7/27/2019 Cooling Tower Inspection Checklist
1/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Equipment Discription
Cooling Tower Type Counter Flow
Manufacturer Tower Engineering - USA
Qty 2 Cooling Towers x 3 Cells (each)
Capacity per Cell 3300 GPM
HWT 100oF
CWT 90oF
EwbT 85oF
Items to be Inspected Inspection Results
A- Exterior
1-Steel Support Grillage
2-Cold Water Collection Basin
Material Stainless Steel AISI Type 316 L
Components / Connections Equalizer Opening
Drain / Clean-out
Outlet Fange drilled 125 psing 16"
Anit-Vortex Hood
Stainless Steel Debris Screen
2 1/2" Make-up Connection
4" Over Flow Stand Pipe
Basin Depth 1 feet
Drop Sump Depth below basin f 3 feet
3-FibreGlass Structure
Structural Members Pultuded FRP, Type:I, II, IV
with synthitic polyster fiber-
Structural Hardware 300 series Stainless Steel
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
2/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
4-Air Inlet Louvers
Casing FRP 12 oz.
Structural Hardware Stainless Steel
5-UV and Corrosion Protection
outer Layer 10-15 mil thick synthetic or
polyster fiber sufacing veil
Second Layer 30 mils thickness polymric veil
6-Exterior Casing
Material 1 3/4" Pultuded FRP double wall construction panels
Panels Color Light grey
Hardware SS series 300 screws and heads
neoprene washers
7-Wind Walls 22'-3" & 22'-0" shipment length
Material 1 3/4" Pultuded FRP double wall construction panels
Panels Color Light grey
Hardware SS series 300 screws and heads
neoprene washers
8-Partition Walls 20'-6" shipment length
Material 1 3/4" Pultuded FRP double wall construction panels
Panels Color Light grey
Hardware SS series 300 screws and heads
neoprene washers
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
3/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
9-End Walls 20'-6" shipment length
Material 1 3/4" Pultuded FRP double wall construction panels
Panels Color Light grey
Hardware SS series 300 screws and heads
neoprene washers
10-Parapet Wall
Material 1 3/4" Pultuded FRP double wall construction panels
Panels Color Light grey
Hardware SS series 300 screws and heads
neoprene washers
11-Fan Deck
Material Pultuded FRP deck panels + UV protection
Hardware SS 304 fasteners
12-Fan Stack
Material High quality handlaid FRP + 17 mils UV gel coat protection
Profile Curved bell inlet and velocity recovery exit
Bolted in-place removable access panel
Hardware SS series 300
Bolts spans 18" centers maximum
13-Posts /HandRail including SS
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
4/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
B- Internals
1-Fill Media Brentwood OF21MA
Material PVC - cellular type
Sheets Wave formed 20 mils thickness
Flute Height 0.818 inch
Flutes Arrangement cross-corrugated with vertical offset
2-Hot Water Distribution FRP Header, PVC SDR-35 Laterals, ABS Nozzles
Side Wall Entry Header
Side Laterals PVC SDR-35
fittings
Nozzles Screw in type, orifice 0.81 color Pink QTY 120/Cell
Distribution Header FRP pipe with 16" flange connection clas 150
Hardware SS
3-Drift Eliminator Brentwood Industries CF150 MAX-15
3 pass design / senusoidal-shaped corrugation
Cellular Material PVC corrugated sheet 15 mil (0.38mm)
Stiffener Sheet Thickness 15 mil (0.38mm)
FRP Hatch
Max. Drift Rate 0.0015% of tower flow rate
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
5/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
4-Fan Motor
Manufacturer Siemens
Horsepower 50/12.5 HP
Frame 365T
Volts/Phase/Freq. 415V/3PH/50Hz
Speeds 1485 / 740 RPM
Windings Single
Enclosure TEFC - Severe Duty
Service Factor 1.0 @ 65oC ambient
Insulation H
Weather Proof elect. Connection boxes
epoxy coating
Neoprene rubber mounts vibration isolators
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
6/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
5-Speed Reducer
Manufacturer Amarillo Gear Co.
Model 135
Gear Ratio 6 to 1
Reduction Type Single
Rated HP 54 (S.F. =2)
Type right angle gear
grey iron casting
Oil fill line SS
Vent line SS
Oil Level Sight Glass gage
Epoxy Coating
Gears Spiral bevel/helical -nikel alloy steel
Gear Housing grey iron casting
Thrust Bearing Life 200,000 hours
Lubrication System Splash
input and output shafts seals dual spring loaded, double lipped
Labyrinth plate for out put shaft also
Oil Charge for every 6 month changing(---Litres)
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
7/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
6-Mechanical Equipmet Support
Material Single piece welded steel
assembly, hot dipped
7-Drive Connection
Manufacturer Rexonord / Addax
Model LR375.275SS
Rated HP 79.8 (S.F. = 2)
Torque Tube Material Composite Fiberglass
Hubs Material 316 Stainless Steel
Driver Shaft Guards at gear End SS
Driver Shaft Guards at Motor E FRP
8-Fan Assembly
Manufacturer Cofimco
Model 4572-8-31N/B6T
Fan Diameter 15 feet
No. of Blades 8
Tip Speed 11663.2 fpm
Fan Speed 247.5 rpm
Type propeller
Manual adjustable pitch
Material Cast Aluminum Alloy
Air Seal Disc FRP
Harware 304 SS
non corrosive spacer sleeve
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
8/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
9-Controls
Electronic vibration switch Metrix Model 440SR
Power Supply 230 Volt
Oil Level Switch Murphy EL-150-EX
Factory installed on gear reducer
10-External Caged Ladders 6 Nos
Material SS (AISI Type 316)
Flat bar with 450mm min. width
main rail 63.5mm X 9.5mm flat bar
rungs 1"
Base plates 100x100x10 mm
Safety Cages 25 x 3 mm SS flats for ladder
11-Internal Ladders 6 Nos
Material FRP
12-Plenum Access 3 x 3 ft FRP each cell + 3x3 ft grating
13-Hardware Series 300 SS
14-Water Level Sensor Flowline "Smart-Trak" sensor with stilling well
15-Float Valve for makeup
line
6 Nos
16-Speciality Connectors/ discharge chute extension
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page
7/27/2019 Cooling Tower Inspection Checklist
9/9
Kharafi National
Project : 1670 - Ministy of Education South Surra
Pre-shipment Inscpection Checklist
LPO#40081610, Supply of Cooling Tower
Vendor: Atlas Blue Co.
Items to be Inspected Inspection Results
C-Spare Parts
Fan motor bearing 1 Set
full charge gear Lubrication oil 1 each gear
Fan Blade Assembly 1 No.
Gear Box 2 Nos.
Shaft 1 Set
D-Warranty
2 years from subatantial completion date June 2014
five years for the geares speed reducer
15 years for PVC elements
E-L/C Documents
Packing List 3 copies
Test Certificate for CT componeone original + 2 copies
Bill of Lading triplicate Original
Certificate of origin in
duplicate (issued by the
Chamber of Commerce)
Ivoice one original + 2 copies
Inspect ion Realease Note original
Inspected By:
Name: Name: Name:
Company: Company: Company:
Signature Signature Signature
Date: Date: Date:
Page