    LARSEN & TOUBRO LIMITED

    MANAMADURAI - TIRUCHULI - VIRUDHUNAGAR RC PROJECT

    ACTION PLAN FOR COMPLETING BALANCE WORKS

    As on : 20.04.2013

    Description of work Remarks

    Work PF Mintu pal 25.04.13 Manikantan Completed

    g of Toilet PF Ravi 20.04.13 Manikantan

    g for Off duty room PF Dept 25.04.13 Manikantan

    toilet , inside toilet of station Building PF Mintu pal 20.04.13 Manikantan

    ork for all rooms PF Dept 18.04.13 Manikantan

    shing and pointing inside Station Building PF Mintu pal 30.04.13 Manikantan

    er window work at booking office PF Dept 25.04.13 Manikantan To be enquired

    ic toilet PF Dept 20.04.13 Manikantan Awaiting approval

    public toilet PF Mintu pal 25.04.13 Manikantan To be enquired

    refixing for windows PF Dept 25.04.13 Manikantan

    or ventilator PF Dept 25.04.13 Manikantan

    r waiting hall ramp & toilet ramp PF Syed 30.04.13 Manikantan

    water cubicle PF Dept Manikantan Before CRS

    by local people to be replaced in water cubicle PF Mintu pal Manikantan Before CRSPF Ghosh 20.04.13 Manikantan

    ooring in Equipment room PF Mintu pal completed Manikantan

    teps in battery room PF Mintu pal completed Manikantan

    lay room and equipment room PF Ravi 20.04.13 Manikantan Completed

    latform PF Dept 30.04.13 pagiyam

    ramp at VPT end PF Dept 15.04.13 pagiyam

    WorkGroup

    Name ofthe S/c

    TargetCompleti

    on

    SiteEngineer

    PVC or rubber sheet tobe ordered

    for cable duct in PF. No.2 to be casted and allointed

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    2/16

    Page 2 of 16

    Description of work RemarksWorkGroup

    Name ofthe S/c

    TargetCompleti

    on

    SiteEngineer

    n

    onnection works PF Ghosh 30.04.13 Manikantan

    rks inside public toilet(Fitting & fixing) PF Ghosh 18.04.13 Manikantan

    own pipe from building top to be provided PF Ghosh 25.04.13 Manikantan

    PF Ghosh 25.04.13 Manikantan

    in off duty room toilet to be replaced PF Ghosh 20.04.13 Manikantan During CRS

    ly challenged toilet to be constructed PF Manikantan

    for windows to be replaced PF Ghosh 20.04.13 Manikantan

    or ventilator PF Ghosh 20.04.14 Manikantan

    et store room PF Ghosh 25.04.13 Manikantan

    PF Ghosh 30.04.13 Manikantan

    CC Blocks steps infront of new station bulding PF Ghosh 25.04.13 Manikantan

    ar side and VPT side of toilet PF 30.04.13 Manikantan

    fixing surrounding toilet in ground floor PF Gopi Manikantan

    provision between new and old station building PF Syed 20.04.13 Manikantan

    er window work at booking office PF Dept 30.04.13 Manikantan

    water cubicle PF Dept Manikantan During CRS

    ater cubicle PF Murugaya 30.04.13 Manikantan

    recast slab in PF. No.2 cable duct PF M.Krisnan 25.04.13 Manikantan Item to be confirmedlay room and equipment room PF Ravi 25.04.13 Manikantan

    PF Ghosh 20.04.13 Manikantan

    PF Murugaya 25.04.13 Manikantan

    wards VPT end of building for collecting rain

    New proposal given on

    10.04.13

    lab broken for electrical works in booking office

    To be discussed withclients

    ooring in rooms broken for S&T and electrical

    ishing of precast slab for cable duct insideng

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    3/16

    Page 3 of 16

    Description of work RemarksWorkGroup

    Name ofthe S/c

    TargetCompleti

    on

    SiteEngineer

    Work Building Mintu pal completed Damodharan Work in progress

    g of Toilet Building Ravi 22.04.13 Damodharan

    ixing PF syed Damodharan

    r toilet , inside toilet of station Building Building Mintu pal 20.04.13 Damodharan

    ork for all rooms Building Mintu pal 20.04.13 Damodharan

    shing and pointing inside Station Building Building Mintu pal Damodharan Before CRS

