33
Control room design provides operation environment with maximum work efficiency Control Room Design <IA-PESC-08-093> Copyright © Yokogawa Electric Corporation <April 2008> Yokogawa Electric Corporation

Control Room Design Service Yokogawa

Embed Size (px)

Citation preview

Page 1: Control Room Design Service Yokogawa

Control room design provides operation environment with maximum work efficiency

Control Room Design

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Yokogawa Electric Corporation

Page 2: Control Room Design Service Yokogawa

Agenda

Introduction

– What is Control Room Design?

– Typical benefits

Best practices

Consulting service

– Service definition

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 2

– Service definition

– Features

– Workflow

– Schedule

Page 3: Control Room Design Service Yokogawa

Introduction

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 3

Page 4: Control Room Design Service Yokogawa

Principles of Control Room Design

Human-centered design approach– Designing suitable working environment for human safety, health,

and happiness in consideration of technical and economical efficiency.

Well-balanced integration in each design process– Human

– Facility & Equipment (Hardware & Software)

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 4

– Facility & Equipment (Hardware & Software)

– Working environment

– Automation systems (Operation, Monitoring, Management)

– Business policy, Business strategy

Page 5: Control Room Design Service Yokogawa

Typical Steps toward Control Room Construction

�Typical steps toward control room construction

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 5

Layout planning

Large screen position

Console design

Constructed control room

Page 6: Control Room Design Service Yokogawa

Typical Benefits

Safety and productivity improvement

– Reduce work stresses and related human errors

– Increase operators’ work performance

– Motivate operators to do more creative work

Compliance with specified standards and regulations

e.g.

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 6

e.g.

– ISO 11064 Ergonomic Design of Control Centers

– Shell Human Factors Engineering - HMI & Control Room Design

Symbolization of client’s company policy

– Stance on care for employees

– Production strategy (cost center or profit center)

– Symbolic presentation to visitors

Page 7: Control Room Design Service Yokogawa

Best Practices

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 7

Page 8: Control Room Design Service Yokogawa

Layout based on Business Workflow

Field staff room

Gas detector

Utilitymonitoring board

Training simulatorroom

Smoking roomRefresh room

Intelligentcommunication room

Daily maintenancemanagement room

Shift ManagerRoom

Utility

Polymers

Aromatics

To polymer plant

To aromatics plant

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 8

Side room

Instrumentationroom

Supply room

Planning Room

Shift managerRoom

Butadiene

Ethylene

Shift manager

Utility

ButadieneAromatics

Ethylene

Planning AccountingReporting

Maintenance

Operation

To ethylene plant

Accounting &Reporting Staff

MaintenanceStaff

Workflow-basedLocation

Page 9: Control Room Design Service Yokogawa

Overhead View

Chemical laboratory

Island A

Island D

Island B

Island C

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 9

Locker room

CanteenRest room

Visitors room

Stairs

Page 10: Control Room Design Service Yokogawa

Layout in Consideration for Visitors

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 10

Page 11: Control Room Design Service Yokogawa

Dimensional Drawing

Traffic LineTraining Room

StaffRoom

StaffRoom

Canteen

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 11

RoomRoom

Page 12: Control Room Design Service Yokogawa

Console Layout based on Ergonomics & Maintainability

The type of console grouping is referred from ISO 11064 Part3 in which Yokogawa contributed.

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 12

Console layout in consideration forhot cut over (DCS migration under plant operation)

Page 13: Control Room Design Service Yokogawa

Color Coordination

• Sober atmosphere• Sense of stability

• Brain activation• Energetic atmosphere

Point of color coordination

– To provide comfortable work environment

– To reduce the tiredness of eyes and bodies

– To increase work efficiency

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 13

Warm Color Coordination Cool Color Coordination

Page 14: Control Room Design Service Yokogawa

Large Screen Setting & Glare Study (not in this phase)

Shift superintendent Board operator Temporary access

View Point 1 View Point 2

Large screen

Study for setting angle of large screen

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 14

Study for setting angle of large screen

View Point 1 View Point 2

Study for glare / reflection

Page 15: Control Room Design Service Yokogawa

Lighting and Ergonomic Design (not in this phase)

