricants,lime , sulphur,gunny bags, chemicals etc will be in the scope of party.
1.1(5) TO run the water effluent treatment plant, air pollution system according to NGT/ CPCB/state pollution control board norms and to get clearance certificate from authorities regarding air and water pollution will be in the scope of party. However, the required fees will be deposited by the mill.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
49
1.1(6) The period of crushing season 2019-20 and 2020-21 will be termed as one week before the actual date of start in RT(8) C report and one week after the actual date of closure of the season in RT(8) C report .Newly erected Plant trial before commissioning will be undertaken before start of season 2018-19,therefore crushing season 2018-19 will be calculated three weeks before the start of crushing as per RT(8)C report and one week after the closure of season as per RT(8)C report.
1.1(7) Technical supervision and guidance will be given by ( The Party) during crushing season.The staff working will be overall under the supervision of (The Party)to comply the terms of the contract entered with them.
1.2 Repair and Maintenance work during off-season
1.2(1) To achieve the performance target figures during crushing seasons,the party will provide technical officer staff, skilled, unskilled workers for off season repair and maintenance work of all sections / stations from cane weighbridges to final molasses storage tank (including sugar stacker, all belt conveyors ,all weighing scales, stitching machines etc.) of sugar mill and co-generation plant. All mechanical, electrical, instrumentation, automation and the necessary required civil work will be carried by the party.
1.2(2) Servicing of various equipments and machinery such as DG sets, turbo sets, turbines,DCS panels, compressors, electric panels , tube wells etc will be in the scope of party.
1.2(3) All the off season repair and maintenance work will be carried out under supervision and guidance of (The Party)and Ramala mill
1.2(4) Off season repair and maintenance work of all the station including trial and testing work will have to complete by 30th October of each year by the party.
1.2(5) Technical supervision and required guidance duringoff-season repair and maintenance work will be given by the party.
2.0 Manpower:
2.1 Providing of sufficient man power of required skill and experience shall be the exclusive duty of the party. The party shall ensure that only trained and qualified personnel of required experience are deputed for the specific job failing which if it is noticed during inspection by the mill that untrained personnel’s have been deputed for any jobs, then the party shall not be paid for such personnel. It shall be the duty of the party to remove the personnel who is not having a requisite experience within 24 hours of brining to the notice to the party. 2.2 The party should have technically sound and well qualified experts and staff as per norms of
Co-operative Sugar Industry/Sugar Wage Board in Uttar Pradesh. Specially, Boiler Engineer, Boiler In charge, Waterman, Fireman should have the boiler operation certificate of concerned class issued by the Directorate of Boilers. Other important technical personnel should have following qualification:-
S.N POST NAME Qualification Experience
1 Boiler Engineer B.Tech. (Mech./Elect.) with BOE
Minimum Six years experience of operation of 95TPH, 67 bar or above boiler.
2 Shift Engineer B.Tech. (Mech.) Minimum Five years experience of similar plants.
3 Electrical Engineer B.Tech. (Elect.) Minimum Six years experience of similar
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
50
plants.
4 Instrument Engineer B.Tech. (Instru.) Minimum Six years experience of similar plants.
5 Boiler Chemical Engineer
B.Tech. (Chemical Engineering)
Minimum Six year experience of operation of 95 TPH, 67 bar boiler.
6 Shift Chemist ANSI/AVSI (Sugar Tech.)
Minimum Five years experience of similar plants.
7 Quality Control Manager/Lab In charge
B.Sc. with ANSI/AVSI in Sugar Technology
Minimum Five years experience of similar plants.
8 Electrician I.T.I. Electrician trade Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
9 Head Fitter I.T.I. Fitter trade Minimum Six years working experience in similar capacity and in DCS based sugar mill complex.
10 Boiler Man 1st Class Boiler
Competency certificate according to Indian boiler act.
Minimum Six years working experience in similar capacity and in DCS based sugar mill complex.
11 Fire Man Second class boiler competency certificate according to IBR act.
Minimum Six years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
12 Water attendent Second class boiler competency certificate according to IBR act.
Minimum Six years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
13 D.M. Plant/Water treatment attendant
I.T.I, in mechanical/boiler trade
Minimum Six years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
14 Boiler feed pump attendant
I.T.I, in mechanical/boiler trade
Minimum Six years working experience in similar capacity .
