PERHITUNGAN SALURAN SEKUNDER 6 ( SS 6)
Luas area sawah ( A) = 45 Ha
Panjang Saluran = 1652 m
DR max= 3,12 L/det/Ha
Qsawah = A x DR max
= 45 Ha x 3,12 L/det/Ha
= 140,4 L/det
Q saluran = (Qsawah /1000) / 0,85
= (140,4/1000)/0,85
= 0,165 m3/det
Elevasi awal = 4,7 m
Elevasi akhir = 4,5 m
∆H=0,2 m kemiringan ( I) = ∆ HL
= 0,21652
= 0,00012 ( I )1/2 =
√0,0001 2=0 ,011 1
m = 1 m2 = 1 √m2+1=√12+1=1,414
koefisien manning ( n) = 0,013 b= 2h
Luas penampang basah ( A ) = ( b+mh)h = (2h+h)h = 3h2
Keliling basah = b+2h √m2+1 = 2h+2h( 1,414) = 4,828 h
Jari –jari hidrolis = R= AP
= 3h2
4,828h=0,621h R2/3 = ( 0,621 h)2/3 = 0,728 h2/3
Kecepatan aliaran (v) = 1n
(R2/3 x I1/2 ) = 1
0,013(0,728 h2/3 x 0,0111 ) = 0,621 h2/3
Q = A x v = 3h2 x 0,621 h2/3 = 1,86 h8/3
0,165 = 1,86 h8/3
h = ( 0,1651,86
)38 = 0,403 m ≈ 0,4 m b = 2h = 0,806 m ≈ 0,81 m
tinggi jagaan ( w ) = 0,2 x h
= 0,2 ( 0,4)
= 0,08 m