Oil Field Services, Pipeline Construction / Supervision Corrosion Control Services, Electrical / Instrumentation and General Contractor CORPORATE PROFILE Nigeria Office: Evoc Yard, Enerhen Road,, P. O. Box 3526 Warri, Delta State, Nigeria. Tel: +234(0)8035419642, 234(0)8114556711 , +234(0)8023082071 , Email: [email protected], [email protected], [email protected] Website: www.anotechglobal.com.ng Ghana Office: No. 16 Zuriel Fort, Mensah Wood Road, East Legon, Accra Ghana Tel: +233 244446894, +233 261655188, +233 542042421

CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

Oil Field Services, Pipeline Construction / Supervision Corrosion Control Services,

Electrical / Instrumentation and General Contractor

CORPORATE PROFILE

Nigeria Office:

Evoc Yard, Enerhen Road,, P. O. Box 3526 Warri, Delta State,

Nigeria. Tel: +234(0)8035419642, 234(0)8114556711

, +234(0)8023082071 ,

Email:

[email protected], [email protected], [email protected] Website:

www.anotechglobal.com.ng

Ghana Office:

No. 16 Zuriel Fort, Mensah Wood Road,

East Legon,

Accra – Ghana Tel: +233 244446894, +233

261655188, +233 542042421

Page 2: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

1 CORPORATE PROFILE

TALBE OF CONTENT

1.0 BACKGROUND HISTORY

2.0 QUALITY POLICY STATEMENT

3.0 CASHES POLICY STATEMENT

4.0 ENGINEERING AND CONSULTANCY SERVICES CAPABILITIES

5.0 Consultancy Services

6.0 HAZARD MANAGEMENT PLAN

7.0 SUPPORTING TEAM

8.0 OUR EXPERIENCE

Page 3: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

2 CORPORATE PROFILE

1.0 BACKGROUND HISTORY

Anotech Global Company Nig. Ltd. was established as a company in the year 2001,

it was incorporated as a limited liability company the same year 2001 by the Corporate

Affairs Commission (CAC), Federal Republic of Nigeria with Registration Number - RC

416,168.

2.0 QUALITY POLICY STATEMENT

It is the policy of Anotech Global Company Nig. Ltd. , to implement a companywide

quality program, which consistently provides products and services, which conform to the

needs and standards defined by our clients. The company is committed to operating and

maintaining a quality assurance system designed to meet the requirements of BS, EN,

ISO 9002 (Latest edition).

Achievement of the Company’s Quality Policy is the responsibility of all personnel who are

individually responsible for the quality of their work and to whom this policy statement

has been explained. The management will ensure that relevant procedures are

communicated to, understood, and adhered to by all personnel.

The company has the capability to establish an in-house Safety and Quality Management

systems that satisfies the local client requirements and international Standards.

3.0 CASHES POLICY STATEMENT

Community Affairs, Security, Health, Environment and Safety (CASHES) is our

watchword in Anotech Global Company Nig. Ltd. All matters relating to CASHES shall be

appropriately dealt with in the manner and to the codes and standards applicable to the

work at hand. All staff to be employed on the project shall be thorough medically examine

and they shall be provided with details of information on the prevention of health

problems.

All activities shall be organized, planned and executed in a manner as to promote the

health of the workforce with no adverse effects to third parties.

Page 4: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

3 CORPORATE PROFILE

Anotech Global Nigeria limited shall aim to reduce unsafe acts and/or conditions while

strengthening unsafe act audit as a proactive and corrective tool for accident prevention.

To ensure compliance with the above, the necessary procedures and work instructions

have been incorporated into our Management System.

Employees are responsible for compliance with all the company policies, procedures,

practices, and laws applicable to their assigned duties. Where an employee is not sure

of the policies he has the responsibility of seeking management or supervisory guidance.