15 Tubewell operator I.T.I. Electric trade Minimum Four years working experience in similar capacity.
16 Switch board attendant High school and I.T.I. Electric trade
Minimum Six years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
17 Mill Motor Operator High School and I.T.I. Electric trade
Minimum Four years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
18 Machinist High School and I.T.I. Mechanical trade
Minimum Four years working experience in similar capacity.
19 Motor attendant High School and I.T.I. Electric trade
Minimum Four years working experience in similar capacity and in similar type of boiler in DCS based sugar mill complex.
20 Instrument Mechanic I.T.I. Instrument trade Minimum Five years working experience in similar capacity and in DCS based sugar mill complex.
21 Foreman (Elec/Mech/Workshop)
Diploma in Elect/Mech Engineering.
Minimum Six years working experience in similar capacity and in DCS based sugar mill complex.
22 Welder I.T.I. Welder trade Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
23 Turbine Operator I.T.I. Electrical trade Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
51
24 Turner I.T.I. Minimum Four years working experience in similar capacity sugar mill complex.
25 D.G. Set Operator I.T.I. Electric Trade Minimum Four years working experience in similar capacity sugar mill complex.
26 Pan Man S.B.C.C. Course from NSI/VSI
Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
27 Pan Incharge S.B.C.C. Course from NSI/VSI
5 years working experience in similar capacity or as pan man and in DCS based sugar mill complex.
28 Evaporator Operator High School Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
29 Centrifugal Mate High school/I.T.I. Fitter Trade and
Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
30 Centrifugal Operator High school/I.T.I. Fitter Trade and
Minimum Four years working experience in similar capacity and in DCS based sugar mill complex.
Note: In addition to above mentioned post, other required manpower at every station should be technically qualified and capable to run the similar capacity sugar mill and co-gen plant with high level of automation like DCS system etc.
2.3 All persons engaged by the party directly or indirectly shall be employees of the firm and it is obligatory on the part or the firm to cover all their employees under Workman compensation act.
2.4 The party will be responsible for deduction and payment of EPF and any other statutory liabilities of all workers/staff and The Kisan Sahkari Chini Mills Ltd. Ramala will not be responsible for any monetary claim or payment to the party employees or statutory authorities under the Employees Provident Fund, Family Pension Fund or any other liabilities. Compliance of labour laws and rules will be the sole responsibility of the party.
2.5 Group insurance of the employees of the party will be responsibility of the party and Ramala Mill will not be responsible for any claim/compensation which may be made under the Workmen Compensation Act.
2.6 In the event of any accident/causality etc. of the employees of the party, the Kisan Sahkari Chini Mills Ltd, Ramala. will not be responsible and party will ensure all safety measures for its employees. In case any claim/compensation arises under Workman Compensation Act/ any other Act, the party will be responsible.
2.7 The Party will ensure that the age of their employees will not be less than 18 years in any case.
2.8 The party will withdraw/ replace those Employees, who are not performing the work to the satisfaction of the Ramala mill for their misconduct and for any other reason, as indicated by the mill in writing to the party, within 48 hours of the said communication. Any damage to the mill due to sabotage, theft by the employees of outsourcing firm will be the responsibility of the party.
2.9 In case due to shortage of manpower, some maintenance jobs are not likely to be completed in time, The Kisan Sahkari Chini Mills Ltd. Ramala will have the right to
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
52
outsource the same to a third Party at the cost and risk of the party, without prejudice to other penal provisions against the party.
2.10 During continuance of the Agreement, the Party shall abide at all times by all existing enactments and rules made there under, regulations, notifications and by laws of the State or Central Government or authority and any other labour law (including rules), regulations, by laws that are applicable, the Party shall keep the Mill indemnified in case any action is taken against the Mill by the competent authority on account of contravention of any of the provisions of any Act or rules made under the regulation or notifications including amendments, if the Mill is caused to pay or reimburse, such amounts as may be necessary to cause or observe, or for non-observance of the provisions stipulated in the notifications/by laws/Acts/Rules/regulations including amendments if any, due to any act or omission in the part of the Party, the Mill shall have the right to deduct money due to the party including his amount of performance security. The Mill shall have right to recover from the party or any sum required or estimated to be required for making good the loss or damages suffered by the Mill. The employees of the Party or any person employed for any work indicated in this agreement or indicated thereto, in no case shall be treated as the employees of the Mill at any point of time.
2.11 The party shall duly comply with the provisions of the Apprentices Act 1961 (III of 1961) the rules made there under and the orders that may be issued from time to time under said Act and the said rules and on his failure or neglect to do so the Party shall be subject to all liabilities and penalties provided by the said Act and rules.