    er window work at booking office Building Dept 30.04.13 Damodharan

    ic toilet Building RAJA 19.04.13 Damodharan

    public toilet Building Mintu pal 18.04.13 Damodharan

    refixing for windows Building Mintu pal 20.04.13 Damodharan

    or ventilator Building Mintu pal 20.04.13 Damodharan

    r toilet ramp Building Syed 22.04.13 Damodharan

    r water cubicle PF Mintu pal Damodharan Before CRS

    ixing PF Syed 20.04.13 Damodharan

    PF Mintupal 22.04.13 Damodharan WIP

    latform PF Mintupal 20.04.13 Damodharan WIP

    ramp at VPT end PF Mintupal 20.04.13 Damodharan

    casting PF Gopi 20.04.13 Damodharan

    erection PF Gopi 30.04.13 Damodharan

    25.04.2013

    for cable duct in PF. No.2 to be cast and allointed

    Post - 250/250;Walling- 200/250

    To commence by23.04.13

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    4/16

    Page 4 of 16

    LARSEN & TOUBRO LIMITED

    TIRUCHULI - VIRUDHUNAGAR RC PROJECT

    ACTION PLAN FOR COMPLETING BALANCE WORKS

    As on : 06.04.13

    ption Qty REMARKS

    AR YARD

    Alwin

    12.04.13 17.04.13 Alwin

    6.75 Alwin

    21.6 Alwin

    1.69 Alwin

    120 Alwin

    Alwin

    Alwin

    11.04.13 18.04.13 Mintupaul Alwin

    35 Mtr 14.04.13 20.04.13 Gopi Alwin

    20.04.13 Gopi Alwin Work in progress

    17.04.13 19.04.13 Ravi Alwin

    7 Nos. 12.04.13 14.04.13 Raja Alwin

    fixing 15.04.13 17.04.13 Mintupaul Alwin

    fixing 12.04.13 14.04.13 Mintupaul Alwin

    StartDate

    EndDate

    Name ofthe S/c

    SiteEngg.

    oping no.: 2,3

    Muthupandi

    PF no: 5 after wallclearance by clientside

    on of PFportion

    olly path

    Muthupandi

    PF no: 5 after wallclearence by clientside

    MuthupandiMuthupand

    iMuthupandiMuthupandi

    PF wallso as tostanceo 1.68mtrack to

    pingto .84mf railping

    Muthupandi

    Balance 40malignment detail tobe given by clients

    k for thetoilet @ainagen

    Muthupandi

    Tiling workcompleted,drainage connectionnot in our scope

    ical & 5 Nos.Each

    Since width ofplatform is less on

    Tvnli end , we canconstruct only 2nosimmediately balancewill be done aftercompleting FOBfoundation works

    ng left

    PF no:5

    shing ofng

    shing ofding

    ding, pvcg

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    5/16

    Page 5 of 16

    ption Qty REMARKSStartDate

    EndDate

    Name ofthe S/c

    SiteEngg.

    17.04.13 Mintupaul Alwin Work in progress

    2 Nos. 13.04.13 20.04.13 Kuppan Alwin

    2 Nos. 15.04.13 20.04.13 Murugaiya Alwin Perali, Villipathiry

    ilet room 2 Nos. 15.04.13 25.04.13 Alwin

    ilding

    4 Nos. 13.04.13 20.04.13 Murugaiya Alwin Leach Pit Completed

    4 Nos. 13.04.13 30.04.13 Murugaiya Alwin

    2 Nos. 18.04.13 19.04.13 Gopi Alwin

    14.04.13 22.04.13 Dept Alwin

    room 1 No. 13.04.13 20.04.13 Murugaiya Alwin Irrunchirai

    d portion

    rd in the

    n of

    n lc gate

    Department

    Nagampatti,Thottiyankulam

    n andon of

    m gateoad

    shing of Irrunchirai , Narikudibalance

    sing -

    ngs withpaled gate

    2 Nos.100cu

    meach

    Keelapasali,Chinnakannanur.

