122
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ Intro Building Background Proposal Façade Redesign Floor System Redesign Core Redesign CoGen Redesign BIM/IPD Metrics of Success Intro Building Background Proposal Facade Redesign Floor System Redesign Core Redesign CoGen Redesign BIM/IPD Metrics of Success Intro Building Background Proposal Façade Redesign Floor System Redesign Core Redesign CoGen Redesign BIM/IPD Metrics of Success Project Team BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Project Team

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

Page 2: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Building Statistics

620 Eighth Ave. Times SquareMidtown Manhattan, New York, NY

The New York Times Building

o The New York Times Company: Floors 2 ‐ 27o Forrest City Ratner Companies: Floors 29 ‐ 50

Building Ownerso Class A Office Buildingo Retail Space on Ground Floor

Building Function

o Assumed construction cost of $ 1 billiono New York Times Portion: $ 604 ‐ $ 624 million

Building Cost

www.international-pc.com/

2

Page 3: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Building Background

o 6250 ton chilled water systemo 1.4 MW cogeneration systemo District steam heatingo UFAD / VAV air distribution

Mechanical:

Lighting/Electrical:Building Architecture

o 52 story office building, 745’ tall o Unique façade with ceramic rod shading systemo 1.5 million square feet

Vertical Transportationo 28 elevators serving the towero High speed “smart” design (1,600 ft/min)o Cutting edge call system

o 18,000 Luminaireso Fixtures Controlled by a Digitally     

Addressable Lighting Interface (DALI)o 5 Transformers with  Room for Expansion

Structural:o Composite Beam & Girder Floor Systemo Steel Braced Frame Lateral Force Resisting Systemo Outriggers on 28th & 51st Mechanical Levelso Exposed Pretension Exterior Steel Rodso Exposed 30”x30” Built‐up Steel Columnso Thermal Trusses on 51st Mechanical Floors

www.international-pc.com/

3

Page 4: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Project Team

o August 23, 2004 – Excavation Begins

o July 2006 – Topping Out Ceremony

o November 19, 2007 – Grand Opening of the New York Times Building

Project Milestones:Architects: Renzo Piano Building WorkshopFXFOWLE Architects 

CM:  AMEC Construction Mgmt. (Core & Shell)Turner Construction (NYT Interiors)

Structural: Thornton Tomasetti

MEP: Flack and Kurtz 

www.international-pc.com/

4

Page 5: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Goals

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

www.international-pc.com/

5

Page 6: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Strategies

Decrease floor to floor height to allow for an additional rentable floor

Redesigning core to add additional rentable         space on each floor

Improve the sustainability profile

www.international-pc.com/

6

Page 7: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Façade Redesign

Façade Goals:

Redesign Opportunities: 

o Increase Thermal Efficiency o Maintain or Exceed Daylighting Performanceo Maintain Iconic Image

TransparencyLightnessInnovative Design

o Explore Double‐Skin Façade o Explore Alternate Shading Techniques

7

Page 8: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

System Description 

2’ 6” air cavity with horizontal  louvered shading system 

1” interior insulating glazing curtain wall

5/8” exterior laminated glazing unit 

8

Page 9: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Daylight Autonomy: Rod Design  Daylight Autonomy: Louvered Design 

Façade Daylight Analysis

9

Page 10: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Eighth Floor Power Consumption

Maximum Potential:  71 kWh

Rod  Design:  27 kWh

Louvered Design:  28 kWh

60% Energy Savings

$10,000 / Year

Façade Daylight Analysis

10

Page 11: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Peak cooling: 58%o Peak heating: 75%

Existing HVAC Envelope Loads:

o Decreased U‐valueo Decreased Shading Coefficient

Double‐Skin Façade Thermal Efficiency:

Existing Façade  Double‐Skin Façade 

U‐Value 0.625 0.50

Shading Coefficient 0.750 0.38

Thermal Loads

11

Page 12: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Peak cooling: 58%o Peak heating: 75%