3.00 Accommodation
3.1 As per availability, accommodation for staff of the party will be made available free of cost by the The Kisan Sahkari Chini Mills Ltd Ramala.
3.2 The electricity for light / fan and water will be provided at the cost of The Kisan Sahkari Chini Mills Ltd Ramala. Their staff will not misuse the electricity and water.
3.3 All other arrangements for food etc will be made by the Party.
4 Damage to Machinery:-
4.1 Any damage to machinery in particulars and factory property/premises, in general during operation and off-season due to negligence of staff of the party, will be recovered from the Party. The decision of the General Manager, Ramala Mill with respect to damage and liability of the person concerned will be final and binding on the party in above cases.
4.2 If machinery damaged is due to manufacturing defects, then the loss will be borned by the Ramala Mill and if any machine or part thereof get damaged due to negligence of any individual/poor workmanship during off season repair work, then loss liability will be debited /recovered to the Party. The decision with respect to fixing of responsibility/ extent of loss shall be determined by the General Manager, whose decision shall be final.
4.3 If any machinery /equipment is damaged or become unoperable which affects the warranty of the plant supplier i.e.(The Party)., and any financial loss is incurred to Ramala Mill. Such loss shall be recovered /Indemnified by the party.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
53
5 Penalties:
5.1 Repair and Maintenance:
In case it is found that work is not being completed in the time schedule resulting in delay in start of the season ,then penalty will be imposed @ of
rupees 2.00 lacs per fortnight or maximum 5% of Total Off Season Repair cost whichever is lower for every fortnight delay and part there off.
5.2 A- Repair & Maintenance:
I. Incase it is found that work is not being completed in the time schedule resulting in delay to start of the season, then penalty will be imposed @ 5% of total Off season Repair cost for every fortnight delay. For the purposed of calculation of penalty, parts of fortnight shall be treated as full fortnight.
II. Operation of the Mill: In the event of not achieving any of the below mentioned performance parameters as per R.T. (8) C report, penalty of Rs. 5.00 Lac (Rs. Five Lacs) only per parameter will be recovered from the PARTY. It may berecovered from the dues of the PARTY.
B- Damage to Machinery: I. Any damage of machinery/machinery parts during operation, if it has occurred due to
negligence of staff of the PARTY, will be recovered from the party. II. It any machinery/parts is damaged during repairing work in off-season or during
operation in season, a committee headed by General Manager of the Mill, will review. If damage took place due to manufacturing defects then loss will be borne by the Mill. If machinery get damaged due to negligence of any staff of PARTY, then loss liability/loss responsibility shall be determined by the committee headed by General Manager, Ramala, whose decision shall be final.
5.3 Parameters
I. Gross Capacity Utilization min 95% (Excluding no cane stoppages) II. RME (Mittal Formula) 96%+at maceration % Fiber upto 250
III. RBHR (Gundu Rao Formula) 90%+ IV. The Steam generating plant shall give an average thermal efficiency of 71% (IS code) on
G.C.V. of Bagasse having 50% moisture. V. Stoppage due to Mechanical Breakdown – Maximum 1.5%
stoppage due to process related, General cleaning, electrical etc. - Maximum 1.5%
VI. Quality of sugar: VII. The quality of sugar will be of 31 & 30 colour as under
M-31/S-31 upto 30% (subject to required purity of lime, sulphur & phosphoric Acid) M-30/S-30 -70%
VIII. The power generating plant shall give an average steam consumption of ……. kg per KW per hr. in season…… kg/KW/hr in off season for new T.G.set
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
54
IX. The Co-generation plant must generate a total power of ………. MW in season and …….. MW in Off-season to the grid. Note- The above performance parameters shall be applicable after successful completion of performance trials and guarantee test of the plant.
6.0 BANK GUARANTEE (BG)
To secure the contractual obligations the Party at their own cost, party shall furnish a unconditional bank Guarantee (BG) for Rs.20.00 Lacs (Rs. Twenty lacs only) of any nationalized bank to the Ramala chini mill within 10 days of signing the agreement. This BG shall be valid for a period of 24 months. If party fails to submit the above said bank guarantee within stipulated period, the agreement will be terminated without assigning any reason and EMD deposited will be forfeited.
In the event of breach of contract/failure of contractual responsibilities /if repairs work are left unfinished & incomplete/unable to operate the plant in complete season etc by the party, then General Manager Ramala chini mill shall have the full rights to invoke the bank guarantee with the prior approval of Managing Director, U.P. Co-operative. Sugar Factories federation ltd Lucknow.