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    6/16

    Page 6 of 16

    LARSEN & TOUBRO LIMITEDTIRUCHULI - VIRUDHUNAGAR RC PROJECT

    ON PLAN FOR COMPLETING BALANCE WORKS - WEARING CDate : 12.04.2013

    Sl. No. Br. No. Location Wearing Coat (Cum) Completion date

    1 294 589/11-12 9.00 20.04.13

    2 296 590/14-15 33.00 27.04.13

    3 299 591/10-11 3.00 28.04.13

    4 300 591/12-13 1.38 29.04.13

    5 302 592/15-593/1 4.50 30.04.13

    6 308 595/3-4 3.60 2/05,13

    7 313 595/12-13 11.00 03.05.13

    8 329 608/9-10 5.00 04.05.13

    9 330 609/5-6 4.50 06.05.13

    10 331 611/12-13 5.00 07.05.13

    11 333 612/9-10 12.30 10.05.13

    12 338A 613/14-15 6.10 11.05.13

    13 340 613/15-614/1 5.00 12.05.13

    14 348 618/12-13 12.00 13.05.13

    115.38

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    7/16

    REACH-I MANAMADURAI-THIRUCHCHULI VENT

    LOCATION PROPOSED SPAN BARREL WRIDTH DEPTH

    55613-14 1 x2x 3 RCB 8.000 2 0.30

    556/14-15 1x1.2x1.2 RCB

    556/16-17 1x1.2x1.2 RCB

    557/2-3 1x1.2x1.2 RCB 7.650 1.2 0.40

    557/5-6 1x1.2x1.2 RCB 7.650 1.2 0.50

    557/6-7 1x6x2.3 RCB 6.850 6 0.37

    557/9-10 1x1.2x1.2 RCB 7.650 1.2 0.23

    557/10-11 1x1.2x1.2 RCB 7.650 1.2 0.33

    559/3-4 1x6x3.1 RCB 6.850 6 0.40

    559/6-7 1x6x2.4 RCB 6.850 6 0.50

    559/8-9 1x4x2.5 RCB 6.850 4 0.57

    559/9-10 1x1.2x1.2 RCB 7.650 1.2 0.30

    559/11-12 1x1.2x1.2 RCB 7.650 1.2 0.40

    559/14-15 1x1.2x1.2 RCB 7.650 1.2 0.57

    559/16-17 1x1.2x1.2 RCB 7.650 1.2 0.10

    559/16-560/1 1x1.2x1.2 RCB 7.650 1.2 0.50

    560/4-5 1x1.2x1.2 RCB 10.710 1.2 0.53

    560/5-6 1x1.2x1.2 RCB 9.180 1.2 0.40

    560/10-11 1x1.2x1.2 RCB 7.650 1.2 0.53

    561/1-2 1x4.5x3 RCB 6.850 4.5 0.50

    561/3-4 6x12.2 PSC Major Bridge

    561/5-6

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    8/16

    561/11-12 1x1.2x1.2 RCB 9.180 1.2 0.47

    562/1-2 1x4x2.4 RCB 6.850 4 0.47

    562/3-4 1x1.2x1.2 RCB 7.650 1.2 0.50

    562/6-7 1x1.2x1.2 RCB 7.650 1.2 0.27

    562/8-9 1x1.2x1.2 RCB 7.650 1.2 0.50

    563/7-8 1x6x2.2 RCB 6.850 6 0.50

    563/8-9 1x6x3 RCB 6.850 6 0.67

    563/10-11 1x4x3 RCB 6.850 4 0.50

    564/1-2 2x4x1.7 RCB 7.000 4 0.50

    564/15-565/1 1x1.2x1.2 RCB 7.650 1.2 0.60

    565/7-8 1x4x1.6 RCB 6.85 4 0.53

    565/8-9 1x4.5x1.8 RCB 6.850 4.5 0.60

    565/9-10 1x1.2x1.2 RCB 7.650 1.2 0.27

    565/13-14 1x1.2x1.2 RCB 7.650 1.2 0.50

    566/1-2 1x1.2x1.2 RCB 7.650 1.2 0.47

    566/3-4 1x1.2x1.2 RCB 7.650 1.2 0.50

    566/3-4 1x1.2x1.2 RCB 7.650 1.2 0.60