4.0 ENGINEERING AND CONSULTANCY SERVICES CAPABILITIES

Introduction

Anotech offers a multidisciplinary package for successful execution of small to big sized

engineering projects in the oil and gas industry in Nigeria. Anotech is based in Warri,

Delta State, which is the hub of the oil and gas industry in this region. We have

considerable project experience in this vicinity and indeed the whole of the Niger Delta.

We have useful local knowledge on community relations, recruitment, procurement,

transport, accommodation and other logistical matters. All of this is in addition to our

excellent technical expertise.

Our preparedness to expediently mobilize a high quality project team either at our home

base or at any other location in the region will ensure that your project is off to an

excellent start, lending the project an ankle rebottling space.

Engineering Projects Capabilities

Anotech Global Company Nig. Ltd. has proven competence in the

following:

feasibility studies, designing, construction, installation, maintenance works, and supply of

resource project management personnel.

Page 5: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

4 CORPORATE PROFILE

Project Management

Many organizations have experienced failed implementation exercise due to inadequate

of Total Quality Management (TQC) concept for every project supervised. This includes

the following:

Effective management of the project scope from mobilization to commissioning,

Strict management of the procurement exercises,

Strict control of key constraining factors,

Appropriate management of the project personnel and the change process,

Harmonious co-ordination of project information and communication and Balanced

management of the inherent risk in the project.

Civil, Welding and Fabrication Works

Our services in this area cover the following:

Development of sites and Access Roads,

Roads, Drainages, Manholes and Bridges Construction,

Buildings Renovation and Refurbishment,

Civil and Building Works Implementation,

Civil works for under Ground Cabling,

Wellhead Installations & maintenance,

Preparation of Bond walls,

Flow-line replacements,

Dredging works,

Opening of canals,

Sheet pilling / conventional pilling,

Welding and fabrication of jackets. Etc.

Mechanical and Structural

Engineering Here our services include:

Erection of support Structures,

Mechanical Instrumentation and Transmission,

Corrosion control (Blasting and painting),

Construction of pipeline,

Design and installation of central A/C system,

Page 6: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

5 CORPORATE PROFILE

Design and construction of plumbing systems and tanks,

Plant Hire/Leasing and Maintenance Services,

Maintenance of production Equipment – pumps, valves, air compressors. Etc.

Electrical Engineering Here our services

include:

Interpretation of Engineering design,

Installation and Maintenance of Electrical Equipment, i.e. Generators, control

Panels, Battery Systems, etc.

Industrial and Domestic cabling projects,

High Tension Power Routes,

Construction of power Huts and Hook – Ups,

Installation of Earthing Systems, and

Cathodic protection

Inspection, testing and commissioning of electrical installations.

Fire and Safety Engineering Here, our

services include:

Feasibility/investigative studies on designed structures to be erected,

Fire materials/equipment procurement/servicing,

Installations of electro safety systems such as: Fire alarm systems, smoke

detectors, Automatic sprinkler, Hydrant systems, Hose reels etc.

Fumigation of sites,

Waste disposal services,

Maintenance/inspection of fire equipment and Training/Commissioning.

Telecoms/Datacoms and Computer

Engineering:

The main areas covered by our operations are as follows:

Installation of structured office cabling (Data/Telecom),

Datacoms Room and underground cabling and conduit System,

Page 7: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

6 CORPORATE PROFILE

Installations computer Raised Floors,

Installation and Maintenance of satellite TV Systems in both land and

Swamp / offshore locations,

Installations Maintenance of Mast and Towers for Data/Telecom Transmission System.

5.0 CONSULTANCY SERVICES

Bids and Technical Proposal Consultancy Services

Here, our services include:

Preparation of feasibility studies for proposed project,

Preparation of Tenders/Bids Documents,

Preparation of Technical Responses for Companies,

Preparation of Quality and CASHES Cases, Preparation of Quality and CASHES

Plans and Manpower supplies and Development.

Recruitment Support Services

Increasingly companies are on the lookout for thoroughbred personnel who have good

technical business knowledge and effective managerial skills. We search for and groom

these personnel for your employment.