BG shall be released on successfully completion of allotted job.
7.0 CHARGES
7.1 A charge of Rs………….. (Rupees in words) per month during the “Season”2018-19,2019-20 and 2020-21 for operation of the plant(which includes 5000 tcd sugar mill and 27 co-generation plant) including repair & maintenance during season, per month chages of Rs…………(Rs in words) for operation of 27 MW co-gen plant during off season 2019 and 2020 ,a Lump sum charges of Rs………….. (Rupees in words) for the “Off Season”2019 after season 2018-19 and 2020 after season 2019-20 shall be payable for all the services of annual overhauling and repair and maintenance. TDS (Tax deduction at source) at prevailing rates shall be deducted by MILL while releasing payment to PARTY.
7.2 Service Tax and other levies as applicable shall be charged extra to MILL at actual.
7.3 Other Taxes as applicable shall be charged from time to time.
8. Payment Terms
8.1 DURING SEASON
The rates for operation of plant during the season will be calculated and paid on per month basis. The party will submit the invoice for payment once in a month after completion of the previous month within the first week of the next month.
8.1(1) Ninety percent payment of operation during season on monthly basis on pro-rata basis will be paid within seven days after submission of invoice/bill. Payment of balance Ten percent will be made after finalization of R.T. (8) C latest within three months from the end of the Crushing Season.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
55
.8.1(2) All taxes and duties will be applicable as per rules. Service tax will be paid extra on produce of proof of payment.TDS will be deducted at source as per prevailing law/act.
8.1(3) After closure of crushing season, few jobs should be completed which are mandatory for any sugar factory like boiling off process, production of brown/biss sugar, cleaning and washing of complete plant, boiling house vessels, scraping of sugar, weighing and shifting of brown sugar to storage place, dismantling of cane carrier chain and mill rollers etc., will be completed prior to submission of final bill for payment.
8.1(4) Final payment shall be made by the Ramala Chini Mill within one month of receiving the proof of payment of all government dues and all labour/workmen dues, including PF, service tax etc. by the party.
8.2 DURING OFF SEASON:-
a) The Party will supply the price break up and time schedule of the dismantling and repair & maintenance station wise along with necessary civil work immediately after closure of season with consultation of Ramala chini Mill. The price break up will be approved by Ramala mill within one week of submission. Payment will be released accordingly on the submission of invoice after deducting the advance as mentioned in para 7.2(b). The party will submit the invoice for payment on the basis of actual work done at each station corresponding to approved price breakup once in a month after completion of the month within the first week of the next month. Bill to be paid will be verified by Ramala chini mill as per actual work done and approved price break-up.
b) An advance of Rs.20.00 Lakh (Rupees Twenty Lakh only) may be given to the party against the Bank Guarantee of Nationalized Bank for off season repair. This advance guarantee will be valid for a period of 24 month. Aforesaid advance shall be repaid by party in following manner-
“30%, 30% and 40% of advance of rupees 20.00 lacs (Twenty Lacs) will be deducted in successive three bills of off-season. If any advance is left unrecovered, then the validity of above bank guarantee will be extended for suitable period by the party at their cost.
c) During Off Season, maximum payment of 20% of approved price breakup of each station shall be made for dismantling work of the each station and payment will be made as per % dismantling progress of each station.
d) Maximum payment of 50% of approved price breakup of each station shall be made for the repairing and overhauling of each station and payment will be made as per % repair progress of each station.
e) Payment of 15% of approved price breakup of each station shall be made for repairing and overhauling and payment will be made as per % trial progress of each station.
f) 05% payment of approved price breakup of each station will be made after 30 days of successful running of the plant from the date of start of the cane crushing.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
56
g) Payment of balance 10% will be made after one month of start of crushing season.
(h) EMD will returned on successful completion of contract.
9.0 Agreement
The Kisan Sahkari Chini Mills Ltd. Ramala and the party will enter into an Agreement within 10 days after issue of Letter of Intent. Price breakup of Repair & maintenance during Off-season will be the part of the Agreement.
10.0 EXTENSION OF CONTRACT
On satisfactory performance and completion of contract period, the contract for jobs mentioned in Scope of Work under Section-II of technical e-bid with the successful party may be extended further with updated mutually agreed upon performance parameters and terms and conditions.