    567/4-5 1x4.5x1.8 RCB 6.850 4.5 0.47

    568/1-2 1 x4x 2 RCB 6.850 4 0.40

    568/2-3 1x4x2.3 RCB 6.850 4 0.50

    568/7-8 4x12.2 PSC Major Bridge

    568/8-9 1x4.5x2.6 6.850 4.57 0.27

    569/3-4 1x1.2x1.2 RCB 9.180 1.2 0.50

    569/5-6 1x1.2x1.2 RCB 10.710 1.2 0.20

    569/6-7 1x1.2x1.2 RCB 10.710 1.2 0.27

    569/7-8 1x2.5x2.6 RCB 6.850 2.5 0.33

    569/8-9 1x4.5x4.4 RCB 6.850 4.5 0.40

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    9/16

    569/14-15 1x1.2x1.2 RCB 9.180 1.2 0.27

    570/14-15 1 x4x 1.9 RCB 6.850 4 0.20

    572/3-4 1x1.2x1.2 RCB 7.650 1.2 0.17

    572/13-14 1x 6x 3 RCB 6.850 6 0.10

    572/14-15 1x6x5.3 RCB 6.850 6 0.37

    573/3-5 9x12.2 PSC Major Bridge

    573/5-6

    573/8-9 1x1.2x1.2 RCB 10.710 1.2 0.23

    573/9-10 1x1.2x1.2 RCB 9.180 1.2 0.10

    573/11-12 1x1.2x1.2 RCB 7.650 1.2 0.17

    573/14-15 1x1.2x1.2 RCB 7.650 1.2 0.17

    574/2-3 1x1.2x1.2 RCB 7.650 1.2 0.38

    574/4-5 1x1.2x1.2 RCB 7.650 1.2 0.20

    574/5-6 1x6x2.3 RCB 6.850 6 0.27

    574/12-13 1x1.2x1.2 RCB 7.650 1.2 0.27

    575/5-6 1x4.5x3 RCB 6.850 4.5 0.53

    575/15-576/1 1x1.2x1.2 RCB 7.650 1.2 0.27

    575/15-576/1

    576/7-8 1x1.2x1.2 RCB 32.130 1.2 0.20

    576/10-11 1x2x2.3 RCB 32.325 2 0.17

    577/6-7 1x4.5x3.4 RCB 6.850 4.5 0.17

    577/9-10 1x1.2x1.2 RCB 10.710 1.2 0.33

    577/12-13 1x1.2x1.2 RCB 9.180 1.2 0.23

    577/12-13 1x2.5x2.8 RCB 6.850 2.5 0.30

    577/14-15 2x4x2.1 RCB 6.850 4 0.17

    577/16-578/1 1x2x1.2 RCB 6.850 2 0.50

    579/7-8 1x3x1.2 RCB 6.850 3 0.40

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    10/16

    580/3-4 1x4.5x1.4 RCB 6.850 4.5 0.37

    580/13-14 1x1.2x1.2 RCB 7.650 1.2 0.20

    581/2-3 1x1.2x1.2 RCB 7.650 1.2 0.43

    581/5-6 1x1.2x1.2 RCB 7.650 1.2 0.50

    581/7-8 1x1.2x1.2 RCB 7.650 1.2 0.43

    581/13-14 1x1.2x1.2 RCB 7.650 1.2 0.47

    581/15-582/1 1x4.5x1.6 RCB 6.850 4.5 0.37

    582/8-9 1x1.2x1.2 RCB 7.650 1.2 0.43

    582/10-11 1x1.2x1.2 RCB 7.650 1.2 0.40

    583/11-12 Retained

    583/12-13 1x1.2x1.2 RCB 9.180 1.2 0.38

    583/12-13 1x1.2x1.2 RCB 9.180 1.2 0.47

    583/14-15 1x1.2x1.2 RCB 10.710 1.2 0.50

    584/1-2 1x1.2x1.2 RCB 10.710 1.2 0.37

    584/4-5 1x6x2.3 RCB 13.760 6 0.24

    584/7-8 5X12.2 PSC Major Bridge

    584/8-9 1x1.2x1.2 RCB 13.000 1.2 0.30

    585/5-6 1x1.2x1.2 RCB 9.180 1.2 0.17

    585/6-7 1x4.5x3.1 RCB 6.850 4.5 0.43

    587/1-2 1x1.2x1.2 RCB 7.650 1.2 0.38

    588/5-6 1x4.5x3.7 RCB 6.850 4.5 0.67

    588/7-9 11 x12.2 PSC Major Bridge

    Total

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    11/16