Our services here include:

Recruitment of requisite personnel to fit your operations,

Skills audit to requisite personnel to fit your operations,

Career development to help organizations plan the career path for their staff and offer

necessary training, development, and exposure and

Organizational arrangement / structuring for maximum productivity, profitability and

effectiveness.

Professional Training and Development

Anotech offers a flexible approach to our client’s needs. If required, we can quickly

mobilize a high quality design office in most locations. This has been as useful attribute

to our clients with brown field projects. Easy access to site for surveys and data gathering

speeds up the work and assists in ensuring that accurate constructible designs are

produced on time.

Page 8: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

7 CORPORATE PROFILE

Health, safety, environment and security

services Here, our services include:

Provision H.S.E. facilitators,

Project site inspections,

Environmental impact assessment studies,

Fumigation of Industrial and Residential Areas,

Sewage Removal Services,

Pollution Control/Environmental Cleaning,

H.S.E.S. policies and manuals,

Supply of safety officers,

Manpower development (personnel training),

H.S.E. Appraisal and audits,

Accident/ incident investigation and

Personal security appliances (CCTV) Procurement and installation.

Quality Assurance and Control Services Here our

service include:

Provision QA/ QC facilitators,

Preparation of pre- mobilization quality and CAHES plans,

Project site inspection and engineering audit and Quality systems design

and implementation.

6.0 HAZARD MANAGEMENT PLAN

General

The document covers the analysis of hazard associated with the execution of projects and

the safety precautions to be taken to project property and health/safety of persons in the

course of the development and implementation of all facilities associated with the project.

This specification will be used in conjunction with the client’s safety Regulations and

section 29 of the standard construction specifications.

Page 9: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

8 CORPORATE PROFILE

A tabulated and comprehensive HAZARD ANALYSIS shall be attached to this document

which covers the hazards and precautionary measures in all of our projects Viz:

I) Field Accommodation

II) Water Transport

III) Earthworks

IV) Civil Construction

V) Survey Work

VI) Ditching and Backfilling

VII) Mechanical construction

VIII) Welding

IX) Non-Destructive Examination

X) Installation of Platform Manifold/Block valves

XI) Pilling

XII) Painting

XIII) General site Area

XIV) Cleaning, Gauging and Hydro testing

XV) Diving

XVI) Pipe Laying Swamp/Land

XVII) Hydrostatic Pre-testing of Special Sections

XVIII) Major River Crossing Construction

XIX) Temporary CP Systems

XX) Coating of Field Joint and Bend

XXI) Dredging Operation

ANOTECH GLOBAL will be responsible for working safely and is therefore conversant

with the safety standards expressed or implied by the engineering codes and

specifications applicable to the work (e.g. the ANSI, API, ASME, NACE, BSI Standard

Specifications and Codes of Practice), and with the instructions contained in parts III, IV,

and V of the Nigerian Mineral Oil (safety ) Regulations of 1963 and the latest edition of

the Clients Safety Regulations.

Page 10: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

9 CORPORATE PROFILE

Site Safety Officer

All Engineering work sites will be manned by a dedicated site Safety Officer, in addition

to the technical personnel for the job(s).

The site Safety Officer will not be engaged on or seconded to other non – HSES related

parts of the operations.

Site safety Officers will have sound technical know – how and will display the following

capabilities:

I) Ability to prepare Work Hazard Analysis

II) Potentials for HSES Management ability. He will be assertive, decisive and have able

leadership qualities.

III) Ability to administer first aid .

IV) Ability to prepare appropriate contingency plans, drills, and simulates emergency

scenarios, for the works to be executed.

V) Be familiar with the client and Engineering Medevac and Emergency Procedures.

VI) Ability to maintain good records.

VII) Ability to communicate clearly and effectively.

Basic Regulations

ANOTECH GLOBAL is conversant with the statutory laws and regulations governing

safety and health of workers and special regulations and conditions related to petroleum

industry. All person’s engaged at the work-site will be acquainted with the following

regulations and abide by them as an essential condition to work at the site.