11.0 Arbitration Clause
In case of any dispute between the parties arising out from the contract or in relation thereof, the matter shall be referred to the Managing Director, UP Co-operative Sugar Factories Federation Ltd, who shall be the sole arbitrator and his decision shall be binding on both the parties.
12.0 Jurisdiction of Court
All dispute are subject to the EXCLUSIVE jurisdiction of High Court Allahabad and EXCLUSIVE Court subordinate to it atBagpat district, U.P only.
13.0 Termination of Contract
If at any time after signing this agreement, as per directives of Govt. Of Uttar Pradesh or
due to any other reason, Ramala Mill does not require the whole or any part of the jobs
described in tender document/agreement relating to Outsourcing of Technical staff and
skilled, unskilled workers for operation and maintenance of equipments/machinery
during season 2018-19, 2019-20 and 2020-21, off season repair and maintenance work
after season 2019 & 2020 for newly erected 5000TCD sugar mill with DCS based plant
having 145TPH, 110 bar boiler with 27MW co-gen plant at the Ramala situated in District
Bagpat, Uttar Pradesh. The Ramala Chini Mill will give notice in writing of the fact to the
party who shall have no claim to any payment by way of compensation or otherwise on
account of any profit or the advantage which they might have derive from the execution
of the allotted jobs as per agreement which they could not derive in consequence of
giving up the jobs before completion. The party shall be paid at rates for full amount of
jobs executed till date and also actual expenses incurred by them on account of
providing outsourcing man power.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
57
In the event of closing up of the work as above, the party will undertake to refund
within 120 days there after all outstanding unutilized and unadjusted amount of the
advance payment, if any with interest @ the landing rate of banks then prevailing.
IN WITNESS WHERE OF THE PARTIES HERE TO AFFIXED THEIR HAND SEALS ON THIS …………………..
( )
GENERAL MANAGER
THE KISAN SAHKARI CHINI MILLS
LTD. Ramala, DISTT-BAGPAT (U.P.)
( )
THE PARTY
WITNESS : 1
WITNESS : 2
WITNESS : 1
WITNESS : 2
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
58
53. Page 529 CAPABILITY STATEMENT (CS)
SNO Particulars
1 Address of main workshop where the major portion
of the plant and machinery will be
2 Address for sending all communication (letters)
during the execution of the project
3 Name of Banker & Address
4 Number, size of Sugar Plants and Co-gen erected &
commissioned and technology adopted as per
clause 21 of ITB.
5 Detail of Tender Fee
6 Details of E.M.D
7 Details of Orders in hand/executed
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
59
(1) already executed.
(2) under execution
8 The Bidder must have designed, supplied and
successfully commissioned & given performance in
atleast two new green field cane sugar fuel efficient
Plant of latest technology with steam consumption %
cane less than 38% having capacity of minimum
3500 TCD on 22 hr basis expandable to 5000 TCD
on 22 hr basis alongwith cogeneration of minimum
27 MW in last ten years and have supplied, erected
and successfully commissioned minimum five sugar
plants in India/overseas. (please provide details as
per enclosed proforma CS1 and CS2).
7 Details of executed Sugar plants as under
i) Name and Address of the Sugar Plant ii) Date of Commissioning iii) TCH-Min. & Max iv) Mill size & drive details Plant & make v) Boiler capacity pressure & temp. of steam
& make vi) T.G. set- capacity & type, pressure &
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
60
temp. of steam & make vii) Major details of Boiling House
equipments & make viii) Co-Generation Plant details
Please enclose performance certificate, RT8C of
trial and last crushing season
Affiadavit regarding Supply,Erection and
Commissioning of the Plants alongwith copy of letter
of intent (LOI) & copy of agreement with purchaser
Affidavit that the bidder has not been blacklisted
8 Please enclose the Audited balance sheet and profit
and loss account for the last 5 years (latest 2014).
9 Please enclose the certificate from Chartered
Accountant that average annual turn over is more
than 300 crore per year. The data should be certified
from audited profit and loss account
10 Enclose Credit Worthiness certificate for atleast Rs
300/- crores duly certified by the Banker, as per
proforma in bid document.
11 Details of Trade Tax/CGST/TIN NO
12 Central GST Registration Certificate
a) PAN No.
b) TAN No.
c) GST Registration no.
d) Service Tax Registration No.
e) Sales Tax/VAT Registration No. Kindly enclose true attested copies
13 Status of the Proprietary Firm/Partnership
Firm/Companies along with names of
Directors/Partners/Proprietor along with documents.