    Date-17-04-13

    Status

    ompleted 6 Completed

    RMM GC Project

    ompleted 4 Completed

    ompleted 5 Completed

    ompleted 7 Completed

    ompleted 3 Completed

    ompleted 5 Completed

    ompleted 6

    ompleted 4

    ompleted 7

    ompleted 4

    ompleted 5

    ompleted 6

    ompleted 4

    ompleted 5

    ompleted 6

    ompleted 5

    21.04.13 3 4

    21.04.13 11 7

    Completed

    Inside vent way

    cleaning

    Outside vent way

    Cleaning

    Date ofcompletion

    RequiredLabours

    JCB hoursrequired

    Date ofcompletion

    Pitchingwork wasexecutedby otheragency

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    12/16

    21.04.13 4 6

    20.04.13 9 7

    20.04.13 3 5

    19.04.13 2 5

    19.04.13 3 5

    ompleted 7

    ompleted 7.5

    ompleted 6

    ompleted 7

    29.04.13 4 5

    29.04.13 10 7

    30.04.13 13 7

    30.04.13 2 5

    01.05.13 3 5

    01.05.13 3 5

    02.05.13 3 5

    02.05.13 4 6

    03.05.13 10 6.5

    03.05.13 8 5.5

    04.05.13 10 5.5 04.05.13

    Completed

    05.05.13 6 5

    05.05.13 4 6

    06.05.13 2 7

    06.05.13 2 8

    07.05.13 4 6

    07.05.13 9 6

    Pitchingwork wasexecuted

    by otheragency

    Pitchingwork wasexecutedby otheragency

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    13/16

    08.05.13 2 6

    08.05.13 4 6

    09.05.13 1 5 09.05.13

    09.05.13 3 5 09.05.13

    10.05.13 11 6 10.05.13

    Completed

    ompleted 5

    ompleted 5

    ompleted 6

    ompleted 5

    ompleted 5

    ompleted 5

    ompleted 6

    11.05.13 2 4 11.05.13

    11.05.13 12 7 11.05.13

    12.05.13 2 5 12.05.13

    12.05.13 6 6.5 12.05.13

    12.05.13 8 6 12.05.13

    13.05.13 4 5 13.05.13

    13.05.13 3 5 13.05.13

    13.05.13 2 5 13.05.13

    14.05.13 4 5 14.05.13

    14.05.13 3 5 14.05.13

    Completed

    Completed

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    14/16

    15.03.13 8 6 15.03.13

    16.05.13 1 6 16.05.13

    16.05.13 3 5 16.05.13

    16.05.13 3 5 16.05.13

    17.05.13 3 5 17.05.13

    17.05.13 3 5 17.05.13

    18.05.13 8 6 18.05.13

    19.05.13 3 6 19.05.13

    19.05.13 3 5 19.05.13

    Completed

    19.05.13 3 0 19.05.13

    Completed

    Completed

    Completed

    Completed

    Completed

    20.05.13 3 20.05.13

    20.05.13 1 20.05.13

    Completed

    20.05.13 3 20.05.13

    Completed

    Completed

    244 416.5

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    15/16

    REACH - II ( THIRUCHULI - VIRUDHNAGAR )