The Mineral Oil Act

The Mineral Oil(safety) Regulations of 1963,

Safety rules and Regulations with regard to operations and work in or near Electrical

Installations and /or Apparatus,

Latest version of client safety regulations, The Factories Act.

Page 11: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

10 CORPORATE PROFILE

ANOTECH GLOBAL will be responsible for ensuring that his employees and of his -

contractor and /or agents at the work-site comply with the above.

Restricted Areas

Restricted Areas shall be properly defined in the clients safety Manual (Permit-To Work).

All work in Restricted Areas will be in strict accordance with the Regulations in the Safety

Manual.

Permit To Work Before any work is commenced in a Restricted Area, ANOTECH

GLOBAL will obtain officially signed permit-TO-Work (PTW). One copy of the PTW will

be kept on actual Work site for inspection purpose.

Warning Systems

The warning and alarm systems in use at the Work site will be well appreciated by

ANOTECH GLOBAL’S Representatives. ANOTECH GLOBAL will ensure that his employees

know what action to take when such warnings/alarms are given.

Gas Test and Safety Procedures

Gas test and related activities will be carried out in accordance with the PTW document.

Connection to Utilities and Services

Connections to (or disconnection from) any installed utilities or operating services, such

as Electricity, Gas, Air, Steam or Water, for ANOTECH GLOBAL’S use, will only be made

with the written permission of the clients Representative and will only be carried out

under an official PTW. Where necessary, such connections and disconnection may be

carried out by appropriate client personnel.

Land Transport

Vehicles will be registered for which they are being used.

Speed limits and Roads Signs in force on roads will be observed. Vehicles will be driven

at a speed consistent with safety of the vehicle, road and weather conditions, its load,

Page 12: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

11 CORPORATE PROFILE

and other road users. Overloading of vehicles will be avoided and ANOTECH GLOBAL

will ensure that the authorized loads limit is not exceeded.

Movement of extra wide, high or long loads will be planned so as to by-pass any potential

obstacles such as narrow roads, roads with tight bends or low head room, obstructions

such as bridges or pipe-ways, with special attention to electricity cables. Similarly, the

movement of heavy loads will be planned so as to avoid bridges of limited load ratings

and low grade roads, etc.

Water Transport.

Every ANOTECH GLOBAL marine craft in clients operations will carry the

appropriate safety equipment.

Every marine craft will be provided with readily accessible and well-equipped First

Aid Box.

Emergency evacuation instructions will be conspicuously displayed inside the boat

or craft.

Engine – Power Vehicles and Equipment.

The entry and use of Engine-power Vehicles and Equipment in Restricted Areas will be in

strict accordance with the clients safety manual and the PTW Procedure.

Equipment such as drainage pumps, which are likely to be unattended and running will

be clearly marked to show the method of stopping the motor.

The storage of all fuels and lubricants will be in a location and manner agreed with clients

Representative.

Generators and Portable Electrical Equipment.

All electrical equipment, including generators, power tools and other portable equipment

will be covered with Permit-To-Work before use in a Restricted Area.

Temporary Electrical Lighting and Power Circuits

All temporary lighting and small power installations in a Restricted Area will be subject to

the same safety regulations and procedures as the permanent electrical installations.

Page 13: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

12 CORPORATE PROFILE

Keeping Work Areas Clean and Tidy

The working areas and all temporary structures will be kept tidy at all times. Roads,

paths, and access ways will be kept clear.

Spillage of oil or chemicals will be cleaned-up immediately to avoid hazards from fire,

slippery surfaces, toxic substances, etc.

Protective Clothing and Equipment

ANOTECH GLOBAL will supply and ensure the use of all necessary protective clothing

and equipment including:

I) Leather-faced welding/gas-cutting tunics, aprons, gauntlets, and sleeves.

II) Welding shields, helmets and visors.

III) Gas cutting goggles and visors.

IV) Safety helmets and safety goggles.

V) Dust mask and special breathing apparatus.

VI) Safety boots and non-slip footwear.

VII) Ear protectors and sound defenders.

VIII) Work vest.