14 Year of establishment and Registration No. if
applicable
15 Registration No. of ESI and PF
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
61
16 Work Contract Registration Number
18 Name of Banker with full address
19 Style of bank account and account no
20 Whether the firm has any suits/claims Pending
with tax authorities (Give Details)
21 Affidavit that bidder is not blacklisted with U.P.
Cooperative Sugar Factories Federation,
Lucknow/NCDC/NFCSF and by any Central/State
Government organizations.
AMENDED AS
CAPABILITY STATEMENT (CS)
(below details are to be submitted on the official letterhead of the bidder)
SNO Particulars
1 Constitution of Bidder Company/Group Company/LLP/ Partnership Firm/ Firm along with details of registered office address along with :- a) In case of Company
– Memorandum of Association
– Articles of Association
– Name & Address of Directors with %age of share
holding
– Certificate of Incorporation
– List of major Shareholders
b) In case of Group of Companies, for all companies
– Memorandum of Association
– Articles of Association
– Name & Address of Directors with %age of share
holding
– Certificate of Incorporation
– List of major Shareholders
c) In case of Limited Liability Company (LLP)
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
62
- Certificate of Incorporation
- Partnership Deed
- Name & Address of Partners
- %age of holding of partners in LLP
d) In case of Partnership Firm
- Partnership Deed
- Name & Address of Partners
- %age of holding of partners in Partnership Firm
e) In case of Proprietorship firm
Name and Address of Proprietor
2 Address of main workshop where the major portion
of the plant and machinery will be
manufactured/fabricated.
3 Address, mail ID, phone number for sending all
communication (letters) during the execution of the
project, and name of the concerned person (along
with authority letter to sign the required papers) with
mobile number and e-mail id.
4 Name of Banker & Address with style of account and
IFSC code.
5 Details of Orders executed (please enclose
supporting documents) (Pl give Name of Sugar Mill,
Year of installation, Name of Contact person of
respective Sugar Mill with his contact number and e-
mail ID)Only those installations will be considered
which are supported by documentary proof
6 Number, size of Sugar Plants and Co-gen erected &
commissioned and technology adopted as per
clause 21 of ITB.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
63
7 Detail of Tender Fee
8 Details of E.M.D
9 Details of Orders in hand/executed
(1) already executed.
(2) under execution
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
64
10 The Bidder during the last ten years
(not before 2007-2008 season), must
have successfully completed on
Turnkey basis Design, Engineering,
manufacture / procurement, supply,
erection and commissioning of;
1. at least one complete sugar plant
of minimum installed capacity of
5000 TCD for sugar on 22 hr
basis,
or
have expanded atleast one
complete sugar plant to minimum
installed capacity of 5000 TCD on
Turnkey basis,
or
at least one complete sugar plant
of minimum installed capacity of
3500 TCD for sugar on 22 hrs
basis along with minimum one
milling tandems of minimum size
of 40’’ x 80’’ for Sugar Mill of
minimum capacity of 5000 TCD
2. along with, installation of
minimum one cogeneration plant
of minimum 25 MW capacity
(including Extraction cum
condensing type TG set).
3. along with, at least one high
pressure boilers (Min pressure 110
bar, temperature 540 Deg C).
which have been successfully commissioned and
given satisfactory performance for minimum two
crushing season in India. If, prospective bidder has
not installed Boiler as per clause 21.7 (3) above but
has installed and commissioned boiler of 87 bar. It
can participate in tender process but has to supply as
per the approved makes given in the Bid-document.
Please provide details as per enclosed performa CS1
and CS2.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
65
11 Details of executed Sugar plants as under
ix) Name and Address of the Sugar Plant x) Date of Commissioning xi) TCH-Min. & Max xii) Mill size & drive details Plant & make xiii) Boiler capacity pressure & temp. of steam
& make xiv) T.G. set- capacity & type, pressure &
temp. of steam & make xv) Major details of Boiling House
equipments & make xvi) Co-Generation Plant details
Please enclose performance certificate, RT8C of
trial and last crushing season
12 Affiadavit regarding Supply, Erection and
Commissioning of the Plants alongwith copy of letter
of intent (LOI) & copy of agreement with purchaser
13 Affidavit that the bidder has not been blacklisted
14 Please enclose the Audited balance sheet and profit
and loss account for the last 5 years (latest 2017).
15 Please enclose the certificate from Chartered
Accountant that average annual turn over is more
than 250 crore per year. The data should be certified
from audited profit and loss account
16 Enclose Credit Worthiness certificate for atleast Rs
200/- crores duly certified by the Banker, as per
proforma in bid document.