Existing HVAC Envelope Loads:

o Decreased U‐valueo Decreased Shading Coefficient

Double‐Skin Façade Thermal Efficiency:

o Energy  (21%)

Savings:

Thermal Loads

12

Page 13: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Peak cooling: 58%o Peak heating: 75%

Existing HVAC Envelope Loads:

o Decreased U‐valueo Decreased Shading Coefficient

Double‐Skin Façade Thermal Efficiency:

o Energy   (21%)

Savings:

o Cost   ($800,000 / year)

Thermal Loads

13

Page 14: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Peak cooling: 58%o Peak heating: 75%

Existing HVAC Envelope Loads:

o Decreased U‐valueo Decreased Shading Coefficient

Double‐Skin Façade Thermal Efficiency:

o Energy   (21%)

Savings:

o Cost   ($800,000 / year)o Emissions (23%)

Thermal Loads

14

Page 15: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Serviceability and Maintenance 

2.5’ accessible cavity

Louvers support walking loads

15

Page 16: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Cost Comparison: 

Double-skin façade yields an $18.7 million increase in up front cost

Annual energy savings of $800,000

Simple payback period of 23.43 years

Original Façade System $ 83,527,260

Proposed Double Façade $ 102,273,745

Upfront Cost Increase $ 18,746,485

Annual Energy Savings $ (800,000)

Simple Payback Period 23.43 Years

16

Page 17: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N S

E

W

250W Floodlight

400W Floodlight

Façade Lighting Redesign

17

Page 18: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Façade Lighting Redesign

18

Page 19: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N S

E

W

400W Floodlight

Façade Lighting Redesign

19

Page 20: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Façade Lighting Redesign

20

Page 21: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N S

E

W400W Floodlight

Façade Lighting Redesign

21

Page 22: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Façade Lighting Redesign

22

Page 23: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Goals:o Increase rentable floor space o Decrease floor-to-floor height

Redesign Opportunities:o HVAC (UFAD/VAV to Chilled Beams)o Structural Floor System (Castellated Beams)

Floor System Redesign

23

Page 24: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Initial Studyo Investigate the required depth for interstitial

space

Assumptions: o Loading conditions were the same as in the

existing buildingo UFAD System would be removed

Structural Analysis 

Result:o 28” Deep Castellated Beam Required

24

Page 25: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Initial StudyInvestigate the required depth for interstitial space

Assumptions: Loading conditions were the same as in the existing building

UFAD System would be removed

Structural AnalysisCeiling Plenum: 3’ 10”Raised Floor: 6”

Concrete Floor: 5 1/4”

Castellated Beam: 28” Max

Clearance: 5”

Ceiling to Chilled Beam: 1’ 8”

25

Page 26: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System Redesign:

Composite Castellated Beams

Allow for Coordination within Interstitial space

Structural Floor System

26

Page 27: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System Redesign:

Composite Castellated Beams

Allow for Coordination within Interstitial space

Metal Deck

Long Span Metal Deck

Dovetail Ribbed Composite Metal Deck

Structural Floor System

Dovetail Ribbed Composite Metal Deck (DT)

Long Span Metal Deck (LS)

27

Page 28: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System Redesign:

Configuration 1:15’-0” Span Typ.

Configuration 1:o Maximize Spano Minimize Number of Members

Structural Floor System

28

Page 29: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System Redesign:

Configuration 2:10’-0” span Typ.

Configuration 2:o Minimize Shoring

Structural Floor System

29

Page 30: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Options Investigated

Gravity Loadingo Superimposed Dead Load ‐ 20 psfo Live Load – 50 psf (+ 20 psf partitions) 

30

Page 31: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Configuration 1

31

Page 32: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Configuration 2

32

Page 33: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System Redesign:

Floor Vibrations Due to Human Activity  (AISC Design Guide 11)

Structural Configuration 1

33

Page 34: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Configuration 1

34

Page 35: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Structural Floor System

35

Page 36: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

System Steel Framing Concrete Floor Reshoring Total

Lightweight Concrete ‐ Config. 1 $    7,920,000  $   82,160,000  $ 2,490,000  $ 92,580,000 

Normalweight Concrete ‐ Config. 1 $    7,920,000  $   61,950,000  $ 2,490,000  $ 72,370,000 

Lightweight Concrete ‐ Config. 2 $    8,540,000  $   82,160,000  $             ‐ $ 90,700,000 

Normalweight Concrete ‐ Config. 2 $    8,540,000  $   61,950,000  $             ‐ $ 70,490,000 

Existing Floor Configurationo Configuration #2 – 10 ft. typical spanso Wide‐flange Beamso Typical Composite Metal Deck

Floor Configurations Conclusions

New Floor Configuration o Castellated Beams o Configuration #2 – 10 ft. typical spanso Dovetail deck 

Cost Comparison of Floor Configurations

36

Page 37: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Member Check @ Cant. & Overhang

o Used New Loading Conditionso Verified Existing was Adequate or Resized Appropriately  

Structural Floor System Redesign

37

Page 38: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

www.halton.com www.halton.com

www.Halton.com

HVAC Redesign

Multiservice Chilled Beams:o Integrated design

38

Page 39: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Multiservice Chilled Beams:o Integrated design

Typical Layout:o 155 beams per floor

HVAC Redesign

39

Page 40: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Multiservice Chilled Beams:o Integrated design

o Energy (10-16%)Savings:

Typical Layout:o 155 beams per floor

HVAC Redesign

40

Page 41: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Multiservice Chilled Beams:o Integrated design

o Energy (10-16%)Savings:

o Cost ($47,000 / month)

Typical Layout:o 155 beams per floor

HVAC Redesign

41

Page 42: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Multiservice Chilled Beams:o Integrated design

o Energy (10-16%)Savings:

o Cost ($47,000 / month)o Emissions (8-16%)

Typical Layout:o 155 beams per floor

HVAC Redesign

42

Page 43: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

4’ T5HO Direct/Indirect Pendant

Integrated 35W T5 Direct Pendant

4’ Recessed Cove 

N

SEW

Office Lighting Redesign

43

Page 44: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

44

Page 45: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

45

Page 46: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

46

Page 47: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

47

Page 48: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

48

Page 49: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

49

Page 50: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

50

Page 51: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

51

Page 52: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

SEW

Office Lighting Redesign

52

Page 53: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Office Lighting Redesign

53

Page 54: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Cost addition of extra floor

Cost of Proposed Floor System

54

Page 55: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Cost addition of extra flooro Additional SF of leasable area

Cost of Proposed Floor System

55

Page 56: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Cost addition of extra flooro Additional SF of leasable areao Chilled beam cost savings

Cost of Proposed Floor System

56

Page 57: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Cost addition of extra flooro Additional SF of leasable areao Chilled beam cost savingso Overall cost comparison

Cost of Proposed Floor System

57

Page 58: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Constructability

Integrated Design

58

Page 59: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Constructabilityo BIM Use Analysis

o 3D Coordinationo Parties Involved

o Structural o Mechanicalo Lighting / Electricalo Construction Management

o Outcome 

Integrated Design

59

Page 60: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Goals:o Increase rentable floor spaceo Explore trade issues  ( Concrete vs. Steel Core)o Explore cost for core redesign 

Redesign Opportunities:o Reconfigure core layout structurally and architecturallyo Decrease footprint of the structural coreo Service Space

Core Redesign

60

Page 61: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

CG

Maintain structural symmetryo Reduces torsional effects due to lateral loads

o Center of geometry converges with center of pressure, center of mass, and center of rigidity

o Layout of elevators

Core Configuration

61

Page 62: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Existing Configuration

New ConfigurationExample: Floors 46 ‐ 50Maintain flexibility of space

Core Configuration

62

Page 63: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Elevator Configuration

Existing Configuration

26 Passenger Elev.2 Service Elev.

Feasibility Study: Elevator Reduction

22 Passenger Elev.2 Service Elev.

63

Page 64: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Final Configuration

26 Passenger Elev.2 Service Elev.

Core Configuration

64

Existing Configuration

26 Passenger Elev.2 Service Elev.

Page 65: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

New Core ConfigurationExisting Core Configuration

44 ft44 ft

40 ft

48 ft

48 ft

Floor Occupant Existing Leasable Area (SF)

New Leasable Area (SF) Difference (SF)

50 FCRC 21,943 22,126 183 49 FCRC 21,943 22,126 183 48 FCRC 21,943 22,126 183 47 FCRC 21,943 22,126 183 46 FCRC 21,943 22,126 183 45 FCRC 21,943 22,126 183 44 FCRC 21,650 22,126 476 43 FCRC 21,650 22,126 476 42 FCRC 21,650 22,126 476 41 FCRC 21,650 22,126 476 40 FCRC 21,244 21,456 212 39 FCRC 21,244 21,456 212 38 FCRC 21,244 21,456 212 37 FCRC 21,244 21,456 212 36 FCRC 21,244 21,456 212 35 FCRC 21,244 21,456 212 34 FCRC 21,244 21,456 212 33 FCRC 21,244 21,456 212 32 FCRC 21,244 21,456 212 31 FCRC 21,244 21,456 212 30 FCRC 21,244 21,456 212 29 FCRC 20,429 20,959 530

472,371SF 478,235 SF 5,864 SF

Architectural Configuration

65

Page 66: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Core Configuration

32 ft

47 ft36 ft43 ft

Existing Lobby

New Lobby Rendering

66

Page 67: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Service Space Configuration

Service Elevators

70 SF

11 ft

67

Page 68: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Service Space Configuration

Existing Conditions in NYT Portion18 3 1/2” Conduit Feeders  

Powers Lighting and Appliance Panels

6  3 1/2” Conduit FeedersPowers Mechanical Equipment Panels  

Proposed Redesign2  2500 Amp Aluminum Bus Duct Feeders

Powers Lighting and Appliance Panels

1 1600 Amp Aluminum Bus Duct FeederPowers Mechanical Equipment Panels

Bus Duct Vs Conduit AnalysisTotal Cost System

Bus Duct: $1.75 million

Conduit: $1.2 million

Benefit of Bus Duct FeedersPossibility of Expansion Without Adding Additional Feeders

Bus Duct Vs Conduit Analysis

Space ComparisonMinimal difference between required space

68

Page 69: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Lateral Force Resisting System

Concrete Shear Wall Core w/ Outriggers on the 28th Mechanical Floor

69

Page 70: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Initial Design Parameters

Assumed Serviceability Governed DesignSRSS – Period of Vibration

o 10% of 10.8s (Existing Design)Serviceability Limit States Under Wind Load ‐

Lawrence G. Griffis (AISC 1993)

Lateral Drift & DeflectionoWind ‐ H/450 = 19.88” (Existing Design)

o D+0.5L+0.7W (ASCE 7‐05, CC.1.2)o Seismic – 0.015hsx

o 1.0 E

Lateral Force Resisting System

Design checked for Strength

70

Page 71: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Design Summary

Lateral Force Resisting System

Shear Wall Core

Coupling Beamso 36” Deptho Width Dependent upon Support

71

Page 72: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Shear Wall Design: Base Level 

Lateral Force Resisting System N

SEW

72

Page 73: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Shear Wall Design: Level 2 – Level 28

Lateral Force Resisting System

73

N

SEW

Page 74: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Shear Wall Design: Level 29 – Roof

Lateral Force Resisting System N

SEW

74

Page 75: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Outrigger Design – 28th Mechanical Flooro Outrigger Design

Lateral Force Resisting System

75

Page 76: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Lateral Force Resisting Systemo Outrigger Design

Lateral Force Resisting System

76

Page 77: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Lateral Force Resisting Systemo Outrigger Design

Lateral Force Resisting System

77

Page 78: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Design Parameters

Lateral Force Resisting System

Strength Check – Adequate

Assumed Serviceability Governed DesignSRSS – Period of Vibration

o 10% of 10.8s (Existing Design)Serviceability Limit States Under Wind Load ‐

Lawrence G. Griffis (AISC 1993)

Lateral Drift & DeflectionoWind ‐ H/450 = 19.88” (Existing Design)

o D+0.5L+0.7W (ASCE 7‐05, CC.1.2)o Seismic – 0.015hsx

o 1.0 E

78

Page 79: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Cost of concrete core vs. existing steel core

General conditions changeso Superstructure scheduleo GC cost changeso Constructability

Overall Cost Analysis

Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730

Crane Addition 2.5 Month $ 81,700

Temporary Heating 2 Winters $ 4,000,000

Upfront Savings $ (14,412,965)*Additional Rent Annually 

5,864 SF $ 351,840 per year

Cost and Schedule Changes

79

Page 80: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Cost and Schedule Changes

Cost of concrete core vs. existing steel core

General conditions changeso Superstructure scheduleo GC cost changeso Constructability

Overall Cost Analysis

80

Page 81: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730

Crane Addition 2.5 Month $ 81,700

Temporary Heating 2 Winters $ 4,000,000

Upfront Savings $ (14,412,965)*Additional Rent Annually 

5,8464 SF $ 351,840 per year

Cost and Schedule Changes

Cost of concrete core vs. existing steel core

General conditions changeso Superstructure scheduleo GC cost changeso Constructability

Overall Cost Analysis

81

Page 82: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730

Crane Addition 2.5 Month $ 81,700

Temporary Heating 2 Winters $ 4,000,000

Upfront Savings $ (14,412,965)*Additional Rent Annually 

5,8464 SF $ 351,840 per year

Cost and Schedule Changes

Cost of concrete core vs. existing steel core

General conditions changeso Superstructure scheduleo GC cost changeso Constructability

Overall Cost Analysis

82

Page 83: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

E

9” Recessed Downlight

4’ Recessed Cove 

8” Recessed Directional Downlight W

Lobby Lighting Redesign

83

Page 84: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

84

Page 85: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

85

Page 86: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

86

Page 87: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

87

Page 88: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

88

Page 89: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

89

Page 90: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

90

Page 91: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

N

S

EW

Lobby Lighting Redesign

91

Page 92: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Lobby Lighting Redesign

92

Page 93: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o 1.4 MW Internal Combustiono 40% power capacity for NYTo 250 ton absorption chiller

Existing System:

o 100% power capacity for NYTo Increased energy cost savingso Decreased energy associated emissionso All met! 

Redesign Goals:

Existing System / Goals

93

Page 94: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Utility data / Spark gap o Space constraints (3000 ft2 total) 

Utility Yearly $/Unit ReferenceNatural Gas $1.392/Ccf New York State Public Service Commission

Electric $0.249/kWh New York State Public Service CommissionSteam $18.36/Mlb Consolodated EdisonWater $2.31/per(748gals) New York City Water Board

Redesign Considerations

94

Page 95: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Considerations:

o Building thermal and electrical loads o Underutilized cooling potential 

Redesign Consideration

95

Page 96: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Prime Movers

Gas Turbines

IC Engines

Redesign Alternatives

96

Page 97: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Prime Movers Existing System: 1,400 kW

Redesign Alternatives

IC Engines

97

Page 98: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Prime Movers Alternative 1: 4,200 kW

Redesign Alternatives

IC Engines

98

Page 99: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Prime Movers Alternative 2: 2,700 kW

Redesign Alternatives

IC Engines

+

1,300 kW IC Engine

99

Page 100: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Prime Movers Alternative 3: 2,700 kW

Redesign Alternatives

IC Engines

+

1,300 kW Gas Turbine

100

Page 101: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o IC Engine:  Cooling Load Potential  o Gas Turbine:  Excess Thermal 

Redesign Alternatives

101

Page 102: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Alternatives

Energy / Emissions

102

Page 103: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Alternatives

Energy Costs Total Energy Costs: $13.5 million for SHP

103

Page 104: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Redesign Alternatives

Simple Payback Period

104

Page 105: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

o Summary 

Alternative 2: $10 million in savings over 20 years 

Redesign Alternatives

105

Page 106: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Integrated Project Delivery Process

106

Page 107: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

BIM Process

Building Information Modeling Process:

BIM Goals

Group Goals: o Enhance communication and information flowo Visualize project changes

BIM Use Analysis

Workflows

107

Page 108: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

BIM Goals

Building Information Modeling Process:

BIM Goals

Group Goals: o Enhance communication and information flowo Visualize project changes

BIM Use Analysis

Workflows

108

Page 109: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

BIM Use Analysis

Building Information Modeling Process:

BIM Goals

Group Goals: o Enhance communication and information flowo Visualize project changes

BIM Use Analysis

Workflows

BIM Uses Analysis

Design Authoring

Design Review

3D Coordination

Phase Planning

109

Page 110: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

BIM Workflows

Building Information Modeling Process:

BIM Goals

Group Goals: o Enhance communication and information flowo Visualize project changes

BIM Use Analysis

Workflows

110

Page 111: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

$

Metrics of Success

111

Page 112: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

Additional Square Footage 26,864 SF

Additional Rent  $ 1,601,840

112

Page 113: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

113

Page 114: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

114

Page 115: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

115

Page 116: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

116

Page 117: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

117

Page 118: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

Metrics of Success

118

Page 119: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

$

Metrics of SuccessFaçade 

Upfront Cost $ 18.7 million

Annual Energy Savings $ 800,000

Payback Period 23.4 years

Floor System

Upfront Cost $ 12.3 million

Annual Energy Savings $ 565,800

Annual Added Rent $ 1.24 million

Payback Period 6.72 years

Core

Upfront Cost ($ 14.4 million)

Annual Added Rent $ 351,840

Payback Period NA

119

Page 120: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

IntroBuilding BackgroundProposal

Facade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Increased Profitability• Operating Costs• Leasable Space

Increased Marketability• Sustainability • Iconic Image 

$

Metrics of Success

Overall Building

Upfront Cost $ 17 million

Annual Added Rent $ 1.6 million

Annual Energy Savings $ 2.2 million

Payback Period 4.5 years

120

Page 121: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

AcknowledgementsThank you to the following for all the support, assistance and guidance:

Architectural Engineering Faculty and Staff •IPD/BIM Thesis Advisors:

Kevin ParfittBob Holland

•Mechanical Thesis Advisor: Jelena Srebric, Ph.D.

• Structural Thesis Advisor: Andres Lepage, Ph. D

• Lighting/Electrical Thesis Advisors: Kevin Houser, Ph. DTheodore Dannerth

• Construction Management Thesis Advisors: Chimay Anumba, Ph. D Jim Faust

•CHP Instruction: James Freihaut, Ph.D.

• Project Sponsors: The New York Times Company Thornton TomassettiWSP Flack + Kurtz Turner Construction

•CHP Contacts: Dave Yanni | Director, Business Development and Operations,

Endurant Energy, LLC Randy Musselman | Engineering, Cleveland Brothers,

Power Systems Division • High-rise Consultant:

Bob McNamara

Fellow BIM Teams for their support in this collaborative process

THANK YOU to All of our friends and family for their love and support!

Sponsors and Consultants

121

Page 122: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners

BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ

IntroBuilding BackgroundProposal

Façade RedesignFloor  System RedesignCore RedesignCoGen Redesign

BIM/IPDMetrics of Success

Questions/Comments