IX) Life Jackets and life rafts.

Accident Reporting

ANOTECH GLOBAL will immediately report all accidents occurring within the duration

of the contract works in accordance with the clients approved accident-reporting

procedures.

Smoking, Lighters, Matches, etc.

Smoking, use of lighters and Matches will not be permitted on site, especially in Restricted

Areas.

Mechanical Works

Installation procedures for all aspects of mechanical work will follow safe working

practices as specified in the PTW procedure and the attached Hazard Analysis.

Page 14: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

13 CORPORATE PROFILE

Isolation Procedures

The preferred method of isolation from safety viewpoint is to completely disconnect and

close off the pipeline or plant item from all possible sources of hazard. Alternatively,

correctly rated and installed spectacle blinds, spades, blind flanges or stopple fittings may

be used to provide the necessary isolation, whatsoever approved by the client.

Pressure Testing

Pressure Testing of any part of a pipeline or plant installation will be started only after

the complete written test procedure has been submitted to the client Representative. All

pressure Testing will be in accordance with section 29 of the construction specifications

and the attached Hazard Analysis.

Civil Works

All requirements concerning Excavation Works are implicitly stipulated in the PTW

procedure and the Hazard Analysis contained in this document.

Structural Steel

All requirements concerning platform construction and related structural steel works are

stipulated in the PTW Procedure and the Hazard Analysis contained in this document.

Training

ANOTECH GLOBAL will train his personnel with particular emphasis on the importance

of operating safely coupled with the aim to inculcate a sense of safety awareness in each

employee.

The training programme will ensure that each worker is familiar with those parts of safety

regulations relevant to work.

Environment.

ANOTECH GLOBAL will be responsible for complying with all relevant environmental

laws and regulations and for taking all necessary precautions related to or arising out of

performance of the contract in order to protect the environment.

Page 15: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

14 CORPORATE PROFILE

ANOTECH GLOBAL will be responsible for obtaining copies of the relevant sections of

the environmental impact Assessment Report (where it has been carried out) and the

relevant sections of the Environmental procedure manual (when available). The work

will be carried out in accordance with the guidance in these reports and manual.

7.0 SUPPORTING TEAM

Anotech Global Company Nig. Ltd. has on its staff seasoned professionals that

operate and undertake business in oil related fields, Pipeline Construction, Pipeline Repair,

Water Engineering, , Civil Construction, Electrical, Electronics, Mechanical, and General

Merchandise.

Anotech Global Company Nig. Ltd. provides proficient EPIC Services, Thus availing

all our clients cost-efficient and quality needed throughout design, construction

supervision and commissioning of projects.

Anotech Global Company Nig. Ltd. is totally committed to cost-effective design

schemes consistent with client’s requirements, utilizing good quality products.

Since 2001 the company has excelled in the fields of Engineering services, Engineering,

Consultancy, and Procurement.

8.0 OUR EXPERIENCE

Anotech’s Engineers and Designers are carefully selected and well qualified with extensive

experience in the oil and gas industry. Our engineers are fully conversant with both

Nigerian and international Oil Gas Company standards and have successfully completed

designs for NNPC, SPDC, Exxon Mobil, Chevron Texaco, Agip and Addax.