17 Last five years Income tax returns i.e. FY 2016-17, 2015-16, 2014-15, 2013-14 and 2012-13
18 Details of Trade Tax/CGST/TIN NO
19 Central GST Registration Certificate
f) PAN No.
g) TAN No.
h) GST Registration no.
i) Service Tax Registration No.
j) Sales Tax/VAT Registration No.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
66
1
Kindly enclose true attested copies
20 Status of the Proprietary Firm/Partnership
Firm/Companies along with names of
Directors/Partners/Proprietor along with documents.
21 Year of establishment and Registration No. if
applicable
22 Registration No. of ESI and PF
23 Whether the firm has any suits/claims Pending
with tax authorities (Give Details)
24 Affidavit that bidder is not blacklisted with U.P.
Cooperative Sugar Factories Federation,
Lucknow/NCDC/NFCSF and by any Central/State
Government organizations.
ANNEXURE-CS1
Detail of supply, erection and commissioning of two green field cane sugar fuel efficient plant of latest
technology with specification given in Clause 21.7 under Clause 21 of the NIT tender notice under
‘Evaluation of technical e-bid and Evaluation criteria’
Executed
Sn
o
Name &
Full
address of
the
purchaser
Order
No &
Date
Mode of
Supply,
Erection and
Commissioning
of
the Plant
Capacity Delivery period of
project
Performance
certificates
regarding
crushing
capacity, co-
generation
capacity Turn
key
Basis
EPC
Basis
Sugar
Plant
Co-
gen
Plant
As per
contract
Actual
ANNEXURE-CS2
Under Execution
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
67
SNO
Name &
Full
address
of the
purchaser
Order
No &
Date
Mode of Supply,
Erection and
Commissioning of
the Plant
Capacity Delivery period of
project
Performance
certificates
regarding
crushing
capacity, co-
generation
capacity
and
steam
consumption
are to be
enclosed
Turnkey
Basis
EPC
Basis
Sugar
Plant
Co-gen
Plant
As per
contract
Actual
SITE LAYOUT PLAN OF THE PROJECT, SOIL TESTING REPORT AND WATER REPORT ATTACHED.
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
Gate
Temple
177.8682.95
39
410
N/S0,0
E50
E100
E150
E200
E250
E300
W50
W100
E350
E400
E450
E500
W150
W200
W250
W300
W350
N/S0,0
S50
N50
S100
N100
N150
N200
N250
S400
N/S0,0
E50
E100
E150
E200
E250
E300
W50
W100
E350
E400
E450
E500
W150
W200
W250
W300
W350
N/S0,0
S50
N50
S100
N100
N150
N200
N250
S400
DrainRoomSwitch
Drain
Other's Property New Property
Other's PropertyOther's PropertyOther's Property
Ramala Sugar Mill
Residentail Area
Other's Property
B. P. Petrol Pump
MOLASES TANKMOLASES TANK
MOLASES TANK E.T.P.
SprayPond
WATERTANK
MASONARYMOLASES TANK
Cold & HotWater Tank
PumpRoom
Toilet
Shed
Tank
Shed
Conveyor Belt
Toilet
Shed
Shed
Shed
Cycle
Canteen
A.T.M
Flyster
Room
TowerCooling
Husk YardRoom
Room
Room
Room
Room
RoomRoom
PumpRoom
Workshop
BindingWorkshop
Admin.
Office
Park
Shed
Sugar C
aneZila
Sahkari
Bank Ltd
.
Bhawan
GODOWN-9
GODOWN-6
Godown-5
GODOWN-4
GODOWN-2
GODOWN-7
GODOWN-3GODOWN-1
GODOWN-8
Urinal
Room
Room Office
GaurdRoom
Canteen
Shed
Shed
6.70 m Wide Road
To Sahahranpur
Road
Shed
Shed
Cattle shed
Shed
WeighBridge
WeighBridge
WeighBridge
WeighBridge
WeighBridge
WeighBridge
WeighBridge
Cattle shedCattle shed
Stand
CheckPost
Sugar C
ane
Vikas P
arishad
Bhawan
Shed
Fertil
izer
Godow
n
P.N.B.
