Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
State Infrastructure and Industrial DevelopmentCorporation of Uttarakhand Limited (SIIDCUL),Regd. Office: 29, IIE (IT Park), Sahastradhara Road, Dehradun, Uttarakhand,India: 248001 | Phone: 0135-2708100 / 2608092
CorrigendumExpression of Interest
Invitation for setting up manufacturing plant as an Anchor Unit/s at ElectronicManufacturing Cluster (EMC), IIE Kashipur, Udham Singh Nagar, Uttarakhand
With reference to aforesaid EOI dt 11.08.2020, the last date of submissionof EOIs is hereby extended up to 31.10.2020. The interested companies arerequired to fill the application form available at www.siidcul.com/ which can besubmitted either through e-mail ([email protected]) or offline at Registered OfficeAddress. The applications can be submitted upto 31st October 05.00 PM. DetailedEMC brochures can be downloaded from www.siidcul.com/. In future anynotices/information related to this EoI notice shall be uploaded onhttps://www.siidcul.com/ only.
Managing Director
State Infrastructure and Industrial Development Corporation of Uttarakhand Limited (SIIDCUL), Regd. Office: 29, IIE (IT Park), Sahastradhara Road, Dehradun, Uttarakhand, India: 248001 | Phone: 0135-2708100 / 2608092
Expression of Interest
Invitation for setting up manufacturing plant as an Anchor Unit/s at Electronic
Manufacturing Cluster (EMC), IIE Kashipur, Udham Singh Nagar, Uttarakhand
State Infrastructure and Industrial Development Corporation of Uttarakhand Limited (SIIDCUL) invites expression of interest from National as well as International companies for setting up manufacturing plant at EMC Kashipur. The interested companies are required to fill the application form available at www.siidcul.com/ which can be submitted either through e-mail ([email protected]) or offline at Registered Office Address. The applications can be submitted from 11th August 2020 10.00 AM upto 30th September 05.00 PM. Detailed EMC brochure can be downloaded from www.siidcul.com/ . In future any notices/information related to this EoI notice shall be uploaded on https://www.siidcul.com/ only.
Managing Director
SIIDCUL
STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION OF
UTTARAKHAND LTD.
Electronic Manufacturing ClusterKashipur, Uttarakhand
ELECTRONICS SECTOR SNAPSHOT
3%India’s share in Global
Electronics Manufacturing
(2018)
USD 70 BnValue of electronics
produced in India (2018-19)
USD 8.8 BnExport of Electronic
Goods (2018-19)
2ndLargest manufacturer of
mobile phones in the world
(2018)
USD 1.18 BnFDI (2015-19)
Source: Invest India
CONNECTIVITY OF EMC, KASHIPUR
REASONS TO INVEST IN UTTARAKHAND
STRATEGIC ADVANTAGES
❖ Connectivity
❖ Rail: < 5 Kms (Kashipur)
❖ Road: 240 Kms from NCR
❖ Air: <50 Kms (Pant Nagar)
❖ Multi Modal Logistics park at Pant Nagar (< 50Kms)
❖ Inland Container Depot at Kashipur (< 10 Kms)
❖ Kashipur is under influence region of Amritsar Kolkata Industrial Corridor (AKIC)
Delhi
4 hr
Kashipur
Pantnagar35 min
Pantnagar
State Level Nodal Agency for Facilitation
Single Point Clearances
Clean, Pollution – Free
Environment
Good Law & Order; State with one of the lowest man-days lost due to
industrial strife in India
Availability of Cheap and
Reliable Power
Dedicated Relationship Manager
Abundant Availability
of Good Water
Resources
Sector Specific Policies
MMLP, Pantnagar
Kashipur
4 hr
EMC, Kashipur
MASTER PLAN: IIE ESCORT FARM, KASHIPUR
Proposed EMC
AERIAL VIEW OF THE PROPOSED EMC, KASHIPUR
Proposed EMC
EMC, Kashipur 29°13'51.6"N 79°01'30.2"E
~ 102 Acres
IIM, Kashipur
KASHIPURLOCATIONAL ADVANTAGES
Wildlife Tourism Hotspot,
JIM CORBETT NATIONAL PARK is
just 25 Km away
Presence of ~ 50% of Medium & Large Industries of US Nagar District
Private Industrial Estates in Kashipur Region
Proximity to India’s major Auto Hub of Pantnagar
Home to Premier Educational Institutions like
INDIAN INSTITUTE OF MANANGEMENT, Rajputana College, Kendriya Vidyalaya, etc.