Limit of the visual field

Limit of the colored visual field

Range of neck movement

Range of eye motion

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 15

Lighting design (including illumination distribution)

Range of arm motion

Range of eye motion

Ergonomic design for console

Page 16: Control Room Design Service Yokogawa

Oil Refinery

Shin-nihon Oil / Osaka Refining Center

1996

Control room (1F)

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 16

Visitors room (2F)

Visitors room (2F)

Page 17: Control Room Design Service Yokogawa

Gas Supply

Osaka Gas Co., LTD. / Senboku ⅠⅠⅠⅠ Plant

2004

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 17

Front panel; Large screen (70 inch x2), Electric Graphic Panel, Disaster prevention Graphic Panel, Emergency SW, ITV ( 21 inchCRTx6),Annunciator, Digital Indicator

Page 18: Control Room Design Service Yokogawa

Water Treatment

Water Works Bureau of Hurue Water Purification Plant

2004

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 18

Front panel; Large screen (70 inch x3), Digital clock

Features;1. Subsystems are located both adjacent sides of operator consoles for easy access.2. Visitor room is located next to the control room.

Page 19: Control Room Design Service Yokogawa

Gas Supply

Toho Gas Co., LTD. / Midorihama Plant

2001

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 19

Front panel; Large screen (50 inch Multi x6), Emergency SWITV ( 29 inch CRTx2), Annunciator, Digital Indicator

Features;1. Circular arc watch panel is installed.2. Operation work is monitored by two foreman who are sitting

right behind.

Page 20: Control Room Design Service Yokogawa

Consulting Service

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 20

Page 21: Control Room Design Service Yokogawa

Service Definition

Control Room Design Service– Service product which Yokogawa provides the conceptual design of new

control room to newly build a comfortable, safe and functional control room.– The conceptual design includes:

• Design concept (document)• Room layout (figure)• Grounds of layout (document)

– One Control Room Design Service is applied to one control room.

Service Contents– Software & Hardware

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 21

– Software & Hardware• Not included

– Engineering• Development of a conceptual control room design• Preparation of a service report

– Consulting• Facilitation of team meetings• Provision of experiences

– Deliverables• Service report (conceptual control room design)

Page 22: Control Room Design Service Yokogawa

Features

Yokogawa’s 30+ years of experience as an outstanding control room designer in diverse range of industries– More than 500 projects experience of control room design

Deep understanding of production plant– Company organization, business– Business workflow, command structure in case of emergency– Engineering (e.g. chemical, control, electric, mechanical)

Centenary experiences as a control system supplier

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 22

Centenary experiences as a control system supplier– Configuration, dimension, weight– Recommended environment (e.g. temperature, barometric pressure,

humidity, dust control)– Network– Power supply, Earth, CVCF– Functional enhancement and migration

Capable of ergonomic design– Console design– Screen setting and glare prevention– Lighting, air conditioning

Page 23: Control Room Design Service Yokogawa

History of CCR Design Work

1975 Sales release of world’s first DCS “CENTUM”1978 Launch of CCR environmental design service– Water supply: Sapporo, Kimitsu, Hanshin, Kanazawa, Ikeda, Takatsuki– Gas supply: Sendai, Tokyo, Toho, Osaka, Hiroshima, Seibu– Chemical: Mitsubishi chemical, Sumitomo chemical, Shin-etsu chemical– Oil downstream: Tomakomai east oil stock, Fukui oil stock, Koa oil, Japan energy– Electric power: Hokkaido, Tokyo, Chugoku, Shikoku, Kyushu– Iron & Steel: Shin-nihon steel, Kawasaki steel, Kobelco, NKK, JFE steel– Waste treatment: Adachi, Kurito– Food: Nissin oil manufacture, Suntory, Nikka whiskey– Sewage farm: Saibara

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 23

– Sewage farm: Saibara– Paper & Pulp: Ouji paper & pulp, Marusumi paper & pulp– Oversea: Caltex, Tuas, Mobil– Others: Japanese red cross, Yokogawa response center