    MINOR BRIDGES DETAILSAS ON : 17.04.13

    SI. NO BR. NO Location BARREL WRIDTH DEPTH CUM Status

    1 293 A, RUB 589/3-4completed

    2 294 589/11-12 1X2.0X1.2 30 2 0.45 27.00 completed completed

    3 296 590/14-15 2X6.0X2.318.350 12.000 0.300 66.06

    4 297 590/14-15 1X1.2X1.27.680 1.200 0.20 1.84

    5 298 591/5-6 1X1.2X1.29.180 1.200 0.150 1.65

    6 299 591/10-11 1X6.0X2.36.850 6.000 0.200 8.22

    7 300 591/12-13 1X1.2X1.27.650 1.200 0.300 2.75

    8 301 592/2-3 1X4.0X1.86.850 4.000 0.250 6.85

    9 302 592/15-593/115.000 2.000 0.300 9.00

    10 303 593/7-8 1X4.5X3.46.850 4.500 0.300 9.25

    11 304 594/2-3 1X1.2X1.29.180 1.200 0.100 1.10

    12 305 15-595/1 1X1.2X1.2 12.240 1.200 0.200 2.94

    13 306 595/1-2 1X1.2X1.29.180 1.200 0.300 3.30

    14 307 595/2-3 1X1.2X1.26.850 1.200 0.00 completed

    15 308 595/3-4 1X1.2X1.220.000 1.200 0.300 7.20

    16 309 595/5-6 1X1.2X1.212.240 1.200 0.300 4.41

    17 310 595/8-9 1X1.2X1.220.000 1.200 0.100 2.40

    18 311 595/11-12 1X1.2X1.210.710 1.200 0.300 3.86

    19 312 595/12-13 1X1.2X1.2 9.180 1.200 0.300 3.30

    20 313 2X4.0X3.36.850 4.000 0.00 completed

    21 31416.000 2.000 0.350 11.20

    22 315 596/9-1016.000 2.000 0.350 11.20

    23 316 597/1-2 1X1.2X1.212.240 1.200 0.350 5.14

    24 317 597/4-5 1X1.2X1.212.240 1.200 0.500 7.34

    25 318 597/6-7 1X1.2X1.212.240 1.200 0.500 7.34

    26 319 598/6-7 1X1.2X1.2 9.180 1.200 0.300 3.30

    27 320 598/14-15 1X2.5X2.06.850 2.500 0.250 4.28

    28 321 599/7-8 1X1.2X1.27.650 1.200 0.300 2.75

    29 322 600/13-14 1X1.2X1.221.420 1.200 0.350 9.00

    30 324 600/15-16 1X4.0X3.06.850 4.000 0.800 21.92

    31 325 602/14-15 1X4.0X3.06.850 4.000 0.200 5.48

    32 326 604/5-6 1X4.5X2.56.850 4.500 0.850 26.20

    33 327 605/2-3 1X4.5X1.66.850 4.500 0.850 26.20

    34 328 608/1-2 1X1.2X1.27.650 1.200 0.250 2.30

    35 329 608/9-10 1X2.0X2.019.000 2.000 0.250 9.50

    36 330 609/5-6 1X1.2X1.219.000 1.200 0.250 5.70

    37 331 611/12-13 1X1.2X1.219.000 1.200 0.250 5.70

    38 333 612/9-10 2X6.0X3.56.850 0.00 complete

    39 334 612/13-14 1X1.2X1.27.650 1.200 0.300 2.75

    40 335 613/6-7 1X2.0X1.7518.000 2.000 0.300 10.80

    PROPOSEDSPAN

    Inside vent way

    cleaning

    Outside vent way

    Cleaning

    Date ofcompletion

    RequiredLabours

    JCB hoursrequired

    Date ofcompletion

    Pitching workwas

    executed byother agency

  • 7/30/2019 Copy of Comp_Programme_Civil_160412 (1) (1)

    16/16

    41 336 613/7-8 1X1.2X1.2

    7.650 1.200 0.350 0.30

    42 337 613/10-11 1X1.2X1.27.650 1.200 0.300 2.75

    43 338 613/13-14 1X1.2X1.27.650 1.200 0.250 2.30

    44 339 613/14-15 1X6.0X2.76.850 6.000 0.00 completed

    45 340 613/15-614/1 1X1.2X1.219.000 1.200 0.450 10.26

    46 341 614/8-9 1X2.0X1.519.000 2.000 0.450 17.10

    47 342 615/15-616/1 1X4.0X1.36.850 4.000 1.000 27.40

    48 343 617/5-6 1X1.2X1.2

    6.850 1.200 0.300 2.47

    49 344 618/7-8 1X4.0X1.56.850 4.000 1.000 27.40

    50 345 618/8-9 1X4.0X1.510.000 4.000 1.000 40.00

    51 346 618/10-11 1X1.2X1.210.000 1.200 1.000 12.00

    52 347 618/12-13 1X1.2X1.210.000 1.200 0.100 1.20

    53 348 2X4.0X2.59.000 4.000 1.000 36.00

    518.43

    Pitching workwas

    executed by

    other agency