S/ N

NAME OF PROJECT / CONTRACT DESCRIPTION

CLIENT SCOPE

DURATION & YEARS OF EXECUTION

CLIENTS CONTACT, PHONE AND EMAIL

Page 16: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

15 CORPORATE PROFILE

1. CALL-OUT – INSTALLATION /REPAIRS OF FLOWLINES

/PILINES IN CNL SWAMP LOCATION

CNL PIPELINE AND FLOWSTATION REPAIRS

TWO YEARS DAMOLA ADGBITE CONTRACTS MANAGER

2. CONSTURCTION OF DUAL 10” X 65KM PIPELINE FOM OLADIMA TO OGHARA

POOC PIPELINE CONSTRUCTION

3 Months FRED OROMA

3. CONSTRUCTION OF OKPORHURHRU 6” BULKLINE, 4” FLOWLINE, AND MANIFOLD. INCLUDING INSTALLATION OF BINDS

SEPLAT PIPELINE CONSTRUCTION

3 Months NATHEL NBINI

4. REPAIR OF OLERO 18” BUCKLINE (RIVER CROSSING)

CNL REPAIR 1week BEN OMITIMI

080-3342-7958

5. CONSTRUCTION, INSTALLATION & TESTING OF 30” PIPELINE SEGMENT FROM KP14 + 162 TO 29 + 375

NGC/ZAKHEM WELD AND LAY 3months AHMED SALEEM

08015356212

6. REPAIR OF OLERO 18” BUCKLINE (RIVER CROSSING)

CNL REPAIR 1week BEN OMITIMI

080-3342-7958

7. CONSTRUCTION OF AROH 1 & 2 FLOWLINES AND OZIENGBE FLOWSTATION MANIFOLD MODIFICATION

NPDC WELD AND LAY 4months OSAHON IGUS

[email protected]

8. EMERGENCY PIPELINE REPAIR COVER (CALL-OUT) CONTRACT FOR WARRI – BENIN SEGMENT OF SYSTEM 2A PIPELINE

PPMC REPAIR MONTHLY R. C. STANLEY

MANAGING DIRECTOR

9. CONSTRUCTION DUAL 6”

SCHEDULE 80 X 1.5KM FLOWLINE AT ONA 4/5

POOC CONSTRUCTION FLOWSTATION

OF 1month

FRED ROMAN 080-3405-6935 [email protected]

10. REPAIR OF DIBI – ABITEYE 10” WATER PIPELINE AND REPAIR OF OLERO – ABITEYE 12” PIPELINE

CNL REPAIR OF PIPELINE 2weeks BEN OMITIMI

080-3342-7958

11. REPAIR OF DIBI – ABITEYE 18” PIPELINE

CNL REPAIR OF PIPELINE 2weeks BEN OMITIMI

080-3342-7958

12. THE PATCH-WELD REPAIR OF 3NOS LEAK POINTS:

OPUEDEBUBORS (2) AND IJALA (1) ON THE 20” NGC GAS PIPELINE ON

NGC REPAIR OF PIPELINE 2weeks

ELP-A NEAR ESCRAVOS

13. REPAIR OF DIBI – ABITEYE 10” WATER PIPELINE AND REPAIR OF OLERO – ABITEYE 12” PIPELINE

CNL REPAIR OF PIPELINE 2weeks BEN OMITIMI

080-3342-7958

Page 17: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

16 CORPORATE PROFILE

14. REPAIR OF DIBI – ABITEYE 18” PIPELINE

CNL REPAIR OF PIPELINE 2weeks BEN OMITIMI

080-3342-7958

15. REHABILITATION OF ESCRAVOS - WARRI PIPELINE

PPMC PIPELINE REPAIR AUG 2009 – JAN 2010

R. C. STANLEY Managing Director

16. FABRICATION OF 150 FLOATERS AND ROLLERS

ZAKHEM NIG. LTD

FABRICATION 13TH JANUARY 2009 – MAY 2009

JOHN PETTIGREW [email protected]

14 12” X 3.5KM NEMBE PIPELINE REPLACEMENT PROJECT SHELL

PETROLEUM COMPANY NIG. LTD. AND NEST OIL LTD.

CONSTRUCTION OF PIPELINE

DEC 2008 – JAN 2010 GRAHAM CUSHION

07028378639

[email protected]

15 MAKARABA – UTONANA 16” PIPELINE REPAIR

CHEVRON NIG. LTD.

