BongaOUOperating Integrity SG4 Compliance ReportFacility:Bonga FPSOOI FOCAL POINT: Cliff Pain/ Dumo WestOI CHANGE AGENT: Onwelikwu Philip
TopicStage Gate 4 criteriaEvidenceScoreComment/Evidence, Gap closure Action, Who & When to close gapAspect Score1Operating envelopes andAlarm managementA Variable Table (alarm catalogue) exists, covering wells, facilities and pipelinesCovered by PCC 19Document/database2No variable Table yet. Under development of alarm rationalisations partThe Operating envelope limits have been verified against the design envelope. Covered by PCC 18Review variable table2No variable Table yet. Under development of alarm rationalisations partLimits include relevant variables not incorporated in the control/shutdown system (e.g. corrosion inhibitor uptime, pipeline velocities, sand, CO2)Review variable table2No variable Table yet. Under development of alarm rationalisations partVariable table is up to date and accessible for CROs.Covered by PCC 23Observation (Spotcheck against DCS)2No variable Table yet. Under development of alarm rationalisations partMOC procedure for Variable table is in placeCovered by PCC 21Document (Examples of MoC procedure being used)3No variable Table yet. Under developmentVariable Table includes operator responses, reason for alarm, basis for alarm, consequence, escalation, etc (for full list refer to DEP 32801014 Alarm Management)Covered by PCC 7, more specific by 10,11Document/database2No variable Table yet. Under development of alarm rationalisations partAlarm KPI's are identified (as a minimum: alarm rate, standing alarms)There is no PCC on this one !document3alarm rates identified, Information is best reportedinthe daily alarm reportAlarm rate is