Kashipur is A MAJOR TRANSPORT HUB of
Uttarakhand
IIM, KASHIPUR
18+
Well-known Tourism
Destination NAINITAL
is just 2 Hrs Drive
AU
TO
MO
BIL
E E
LE
CT
RO
NIC
S Hero Moto Corp, IIE Haridwar Plant
World’s Largest Two Wheeler Manufacturer
▪ Tata Motors (World`s 2nd largest truck manufacturer)
▪ Bajaj Auto (World`s largest three wheeler manufacturer)
▪ Ashok Leyland (World’s 4th largest bus manufacturer)
▪ Mahindra & Mahindra (World’s largest Tractor Manufacturer)
Other Key Players in the State
MARQUEE OPPORTUNITIES
MAJOR AUTO
HUB OF INDIA
HARIDWAR &
PANTNAGAR
PH
AR
MA
& M
ED
ICA
L D
EV
ICE
EL
EC
TR
ON
ICS
~300+ Pharmaceuticals Units in Uttarakhand, catering to 20% of the Country’s demand
Exports worth 100+ Mn USD During 2017- 18 majorly to USA, Russia and Australia
Dedicated cluster at Selaqui, Dehradun with presence of approx. 50 Industry players engaged in manufacturing of pharma products
Source: Export Strategy of Uttarakhand 2018 by FIEO
Dedicated Medical Device Park is being developed in Haridwar by SIIDCUL
- Total Area: 97 Acres ( Expandable to ~ 200 Acres)
MAJOR
PHARMA
CLUSTER OF
INDIA
SELAQUI
~ 150+ Pharma industries exist in IIE Haridwar of SIIDCUL
MARQUEE OPPORTUNITIES
DE
FE
NC
E E
LE
CT
RO
NIC
S
Dedicated Defence & Aerospace Policy
For More info please click HERE
Opto Electronics Factory (OLF), Dehradun
• Wide range of world class Optics & Opto ElectronicsInstruments and Laser based sighting systems aremanufactured at OLF, Dehradun
MARQUEE OPPORTUNITIES
Center for Defence Electronics Application Laboratory(DEAL), Dehradun
A laboratory of the Defence Research & DevelopmentOrganization (DRDO)
OT
HE
R S
EC
TO
R E
LE
CT
RO
NIC
S
MARQUEE OPPORTUNITIES
E-MOBILITY
Dedicated Policy for Electric Vehicle
manufacturing
➢ Manufacturing of Electric Vehicles
and its Charging infrastructure
02
POWER & UTILITIES
➢ Manufacturing of Renewable
Energy Related Equipment
➢ Manufacturing of Smart Meters ,
IOT Systems, etc
01
TELECOMMUNICATION
➢ Manufacturing of Mobile devices
and telecom products
04
UNMANNED AVIATION
VEHICLES (UAV)
Dedicated Drone Research and
Development Centre at ITDA, Dehradun
➢ Manufacturing of Drones and other
UAV’s
03
CONSUMER GOODS
➢ Manufacturing of electronic products
such as home appliances, computer
peripherals etc.
05
INDICATIVE BENEFITS FOR ANCHOR UNITSEligibility Criteria for Investment by Anchor Units under EMC 2.0 Scheme, MeitY :
o Minimum investment of INR 150 Croreso Occupy at least 10% of saleable land area (~7 Acres)
COMMON BENEFITS (Investment above INR 75 Cr.)
1. CAPITAL SUBSIDY** : 30 % (Max. INR 5 Cr.)
2. COMPREHENSIVE INSURANCE INCENTIVE**: 100% Premium Reimbursement of insurance for
building and plant & Machinery (max. 5Yrs. from commencement of operation)
3. SGST REIMBURSEMENT* : 50% (after adjustment of input tax credit)
4. STAMP DUTY EXEMPTION* : 50% On Land Purchase / Lease Deed
4. ETP SUBSIDY* : 30% (Max. 50 Lakhs)
5. REIMBURSEMENT OF LAND REGISTRATION FEES* : INR 1/- per INR 1000
6. EXTRA EMPLOYMENT SUBSIDY* : @ INR 500 P.M. per Male, @ INR 700 P.M. per Female
INVESTMENT WISE BENEFITS
INCENTIVE
TYPE
MEGA
INR 75 – 200 Cr.
ULTRA MEGA
> INR 200 Cr.
SUPER ULTRA MEGA
> INR 400 Cr. (Min emp. 400 Nos.)
LAND RATE
REBATE*
25% on SIIDCUL prevailing land
rate
30% On SIIDCUL prevailing
land rate
30% On SIIDCUL prevailing
land rate
INTEREST
SUBSIDY*
(For 5 Yrs.)
07% (Max. 35 Lakhs)
07% (Max. 50 Lakhs)
07% (Max. 75 Lakhs)
POWER
ASSISTANCE*
(For 7 Yrs.)
Reimbursement of INR 1/- per unit on the electricity bill and 100% reimbursement
on electric duty for first seven years from establishment
Maximum Limit per Year:
INR 0.75 Cr.