1999 Launch of CCR interior finish work (Production) service2000 Sales release of original desk “FDDS”2003 Sales release of information interface board “ECCR”

Launch of CCR design consulting service2005 Sales release of original desk “Pride”

More than 500 projects experiences

Page 24: Control Room Design Service Yokogawa

Workflow

Define– Define target for control room design

Measure– Use questionnaire to acquire customer information

Analyze– Analyze clients' needs based on acquired information

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 24

– Analyze clients' needs based on acquired information

Improve– Prepare conceptual design

Control– Issue and introduce conceptual design

– Advise on next activities

Page 25: Control Room Design Service Yokogawa

Define

Define target for control room design

e.g.

– Comfort

– Safety

– Functionality

– Innovation

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 25

– Innovation

Page 26: Control Room Design Service Yokogawa

Measure

Use questionnaire to acquire customer information

– Plant

– Building

– System

– Project

– Operation

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 26

Survey existing control room (where possible)

– Control room layout

– Traffic flow

• Operator console layout

• Human machine interface

• Panel

• Fixtures and furniture

Page 27: Control Room Design Service Yokogawa

Example of questionnaire

Category Considerations Purpose Examples

1. Room Dimension

Location Accessibility to a target plant

Aspect, Direction Lighting and anti-glare

Flooring Networking and lighting Type (pit, free access), height of ceiling

Window Lighting and anti-glare w/ or w/o, location, size

Door Accessibility to a target plant Location, Number, Size (for system installation)

Building codes and standards Compliance with standards ISO 11064 Ergonomic Design of Control Centers

Religious custom/National backgrounds Comfort Prayer space, color preference

2. Systems Configuration and access frequency Optimal system/desk location DCS (Console, Controller), SIS, PC, Workstation, Panel

Network structure and necessary performance Optimal system/desk location Proprietary bus, Ethernet

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 27

3. Operation Ladder Optimal system/desk location Foreman, board, field, staff

Official responsibility Optimal system/desk location Supervision, operation, field works

Operational state Optimal system/desk location Normal, emergency, transition, start-up, shut-down

Operational shift, rotation Optimal system/desk location 3 shift, 4 rotation

Business workflow by operational state Optimal system/desk location

Number of people per shift Optimal system/desk location Foreman 1, board 6, field 4

Number of people per operational state Optimal system/desk location

Meetings Meeting room design Purpose, frequency, duration, head-count

4. Project Purpose of construction/renewal Logical planning Control room consolidation, System migration

Project organization chart Efficient hearing

5. Others Timing of system enhancement/migration Space-consuming

Visitors Construction of visitor room

Page 28: Control Room Design Service Yokogawa

Analyze

Analyze clients' needs based on acquired information

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 28

Page 29: Control Room Design Service Yokogawa

Improve

Prepare a conceptual design that includes as follows:

– Design concept (document)

– Room layout (figure)

– Grounds of layout (document)

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 29

Page 30: Control Room Design Service Yokogawa

Room layout

Chemical laboratory

Island A

Island D

Island B

Island C

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 30

Locker room

CanteenRest room

Visitors room

Stairs

Page 31: Control Room Design Service Yokogawa

Control

Issue and introduce a conceptual design

Advise on next activities

e.g.

– Basic design

– Detailed design

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 31

– Detailed design

– Manufacturing

– Construction

Next Activities

Page 32: Control Room Design Service Yokogawa

Schedule

Activity

Target setting

Client

Yokogawa

Step

D

Site/Office

S

Comprehend the provideinformation

Survey existing control room ✔

M

A

O

S

1st month 2nd month

Prepare the answers toquestionnaire

✔M S

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 32

•Yokogawa covers this service in a total period of two months maximum.•DMAIC cycle is executed once in one Control Room Design Service.

Survey existing control room ✔✔A S

Develop a conceptual design

Customer support by telephoneand/or e-mail

Issue and introduce a conceptualdesign

I

I

C

O

O

S

Analyze requirements by interview ✔✔A S

Page 33: Control Room Design Service Yokogawa

<IA-PESC-08-093>Copyright © Yokogawa Electric Corporation<April 2008>

Page 33

Thank you very much for your attention