Contract Type Firm Project Award Year
Design Kimley-Horn Suck Creek $125,500 2002
Design AECOM Little Beaver $245,738 2002
Design AECOM Little Bugaboo $193,479 2002
Design HDR Freedom Park $308,408 2002
Design CH2MHill Cato Property $119,842 2002
Design CDM Warrior Creek $298,691 2002
Design Ecologic Associates Snow Creek $110,540 2002
Design Ward Consulting Sandy Creek $64,879 2002
Design Arcadis Wells Creek $197,300 2002
Design Arcadis UT to South Fork (Hadley-Newlin) $168,056 2002
Design AECOM Cross Creek $132,852 2002
Design KCI Mcintyre Creek $327,118 2002
Design CH2MHill Stewart Creek $311,234 2002
Design Ecologic Associates Reedy Creek $83,280 2002
Design EcoScience Whitelace Creek $255,587 2002
Design Kimley-Horn Purlear Creek $328,950 2002
Construction Backwater Environmental Howell Woods $299,941 2002
Design HDR Irwin Creek $286,130 2002
Design Baker Engineering Silas Creek $232,368 2002
Design BLWI Sturgeon City $90,065 2002
Design KCI Forest Hills $195,400 2002
Design S&EC Hatchet's Grove $161,375 2002
Design URS Brushy Fork $311,607 2002
Design Dewberry Wake Forest $195,375 2002
Design Stantec Ellerbe Creek $278,977 2002
Design Stantec Cane/Mary $160,769 2002
Design Kimley-Horn County Line Creek $24,050 2002
Design BLWI Middle Swamp $179,152 2002
Full Delivery Restoration Systems Casey Dairy $1,690,920 2002
Full Delivery EBX Hargett Tucker $330,750 2002
Full Delivery Land Management McCotter Raines Farm $370,880 2002
Full Delivery Greene Env. Moye Farm I $892,997 2002
Full Delivery Restoration Systems Haw River Swamp I $1,260,000 2002
Full Delivery Spaulding & Norris Four Mile Creek $625,400 2002
Full Delivery KCI Daniels Farm $594,000 2002
Design Kimley-Horn Purlear II $100,500 2003
Design URS Billys Creek $70,144 2003
Design BLWI Little River $175,152 2003
Design AECOM UT to Tar $128,728 2003
Design S&EC Charles Creek $206,715 2003
Planning AECOM Broad LWP $259,649 2003
Design Baker Engineering MacGregor/Stewart $24,265 2003
Design Sungate Mud Creek $167,100 2003
Design Baker Engineering Kings Creek $89,276 2003
Planning Baker Engineering Kenneth Creek $89,276 2003
Planning Arcadis Bear Swamp $13,368 2003
Planning Arcadis Bertie Creek $64,624 2003
Planning Arcadis Kentwood Park $18,167 2003
Planning Baker Engineering Mineral Springs $101,657 2003
Planning Ecologic Associates Montgomery/Bouchard Tracts $18,300 2003
Planning Kimley-Horn UT to Perry Creek $14,881 2003
Design S&EC Watts Property $226,755 2003
Design Dewberry South Fork Cane $186,946 2003
Planning Baker Engineering Upper Smith Creek $14,014 2003
Full Delivery Spaulding & Norris Zacks Fork Creek $705,900 2003
Full Delivery Restoration Systems Elk Shoals $189,400 2003
Full Delivery Greene Env. Moye Farm II $992,650 2003
Planning S&EC Smith-Austin Creek $6,360 2004
Design EcoScience Chavis Park $12,923 2004
Design EcoScience Kentwood Park $36,647 2004
Design HDR Caldwell Station $206,289 2004
Design Stantec Reedy Creek $72,873 2004
Design EcoScience Hall Branch $204,122 2004
Design Dewberry Goldsboro Housing Authority $179,486 2004
Construction Backwater Environmental Cross Creek $575,941 2004
Design Kimley-Horn Naked Creek $278,620 2004
Planning CDM Goose Creek $18,000 2004
Design Ecologic Associates Richland Creek $183,200 2004
Planning KCI Briles $50,064 2004
Planning KCI McCain $50,064 2004
Design Baker Engineering Meredell Farm $264,580 2004
Design URS UT to Cane Creek $239,520 2004
Planning Kimley-Horn Valley Fields $36,514 2004
Design AECOM E. Tarboro Canal $316,650 2004
Design URS Little Sugar Creek $299,320 2004
Design HDR Indian Run $206,463 2004
Design Mulkey Rocky Branch $305,561 2004
Design Arcadis Ratcliffe Cove $257,143 2004
Design Kimley-Horn Cheviot Hills $209,300 2004
Design EcoScience Dula Thoroughfare $276,897 2004
Design Kimley-Horn UT to Sandy Creek $148,450 2004
Design Stantec Mill Branch $107,214 2004
Design Ward Consulting Moccasin Creek $104,680 2004
Design Arcadis Five Mile Branch $454,758 2004
Design Baker Engineering UT to Barnes Creek $149,297 2004
Design ICA UT to Crooked Creek $179,660 2004
Design MacTec Triad Park $11,684 2004
Planning Ward Consulting UT to Rocky River (Smith) $72,390 2004
Design Ward Consulting Alamance CC $12,300 2004
Planning WK Dickson Long Branch $19,247 2004
Planning WK Dickson Mineral Springs $219,154 2004
Design Ecologic Associates Ripshin Branch $16,310 2004
Planning Baker Engineering Stone Mountain $48,249 2004
Full Delivery Restoration Systems Carbonton Dam $8,249,476 2004
Full Delivery EBX Cleghorn Creek $1,495,000 2004
Full Delivery EBX Haw Branch $2,650,000 2004
Full Delivery Restoration Systems Walnut Creek $462,000 2004
Full Delivery EBX Silver Creek $1,959,131 2004
Full Delivery EBX South Fork Hoppers $1,886,000 2004
Full Delivery EBX Bailey Fork $3,105,680 2004
Full Delivery WRC South Muddy Creek $1,013,375 2004
Full Delivery WRC Bailey Fork $716,692 2004
Full Delivery Restoration Systems Lowell Mill $4,373,750 2004
Full Delivery EBX Cox Site $2,324,400 2004
Full Delivery Restoration Systems Haw River Swamp II $1,248,000 2004
Full Delivery Restoration Systems Lick Creek $2,042,500 2004
Full Delivery Earthmark Hillcrest Bay $1,087,500 2004
Full Delivery International Paper McDonalds Pond $1,367,170 2004
Full Delivery EBX Jones Creek $2,508,008 2004
Full Delivery Dismal Swamp Dismal Swamp $4,662,500 2004
Design AECOM Farmville CC $158,675 2005
Design Mulkey Dye Branch $259,529 2005
Design AECOM Roquist $111,306 2005
Design Kimley-Horn Valley Fields $448,795 2005
Design Louis Berger Davidson College $132,832 2005
Design Kimley-Horn County Line Creek $62,500 2005
Design Biohabitats Goose Creek $245,552 2005
Design HDR Brush/Little Pine $34,753 2005
Design HDR Fletcher/Meritor $314,962 2005
Design SEPI Green Mill $450,028 2005
Design BLWI Jacksonville CC $299,262 2005
Design KCI Johnson Site $137,754 2005
Design Biohabitats Brown Branch $35,276 2005
Design AECOM UT to Little Coharie $93,576 2005
Construction Fluvial Solutions Elizabeth City State $40,150 2005
Design Baker Engineering Piedmont Equestrian $299,714 2005
Design EcoScience Hominy Swamp $33,713 2005
Design RK&K UT to Lilliput $298,006 2005
Planning URS Toby Creek $35,950 2005
Monitoring EcoScience Monitoring (Multiple sites) $83,325 2005
Monitoring KCI Monitoring (Multiple sites) $60,396 2005
Monitoring ICA Monitoring (Multiple sites) $193,457 2005
Monitoring RK&K Monitoring (Multiple sites) $222,921 2005
Monitoring BLWI Monitoring (Multiple sites) $254,473 2005
Monitoring AECOM Monitoring (Multiple sites) $108,767 2005
Monitoring Ecologic Associates Monitoring (Multiple sites) $234,026 2005
Monitoring S&EC Monitoring (Multiple sites) $249,506 2005
Design Baker Engineering Freedom Park $24,695 2005
Monitoring Louis Berger Monitoring (Multiple sites) $158,952 2005
Design KCI Bold Run $189,870 2005
Planning Stantec Lockwoods Folly $69,330 2005
Planning Ecologic Johns River $15,695 2005
Design URS Ellerbe Creek $196,977 2005
Planning WK Dickson Fishing Ck LWP Phase II $24,660 2005
Planning BLWI Methodist College $22,446 2005
Design AECOM Heath Dairy $438,745 2005
Planning EcoScience Lower Neuse LWP $66,096 2005
Design Ward Consulting Morgan Crek $155,624 2005
Design Ward Consulting Chapel Creek $110,355 2005
Design KCI McCain $82,636 2005
Construction North State UT to Barnes Creek $660,036 2005
Construction Fluvial Solutions Rocky Branch $265,000 2005
Design ICA Norwood-Gainey $82,513 2005
Construction L-J, Inc. Cheviot Hills $781,517 2005
Construction Husky Construction Moccasin Creek $134,546 2005
Planning Ecologic Associates UT to Zack's Fork Ck $15,185 2005
Planning ICA The Crossings $30,860 2005
Design Stantec Brock $135,208 2005
Design RK&K Second Ck Wetlands $59,198 2005
Design Ward Consulting Sandy Creek $13,808 2005
Design AECOM Price Park $35,920 2005
Full Delivery Baker Engineering Balance Site $2,050,000 2005
Full Delivery River Works Beaverdam Ck $2,983,790 2005
Full Delivery Restoration Systems Big Bull Ck $980,000 2005
Full Delivery Louis Berger Black Gum Ck $2,010,000 2005
Full Delivery CH2MHill Blounts Ck $2,195,166 2005
Full Delivery Restoration Systems Brogden Road $420,000 2005
Full Delivery KCI Brown Farm $1,638,260 2005
Full Delivery KCI Collins Ck $1,889,825 2005
Full Delivery Restoration Systems Conetoe Ck $194,000 2005
Full Delivery EBX Conoconnara Swamp $3,791,300 2005
Full Delivery KCI Daniels Farm $525,000 2005
Full Delivery Restoration Systems Gatlin Swamp $1,875,000 2005
Full Delivery KCI Glen Raven Site $1,070,745 2005
Full Delivery Restoration Systems Gray Farm $2,199,290 2005
Full Delivery KCI Harrell Site $1,946,364 2005
Full Delivery Land Management Howard Farm $426,060 2005
Full Delivery Restoration Systems Little Buffalo $594,000 2005
Full Delivery Greene Env. Little Contentnea $1,098,852 2005
Full Delivery Land Management Manning Farm $148,000 2005
Full Delivery Greene Env. Moccasin Creek $427,816 2005
Full Delivery Albermarle Restoration Modlin Site $1,400,000 2005
Full Delivery Land Management Pleasant Hill Farm $392,500 2005
Full Delivery Baker Engineering Randleman Lake $3,600,000 2005
Full Delivery Mid-Atlantic Mitigation Reeds Creek $378,950 2005
Full Delivery WRC Silver Creek-Conway $1,050,448 2005
Full Delivery WRC Simpson Wetlands $825,660 2005
Full Delivery WRC Simpson Buffers $494,400 2005
Full Delivery Mid-Atlantic Mitigation Tarlton Site $1,218,200 2005
Full Delivery EBX Whitley Site $976,250 2005
Construction Sawyer Land Roquist $440,890 2006
Design Arcadis Bishop Road $167,453 2006
Design Arcadis River Bend $119,606 2006
Design EcoScience Nicholls Farm $93,000 2006
Monitoring Axiom Monitoring (Multiple sites) $89,746 2006
Design Ecologic Associates Ripshin Branch $264,135 2006
Monitoring EcoScience Monitoring (Multiple sites) $166,292 2006
Design EcoScience Johnson Dale $131,995 2006
Design BLWI Branson Creek $152,830 2006
Planning Axiom Sharpe Wetland $4,887 2006
Monitoring BLWI Monitoring (Multiple sites) $272,462 2006
Monitoring KCI Monitoring (Multiple sites) $145,128 2006
Monitoring ICA Monitoring (Multiple sites) $216,518 2006
Monitoring RK&K Monitoring (Multiple sites) $269,413 2006
Construction L-J, Inc. UT to Crooked Creek $448,175 2006
Monitoring Jacobs Monitoring (Multiple sites) $242,434 2006
Monitoring WK Dickson Monitoring (Multiple sites) $274,768 2006
Monitoring Louis Berger Monitoring (Multiple sites) $284,162 2006
Monitoring SEPI Monitoring (Multiple sites) $219,322 2006
Design Ward Consulting Orange County BMPs $4,969 2006
Design AECOM Cat Creek $186,696 2006
Construction Fluvial Solutions Stillhouse Creek $238,903 2006
Design John McAdams UT to Pembroke $252,610 2006
Monitoring RJGA Monitoring (Multiple sites) $161,210 2006
Monitoring Kimley-Horn Monitoring (Multiple sites) $127,000 2006
Design Stantec Oakley Crossroads $146,936 2006
Planning Stantec Trouble/Morgan LWP $62,787 2006
Monitoring Arcadis Monitoring (Multiple sites) $22,084 2006
Design Arcadis UT to South Fork $2,848 2006
Construction North State Charles Creek $204,533 2006
Monitoring MacTec Monitoring (Multiple sites) $198,240 2006
Monitoring S&EC Monitoring (Multiple sites) $211,053 2006
Monitoring URS Monitoring (Multiple sites) $218,879 2006
Planning MacTec HQP Wetland $87,370 2006
Design Baker Engineering Little Grassy $43,015 2006
Monitoring ICA Juniper Bay $66,524 2006
Construction Shamrock East Tarboro Canal $831,291 2006
Planning Baker Engineering Sandy Mush $84,185 2006
Design Biohabitats Little Bugaboo $63,867 2006
Construction Vaughn Contracting Bishop Site $902,785 2006
Construction Fluvial Solutions Rocky Branch $782,195 2006
Design BLWI J-Bar $56,009 2006
Design Kimley-Horn Lower Creek $267,480 2006
Design ICA Little Lick Ck $235,479 2006
Design Axiom Terrible Creek $25,756 2006
Design Estes Design Big Harris $166,806 2006
Design ICA Adkin Branch $669,064 2006
Construction North State Mill Branch $491,163 2006
Planning RJGA Stallings $17,220 2006
Design KCI Little Troublesome $167,618 2006
Design Baker Engineering Mill Creek $172,061 2006
Design Biohabitats Greenbrier Ck $322,947 2006
Design Tetra Tech Wayne CC $54,866 2006
Planning WK Dickson Bradley Creek $14,586 2006
Construction Peter Rollins and Assoc. Ritter Field Stormwater $28,975 2006
Design John McAdams Meadowbranch $214,210 2006
Design Kimley-Horn Moore Property $140,000 2006
Construction Shamrock Stone Mountain $179,468 2006
Planning Axiom Balance Farm $13,243 2006
Design Mulkey UT to Uwharrie $301,822 2006
Design Stantec Stallings $194,920 2006
Construction Carolina Silvics Norwood-Gainey $119,960 2006
Design URS Newfound Creek $284,851 2006
Design WK Dickson Jennys Gut $164,166 2006
Design Jacobs Suther $229,845 2006
Construction Vaughn Contracting Bold Run $295,151 2006
Construction United Construction McIntyre $585,873 2006
Design KCI UT to Crab $247,433 2006
Design Ward Consulting Bowman and Cox $242,189 2006
Design Baker Engineering South Muddy Creek $320,769 2006
Monitoring Axiom Monitoring (Multiple sites) $120,992 2006
Design Jacobs Lewis Creek $103,720 2006
Full Delivery Louis Berger Acre Swamp $2,413,000 2006
Full Delivery Albermarle Restoration Armstrong Property $760,000 2006
Full Delivery EBX Floogie Site $3,343,100 2006
Full Delivery Baker Engineering Blockhouse Ck $1,248,750 2006
Full Delivery Mulkey Little White Oak $5,314,400 2006
Full Delivery Baker Engineering Puzzle Creek $1,266,700 2006
Full Delivery EBX Morgan Creek $3,113,040 2006
Full Delivery Restoration Systems Cane Creek $2,276,172 2006
Full Delivery Mulkey Trib. To Reedy Fork $1,813,000 2006
Full Delivery Restoration Systems Holly Grove $4,088,760 2006
Full Delivery KCI Farrar Dairy $5,968,895 2006
Full Delivery EBX Beaverdam Swamp $2,796,300 2006
Full Delivery EBX Coleman Road $1,726,400 2006
Full Delivery WRC Thompsons For & Trib. $1,212,000 2006
Full Delivery Restoration Systems Morgan Creek $1,745,000 2006
Full Delivery KCI Dog Bite Ck $976,235 2006
Full Delivery Restoration Systems Brown Marsh Swamp $1,287,500 2006
Full Delivery Louis Berger Plum Creek $1,240,000 2006
Full Delivery Baker Engineering Pinch Gut Ck $2,290,000 2006
Full Delivery Sungate Ellington Branch $1,362,500 2006
Full Delivery Baker Engineering Logan Creek $1,095,000 2006
Full Delivery Restoration Systems Anderson Swamp $434,000 2006
Full Delivery EBX 601 North $894,000 2006
Full Delivery EBX Wolf Pond $1,305,000 2006
Full Delivery WRC Beaverdam Creek & Trib. $786,044 2006
Full Delivery Baker Engineering Big Cedar $3,014,760 2006
Full Delivery EBX 601 West $1,282,500 2006
Full Delivery WRC Davis Branch $1,365,293 2006
Full Delivery Mid-Atlantic Mitigation Stricker Branch $885,000 2006
Full Delivery Baker Engineering Duke Swamp $1,400,000 2006
Full Delivery Albermarle Restoration Powell Property $2,865,100 2006
Full Delivery Restoration Systems Cutawhiskie Ck $1,301,625 2006
Full Delivery Dismal Swamp Timberlake Farm $1,040,000 2006
Full Delivery Louis Berger Woodlawn Branch $1,145,000 2006
Full Delivery Restoration Systems Jarmans Oak $2,516,000 2006
Design Baker Engineering Stone Mountain $10,269 2007
Construction Atlantic Dewatering UT to Pembroke $98,450 2007
Construction Backwater Environmental South Fork Cane Ck $499,167 2007
Construction Land Mechanic Designs County Line Creek $128,115 2007
Design ICA UT to Bear Creek $194,870 2007
Design EcoScience Helms Site $74,767 2007
Monitoring ESI Croatan Wetland $177,675 2007
Monitoring ESI Juniper Bay $135,542 2007
Design Arcadis Little Alamance/Brown Branch $266,305 2007
Construction Shamrock UT to Sandy Creek $352,603 2007
Design Biohabitats Glade Creek $159,996 2007
Construction Fluvial Solutions Naked Crek $348,717 2007
Monitoring Axiom Monitoring (Multiple sites) $99,976 2007
Design Baker Engineering UT to Jumping Run $225,310 2007
Construction L-J, Inc. Brile Site $279,615 2007
Planning Stantec TLW select-Cental $31,596 2007
Planning Tetra Tech CAT 3 BMP for credit $34,972 2007
Design Stantec Jacksonville CC $152,260 2007
Design Stantec J-Bar $83,819 2007
Design Sungate UT to Hendricks $104,762 2007
Construction Quartermaster Env. Johnson Site $331,795 2007
Construction River Works Meredell Farm $597,451 2007
Planning Axiom Six Run & wildcat Branch $17,850 2007
Design Withers & Ravenel McKee Creek $228,351 2007
Construction Shamrock UT to Little Coharie $377,917 2007
Construction North State Valley Fields $1,246,534 2007
Design Mulkey Branson Creek $169,997 2007
Design Ward Consulting Sandy Creek $9,530 2007
Monitoring Stantec Monitoring (Multiple sites) $142,000 2007
Planning RJGA Cultural Resources (Multiple) $32,498 2007
Design Ward Consulting Peeler/UT to Hauser $276,521 2007
Construction River Works Little Grassy $71,790 2007
Design Baker Engineering Meredell Farm $66,238 2007
Construction Backwater Environmental UT to Pembroke $357,205 2007
Design Mulkey UT to Haw $151,402 2007
Monitoring RK&K UT to Barnes Creek $31,295 2007
Planning RJGA Cultural Resources (Multiple) $18,081 2007
Planning KCI Pott Creek II $30,461 2007
Construction Backwater Environmental Terrible Creek $156,329 2007
Design AECOM Little Beaver Ck $42,856 2007
Planning Equinox Env. Muddy Creek $39,940 2007
Full Delivery Restoration Systems Frizzell Site $980,000 2007
Full Delivery EBX North Muddy Creek $2,094,570 2007
Full Delivery Restoration Systems Three Mile Creek $2,492,695 2007
Full Delivery Baker Engineering Elk Branch $1,192,000 2007
Full Delivery Baker Engineering Sink Hole Creek $1,185,000 2007
Full Delivery Mid-Atlantic Mitigation Six Mile Creek $1,428,500 2007
Full Delivery AECOM Badin Inn $984,150 2007
Full Delivery Louis Berger Clarks Creek $353,025 2007
Full Delivery Baker Engineering Little River $1,219,654 2007
Full Delivery EBX Rockwell Pastures $3,025,638 2007
Full Delivery Baker Engineering Snowbird Tributaries $610,470 2007
Full Delivery Baker Engineering East Buffalo Ck $876,090 2007
Full Delivery Restoration Systems Columbus Swamp $1,120,000 2007
Full Delivery Albermarle Restoration Goodman Property $1,112,384 2007
Construction Micky B. Hensen Ent. Goldsboro Housing Authority $554,488 2008
Construction Kris-Gray Bishop Road $349,205 2008
Design ICA UT to Rocky River $160,898 2008
Construction ITSI Dye Branch $641,631 2008
Design Ward Consulting Glade II/Little Pine II $253,708 2008
Construction River Works UT to Cane Creek (Pickard) $772,270 2008
Construction Fluvial Solutions Freedom Park $233,429 2008
Monitoring RK&K Monitoring (Multiple sites) $124,544 2008
Design SEPI UT to West Fork of the Deep River $209,985 2008
Design Stantec Big Harris $488,799 2008
Design Sungate UT to Sandy Creek $151,300 2008
Construction Shamrock Goose Creek $578,792 2008
Construction Husky Construction Helms Site $202,030 2008
Monitoring Axiom Monitoring (Multiple sites) $172,363 2008
Monitoring KCI Monitoring (Multiple sites) $234,435 2008
Monitoring WK Dickson Monitoring (Multiple sites) $14,781 2008
Monitoring FWA Monitoring (Multiple sites) $81,396 2008
Monitoring WK Dickson Monitoring (Multiple sites) $53,743 2008
Monitoring EcoScience Monitoring (Multiple sites) $73,889 2008
Monitoring Equinox Env. Monitoring (Multiple sites) $203,896 2008
Monitoring Jacobs Monitoring (Multiple sites) $77,928 2008
Monitoring KCI Monitoring (Multiple sites) $67,464 2008
Monitoring RJGA Monitoring (Multiple sites) $97,641 2008
Monitoring SEPI Monitoring (Multiple sites) $211,130 2008
Monitoring Catena Monitoring (Multiple sites) $179,904 2008
Design URS UT to Bald Creek $182,679 2008
Monitoring Jacobs Monitoring (Multiple sites) $326,778 2008
Monitoring RJGA Monitoring (Multiple sites) $103,927 2008
Planning Tetra Tech Goose Creek LWP $74,900 2008
Monitoring Kimley-Horn Monitoring (Multiple sites) $113,320 2008
Monitoring John McAdams Monitoring (Multiple sites) $209,096 2008
Monitoring Kimley-Horn Monitoring (Multiple sites) $184,590 2008
Monitoring LMG Monitoring (Multiple sites) $98,137 2008
Monitoring URS Monitoring (Multiple sites) $167,454 2008
Planning Equinox Env. Little Tennessee LWP $87,668 2008
Planning John McAdams Upper Yadkin LWP $132,377 2008
Construction Invasive Plant Control Forest Hills $9,000 2008
Construction EQR Ellerbe Ck (Northgate) $585,621 2008
Construction River Works Chapel Creek $189,173 2008
Construction McQueen UT to Rocky River (Smith) $246,868 2008
Construction Carolina Env. McCain $300,880 2008
Planning RJGA Little Pine II $7,838 2008
Monitoring Axiom Monitoring (Multiple sites) $139,602 2008
Planning Entrix Indian Ck and Howard's Ck LWP $99,511 2008
Planning Axiom Randleman Lake $37,485 2008
Design Baker Engineering UT to Martins $146,613 2008
Design Baker Engineering Martins Ck II $216,062 2008
Construction Shamrock Brock $157,009 2008
Construction Angler Little Troublesome $313,833 2008
Construction Backwater Environmental Wayne CC $92,306 2008
Construction Land Mechanic Designs UT to Bear Creek $384,620 2008
Construction Charles Hughes Jacksonville CC $486,225 2008
Construction River Works UT to Lilliput $415,444 2008
Construction Blythe Development Irwin Creek $194,730 2008
Planning Axiom Rock Farm II $6,410 2008
Planning KCI South Fork $37,808 2008
Monitoring Mulkey Dye Branch $10,256 2008
Monitoring Stantec Beamon Run $17,855 2008
Monitoring Stantec Monitoring (Multiple sites) $144,956 2008
Construction Micky B. Hensen Ent. Adkin Branch $1,214,748 2008
Design Axiom UT to Haw (Gwynn) $45,008 2008
Design ICA Rowan Branch $150,940 2008
Design ICA Neighbor Bob $277,507 2008
Design WK Dickson Mcintyre $32,796 2008
Construction HARP Ellerbe Ck (Northgate) $42,245 2009
Construction Fluvial Solutions Cat Creek $488,417 2009
Construction HARP Invasive Control (Multiple) $139,500 2009
Design Kimley-Horn Shadrick Ck $284,800 2009
Design Mulkey Dye Branch $112,746 2009
Planning RJGA Waxhaw Creek $9,249 2009
Planning RJGA Cultural Resources (Multiple) $12,753 2009
Monitoring Axiom Terrible Creek $23,632 2009
Construction River Works Suther $180,774 2009
Construction Carolina Env. UT to Crab Ck $394,999 2009
Planning Equinox Env. Little Tennessee LWP $166,352 2009
Design Ecological Eng. UT to Altamahaw $48,438 2009
Design Equinox Env. Invasive Control (Multiple) $35,257 2009
Design RJGA Invasive Control (Multiple) $45,710 2009
Design RJGA Wells Creek II $22,204 2009
Design KCI Mcintyre $75,001 2009
Design KCI UT to Pembroke $29,770 2009
Construction Carolina Silvics Norwood-Gainey $39,882 2009
Design Baker Engineering Little Grassy $71,470 2009
Design Wildlands Jumping Run Creek $109,479 2009
Design Wildlands Bear Creek (Phillips) $170,991 2009
Planning Confluence Eng. Upper South Hominy LWP $13,262 2009
Design ICA UT to Neuse $193,540 2009
Design Jacobs UT to Clarke Ck $227,962 2009
Construction River Works Richland Creek $478,290 2009
Monitoring Ecological Eng. Bishop Road $46,208 2009
Monitoring Ecological Eng. Brock $30,670 2009
Construction River Works Mason Farm $225,106 2009
Construction EQR Sandy Creek $105,466 2009
Design Ecological Eng. Watts $172,241 2009
Construction Backwater Environmental UT to Jumping Run $579,700 2009
Construction EQR Moore Property $288,263 2009
Construction Land Mechanic Designs Indian Run $358,218 2009
Construction River Works McKee Creek $214,933 2009
Construction EGS Oakley Crossroads $295,939 2009
Construction Carolina Silvics UT to Haw (Gwynn) $29,721 2009
Design Axiom UT to Haw (Beckom) $47,023 2009
Full Delivery ICA UT to Lumber $1,403,360 2009
Full Delivery Restoration Systems Vicki's Thicket $515,172 2009
Full Delivery EBX Neuse (Nahunta) $910,920 2009
Full Delivery Restoration Systems Heath Site $1,043,940 2009
Full Delivery Restoration Systems Fox Run $782,955 2009
Full Delivery EBX North Fork Mtn $1,917,600 2009
Full Delivery EBX Newtown Stream $1,899,800 2009
Full Delivery Louis Berger Little Buffalo $1,851,000 2009
Full Delivery Wildlands Scaly Bark $1,789,785 2009
Construction Backwater Environmental Jacksonville CC $95,740 2010
Construction Vaughn Contracting UT to Rocky River $297,843 2010
Construction Foggy Mountain Nursery Ripshin Branch $28,823 2010
Construction Carolina Env. South Muddy Creek $611,047 2010
Construction Vaughn Contracting UT to Uwharrie $581,533 2010
Construction Fluvial Solutions Dye Branch $386,407 2010
Construction EQR Meadowbranch $70,146 2010
Design Ward Consulting Little Beaver Ck $72,325 2010
Monitoring Axiom Monitoring (Multiple sites) $248,315 2010
Construction Restoration Systems Invasive Control (Multiple) $78,788 2010
Monitoring Jacobs Monitoring (Multiple sites) $285,315 2010
Monitoring Ward Consulting Monitoring (Multiple sites) $323,284 2010
Construction EQR Adkin Branch $156,376 2010
Planning Tetra Tech Yadkin LWP $109,233 2010
Design Axiom UT to Bear Swamp $33,300 2010
Monitoring Kimley-Horn Monitoring (Multiple sites) $295,257 2010
Monitoring Stantec Monitoring (Multiple sites) $162,787 2010
Design Ecological Eng. Remedial Design (Multiple) $39,787 2010
Design MacTec Pigeon Fork Wetlands $53,757 2010
Construction HARP Wells Creek II $13,100 2010
Monitoring Equinox Env. Monitoring (Multiple sites) $268,174 2010
Construction Carolina Env. Lewis Creek $316,384 2010
Construction Yadkin Valley Construction Glade Creek $299,760 2010
Construction Carolina Env. Greenbrier Ck $278,654 2010
Construction Wright Contracting Mill Creek $186,688 2010
Full Delivery Wildlands Underwood $2,182,808 2010
Full Delivery Wildlands Little Troublesome $1,918,600 2010
Full Delivery Baker Engineering Upper Silver Creek $1,597,050 2010
Full Delivery Restoration Systems Herman Dairy Farm $1,660,050 2010
Full Delivery Wildlands Lyle Creek $2,032,341 2010
Full Delivery Albermarle Restoration Hubers Property $1,046,500 2010
Full Delivery Restoration Systems Summit Seep $256,250 2010
Full Delivery KCI Buffalo Flats $1,241,013 2010
Full Delivery Baker Engineering UT to Town Ck $1,920,900 2010
Design Jacobs Shepard's Tree $25,665 2011
Design Wolf Creek First Broad River $110,268 2011
Design Wolf Creek Middle South Muddy $204,261 2011
Design Confluence Eng. Hogan Creek $167,778 2011
Design Confluence Eng. Moores Fork $317,439 2011
Design Kimley-Horn Cheviot Hills $132,800 2011
Construction Shamrock Little Alamance/Brown Branch $264,744 2011
Design ICA Panther Branch $160,913 2011
Construction River Works Planting (Multiple) $15,721 2011
Planning Wildlands Ararat River LWP $64,865 2011
Maintenance USDA-APHIS Wildlife Services $150,000 2011
Design Atkins Polly Branch $220,191 2011
Monitoring Jacobs Lewis Creek $67,014 2011
Design_Repair Stantec Jacksonville CC $29,917 2011
Construction Wright Contracting Repair (Multiple) $27,660 2011
Design Wildlands Crooked Creek #2 $272,137 2011
Construction Eagle Wood Newfound Creek $777,784 2011
Monitoring Stantec Oakley Crossroads $67,160 2011
Construction Carolina Silvics Planting (Multiple) $7,200 2011
Construction North State Five Mile Branch $554,186 2011
Construction River Works UT to Haw River $272,118 2011
Construction James Reece Jones UT to Sandy Creek $62,746 2011
Construction River Works UT to Bald Creek $182,261 2011
Construction Quartermaster Env. Snow Creek $18,500 2011
Construction North State Glade Creek II $735,278 2011
Construction Land Mechanic Designs UT to Pembroke $76,480 2011
Construction HARP East Fork of the Pigeon $76,028 2011
Design Stantec Stallings $58,234 2011
Construction Wright Contracting Price Park $21,000 2011
Construction Buchanan and Sons Fletcher-Meritor $762,969 2011
Monitoring Kimley-Horn Moore Property $146,000 2011
Construction Wright Contracting Louisburg HS BMP $97,588 2011
Monitoring Ecological Eng. UT to Altamahaw $75,089 2011
Monitoring Stantec Little River $11,536 2011
Full Delivery EBX Junes Branch $1,197,000 2011
Full Delivery Baker Engineering Town Creek $996,805 2011
Full Delivery Baker Engineering UT to Mill Swamp $1,195,745 2011
Full Delivery KCI Jacobs Landing $1,312,710 2011
Full Delivery KCI Jacobs Ladder $1,391,670 2011
Full Delivery Wildlands Devils Racetrack $8,720,033 2011
Full Delivery Wildlands Byrd's Creek $1,535,295 2011
Full Delivery Restoration Systems Sliver Moon $420,000 2011
Full Delivery AECOM Trib. of Wicker Branch $528,090 2011
Full Delivery EBX 601 North II $1,121,432 2011
Full Delivery EBX Hockett Dairy $489,700 2011
Full Delivery EBX Green Valley Farms $398,400 2011
Full Delivery EBX Muddy Run $1,862,378 2011
Full Delivery Wildlands Burnetts Chapel $765,000 2011
Full Delivery Baker Engineering St. Clair Ck $1,102,400 2011
Full Delivery Wildlands Loflin Dairy $595,000 2011
Full Delivery Restoration Systems Wall Buffer $734,500 2011
Training Stream Mechanics, PLLC Geomorphology Training $15,000 2011
Research UNC Database Dev. $65,223 2011
Monitoring ICA UT to Rocky River $129,980 2011
Maintenance RDS Gauge Repair $6,066 2011
Monitoring Stantec Jumping Run Creek $55,428 2012
Monitoring Axiom Terrible Creek $24,334 2012
Monitoring Equinox Env. Cat Creek $105,150 2012
Monitoring Equinox Env. UT to Crab Ck $95,780 2012
Planning WK Dickson Fishing Creek LWP $40,560 2012
Design Wildlands Little Pine III $325,867 2012
Design KCI Roquist $30,731 2012
Monitoring Axiom Mcintyre $65,700 2012
Monitoring Baker Engineering Muddy Creek $103,700 2012
Monitoring Equinox Env. Dye Branch $116,360 2012
Monitoring Axiom UT to Haw (Gwynn) $25,663 2012
Design Axiom UT to Haw (Beckom) $31,068 2012
Monitoring KCI UT to Pembroke $49,462 2012
Monitoring Axiom Irwin Creek $35,960 2012
Monitoring Baker Engineering Hopper's Creek $122,300 2012
Monitoring RK&K UT to Little Coharie $42,243 2012
Monitoring WCU Big Harris $300,000 2012
Monitoring John McAdams Naked Creek $25,572 2012
Construction Carolina Env. Simmons Street $998,391 2012
Monitoring Axiom Goose Creek $25,000 2012
Construction Backwater Environmental Heath Dairy $749,831 2012
Full Delivery Albermarle Restoration Hudson Property $699,300 2012
Full Delivery Baker Engineering Brown Creek $2,801,277 2012
Full Delivery Wildlands Hopewell $2,416,203 2012
Full Delivery Albermarle Restoration Hofler Property $616,000 2012
Monitoring Sungate UT to Sandy Creek $120,441 2012
Design Equinox Env. Sandy Mush $59,112 2012
Design Confluence Eng. Glade Creek II $88,990 2012
Monitoring ICA Little Troublesome $66,004 2012
Monitoring Mulkey UT to Uwharrie $130,000 2012
Full Delivery EBX Poplin Ridge $2,298,464 2012
Monitoring KCI Little Grassy $23,318 2012
Full Delivery KCI Twin Bays $735,152 2012
Full Delivery KCI Bear Basin $624,580 2012
Monitoring Mulkey UT to Haw River $63,750 2012
Full Delivery Restoration Systems Wall II $538,200 2012
Monitoring UNC Database Dev. $90,418 2012
Full Delivery EBX Best Site $2,698,082 2012
Full Delivery EBX Muddy Run II $2,554,000 2012
Full Delivery KCI Stanleys Slough $1,567,544 2012
Full Delivery EBX Pee Dee $2,142,162 2012
Full Delivery Wildlands Norkett Branch $3,312,183 2012
Construction Carolina Silvics Planting (Multiple) $226,125 2012
Design KCI Ellerbe Ck (Northgate) $72,609 2012
Monitoring URS Meadowbranch $43,928 2012
Monitoring Axiom Greenbrier Ck $62,961 2012
Monitoring Axiom Ripshin Branch $92,663 2012
Monitoring Axiom Mill Creek $60,005 2012
Monitoring Axiom UT to Hauser $61,213 2012
Monitoring Axiom Chapel Creek $23,593 2012
Monitoring Axiom McCain $27,258 2012
Monitoring Axiom Briles $27,258 2012
Monitoring KCI Bear Creek (Phillips) $25,924 2012
Monitoring ICA Adkin Branch $150,680 2012
Planning USGS Bolin Creek Watershed $25,000 2012
Construction River Works Martins Ck II $639,767 2012
Construction River Works UT to Martins $436,398 2012
Design KCI Cross Creek $30,862 2012
Monitoring HDR Fletcher-Meritor $164,656 2012
Construction River Works Sandy Creek $190,054 2012
Full Delivery Restoration Systems Pepperwood Farm $720,500 2012
Full Delivery Restoration Systems Basin Crek $720,460 2012
Full Delivery EBX Cochran Branch $1,143,894 2012
Full Delivery Baker Engineering UT to Cane Creek $1,338,600 2012
Construction North State Little Beaver Ck $154,279 2012
Full Delivery Wildlands Agony Acres $2,441,312 2012
Full Delivery Wildlands Foust Creek $1,796,344 2012
Full Delivery EBX 601 East $1,298,088 2012
Monitoring URS Newfound Creek $95,163 2012
Monitoring Axiom UT to Bald Creek $58,806 2012
Monitoring EEE Little Alamance/Brown Branch $57,489 2012
Design Axiom Little Lick Ck $26,475 2012
Design ICA Wake Forest CC $19,377 2012
Full Delivery KCI Norman's Pasture $1,302,600 2012
Full Delivery ICA UT to Miller's Creek $1,013,625 2012
Full Delivery EBX Cedar Creek $1,910,000 2012
Full Delivery KCI Bowl Basin $529,200 2012
Maintenance HARP Mary's Creek $85,970 2012
Construction Carolina Env. UT to Neuse $475,745 2012
Monitoring KCI Richland Creek $64,801 2013
Construction North State UT to Clarke Ck $386,599 2013
Planning Wildlands Neuse I Regional Plan $134,200 2013
Maintenance Carolina Silvics Bishop Road $41,089 2013
Maintenance Equinox Env. Planting (Multiple) $29,785 2013
Maintenance HARP Brock $12,138 2013
Construction Land Mechanic Designs Bear Creek (Phillips) $467,098 2013
Maintenance RDS Gauge Repair $15,609 2013
Maintenance Carolina Silvics UT to South Fork $6,400 2013
Design Wildlands UT to Jumping Run $8,895 2013
Bank Credit Restoration Systems Cripple Ck Mit Bank site $26,000 2013
Bank Credit Restoration Systems Lane Island Mit Bank site $164,414 2013
Full Delivery OBrien & Gere Coon Creek $852,094 2013
Design ICA Cheviot Hills $170,372 2013
Construction Carolina Env. Adkin Branch $252,790 2013
Full Delivery KCI Stanley's II $422,500 2013
Maintenance USDA-APHIS Wildlife Services $401,689 2013
Construction North State Jacksonville CC $124,295 2013
Design Wildlands Little Pine Creek II $155,006 2013
Design Confluence Eng. Shadrick Ck $162,968 2013
Construction Backwater Environmental Prestonwood CC $41,900 2013
Construction North State Big Harris $37,793 2013
Monitoring SEPI Indian Run $37,350 2013
Monitoring Mogensen Mitigation Lewis Creek $29,500 2013
Monitoring KCI Valley Fields $48,776 2013
Monitoring SEPI UT to Clarke Ck $67,300 2013
Monitoring KCI UT to South Fork $15,932 2013
Monitoring Mogensen Mitigation Morgan Creek $15,000 2013
Monitoring Mogensen Mitigation Upper UT to Cane Ck $14,500 2013
Monitoring ICA UT to Neuse $114,000 2013
Bank Credit French Broad Mitigation Wash Creek Mit Bank site $35,000 2013
Bank Credit Weyerhaeuser Bachelor's Delight Mit Bank site $284,064 2013
Bank Credit EBX Forrest Creek site $130,068 2013
Bank Credit EBX Neu-Con Umbrella Mit Bank site $360,000 2013
Bank Credit Restoration Systems Pancho Mit Bank $1,205,932 2013
Design Wildlands Mud Lick Creek $209,640 2013
Design KCI Beaver Creek $52,407 2013
Construction Wildlands Boundary Marking $14,125 2013
Construction Restoration Systems Boundary Marking $21,844 2013
Construction KCI Farrar Dairy $18,901 2013
Feasibility KCI Black Gum Ck $14,923 2013
Construction Carolina Silvics Planting (Multiple) $53,550 2013
Construction Carolina Silvics Planting (Multiple) $43,500 2013
Full Delivery Baker Engineering Thomas Creek $1,540,000 2013
Monitoring Axiom Ripshin Branch $26,503 2013
Maintenance Equinox Env. Invasive Control (Multiple) $59,022 2013
Maintenance RDS Gauge Repair $9,999 2013
Design ICA UT to the West Br of the Rocky Riv. $208,924 2013
Monitoring Catena Little Beaver Ck $34,490 2013
Bank Credit Restoration Systems Bass Mountain Mit Bank site $271,805 2013
Construction River Works Little Lick Ck $31,606 2013
Maintenance HARP Invasive Control (Multiple) $33,969 2013
Repair Carolina Env. Ellerbe Ck (Northgate) $171,614 2013
Maintenance Keller Env. Helms Site $6,930 2013
Construction Carolina Silvics Stallings $44,900 2013
Maintenance Carolina Silvics Invasive Control (Multiple) $46,000 2013
Repair Scott Fence Company UT to Coharie (Roseboro) $3,258 2013
Monitoring Axiom Bear Creek (Phillips) $55,448 2013
Monitoring Axiom UT to Martins/Martins Ck II $149,000 2013
Monitoring RJGA Wells Creek II $11,632 2014
Monitoring Catena Sandy Creek $19,388 2014
Monitoring KCI Johnson Site $12,388 2014
Repair Wright Contracting Wake Forest CC $11,488 2014
Maintenance Bruton Natural Systems Norwood-Gainey $10,600 2014
Monitoring RJGA Suther $38,850 2014
Monitoring Axiom Helms Site $12,002 2014
Monitoring RJGA Stallings $27,580 2014
Full Delivery KCI Norman's Pasture II $527,912 2014
Full Delivery ICA Roses Creek $1,999,515 2014
Full Delivery Wildlands Henry Fork $1,867,100 2014
Full Delivery Baker Engineering Browns Summit $1,997,500 2014
Full Delivery Restoration Systems Abbey Lamm $1,941,222 2014
Full Delivery Restoration Systems Aycock Springs $1,331,430 2014
Full Delivery Wildlands Maney Farm $1,752,012 2014
Full Delivery Wildlands Candy Creek $5,533,248 2014
Full Delivery Wildlands Holman Mill $1,414,872 2014
Maintenance Carolina Silvics Bear Creek (Phillips) $16,182 2014
Construction River Works Watts $209,608 2014
Design KCI Mcintyre $43,029 2014
Repair Carolina Env. Beaver Creek $134,580 2014
Bank Credit EBX Carl Lloyd Mit Bank site $6,726 2014
Monitoring Axiom Little Lick Ck $28,300 2014
Construction Carolina Env. Hogan Creek $370,595 2014
Full Delivery Baker Engineering Flea Hill $865,000 2014
Full Delivery Wildlands Vile Creek $1,684,500 2014
Monitoring NCSU Millstone Creek $77,373 2014
Monitoring Equinox Env. East Fork of the Pigeon $15,495 2014
Design Confluence Eng. Upper South Hominy $13,059 2014
Monitoring Ecological Eng. Watts $109,180 2014
Repair Fluvial Solutions Little Bugaboo $37,490 2014
Monitoring Arcadis Five Mile Branch $74,959 2014
Bank Credit Wildlands Buck Swamp Mit Bank site $225,000 2014
Bank Credit Restoration Systems Pancho Mit Bank site $113,281 2014
Bank Credit EBX Cedar Grove Mit Bank site $198,633 2014
Bank Credit EBX Ezell Mit Bank site $135,572 2014
Bank Credit EBX Hatley Mit Bank site $150,193 2014
Bank Credit EBX Rudolph Mit Bank site $17,306 2014
Bank Credit EBX Arrington Mit Bank site $19,426 2014
Bank Credit EBX Carl Lloyd Mit Bank site $7,641 2014
Maintenance Keller Env. Planting (Multiple) $131,106 2014
Monitoring KCI Richland Creek $42,766 2014
Maintenance Carolina Silvics Planting (Multiple) $4,500 2014
Monitoring Axiom Upper South Hominy $33,858 2014
Design KCI Northgate Park $46,700 2014
Monitoring Axiom Reports (Multiple) $149,310 2014
Monitoring Equinox Env. Sandy Mush $16,240 2014
Maintenance HARP UT to Bear Creek $6,060 2014
Construction North State Crooked Creek #2 $277,205 2014
Construction Carolina Env. Neighbor Bob $1,053,008 2014
Design-Build Wildlands Big Harris $6,221,648 2014
Bank Credit Restoration Systems Pancho Mit Bank site $567,410 2015
Bank Credit South App Highlands Anderson Farm Mit Bank site $332,500 2015
Bank Credit Lower Cape Fear Lower CF Mit Bank site $168,762 2015
Bank Credit Restoration Systems Bass Mountain Mit Bank site $37,600 2015
Bank Credit EBX Marston Mit Bank site $17,000 2015
Construction River Works Middle South Muddy $414,824 2015
Monitoring KCI Beaver Creek $24,500 2015
Repair Land Mechanic Designs Morgan Creek $17,891 2015
Full Delivery KCI Sandy Bridge Farm $842,500 2015
Full Delivery EBX John Deere $1,096,920 2015
Monitoring Wildlands Hogan Creek $112,000 2015
Monitoring Wildlands Moores Fork $120,000 2015
Repair Backwater Environmental UT to Crab Ck $9,982 2015
Construction Carolina Env. Glade Creek II $377,345 2015
Construction Fluvial Solutions Millstone Creek $59,910 2015
Design KCI Bowman $64,760 2015
Construction North State Little Pine Creek III $840,675 2015
Monitoring Mogensen Mitigation Heath Dairy $64,995 2015
Repair Fluvial Solutions Jumping Run Creek $12,250 2015
Full Delivery KCI Rough Horn Swamp $1,193,500 2015
Full Delivery KCI Cedar Branch $1,806,000 2015
Maintenance Bruton Natural Systems Planting (Multiple) $191,243 2015
Repair Fluvial Solutions Upper South Hominy $49,930 2015
Design Wildlands Upper South Hominy $16,409 2015
Design Wildlands Glade Creek II $57,352 2015
Maintenance Carolina Silvics Planting (Multiple) $249,000 2015
Design KCI Adkin Branch $24,859 2015
Repair Backwater Environmental UT to Altamahaw $10,804 2015
Monitoring Wildlands Crooked Creek #2 $139,152 2015
Repair Baker Grading Muddy Creek $13,725 2015
Design Wildlands Shadrick Ck $89,370 2015
Design Wildlands Moores Fork $15,000 2015
Repair Fluvial Solutions Richland Creek $87,550 2015
Repair Backwater Environmental Mcintyre $102,880 2015
Design KCI Cheviot Hills $63,250 2015
Design KCI UT to West Branch-Rocky $121,485 2015
Repair Wright Contracting McDaniel Farm $28,335 2015
Repair Carolina Env. Moores Fork $131,889 2016
Monitoring Wolf Creek Middle South Muddy $105,000 2016
Full Delivery Mogensen Mitigation Tar River Headwaters $305,000 2016
Full Delivery Water & Land Solutions Pen Dell $1,356,808 2016
Full Delivery Water & Land Solutions Edwards-Johnson $1,195,259 2016
Full Delivery Water & Land Solutions Lake Wendell $1,499,499 2106
Full Delivery Wildlands Dry Creek $2,823,919 2016
Full Delivery Baker Engineering Lochill Farm $1,386,117 2016
Full Delivery Wildlands Buckwater $4,705,890 2016
Full Delivery KCI Stony Fork $2,870,241 2016
Full Delivery Wildlands Martin Dairy $865,928 2016
Full Delivery Restoration Systems Alliance Headwaters $2,596,230 2016
Monitoring Wildlands Glade Creek II $117,000 2016
Monitoring Wildlands Little Pine Creek III $145,000 2016
Monitoring Axiom Neighbor-Bob $72,803 2016
Full Delivery Wildlands Deep Meadow $1,405,910 2016
Full Delivery OBrien & Gere Eden Farm $1,186,725 2016
Full Delivery Wildlands Lone Hickory $4,187,706 2016
Full Delivery KCI Mill Dam $3,432,000 2016
Full Delivery Baker Engineering Russell Gap $2,959,000 2016
Full Delivery EW Solutions Fletcher $3,991,500 2016
Full Delivery EW Solutions Harrell $847,343 2016
Construction Baker Grading Shadrick Ck $823,770 2016
Construction Equinox Env. Shadrick Ck $47,950 2016
Repair Baker Grading UT to Bald Creek $24,465 2016
Construction North State Mud Lick Creek $242,649 2016
Construction Cole Land & Timber Bowman $85,150 2016
Repair Backwater Environmental McKee Creek $33,700 2017
Construction Carolina Silvics Bowman $13,973 2017