PIPELINE REPAIR 2008 BEN OMITIMI

080-3342-7958 16 MAKARABA 16” BULK REPAIR

CHEVRON NIG. LTD. AND

KONWAWIL NIG LTD

PIPELINE REPAIR 2008 BEN OMITIMI

080-3342-7958

17 FABRICATION OF STEEL FORM WORKS FOR EGP3A CHEVRON NIG.

LIMITED and HYUNDAI HEAVY INDUSTRIES

FABRICATION 2007 MR SORAB

0807-2972-096

18 FABRICATION OF STEEL COFFERDAM PANELS FOR EGP3A (CHEVRON

NIG. LIMITED ) and HYUNDAI HEAVY INDUSTRIES

FABRICATION 2007 MR SORAB

0807-2972-096

19 CONSTRUCTION OF 5,781.52M FROM KWALE TO BENEKU(P1-6 TO P1-15)

PLATFORM PETROLEUM LIMITED

FLOWSTATION FABRICATION 2007

PATRICK

ERONWON

080-5619-5351 [email protected]

20 INSTALLATION OF 10,000BPD F/S

PROCESS PIPING AND ASSOCIATED WORKS

PLATFORM PETROLEUM LIMITED

FLOWSTATION FABRICATION 2007

PATRICK

ERONWON

080-5619-5351 [email protected]

21 INSTALLATION OF 4”, 4Km,SINGLE FLOWLINE PAN OCEAN

OIL CORPORATION

CONSTRUCTION FLOWSTATION

OF 2006

FRED ROMAN 080-3405-6935 [email protected]

22 INSTALLATION OF 4”, 4Km,DUAL FLOWLINE PAN OCEAN

OIL

CORPORATION

CONSTRUCTION FLOWSTATION

OF 2006

FRED ROMAN 080-3405-6935 [email protected]

23 WATERLINE AND TIE IN AT CNL F/S PAN OCEAN

OIL

CORPORATION

CONSTRUCTION FLOWSTATION

OF 2006

FRED ROMAN 080-3405-6935 [email protected]

24 NDT,WELLHEAD & MANIFOLD FABRICATION AND HOOK UP PAN OCEAN

OIL

CORPORATION

CONSTRUCTION FLOWSTATION

OF 2006

FRED ROMAN 080-3405-6935 [email protected]

Page 18: CORPORATE PROFILE · maintaining a quality assurance system designed to meet the requirements of BS, EN, ISO 9002 (Latest edition). Achievement of the Company’s Quality Policy is

17 CORPORATE PROFILE

25 INSTALLATION OF VARIOUS LIQUID AND GAS TIE – IN POINTS AT OVADE – OGHARAFE F/S

PAN OCEAN OIL CORPORATION

INSTALLATION OF GAS LINE

2006

FRED ROMAN 080-3405-6935 [email protected]

26 16”MAKARABA – UTONANA PIPELINE REPAIRS

CHEVRON NIG. LIMITED

REPAIR OF PIPELINE 2006 Engr Ben Omitimi

080-3342-7958 27

WELDING, STRINGING AND HYDRO TEST OF 20” WEST AFRICA GAS PIPE LINE

NACAP PLS CONTRUCTION OF GAS LINE

2006 Gerald Stellema

080-2309-5565

28 SUPPLY OF 1000 TON BARGE “KARO”

CHEVRON

NIG LTD

SUPPLY OF BARGE 2006 Engr Ben Omitimi

080-3342-7958 29

26” ABITEYE – ESCRAVOS PIPE LINE REPAIRS

CHEVRON

NIG LTD

REPAIR OF PIPELINE 2005 Engr Ben Omitimi

080-3342-7958 30

ASSESSMENT/ HYDROSTATIC PRESSURE TESTING OF PIPELINES/FLOW LINES

CHEVRON

NIG LTD HYDROSTATIC PRESSURE TESTING OF PIPELINES/ FLOW LINES

2005 ‘’

31 CIVIL CONSTRUCTION AND DEMOLITION WORKS

CHEVRON

NIG LTD UPROOTING AND CONSTRUCTION OF CIVIL SLAGE

2004 Engr Callistus

080-2336-3619

32 20” x 3.5KM

PIPELINE

CONSTRUCTION

SHELL PETROLEUM DEV.COMPANY

CONTRUCTION OF PIPELINE

2005 Engr. Chris