Maximum Limit per Year:
INR 1 Cr.
Maximum Limit per Year:
INR 1.5 Cr.
To access the detailed policy documents, please visit: https://investuttarakhand.com/site/Policies
Note: The quantum of incentives will depend on the policy chosen by the investor, subject to terms & conditions
* Mega Industrial & Investment Policy, 2015 ** Industrial Development Scheme, 2017
BENEFITS UNDER SPECS, MEITY, Govt. of India(Investment Range: INR 05 Cr. – INR 1000 Cr.)
CAPITAL SUBSIDY: 25 % on reimbursement basis
(Total Available Incentive of INR 3,285 Cr.) To access the detailed scheme document, please visit: https://www.meity.gov.in/esdm/SPECS
29, IT Park, Sahastradhara Road, Dehradun, Uttarakhand, India 248001
+91-135-2708100 [email protected]
www.siidcul.com
KEY CONTACTS:
DGM Commercial -
+91-9917492613 ([email protected])
Architect Planner -
+91-9917492603 ([email protected])
Regional Manager (IIE, IT Park) -
+91-9719536093 ([email protected])
Reach Us at
STATE INFRASTRUCTURE AND INDUSTRIAL DEVELOPMENT CORPORATION OF
UTTARAKHAND LTD.
Invitation for setting up manufacturing plant as an Anchor Unit/s
at Electronic Manufacturing Cluster (EMC), IIE Kashipur,
Udham Singh Nagar, Uttarakhand
State Infrastructure and Industrial Development Corporation of Uttarakhand Ltd. (SIIDCUL) the
nodal agency of Government of Uttarakhand is engaged in development of Integrated Industrial
infrastructure of International standards.
By far, SIIDCUL has developed seven IIE’s which house some of the major Industrial Houses of the
country. The IIE Haridwar and IIE Pantnagar have emerged as a major Automobile Hubs of India and
IIE Pharma City at Selaqui is a major pharma cluster of India.
SIIDCUL in its endeavor of development of the industrial infrastructure in the state has identified area
to an extent of 102 acres at Kashipur, Udham Singh Nagar for development of an Electronic
Manufacturing Cluster. The project is envisaged to be developed under the EMC 2.0 Scheme set out
by MietY, Ministry of Electronics & Information Technology, Government of India.
The objective is to develop an electronic manufacturing hub in the field of ESDM, Consumer
electronics, medical devices, e-mobility, defense, power & utilities, telecommunication, consumer
goods, etc. in which anchor companies will act as a magnet for vendors down the supply chain.
Expressions of Interest is invited from the concerned companies to set up an anchor unit in the EMC
at Integrated Industrial Estate, Kashipur.
The interested companies are required to fill the application form available at www.siidcul.com/
which can be submitted either through e-mail ([email protected]) or offline at Registered Office
Address. The applications can be submitted from 11th August 2020 10.00 AM upto 30th September
05.00 PM. Detailed EMC brochure can be downloaded from www.siidcul.com/ .
In future any notices/information related to this EoI notice shall be uploaded on
https://www.siidcul.com/ only.
For any further queries, please write to us at [email protected]
Project Facilitators-SIIDCUL
Mr. Naresh Kumar Koranga, DGM(SIIDCUL)
Mobile : 9917492613
E-mail : [email protected]
Managing Director
APPLICATION FORM EXPRESSION OF INTEREST TO JOIN ELECTRONICS MANUFACTRUING CLUSTER,
SIIDCUL, IIE KASHIPUR
Name of Applicant:
Designation of Applicant:
Company Name:
Constitution Type: (Proprietorship/Partnership/LLP/Pvt
Ltd/Limited Company)
Owner Details (MD/ CEO/ Founder/Chairman):
Owner Contact Details (MD/ CEO/ Founder/Chairman):
Date of Registration:
Registered Address:
Presence in Uttarakhand: (YES/NO) Address:
Official Website:
Details of Existing Manufacturing Facilities:
Net Worth (INR Cr.):
Annual Turnover (For last three years):
State:
Phone No.:
Mobile No.:
Email ID:
Existing Product:
Annual Production Capacity:
Proposed Product:
Proposed Annual Production Capacity:
Land Requirement (Acres): (Occupy at least 10% of
saleable land area (~7 Acres))
Proposed Investment: (Minimum Investment by Anchor
Units under EMC 2.0 Scheme, MeitY of INR 150 Crores.)
Plant & Machinery: _________ INR Cr. Total Investment: _________ INR Cr.
Proposed Employment:
Proposed Organisation Type:
Member of Any Recognised Industry
Association:
Expectations from the state Government:
DATE (SIGNATURE OF THE OFFICIAL)
*For any queries/ submission of this form, please get in touch with us at:
+91-9917492613, DGM Commercial SIIDCUL or at [email protected]