8/17/2019 Copy of Slamming & Green Sea Check
1/33
Sea goingV 10 knotsL 235 Zg
Cw 10.23 Sg 0.85Cf 4 np 0.8β 34 fy 355
T 8 m Km 1222.! m "s# !00 k$%m&2
'0 14.! mC 0.53
s 0.85# 1Ka2 0.85Ka 0.()*f 355
"s# 42!.)
t0 10.13228
+t ,e#-V 0 knotsL 235 mCw 10.23Cf 2.5β 34
T 15 m
8/17/2019 Copy of Slamming & Green Sea Check
2/33
8/17/2019 Copy of Slamming & Green Sea Check
3/33
8/17/2019 Copy of Slamming & Green Sea Check
4/33
8/17/2019 Copy of Slamming & Green Sea Check
5/33
8/17/2019 Copy of Slamming & Green Sea Check
6/33
8/17/2019 Copy of Slamming & Green Sea Check
7/33
8/17/2019 Copy of Slamming & Green Sea Check
8/33
8/17/2019 Copy of Slamming & Green Sea Check
9/33
e#ta 12(4!1 TL 234 m/ 42 m
T 14.)( m
Cw 10.21381'0 0.(42C 1a#p'a 0.))4838 a-
eta 0.59341 a-
V 8 knotsC 0.2C 1 0.8
a0 0.2)0)4!C 0.845214t'eta 0.08!05( a-
k 13.4(3.8!
T 13.(121k 1
0.)0(1)8p'i 0.38(!)1 a- 22.2130( 10 0.1(4533
gamma 0.14(813Cf 3.28675
8/17/2019 Copy of Slamming & Green Sea Check
10/33
11!.25
8/17/2019 Copy of Slamming & Green Sea Check
11/33
8/17/2019 Copy of Slamming & Green Sea Check
12/33
8/17/2019 Copy of Slamming & Green Sea Check
13/33
8/17/2019 Copy of Slamming & Green Sea Check
14/33
8/17/2019 Copy of Slamming & Green Sea Check
15/33
8/17/2019 Copy of Slamming & Green Sea Check
16/33
8/17/2019 Copy of Slamming & Green Sea Check
17/33
8/17/2019 Copy of Slamming & Green Sea Check
18/33
o e 6 T7 pe m4.(0
8/17/2019 Copy of Slamming & Green Sea Check
19/33
A Green sea loads as per Pt.3 Ch.1 Sec.8 is gi en !" P1#
'e e 9
12(4!1 T 6f:##y #oa-e- on-ition7
L 234 m/ 42 m
T 14.)( m 6f:##y #oa-e- on-ition7Loa "oint 22 ! m
isp#a ement9 <
8/17/2019 Copy of Slamming & Green Sea Check
20/33
(ocal Scantlings as per )%* +,les -or ships Pt.3 Ch.1 Sec.10Plate /hic$ness
Ka 1
s 0.825 m 6ma=im:m sti>ene spa ing7f1 1.3)* 222.4 $%mm2" 54.!2 k$%m2
t 6 '' gi en# 15''# $
C Sti ner Section 'od,l,s re ,ire'ents
# 3.02 m 6Typi a# span is 2.5m7s 0.825 m 6ma=im:m spa ing 7
185 c' 3 gi en# 445.90 c' 3# o$
" 1
8/17/2019 Copy of Slamming & Green Sea Check
21/33
8/17/2019 Copy of Slamming & Green Sea Check
22/33
) Girder Section 'od,l,s re ,ire'ents as per )%*G( S C102# Ch
S 3.02 m
2 m 6ma=im:m spa ing fo ose ati1
447 c' 3 gi en#1410.56 c' 3# o$
wk
8/17/2019 Copy of Slamming & Green Sea Check
23/33
8/17/2019 Copy of Slamming & Green Sea Check
24/33
8/17/2019 Copy of Slamming & Green Sea Check
25/33
8/17/2019 Copy of Slamming & Green Sea Check
26/33
8/17/2019 Copy of Slamming & Green Sea Check
27/33
A Green sea loads as per Pt.3 Ch.1 Sec.8 is gi en !" P1#
'e e 9
12(4!1 T 6f:##y #oa-e- on-ition7
L 234 m/ 42 m
T 15.3 m 6f:##y #oa-e- on-ition7Loa "oint 22 0( m
isp#a ement9 <
8/17/2019 Copy of Slamming & Green Sea Check
28/33
(ocal Scantlings as per )%* +,les -or ships Pt.3 Ch.1 Sec.10Plate /hic$ness
Ka 1
s 0.30! m 6ma=im:m sti>ene spa ing7f1 1* 1!0 $%mm2" 34.(8 k$%m2
t 2 '' gi en# 17''# $
C Sti ner&Girder Section 'od,l,s re ,ire'ents
# 4 ms 0.30! m 6:ns:ppo te- p#ate wi-t'9 ma=7
106 c' 3 gi en# 1572.69 c' 3# o$
" 1
8/17/2019 Copy of Slamming & Green Sea Check
29/33
8/17/2019 Copy of Slamming & Green Sea Check
30/33
8/17/2019 Copy of Slamming & Green Sea Check
31/33
8/17/2019 Copy of Slamming & Green Sea Check
32/33
8/17/2019 Copy of Slamming & Green Sea Check
33/33
S omments ??"/L@?As ep#y1
1 Noted. The revised drawing will be updated accordingly.
2 Noted. The revised drawing will be updated accordingly.
1. "1501BT SB(0000B BCLB0030D+0 Eoa-ing Fose "#atfo m St : t: a# +na#ysisG
Green water and wave run up forces acting on the Offloading HosePlatform structure shall be considered (structure goes more than
!"# mm below main dec$ and at this point green water and runup forces acts on the structure%.
Green sea loads and &ave slamming loads on the riser balconystructure are considered as presented in the document' TO'T)'*T+'!,"'-, T /HN0/- ) )O ON O22 O-30NG HO*P -T2O+) * -))0NG -N3 G+ N * - O-3* . The revised
design report will be updated accordingly.
2. "1501BT SB(0000B B B002(D+0 Eoa-ing Fose "#atfo m St : t: a# awingsG -4* to include P1#,1'TO*'",,,,')O'/ ',,5, Offloading HosePlatform *tructural -nalysis as reference document in both pagesof the drawing
-4* to include the design loads (static and dynamic% on thedrawing.