Copyright Reserved GreenTech Malaysia PROJECT : CDM Energy Secretariat REPORTING PERIOD : 1 – 31 Aug 2013 1 Project Brief/Summary •Appointed since 2002 •101 registered energy projects with CDM EB •37 CDM projects received CER Objectives •To carry out a first evaluation of CDM project proposals •To create awareness on CDM and disseminate information •To assist the DNA in monitoring the CDM projects •To provide reference materials as a guide in CDM project development Project Fund: RM 59,086.00 (NRE) Duration: May – Dec 2013 Expected Outcomes Inception Report Progress Report Final Draft Report Final Report Status completed completed Due: Sep 13 Due: Nov 13

Copyright Reserved GreenTech Malaysia PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013 1 Project Brief/Summary Appointed since 2002 101

Embed Size (px)

Citation preview

Page 1: Copyright Reserved GreenTech Malaysia PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013 1 Project Brief/Summary Appointed since 2002 101

Copyright Reserved GreenTech Malaysia

PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013

1

Project Brief/Summary•Appointed since 2002•101 registered energy projects with CDM EB•37 CDM projects received CER

Objectives

•To carry out a first evaluation of CDM project proposals•To create awareness on CDM and disseminate information •To assist the DNA in monitoring the CDM projects•To provide reference materials as a guide in CDM project development

Project Fund:RM 59,086.00 (NRE)

Duration: May – Dec 2013

Expected Outcomes

• Inception Report

• Progress Report

• Final Draft Report

• Final Report

Status

• completed

• completed

• Due: Sep 13

• Due: Nov 13

Page 2: Copyright Reserved GreenTech Malaysia PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013 1 Project Brief/Summary Appointed since 2002 101

Copyright Reserved GreenTech Malaysia 2

Activities Completed (During reporting period)

•Progress report was completed

•Meeting with UK Carbon Trust, 19 Aug 2013

% completed: 50 % based on report completion

% funds utilised: 40 % based on progress payment by NRE (RM 23, 634.00)

Activities Planned (For next reporting period)

• DNA Regional Training on CDM PoA, Manila, 2-6 Sept 13 • Presentation on CDM Biogas Project at IGU Committee Meeting, Kota Kinabalu, Sabah, 5 Sept 13. • Site visit to Bukit Tagar Sanitary Landfill, Hulu Selangor, 18 Sept 13. •Submission of First Draft Report to NRE

PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013

Page 3: Copyright Reserved GreenTech Malaysia PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013 1 Project Brief/Summary Appointed since 2002 101

Copyright Reserved GreenTech Malaysia 3

Impacts of the Project•Largest sector for CDM in Malaysia (Energy)•Rank 5th in the world•ER- 5,239,395 tCO2 achieved

Photos of activities for the period of reporting

- not available-

Challenges Actions

PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013

• No application receive so far, due to unattractive price of CER.

• Participate in the 6 GTFS Roadshow with FMM

• 3 workshop on Challenges & Opportunity on CDM implementation will be conducted

Page 4: Copyright Reserved GreenTech Malaysia PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013 1 Project Brief/Summary Appointed since 2002 101

Copyright Reserved GreenTech Malaysia

Project planned activities:

CDM Electricity Baselines for 2012

CDM Information Handbook ver.3

CDM project monitoring (2 site visits)

Workshop on Challenges & Opportunity of CDM Implementation (3 workshops)

PROJECT: CDM Energy Secretariat REPORTING PERIOD: 1 – 31 Aug 2013