ShedStore
Toilet
Kishan
Bhawan
TokenRoom
TechnicalBlock
WeighBridge
Open Drain
Open Drain
Open Drain
Dryer
BUFFERING
Shed
Water Cooler
Shed
Soil Tes
ting
Lab
OIL & GREASE TRAP
EqualisationTank
EqualisationTank Aeration Chamber
CLARIFIED
SLUDGE SUMP
Sludge Drying
Faster Tub
Faster Tub
CRANE CARRIER
SHED
MILL HOUSE
Chimney ChimneyTank
Bed
Cold & HotWater Tank
To Baraut
Road
Gate
Gate
Gate
Gate
Gate
Gate
Gate
Gate
Antina
PUMPROOM
Other's Shop
Cane Yard
Cane Yard
B r i c k R o a dB r i c k R o a d
Cane Yard
Open Land
Open Land
Open Land
Open Land
Assumed B.M=100.0M.
septic
Tank
septic
Tank
septic
Tank
WeighBridge
Flyster
WeighBridge
Gate
Gate
Gate
Gate
GateOther's Property
MOLASSES TANK
BOILERTURBINE RM.
POWER HOUSE
LIME MIXTURE PLANT
MOLASES TANK
Wat
er In
ject
ion
pum
p
Pipe Rack
RoadRoad
Road
Road
Road
Road
Road
Road
Road
3.0 m Wide Road
Road
Road
Road
Road
Road
Road
Road
RoadRoad
Road
Road
Road
R o a d
R o a d
R o a d
B r i c k R o a d
Cane Yard
Cane Yard
PROPOSED BAGGASE YARD
MILL HOUSE(98.0M.x24.0M.)
CONTROL RM.
BOILER AREA
CLARIFICATION HSE.
EVAPORATION HSE
PAN HSE
SUGAR HSE
BAGGASE CARRIER
POWER HSE.(50.0M.x24.0M.)
CANE CARRIER
Chimney
ESP
PROPOSED
PROPOSEDPROCESS COOLING TOWER
COGEN COOLING TOWER
PROPOSEDSUGAR GODOWN
CAN LAB
PROPOSEDM/C SHOP
PROPOSED ROAD 6.0 M. WIDE
PROPOSED ROAD 6.0M. WIDE
PROP
OSED
ROA
D 6.
0M. W
IDE
VMS CONSULTANTS PVT.LTD.
JOB NUMBER
02-18
DRAWING NUMBER REVISION
TITLE
PROJECT
2750 TCD TO 5000 TCD EXPANDABLE UP TO 7500 TCD
CLIENT
RAMALA SAHKARI CHINI MILLS LTD. RAMALA (U.P)
SCALE SHEET NUMBER
THIS DRAWING IS THE PROPERTY OF VMS AND MUST BE RETURNED ON REQUEST. IT IS SUBMITTED AS CONFIDENTIAL
INFORMATION IN CONNECTION WITH THE ENQUIRY. TENDER ORDER OR CONTRACT. IT IS NOT TO BE USED FOR
ANY OTHER PURPOSE OR ORDER NOR MAY IT BE COPIED OR LENT WITHOUT OUR AUTHORITY IN WRITING.
APPROVAL
ADVANCE
MUNICIPAL
CONSTRUCTION
ISSUED FOR
REVISION DATE REVISION DESCRIPTIONDRAWN
BY
CHK'D
BY
APPD.
BY
SHEET SIZE A1
230,Nariman Point,83/84, Sakhar Bhavan,
MUMBAI-400 021Ph.No.022-61725200
Email : [email protected] No.U74140MH1978PTC020578
Web site : www.vakilmehtasheth.com
SUGAR PLANT & 25 MW CO-GEN. PLANT.
PROPOSED MASTER PLAN
MFB-F-01 R0
01 0F 011:150
PROPOSED MASTER PLAN
PLANT BUILDING AREA :-
S.NO. DESCRIPTION
01 MILL HOUSE BUILDING
SIZE AREA
98 x 24 2352 SQ.M.
POWER HOUSE02 50 x 24 1200 SQ.M.
TOTAL BUILDING AREAS:- 7081 SQ.M.
01
02
03
CLARIFICATION HOUSE03 25 x 25 625 SQ.M.
EVAPPORATION HOUSE04
PAN/ BOILING HOUSE05
SUGAR HOUSE06
24 x 48
24 x 52
24 x 21
04
05
06
1152 SQ.M.
1248 SQ.M.
504 SQ.M.
E
N
S
W WIND DIRECTION
LEGEND
PROPOSED STRUCTURE----------------
EXISTING STRUCTURE----------------
SUPPLIERS MAY SUBMIT THEIR OWN LAYOUT OF THE FACTORYNOTES
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor