“Discovery of Major Copper Mineralised Systems currently being Drill TestedInvestor Presentation August 2010

Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

“Discovery of Major Copper Mineralised Systems currentlybeing Drill Tested”

Investor Presentation ‐ August 2010

Page 2: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

• Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements at Nakru, Simuku and Talelumas.

• Major Copper Mineralised System Demonstrated with drill hole intersection of 213.75m grading 0.92% copper and 0.33 g/t gold at the Nakru‐1 breccia system.

• Drilling underway at the adjacent Nakru‐2 system.

• Drilling underway at the Simuku system to test for additional tonnage potential from the Inferred Mineral Resource of 200 million tonnes at 0.47% copper equivalent*.

• Projects are located close to major infrastructure including roads, deep water port, airport and general amenities.

• Coppermoly have two tenement applications with copper and gold prospects on New Britain Island covering 1500 square kilometers.

Highlights

Page 3: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Mineralised Papua New Guinea

Lihir ‐ 40 Moz AuEq 

944Mt at 0.48% Cu, 0.56g/t Au

Misima ‐ 5 Moz Au 

Morobe ‐ 5 Moz Au 

Yandera ‐667 Mt at 0.33% Cu

Porgera –25 Moz Au 

Frieda ‐1060 Mt at 0.53% Cu,0.29g/t Au 

Copper Production in PNG averages Copper Production in PNG averages around 200,000t per annum. (US $1.4b)around 200,000t per annum. (US $1.4b)

Tolukuma ‐ 1 Moz AuEq

Ok Tedi –663 Mt at 0.76% Cu, 0.85g/t Au 

200Mt at 0.47% CuEq 

Mt. Nakru

Panguna ‐

Simuku

AustraliaMap Area

Papua New Guinea

Australia

Kainantu ‐ 2 Moz Au 

Page 4: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Excellent Location for Project Development

• Vehicle access to both projects

• Deep water port at provincial capital of Kimbe

• Good local infrastructure and relatively easy logistics

• Topography not extreme (200m to 800m elevation)

• Landowners work on projects

• Large oil palm industry on the islandhave developed local infrastructure

Page 5: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Copper Industry Grade Decline

NakruCopper Project

Page 6: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Kimbe Port and Hoskins Airport

Page 7: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

New Britain Island Copper‐Gold Province

Topography Image

Tenements subject to Barrick Farm‐in:• EL 1077 ‐ Simuku• EL 1043 ‐Mt. Nakru• EL 1445 ‐ Talelumas 

Page 8: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

New Discovery ‐ Nakru Copper ‐ Gold Breccia

19m at 4.3% copper

55m at 4.79 g/t gold

213.75m grading 0.92% copper and 0.33 g/t gold

6.7m grading 3.80% copper

Nine kilometers of surfacebulldozer trenching

Twenty Two Drill Holes Completed (3017.9m)

Page 9: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru 2 Chargeability            Nakru 1 Chargeability

Near surface copper lens 3% to 4%

copper target

Area of previous drilling, copper in drill holes average > 0.7%

BWNBDD00001213.75m averaging

0.93% copper

copper target

Nakru 2 Nakru 1

3‐D Induced Polarisation (IP) geophysical anomalyHigh grade copper targets currently being tested

BWNBDD00002

Page 10: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru 1 Drilling and Geophysics (Chargeability Slice at 200m Depth)

EOH 276.7m

NAK017210.1m at 0.45% Cu, 0.17g/t Au, from 61.2m

NAK006140m at 0.57% Cu from 57m

NAK00386.15m at 0.46% Cu, 0.46g/t Au, from 85m

BWNBDD0001213.75m at 0.92% Cu, 0.33g/t Au, from 74.45mEOH 361.1m

Section Linefor Schematic Plan

Page 11: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Oxide ZoneAu + Mo + As +Ag, Pb, Zn, Te

GoethiteHaematite

16m at 0.74 g/t Au0.14 % Cu

Drill Section Schematic Plan

Primary Copper Zone

5m at 2.1 % Cu, 1.2 g/t Au

SW NW

Secondary CopperEnrichment Zonechalcocite + covellite

213.75m at 0.92% Cuand 0.33g/t Au(1.12% CuEq)

chlorite + silica + sericite breccia  chalcopyrite + pyrite in quartz veinlets and matrix  controlled

13m at 2.8% Cuincluding 3m at 7.51% Cu

MAJOR IP

TARGET

7m at 2.37% Cuand 1.29 g/t Au

22.25m at 1.47% Cu

61m at 0.32 g/t Au

NAK0

17

NAK0

14

NAK0

13

NAK0

15

NAK002

NAK0

16

NAK0

01

28m at 1.1 % Cu,0.27 g/t AuIncluding:4m at 3.1 %Cu9m at 1.94 %Cu

IPTARGET

24m at 1.35% Cuand 1.03 g/t Au

??

?

lower cpy:py

Base of Oxidation

BWNBDD0001

Page 12: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

BWNBDD00001

SUPERGENE COPPERZONE

PRIMARY COPPER – GOLD ZONE

50m

1.0%  CuEq

0.25% CuEq361.1m

?

OPEN

?

?

?

?

??

Nakru 1, – NAK017 and BWNB00001 Cross Sections

210m at 0.45% Cu and 0.17g/t Au

272.6m

50m

NAK017

OPEN

?

?

SUPERGENE COPPERZONE

PRIMARY COPPER – GOLD ZONE

213.75m at 0.92% Cu and 0.33g/t Au,(1.12% CuEq)

?

?

?

?

??

Page 13: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru Copper ‐ Gold Project

1 KILOMETER

STRINGER ZONE

OUTER

MARGINALCORE

Silica ‐ Pyrite ‐ Sericite+/‐ Cpy + Au

Silica ‐ Sericite ‐Pyrite 

Chlorite ‐ Sericite + Tr. Py 

Ba ‐ Ag ‐ Au Zn ‐ Cu  Cu ‐ Pb ‐ Zn 

Zn ‐ Pb – Ag ‐ Cu 

Fine grained volcaniclastics and sediments

Recent Ash / Pumice

March 2010Denis O’Neill

Pumiceous BrecciaRhyo ‐ dacitic "flow dome"Hydrothermal breccia(NAKRU VOLCANIC COMPLEX)

Exhalative massive sulphide lenses(NAKRU 2)

Stringer Zone feeding nearsea floor massive sulfides

'Supergene' Copper Zone 

(Nakru 1)Core zoneDisseminated Py ‐ Cu (Mt. Lyell)?toMassive Py ‐ Cu (Highway ‐ Reward)?

HYBRID / EPITHERMAL COPPER‐GOLD “BRECCIA PIPE” MODEL for the NAKRU SYSTEM

Page 14: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru 1 and 2 Drilling and Geophysics

Copper intersected in 

drill holes >0.1%

Drill tested by Barrick

Envelope of copper mineralisation at surface > 0.1%

Core from NAK 17 Semi-massive Sulphide

Page 15: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru 2 Sulphide Copper System

• Large 700m diameter envelope of surface mineralisation• Breccia hosted polymetallic System• First ever two diamond drill holes by Coppermoly intersected copper lens of 3% to 4% associated with geophysical anomaly

Sulphide related anomaly

NAK02‐00273m at 0.96% Cu from 36m depth

NAK02‐00151.7m at 1.21% Cu at 30.3m depth

Soil contours > 100ppm Cu

Page 16: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Nakru 2 DrillingSection ResultsMASSIVE SULPHIDE

6.7m at 3.8% Cu0.19 g/t Au1.66% Zn

MASSIVE SULPHIDE7m at 3.36% Cu0.19 g/t Au2.0% Zn11.4 g/t Ag57 ppm Mo

Trench88m at 1.2% Cu, 0.33 g/t Au19.9% Cu sample in trench

Sulphide breccia outcrop

21m at 0.83% Cu

9m at 0.53% Cu

3m at 1.41% Cu

NAK2‐002112.5m

NAK2‐001299.8m

52m at 1.2% Cu

73m at 0.96% Cu

Core shed at Nakru

Page 17: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Simuku / Talelumas ProjectSimuku Warden’s Hearing

May 2010

Simuku Warden’s Hearing, May 2010

Page 18: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Simuku and Yandera Copper Systems 

Simuku:1. Maiden Inferred Resource of 

200 million tonnes at 0.36% copper within one third of the known mineralised system

2. 20km from deep water port3. 300m above sea level

Yandera:1. Indicated and Inferred 

Resource of 667 million tonnes at 0.33% copper

2. 80km from deep water port3. 1700m above sea level

Page 19: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Simuku Copper/Molybdenum System

Barrick to Begin Drill TestingFor Tonnage/Size Potentialof the Mineralised System

Simuku Fly Camp

Page 20: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Surface Trench Results –

28 kilometres

• 14m at 1.03% copper and 0.26 g/t gold

• 200m at 0.75% copper

Drilling Results 

(31 diamond holes)

• 117m at 0.61% copperCopper Enrichment Top 20m

• Tobarum : 27m thick at 0.74% copper

• Nayam: 16m thick at 1.0% copper

Primary Copper Zone

• SMD026: 56m at 0.77% copper at 207m depth below average grades of 0.38% copper

Simuku Copper Results

Page 21: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Talelumas – EL 1445 Gold and Copper Prospects

Isme Creek Gold Prospect• Geochemistry similar to 

the Nakru systems

Mt.Misusu Copper Prospect• Copper anomalous area of 

850 metres by 500 metres

• Possible extension of Simuku system

Page 22: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Achieving its Objectives

July onwards 2010Barrick Drilling Results

March ‐ June 2010Coppermoly Undertakes Projects Acquisition

Second Half 2010Coppermoly Begins Exploration Activities on its Tenement applications

May 2010Barrick Begins Drilling

November 2009Project Funding A$20m through Barrick

May 2009Maiden Inferred Resource

February 2009Nakru Geophysics and Drilling Results

May‐June 2008Acquire Heavy Machinery, upgrade Track access, set‐up camps, Landowner discussions

January 2008IPO Raises $8million

DateTask

Page 23: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Peter McNeil – Non Executive Chairman, 25 years experience in PNG.

Peter Swiridiuk –Managing Director, 20 years experience in Exploration in PNG, Middle East, Mexico, Solomon Islands, Cyprus and  Australia.

Maurice Gannon – Executive Director and Company Secretary, BSc, FCIS, FAIM, MAusIMM, 21years experience in earth sciences, business and financial management.

Bob McNeil – Non Executive Director, 47 years experience in mining and exploration.

Dal Brynelsen – Non Executive Director, CEO of Vangold Resources. North American connections.

Ces Iewago – Non Executive Director. BACom, MBA, FAICD, Expertise in PNG banking and finance. Director of NGG. Political and Mining connections in PNG.

On‐Site PNG Administration and Base of Operations.

Denis O’Neill – Geological Consultant, over 36 years experience in mining and exploration.

Experienced Board and Management

Page 24: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Corporate Overview (ASX:COY)

Raised $2.1mRights Issue and Shortfall September 2009

Raised $0.57mBarrick (5% COY shares issued)

14 centsShare Price 

$19.2 millionMarket Capitalisation

46 million Total Listed Options (COYO 30cents) and (COYOA 7cents)

58%Top 20 Shareholders currently hold

$1.8 MCash at Bank

13 million Total Unlisted Options

137 million  Current Shares on Issue

Raised $8mListed on ASX January 2008

Page 25: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

• Leverage though a major discovery at Nakru

• Excellent experience in PNG

• Large copper, gold and molybdenum systems

• High‐grade primary and secondary copper mineralisation

• Drilling and results by Barrick funding on a monthly basis

• Acquisition of two new projects covering 1500 sq.km

• Excellent exploration methodology

Why invest in Coppermoly?

Page 26: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Disclaimer 

This document is not a disclosure document nor does it constitute the provision of financial product advice. No representation or warranty is made as to the accuracy, completeness or reliability of the information.

The information is provided expressly on the basis that recipients will carry out their own independent inquiries into the matters contained herein and make there own independent decisions about the affairs, financial position or prospects of the Company which reserves the right to update, amend or supplement any information at any time in its absolute discretion.

The technical information provided by Barrick has been interpreted by Coppermoly Ltd and does not necessarily reflect the viewsby Barrick.

Competency Statement  

The information in this presentation that relates to Exploration Results is based on information compiled by Peter Swiridiuk, who is a Member of the Australian Institute of Geoscientists.

Peter Swiridiuk is a consultant to Coppermoly Ltd and employed by Aimex Geophysics.  Peter Swiridiuk has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.  Peter Swiridiuk consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Please consult www.coppermoly.com.au for more detailed information.

Page 27: Coppermoly Presentation August 2010...Investor Presentation ‐August 2010 • Barrick currently spending up to A$20m on drilling to attain a 72% stake of Coppermoly’s three tenements

Notes:

• All stated intersections are weighted assay averages ([Sum of each total interval x grade] / Total length of intersection).

• Drillhole samples from drillholes were transported to the camp site, logged, orientated and sampled between 1m and 2m intervals from core split by saw. The split samples are then transported to the town of Kimbe where they are air freighted to Intertek in Lae (PNG) for sample preparation. Samples are dried to 106 degrees C and crushed to < 2 mm. Samples greater than 2kg are rifle split down to 1.5kg and pulverised to 75 microns. The final 300g sized pulp samples are then sent to Intertek laboratories in Jakarta for geochemical analysis. Intertek analyse for gold using a 50g Fire Assay with Atomic Absorption Spectroscopy finish. Other elements are assayed with ICPAES Finish. Copper values greater than 0.5% are re-assayed. Intertek laboratories have an ISO 17025 accreditation. Unused half core is stored on site before being transported to the town of Kimbe for permanent storage.

• Drillhole BWNBDD0001 Drill Core is PQ, HQ and NQ in size with core recovery predominantly 100%.

• Drillhole co-ordinates are given in UTM Zone 56, AGD66 Datum.

• Mineralised intersections are quoted as downhole widths.